|
|
Line 2: |
Line 2: |
| | number = ML100610316 | | | number = ML100610316 |
| | issue date = 03/02/2010 | | | issue date = 03/02/2010 |
| | title = Acceptance Review Email, Request for Exemption from 10 CFR Part 73 Physical Security Requirements (TAC ME3108 and ME3109) | | | title = Acceptance Review Email, Request for Exemption from 10 CFR Part 73 Physical Security Requirements |
| | author name = Kalyanam N | | | author name = Kalyanam N |
| | author affiliation = NRC/NRR/DORL/LPLIV | | | author affiliation = NRC/NRR/DORL/LPLIV |
Letter Sequence Acceptance Review |
---|
|
|
|
|
---|
Category:Acceptance Review Letter
MONTHYEARML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML18155A2832018-06-0707 June 2018 Acceptance of Requested Licensing Action Revision of Technical Specification 3/4.7.4, Ultimate Heat Sink ML13282A3082013-10-0909 October 2013 Acceptance Review Email, Request for Alternative W3-ISI-023, ASME Code Case N-770-1 Successive Examinations, Third 10-Year Inservice Inspection Interval ML12311A1342012-11-0505 November 2012 Entergy Fleet and ISFSI-Acceptance Review Email, Direct License Transfer and Conforming Amendments for Arkansas Nuclear Units 1 & 2; Grand Gulf Unit 1, and Grand Gulf Early Site Permit; Indirect License Transfer for River Bend and Waterford ML1203401282012-02-0303 February 2012 Acceptance Review Email, License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition ML1202607432012-01-26026 January 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Acceptance Review Email, Amendment to Revise Quality Assurance Program Manual and Staff Qualification Technical Speci ML1202303452012-01-23023 January 2012 Acceptance Review Following Supplement Email, License Amendment Request to Revise Technical Specification 3/4.7.4 Table 3.7-3, Ultimate Heat Sink Minimum Fan Requirements Per Train ML1125003802011-09-0707 September 2011 Acceptance Review E-mail, License Amendment Request, Revise Technical Specifications Related to Steam Generator Tube Integrity to Support Replacement of Steam Generators ML1113707352011-05-17017 May 2011 Acceptance Review Email, License Amendment Request, Revise Technical Specification Applicability and Action Language for Revised Fuel Handling Accident Analysis ML1108310032011-03-24024 March 2011 Acceptance Review Email, Request for Alternative W3-1SI-018, Inspection of Reactor Pressure Vessel Head Control Element Drive Mechanism Nozzles During the Third Ten-Year Inservice Inspection Interval ML1027002292010-09-27027 September 2010 Acceptance Review E-mail, Request to Implement Emergency Action Level Schemes Based on NEI 99-01, Rev 5 ML1023001412010-08-18018 August 2010 Acceptance Review Email, License Amendment Request, Revise TS 3.7.1.2, Emergency Feedwater System, Limiting Condition for Operation to Clarify Acceptability of Transitioning from Mode 4 to Mode 3 ML1020902322010-07-28028 July 2010 Acceptance Review Email, License Amendment Request for Approval of Cyber Security Plan ML1013105982010-05-20020 May 2010 License Amendment Request for Approval of the Cyber Security Plan ML1009707752010-04-0707 April 2010 Acceptance Review E-mail, License Amendment Request, Modify Technical Specification 3/4.9.4, Containment Building Penetrations, to Allow Alternative Means of Penetration Closure During Refueling Operations ML1009707482010-04-0707 April 2010 Acceptance Review E-mail, License Amendment Request, Delete Operating License Condition 2.C.14, Fuel Movement in the Fuel Handling Building ML1008205662010-03-23023 March 2010 Acceptance Review Email, License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves ML1006404132010-03-0505 March 2010 Acceptance Review Email, Relief Request No. W3-ISI-017, Alternative to ASME IWA-5211 Regarding Chemical Volume Control System Pipe Visual Inspection ML1006103162010-03-0202 March 2010 Acceptance Review Email, Request for Exemption from 10 CFR Part 73 Physical Security Requirements ML0930202372009-10-29029 October 2009 Acceptance Review Email Relief Request W3-ISI-016 ML0930202322009-10-29029 October 2009 Acceptance Review Email Relief Request W3-ISI-015 ML0917302342009-06-22022 June 2009 Acceptance Review Email, License Amendment Request, Revise Technical Specification 2.1.1.1 Departure from Nucleate Boiling Ratio (DNBR) Safety Limit ML0916602952009-06-15015 June 2009 Acceptance Review Email, Requests for Relief from ASME Section XI Volumetric Examination Requirements - Second 10-Year ISI Interval ML0916301512009-06-12012 June 2009 Acceptance Review Email, License Amendment Request, Revise Technical Specification 6.9.1.11, Core Operating Limits Report to Add New Analytical Methods to Support Implementation of Westinghouse Next Generation Fuel ML0913200592009-05-12012 May 2009 Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207) ML0833805732008-12-0303 December 2008 E-mail Waterford Steam Electric Station, Unit 3 - Acceptance Review Email to Modify TS Section 3/4.9.6, Refueling Machine ML0833701732008-12-0202 December 2008 Acceptance Review Email ML0831808522008-11-0505 November 2008 Acceptance Review Email ML0829704262008-10-23023 October 2008 Acceptance Review E-Mail of LAR NPF-38-279 ML0829403772008-10-20020 October 2008 Acceptance Review Email of Requested Licensing Action Proposed Alternative Request, W3-ISI-006 ML0829102062008-10-16016 October 2008 Acceptance Review Request ML0829101572008-10-15015 October 2008 Acceptance Review Email ML0820010842008-07-25025 July 2008 River Bend Station, and Waterford Steam Electric Station, Unit 3 - Acceptance Review, Relief Request No. CEP-ISI-011 for 10-Year Inservice Testing Interval (TAC MD8826, MD8827, MD8828, & MD8829) 2019-02-28
