MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20203D6311997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Seabrook Station, Unit 1 ML20198Q2591997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Seabrook Station ML20217H6101997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Seabrook Station, Unit 1 ML20216H6141997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Seabrook Station ML20210K6011997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Seabrook Nuclear Station,Unit 1 ML20141H1031997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Seabrook Station ML20148K6791997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Seabrook Station ML20141F3331997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Seabrook Station Unit 1 ML20137V9651997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Seabrook Station Unit 1 ML20147E5891997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Seabrook Station Unit 1 ML20134M2261997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Sns ML20133M6221996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Seabrook Station Unit 1 ML20132D6251996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Seabrook Station Unit 1 ML20134H3721996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Seabrook Station Unit 1 ML20128N5241996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Seabrook Station Unit 1 ML20117N1551996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Seabrook Station ML20116J0761996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Seabrook Station, Unit 1 ML20115B1061996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Seabrook Station Unit 1 ML20117K4941996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Seabrook Station, Unit 1 ML20111B0361996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Seabrook Station.W/ ML20101R2261996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Seabrook Station Unit 1 ML20106G8461996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Seabrook Station, Unit 1 ML20100G8611996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Seabrook Station Unit 1 ML20096B9021995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Seabrook Station Unit 1 ML20095C1071995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Seabrook Station Unit 1 ML20094L1381995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Seabrook Station Unit 1 ML20093F5431995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Seabrook Station Unit 1 ML20092G2781995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Seabrook Station Unit 1 ML20087F1521995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Seabrook Station Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212D1461999-09-17017 September 1999 SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210Q7581999-08-11011 August 1999 SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal ML20210R9781999-08-0606 August 1999 ISI Exam Rept of Seabrook Station, for RFO 6,period 3 ML20210J8681999-08-0303 August 1999 SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1 ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20210H1151999-06-30030 June 1999 Naesc Semi-Annual Fitness-for-Duty Rept for 990101-0630 ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20195C0491999-05-25025 May 1999 Offshore Intake Seal Deterrent Barrier Design ML20206E4761999-04-30030 April 1999 LER 99-S01-00:on 990408,contractor Employee Was Granted Temporary Unescorted Access to Seabrook Station Protected Area.Caused by Failure of Contractor Employee to Provide Accurate Info.Individual Access Revoked.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20196L2081999-04-19019 April 1999 Rev 01-07-00 to RE-21, Cycle 7 Colr ML20205K5441999-03-31031 March 1999 Decommissioning Update ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20205C1981999-03-24024 March 1999 Safety Evaluation Concluding That Proposed Relief Request IR-8,Rev 1,provides Acceptable Alternative to ASME Code Requirements.Recommends Authorization of Proposed Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198P1831998-12-31031 December 1998 LER 98-S01-00:on 981214,incomplete pre-employment Screening Records Was Noted.Caused by Failure of Contractor Employee to Provide Accurate Info.Subject Contractor Employees Employment Was Terminated.With ML20202E8241998-12-31031 December 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980701-981231 ML20196F5741998-12-0202 December 1998 Safety Evaluation Concluding That Licensee Has Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Seabrook ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154H5291998-10-0808 October 1998 Special Rept:On 980928,meteorological Monitoring Instrumentation Channel Inoperable for Period Greater than 7 Days.Caused by Vendor to Follow Std Industry Practice for Calibr of Instrumentation.Instruments Installed ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236R1781998-06-30030 June 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980101-0630 ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20237A4871998-06-0303 June 1998 North Atlantic Seabrook Station 1998 Exercise on 980603 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20247H3171998-04-27027 April 1998 Rev 1 to Seabrook Station SGs B & C Isi,May/June 1997 ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station 05000443/LER-1998-002, Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted1998-03-20020 March 1998 Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted ML20216H9211998-03-13013 March 1998 Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20197A7531998-02-27027 February 1998 Safety Evaluation Accepting License Request for Relief from ASME Code,Section IX Requirements Re Inservice Insp of RHR Heat Exchanger Nozzle Welds & Reactor Vessel Closure Head Nuts ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198G0271997-12-31031 December 1997 Commonwealth Energy Sys 1997 Annual Rept ML20248L7711997-12-31031 December 1997 Western Massachusetts Electric 1997 Annual Rept. Supporting Info,Encl ML20198G1021997-12-31031 December 1997 Baycorp Holdings 1997 Annual Rept ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20198G0351997-12-31031 December 1997 Eastern Edison Co 1997 Annual Rept ML20198G0681997-12-31031 December 1997 Taunton Municipal Lighting Plant 1997 Annual Rept ML20248L7671997-12-31031 December 1997 North Atlantic 1997 Annual Rept ML20198F9511997-12-31031 December 1997 United Illuminating Co 1997 Annual Rept ML20236M9561997-12-31031 December 1997 Amended Public Service of New Hampshire 1997 Annual Rept 1999-09-30
[Table view] |
Text
________ _ _ _____ _ .
e
3 North .
Nordadanddnerg Smim Corgioradon I'.O. Ilox 300
'pJ . Atlatitic Seas,eet. Nii O3874 (603) 474 9 fat The Northeast Utilities System December 10,1997 D.ecket No 50-443 NYN-97120 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Seabrook Station hionthly Oncrating Renort Enclosed please find hionthly Operating Report 97-11. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of November,1997 and is submitted in accordance with tb requirements of Scabrook Station Technical Specification 6.8.1.5.
S' auld you require further information regarding this matter, please contact hir. Terry L liarpster, Director of Licensing Services, at (603) 773 7765.
