Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20203D6311997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Seabrook Station, Unit 1 ML20198Q2591997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Seabrook Station ML20217H6101997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Seabrook Station, Unit 1 ML20216H6141997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Seabrook Station ML20210K6011997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Seabrook Nuclear Station,Unit 1 ML20141H1031997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Seabrook Station ML20148K6791997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Seabrook Station ML20141F3331997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Seabrook Station Unit 1 ML20137V9651997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Seabrook Station Unit 1 ML20147E5891997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Seabrook Station Unit 1 ML20134M2261997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Sns ML20133M6221996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Seabrook Station Unit 1 ML20132D6251996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Seabrook Station Unit 1 ML20134H3721996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Seabrook Station Unit 1 ML20128N5241996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Seabrook Station Unit 1 ML20117N1551996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Seabrook Station ML20116J0761996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Seabrook Station, Unit 1 ML20115B1061996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Seabrook Station Unit 1 ML20117K4941996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Seabrook Station, Unit 1 ML20111B0361996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Seabrook Station.W/ ML20101R2261996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Seabrook Station Unit 1 ML20106G8461996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Seabrook Station, Unit 1 ML20100G8611996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Seabrook Station Unit 1 ML20096B9021995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Seabrook Station Unit 1 ML20095C1071995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Seabrook Station Unit 1 ML20094L1381995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Seabrook Station Unit 1 ML20093F5431995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Seabrook Station Unit 1 ML20092G2781995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Seabrook Station Unit 1 ML20087F1521995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Seabrook Station Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000443/LER-1999-002, :on 990921,determined That TS 3.8.1.1 Actions Were Not Met.Caused by Personnel Error.Requirements of TS 3.8.1.1.b Were Subsequently Met by Completion of Test Required by TS 4.8.1.1.1a.With1999-10-21021 October 1999
- on 990921,determined That TS 3.8.1.1 Actions Were Not Met.Caused by Personnel Error.Requirements of TS 3.8.1.1.b Were Subsequently Met by Completion of Test Required by TS 4.8.1.1.1a.With
ML20217C8491999-10-0505 October 1999 Safety Evaluation Supporting Amend 64 to License NPF-86 ML20212L1231999-10-0101 October 1999 Safety Evaluation Supporting Amend 63 to License NPF-86 ML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212D1461999-09-17017 September 1999 SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20212D0841999-09-17017 September 1999 Safety Evaluation Supporting Amend 62 to License NPF-86 ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210Q1731999-08-12012 August 1999 Safety Evaluation Supporting Amend 61 to License NPF-86 ML20210Q7581999-08-11011 August 1999 SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal ML20210R9781999-08-0606 August 1999 ISI Exam Rept of Seabrook Station, for RFO 6,period 3 ML20210J8681999-08-0303 August 1999 SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1 ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20210H1151999-06-30030 June 1999 Naesc Semi-Annual Fitness-for-Duty Rept for 990101-0630 ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20195C0491999-05-25025 May 1999 Offshore Intake Seal Deterrent Barrier Design ML20206E4761999-04-30030 April 1999 LER 99-S01-00:on 990408,contractor Employee Was Granted Temporary Unescorted Access to Seabrook Station Protected Area.Caused by Failure of Contractor Employee to Provide Accurate Info.Individual Access Revoked.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20196L2081999-04-19019 April 1999 Rev 01-07-00 to RE-21, Cycle 7 Colr ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20205K5441999-03-31031 March 1999 Decommissioning Update ML20205C1981999-03-24024 March 1999 Safety Evaluation Concluding That Proposed Relief Request IR-8,Rev 1,provides Acceptable Alternative to ASME Code Requirements.Recommends Authorization of Proposed Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20204E3461999-03-12012 March 1999 Safety Evaluation Supporting Amend 60 to License NPF-86 ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20202C2851999-01-21021 January 1999 Safety Evaluation Supporting Amend 59 to License NPF-86 05000443/LER-1998-014-01, :on 981222,on Automatic Reactor Trip Occurred While at 100 Percent Power.Caused by Auxiliary Switch Linkage Pin in Breaker 163,fell Out Preventing Linkage from Actuating Auxiliary Contact.Breaker 163 Switch Reinstalled1999-01-18018 January 1999