[Table view] Category:E-Mail
MONTHYEARML24241A1922024-08-27027 August 2024 October 2024 Emergency Preparedness Program Inspection - Request for Information ML24159A2672024-06-0707 June 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Licensee Amendment Request (LAR) to Modify Surveillance Requirements in Support of Surveillance Frequency Control Program ML24137A2702024-05-16016 May 2024 NRR E-mail Capture - Entergy Fleet - Acceptance Review of License Amendment Request to Remove Obsolete License Conditions from Operating Licenses for GGNS, RBS, and WF3 (L-2024-LLA-0062) ML24115A0862024-04-23023 April 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Proposed Alternative WF3-RR-24-01 for Examinations of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML24115A0882024-04-23023 April 2024 NRR E-mail Capture - NRC Notice of Acceptance: Waterford Steam Electric Station, Unit 3, Proposed Alternative WF3-RR-24-02 for Examinations of Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles ML24088A0092024-03-27027 March 2024 NRR E-mail Capture - Entergy Fleet - Final Request for Confirmation of Information (RCI) Re Alternative Request EN-RR-22-001 Concerning ASME Code Case N-752 (L-2022-LLR-0054) ML23348A1222023-12-14014 December 2023 NRR E-mail Capture - Grand Gulf, River Bend, and Waterford, Unit 3 - 2nd Round of Official RAIs for RR EN-RR-22-001, Use ASME Code Case N-752, Risk Informed Categorization for Class 2 and 3 Systems ML23097A0412023-04-0606 April 2023 June 2023 Emergency Preparedness Exercise Inspection - Request for Information ML23076A0552023-03-13013 March 2023 EP Program Inspection RFI Hjs 10132022 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23052A0882023-02-17017 February 2023 Inspection Request for Information ML22336A0202022-12-0101 December 2022 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Revise Technical Specification 3/4.3.2 ML22335A4802022-12-0101 December 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22329A0152022-11-0202 November 2022 NRR E-mail Capture - NRC Update Completion Date for Waterford 3 LAR to Adopt TSTF-505 ML22290A0442022-10-13013 October 2022 December 2022 Emergency Preparedness Program Inspection - Request for Information ML22215A1492022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Permit the Use of Risk-Informed Completion Times in Accordance with Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2 ML22215A2062022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Adopt Title 10 of the Code of Federal Regulations, Section 50.69: Loe and Completion Date Update ML22206A0172022-07-22022 July 2022 NRR E-mail Capture - Request for Additional Information: Waterford 3 - License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 ML22206A0152022-07-21021 July 2022 NRR E-mail Capture - Entergy (Grand Gulf, River Bend, and Waterford-3) - Acceptance Review of the RR EN-RR-22-001, Case N-752, Risk-informed Cat & Treatment for Repair/Replacement Activities in Class 2 & 3 Systems ML22209A1082022-07-15015 July 2022 NRR E-mail Capture - Draft RAIs to License Amendment Request for Application to Adopt 10 CFR 50.69 and Revise Technical Specifications to Adopt TSTF-505, Revision 2 ML22144A1662022-05-24024 May 2022 PI&R Request for Information and Transmittal e-mail ML22108A1792022-04-14014 April 2022 WF3 Cpcs Installation Inspection Plan Email ML22209A1062022-01-20020 January 2022 NRR E-mail Capture - (External_Sender) Options Moving Forward Regarding Waterford TSTF-505 and 50.69 ML22209A1052022-01-0606 January 2022 NRR E-mail Capture - Estimate for Completion of 50.69-TSTF-505 Peer Review ML22012A1592022-01-0505 January 2022 WF3 2022 EP Exercise Inspection RFI Sdh 010522 ML21356A5872021-12-22022 December 2021 NRR E-mail Capture - Acceptance for Review: Waterford 3 - Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule ML21349A2242021-12-14014 December 2021 NRR E-mail Capture - (External_Sender) Waterford 3 - Request for One-Time Exemption from 10 CFR 50, Appendix E Biennial EP Exercise ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21280A0812021-10-0505 October 2021 Email 10-5-21 - Request for Information_ Waterford EP Inspection (71114.04 & 71151) - Nov-Dec 2021 ML21285A0242021-10-0505 October 2021 Digital Instrumentation and Control Modification Inspection Request for Information ML22112A1512021-08-0606 August 