Very truly yours, NORTil ATLANTIC ENERGY SERVICE CORP.
b_- i William A. D' 9o Station Direct ec: 11. J. hiiller, Region 1 Administrator C. W. Smith, NRC Project hianager, Seabrook Station '
R. K. Lorson, Senior Resident inspector, Seabrook Station d
hI 9712160247 971130 D ,. i, m, -
-m -i ,. . ... . . . .
--si W
OPERATING DATA REPORT l
DOCKET NO. 50-443 l UNIT Seabrixik 1 DATE December 1,1997 COMPLETT.D BY P.E. Nardone TELEPilONE ((40) 773 7074 Ol'ERAllhGSIAID 1 Utut Name: Seabrcuk Station Unit 1
- 2. Returtmg Penod NOVEMBER 1997
- 3. LAemed Thermal Power (MWt): 3411
- 4. Nanwplate Rating (Gross MWe): 1197
- 5. D5 sign Electrical Raimg (Net MWe): 1148
- 6. Maumum Deperklable Capacity (Grnst MWe): 12(4
- 7. Matimum Depermiable Capacity (Net MWe): 1158 N. If Changes Occur m Capacity Raungs (Iterm Number 3 through 7) Smce Last Not Apphcable Report, Give Reasons:
- 9. Pom ir i evel To Whsch Restruted, if Any (Net MWe): None 10 Reasons For Restnctums, if Any: Not Apphcable This Month Yr tu Date Cumulative 11, liours in Reportmg Pernal 720.0 80160 97513.0
- 12. Number of flours Reactor Was Cnucal 720 0 6874.7 56549.6
- 13. Reactor Reserse Shutdown llours 00 0.0 953 3
- 14. Ilours Generator On.Line 720.0 6817.7 54118.5
- 15. thut Rewrse Shutdown flours 0.0 0.0 0.0
- 16. Grou Thermal Energy Generated (MWil) 2455554 230i9207 17908 417
- 17. Grou Elec. Energy Generated (MWill R67067 8126032 62507999
- 18. Net Elutrwal Energy Generated (MWil) 834419 7817915 fai69xM
- 19 Umt Service i actor 100.0 NS 1 82.6
- 20. Unit Asailabiliry factor 100.0 85.1 82.6
'21. Unit Capastry I' actor (Usmg MIX' Net) 100.1 84 2 80.2
'22. Umt Caractry factor (Using DER Net) 101.0 85.0 %).5
- 23. Unit Forced Outage Rate 00 00 4.8
- 24. Shut 4m ns Scheduled Over Nest 6 Months (Ty pe, Date, None Scheduled ars! Duranon of Eacht
- 25. If Shut IAmn At Ers! Of Relurt Period. Estimated Date of Not Applicable Startup-
- NOTE: ' Cumulative" salues bned on total hours startmg 8/199), date Regubr Full Power Operanon began.
Irwreawd MIX's alues (trems 6 & 71 starting 12/01/95.
Iof4
e 8
a AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50443
. UNIT Seabrooki DATE Decemter 1.1997 COMPLETED IlY P.E. Nardone 1
TELEPilONE (603) 773 7074 l l
l l
MONTil NOVEMilER,1997 ;
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) {
l lito 17 1159 2 life Ib 1159 3 lifo 19 1159 4 1859 20 1159 5 1159 21 1159 6 1159 22 1159 7 1159 23 1159 8 life 24 !!59 9 1859 25 1159 10 1159 26 1159 II I159 27 l159 12 1159 28 1159 13 1159 29 1159 14 1158 30 1159 15 1859 16 1159 INSTRUCTIONS On this format. Int the average duly unit power levelin MWe Net for each day in the repirt ng month. Compute to the nearest whole megawatt.
2 of 4
UNIT SIIUTDOWNS AND POWER REDUCTIONS $
DOCKET NO. 50-443 UNTT Seat m 4 1 DATE December 1.1997 CONtPLETED BY P E. Nankme TELEPilONE (603) 773-7074 MONTil NONTAtBER.1W7 NO. DA1T. TYPE' DURATION REASON
- MET 1tOD OF SIIETTING LICENSEE DT.NT CAUSE & CORRECTI)E ACTION TO PRE \T_NT (llOURS) IXWIN REACTOR
- REFORT # RECT *RRENCE Pagetof1 No erurrs for tis auxnh a x s F: Forced Reason: Mettad.
S: Scheduled A - Equipmera Failure (Explam) 1 - Manual B - Mamrename or Tnt 2 - Manual Scram C - Refucirng 3 - Auunnatx: Scram D - Regulatory Restrictum 4 - Corrmued from presmuis monrh E - Operator Traimng & Eiceme Exanunatum 5 - Power Reductam (Duratum = 0)
F - Admmistratne 9 - Other (Explam)
G - Operatier:a! Error (Explam) l 11 - Other (Explamt 3 of 4
,, . . REFUELING INFORMATION REQUEST d
DOCKIT NO. 50443 UNIT Seabrmki DATE December 1. lW7 COMPLETED BY P.E. Nardone TELEPilONE (603) 773-7074
- 1. Name of Facility: Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown: Refueling Outage 6, 03/06/99
- 3. Scheduled date for restart following refueling: Refueling Outage 6, 04/14/99 l 40 days ]
4 Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
N/A
$. Schedule date(s) for submitting licensing action and supporting information:
N/A
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A
- 7. The number of fuel assemblies (a) in the core (b) in the spent fuel storage pool and (c) in the new fuel storage vault (a) ___121_. (b) 372 (c) 4
- 8. The present licensed spent fuel pool storage capacity and the size of any increa : in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity: 1236 No increase in storage capacity requested or planned.
- 9. The projected date of the last refueling that can be disenarged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full core ofuoad capability.
The current licensed capacity is adequate until at least the year 2010.
4 of 4