- on 981222,on Automatic Reactor Trip Occurred While at 100 Percent Power.Caused by Auxiliary Switch Linkage Pin in Breaker 163,fell Out Preventing Linkage from Actuating Auxiliary Contact.Breaker 163 Switch Reinstalled
ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198P1831998-12-31031 December 1998 LER 98-S01-00:on 981214,incomplete pre-employment Screening Records Was Noted.Caused by Failure of Contractor Employee to Provide Accurate Info.Subject Contractor Employees Employment Was Terminated.With ML20202E8241998-12-31031 December 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980701-981231 05000443/LER-1998-011, :on 981120,inoperable Containment Penetration Overcurrent Protective Devices Were Noted.Caused by Inadequate Preparation & Review of Design Change.Class 1E Fuses Have Been Installed.With1998-12-21021 December 1998
- on 981120,inoperable Containment Penetration Overcurrent Protective Devices Were Noted.Caused by Inadequate Preparation & Review of Design Change.Class 1E Fuses Have Been Installed.With
05000443/LER-1998-012, :on 981120,unanticipated Isolation of FWIVs Occurred.Caused by Personnel Error.Separate Individual Was Assigned in CR to Perform Oversight Duties During Latest Plant Heatup & Power Ascension.With1998-12-21021 December 1998
- on 981120,unanticipated Isolation of FWIVs Occurred.Caused by Personnel Error.Separate Individual Was Assigned in CR to Perform Oversight Duties During Latest Plant Heatup & Power Ascension.With
05000443/LER-1998-010, :on 981113,plant Placed in Cold Shutdown Condition Due to Degraded Generator step-up Transformer Connection.Visual Insp of Damaged Transformer Connections Performed to Determine Cause of Event.With1998-12-14014 December 1998
- on 981113,plant Placed in Cold Shutdown Condition Due to Degraded Generator step-up Transformer Connection.Visual Insp of Damaged Transformer Connections Performed to Determine Cause of Event.With
ML20196F5741998-12-0202 December 1998 Safety Evaluation Concluding That Licensee Has Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Seabrook ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With 05000443/LER-1998-009, :on 980915,noted Incomplete Digital Channel Operation Tests (Dcots) for CR & Containment on-line Purge (COP) Rms.Caused by Development of Incomplete Sps.Revised COP Dcot Sps to Check Isolation Relays.With1998-10-15015 October 1998
- on 980915,noted Incomplete Digital Channel Operation Tests (Dcots) for CR & Containment on-line Purge (COP) Rms.Caused by Development of Incomplete Sps.Revised COP Dcot Sps to Check Isolation Relays.With
ML20154H5291998-10-0808 October 1998 Special Rept:On 980928,meteorological Monitoring Instrumentation Channel Inoperable for Period Greater than 7 Days.Caused by Vendor to Follow Std Industry Practice for Calibr of Instrumentation.Instruments Installed ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station 05000443/LER-1998-007, :on 980619,inoperable PORV Channel Calibration Was Noted.Caused by Procedural Technical Inaccuracies.Porv Channel Calibration Surveillance Test Were Changed & Retested for Issues Identified on 9806191998-07-17017 July 1998
- on 980619,inoperable PORV Channel Calibration Was Noted.Caused by Procedural Technical Inaccuracies.Porv Channel Calibration Surveillance Test Were Changed & Retested for Issues Identified on 980619
05000443/LER-1998-006, :on 980611,plant Was Shutdown Due to Inoperability of Control Room Air Conditioning Subsystem. Caused by Inadequate Design of Subsystem.Assembled Task Force to Review History of Subsystem & Incorporated Mods1998-07-10010 July 1998
- on 980611,plant Was Shutdown Due to Inoperability of Control Room Air Conditioning Subsystem. Caused by Inadequate Design of Subsystem.Assembled Task Force to Review History of Subsystem & Incorporated Mods
ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20236R1781998-06-30030 June 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980101-0630 ML20249C6421998-06-24024 June 1998 Safety Evaluation Supporting Amend 58 to License NPF-86 ML20249B0601998-06-16016 June 1998 Safety Evaluation Supporting Amend 57 to License NPF-86 ML20237A4871998-06-0303 June 1998 North Atlantic Seabrook Station 1998 Exercise on 980603 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 05000443/LER-1998-005, :on 980501,inoperability of SG Steam Line Pressure Protection Channels Was Noted.Caused by Procedural Deficiencies.Revised Procedures to Ensure Correct & Consistent Interpretation of Record Traces1998-05-29029 May 1998
- on 980501,inoperability of SG Steam Line Pressure Protection Channels Was Noted.Caused by Procedural Deficiencies.Revised Procedures to Ensure Correct & Consistent Interpretation of Record Traces
1999-09-30
[Table view] |
Text
. _..
e s
\\wr.,,
North North Atlantic Energy Service Corporation P.O. Box 300 Adantic Seahreet, Nii O3874 l
(603) 474-9521 The Northeast Utilities System February 11,1997 Docket No. 50-443 NYN-97014 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Seabrook Station Jannnrv.1997 Monthly Ooerating Reoort Enclosed please find Monthly Operating Report 97-01. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of January,1997 and is submitted in accordance with the rcquirements of Seabrook Station Technical Specification 6.8.1.5.
Very truly yours, NORTH ATLANTIC ENERGY SERVICE CORP.
NdVf/ l William A. DiProf' Station Director cc:
H.J. Miller, Region I Administrator A.W. De Agazio, NRC Project Manager, Seabrook Station J.B. Macdonald, Senior Resident Inspector, Seabrook Station r
Y 9702200147 970131 PDR ADOCK 050004 3 R
ID0119 t
g OPERATING DATA REPORT DOCKET NO.
50-443 UNIT Scabrook i DATE February 4,1997 COMPLETED BY P.E. Nardone TELEPHONE (603) 773-7074 OPERATING hTATUS 1.
Unit Name:
Sc. brook Station Unit 1 2.
Reportmg Period:
JANUARY,1997 i
l 3.
Licensed Thermal Power (MW:):
3411 I
{
4.
Nameplate Rating (Gross MWe):
1197 5.
Design Electrice.1 Rating (Net MWe):
1148 l
6.
Maximum '.)ependable Capacity (Gross MWe):
1204 I
7.
Maximum Dependable Capacity (Net MWe):
1158 I
8 If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Not Applicable Report Give Reasons:
9.
Power Level To Which Restricted, if Any (Net MWe):
None 10.
Reasons For Restrictions,if Any:
Not Applicable l
This Month Yr-to-Date Cumulative i1.
Hours in Reporting Period 744.0 744.0 90241.0 12.
Number of Hours Reactor Was Critical 744.0 744.0 50418.9 l
13.
Reactor Reserve Shutdown Hours 0.0 0.0 953.3 14.
Hours Generator On-Line 744.0 744.0 48044.8 l
15.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Thermal Energy Generated (MWH) 2538753 2538753 158609963 l
17, Gross Elec. Energy Generated (MWH) 898351 898351 55280318 18.
Net Electrical Energy Generated (MWH) 864316 864316 55116265
Unit Service Factor 100.0 100.0 82.5
Unit Availability Factor 100.0 100.0 82.5 i
'21.
Unit Capacity Factor (Using MDC Net) 100.3 100.3 79.9
Urut Capacity Factor (Using DER Net) 101.2 101.2 80.2
Urut Forced Outage Rate 0.0 0.0 5.4 24.
Shutdowns Scheduled Over Next 6 Months (Type Date, Refueling, 05/10/97, 38 Days and Duration of Each):
I l
25.
If Shut Down At End Of Report Period, Estimated Date of Not Applicable i
Startup:
- Cumulative" values based on total hours starting 8/19/90, date Regular Full Power Operation began.
Increased MDC values (Items 6 & 7) starting 12/01/95.
l 1of4
1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50443 UNIT Seabrook1 DATE February 4,1997 COMPLETED BY P.E. Nardone TELEP110NE (603) 773-7074 MON 711: JANUARY,1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1161 17 1161 2
1162 18 1162 3
1162 19 1161 4
1163 20 1161 5
1863 21 1161 6
1162 22 1162 7
1162 23 1162 8
1161 24 1161 9
1162 25 1162 1
10 1162 26 1162 11 1162 27 1161 l
12 1162 28 1162 13 1162 29 1161 14 1162 30 1161 15 1162 31 1161 16 1163 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to ele nearest whole megawatt.
I 2 of 4
UNIT SHUTDOWNS AND POWER REDUCTIONS
~
DOCKET NO.
50 443 UNIT Seabrook I e
DATE February 4,1997 COMPLETED BY P.E. Nardone TELEPIIONE (603) 773-7074 REPORT MONTil JANUARY 1997 8
NO.
DALE TYPE' DURATION REASON ME"ITIOD OF SIIUTTING LICENSEE EVENT CAUSE & CORRECITVE ACTION TO PREVFAT (IIOURS)
DOWN REACIOR' REPORT #
RECURRENCE Page 1ofI rm emries for this morah I
2 3
F: Forced Reasort Method:
S: Scheduled A - Equipmett Failure (Explain) 1 - Manual B - Maimenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Contmued from previous month E - Operator Training & License Examination 5 - Power Reducten (Duration = 0)
F - Administrative 9 - Other (Explain)
G - Operational Error (Explain)
II - Other (Explain) 3 of 4
o REFUELING INFORMATION REQUEST DOCKET NO.
50443 i
l UNIT Seabrook1 DATE February 4,1997 COMPLETED BY P.E. Nardone TELEPHONE (603) 773-7074 1.
Name of Facility:
Seabrook Unit 1 l
2.
Scheduled date for next refueling shutdown:
Refueling Outage 5, 05/10/97 1
3.
Scheduled date for restart following refueling: Refueling Outage 5, 06/16/97 [ 38 days: based on RO 04 ]
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
N/A 5.
Schedule date(s) for submitting licensing action and supporting information:
N/A l
6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)in Core:
193 (b) 288 k
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been i
requested or is planned, in number of fuel assemblies:
Present licensed capacity:
1236 No increase in storage capacity requested or planned.
i 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full core offload capability.
The current licensed capacity is adequate until at least the year 2010.
l l
l 4 of 4
>