2021 NRR E-mail Capture - for Review: Draft RAIs to LAR to Relocate Chemical Detection Systems Technical Specifications (TS) to Technical Requirements Manual (TRM) ML21216A4562021-08-0404 August 2021 WF3 2021 EP Exercise Inspection Request for Information (RFI) ML21218A0402021-07-26026 July 2021 NRR E-mail Capture - Final RAIs to Entergy Operations, Waterford Steam Electric Station, Unit 3 LAR to Adopt 10 CFR 50.69 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21173A1082021-06-22022 June 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request to Adopt TSTF-563 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21160A0852021-06-0404 June 2021 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Louisiana Regarding a Waterford Steam Electric Station, Unit 3 Amendment - Digital Upgrade I&C ML21145A0062021-05-24024 May 2021 NRR E-mail Capture - Supplement Received - Waterford Unit 3 - License Amendment Request for Boration Systems Tech Specs ML21120A1192021-04-30030 April 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - LAR to Relocate Chemical Detection TSs to TRM ML21105A0512021-04-14014 April 2021 4-14-21 Email - RFI for In-Office Inspection of Recent WF3 Submission of EAL Procedure Revision ML21104A0382021-04-13013 April 2021 NRR E-mail Capture - Acceptance Review for Waterford Unit 3 - License Amendment Request for TSTF-505 ML21084A2552021-03-22022 March 2021 NRR E-mail Capture - Supplement to Audit Plan Dated October 1, 2020 (Waterford 3, L-2020-LLA-0164) ML21088A1512021-03-15015 March 2021 NRR E-mail Capture - Draft Waterford Acceptance Review Letter for TSTF-505 LAR ML21069A1842021-03-0202 March 2021 NRR E-mail Capture - Announcement of QA Inspection ML21040A3892021-02-0808 February 2021 NRR E-mail Capture - Announcement of QA Inspection ML21039A6412021-01-28028 January 2021 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford 3 50.69 LAR ML21022A1692021-01-22022 January 2021 NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2 ML20329A1442020-11-20020 November 2020 Terrapower QAPD Preliminary Questions Email 2024-08-27
[Table view] |
Text
From: Kalyanam, Kaly Sent: Tuesday, March 02, 2010 11:13 AM To: MURILLO, ROBERT J; MASON, MICHAEL E (WF3)
Cc: Feintuch, Karl; Lingam, Siva; Burkhardt, Janet; Lent, Susan
Subject:
Acceptance Review of TAC Nos. ME3108 and ME3109
Reference:
Request for Exemption from Physical Security Requirements Waterford Steam Electric Station, Unit 3 (Waterford 3)
TAC No.: ME3108 (Exemption) and ME3109(Environmental Assessment)
Bob/Mike:
By letter dated January 19, 2010, as supplemented by letter dated February 17, 2010, Entergy Operations, Inc. (Entergy, the licensee) submitted, in accordance with the requirements of 10 CFR 73.5, a request to the U.S. Nuclear Regulatory Commission (NRC) for approval of an exemption from specific requirements of 10 CFR Part 73, "Physical Protection of Plants and Materials," for Waterford 3. The requested exemption extends the compliance date for the implementation of certain new security requirements issued by NRC in a final rule dated March 27, 2009 (74 FR 13926). Pursuant to the final rule, the new security requirements must be implemented by March 31, 2010. Entergy has evaluated these new requirements and determined that the majority can be implemented by the March 31, 2010, compliance date. The application provides additional details regarding the specific provisions of the rule for which an exemption is requested, as well as an environmental assessment.
On February 2, 2010, the NRC staff discussed with the Entergy staff (Bob Murillo, Scott Anders, Tony Qualantone, Mike Mason, Don Marpe, Alvin Madere, Bob Whitman, and Les England) certain aspects of the Exemption Request which needed additional clarification. The Entergy staff, stated the requested clarification would be provided on the docket soon, in keeping with the requested approval date of the exemption.
The purpose of this letter is to provide the results of the NRC staff's acceptance review of this exemption request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and the supplement and concluded that adequate technical information, in sufficient detail, will be available to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the exemption request, in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1480.
Kaly N. Kalyanam E-mail Properties
Mail Envelope Properties (94A2A4408AC65F42AC084527534CF41608634C8AAD)
Subject:
Acceptance Review of TAC Nos. ME3108 and ME3109 Sent Date: 3/2/2010 11:13:13 AM Received Date: 3/2/2010 11:13:13 AM From: Kalyanam, Kaly Created By: Kaly.Kalyanam@nrc.gov Recipients:
RMURILL@entergy.com (MURILLO, ROBERT J)
Tracking Status: None MMASON@entergy.com (MASON, MICHAEL E (WF3))
Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)
Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)
Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)
Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 11936 3/2/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: