NL-09-069, 2009 Summary Reports for In-Service Inspection and Repairs or Replacements: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 48: Line 48:
(refueling outage number)
(refueling outage number)
Signed_        _          __u_                  __T
Signed_        _          __u_                  __T
__*_
                             'Owner dr wner' s Designee, Title Date                  (oSI(2' CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                              New York                              and employed by _HSB-CT of Hartford, Connecticut__ have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
                             'Owner dr wner' s Designee, Title Date                  (oSI(2' CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of                              New York                              and employed by _HSB-CT of Hartford, Connecticut__ have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report.

Latest revision as of 11:57, 12 March 2020

2009 Summary Reports for In-Service Inspection and Repairs or Replacements
ML091950303
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 07/01/2009
From: Robert Walpole
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-09-069
Download: ML091950303 (6)


Text

Entergy Nuclear Northeast Indian Point Energy Center

-EEntergy 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Robert Walpole Licensing Manager NL-09-069 July 1,2009 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

2009 Summary Reports for In-Service Inspection and Repairs or Replacements at Indian Point Unit No. 3 Docket No. 50-286 License No. DPR-64

Dear Sir or Madam:

In accordance with ASME Section XI, Code Case N-532-4, "Repair/Replacement Activity Documentation Requirements and In-service Summary Report Preparation and Submission" Indian Point Nuclear Generating Unit No. 3 (IP3) hereby submits 2009 Form OAR-i, Owners Activity Report for Inservice Inspections. This report describes relevant conditions that required evaluation and repairs and replacements performed during the period April 2007 through April 2009.

There are no new commitments being made in this submittal.

If you have any questions or require additional information, please contact me at (914) 734-6668.

Sincerely, 4Cýt77 tj a

NL-09-069 Pageo2 of 2 .

Enclosure:

1. 2009 Summary Reports for In-Service Inspection and Repairs or Replacements at Indian Point Unit No. 3 IP3 Owners Activity Report (OAR), Second Outage, Third Period, Third Interval, Table 1 - Items with Flaws or. Relevant Conditions that Required Evaluation for Continued Service Table 2 - Abstract of Repairs, Replacements Required for Continued Service cc: Mr. Samuel J. Collins, Regional Administrator, NRC Region I Mr. John Boska, Senior Project Manager, NRC NRR DORL NRC Resident Inspector's Office, Mr. Paul Eddy, New York State Dept. of Public Service Mr. Francis J. Murray, President and CEO, NYSERDA

ENCLOSURE 1 TO NL-09-069 2009 Summary Reports for In-Service Inspection and Repairs or Replacements at Indian Point Unit No. 3

  • I P3 Owners Activity Report (OAR), Second Outage, Third Period, Third Interval
  • Table 1 - Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service

, Table 2 - Abstract of Repairs, Replacements Required for Continued Service ENTERGY NUCLEAR OPERATIONS, INC.

INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 DOCKET NO. 50-286 LICENSE NO. DPR-64

,FORM OAR-i OWNERS ACTIVITY REPORT Report Number NL-09-069 Plant Indian Point EnerLyv Center. Buchanan. New York 10511-0249 Unit No. 3 Commercial service date 08/30/1976 Refueling outage no. 3R15 (if applicable)

Current inspection interval 3rd (1st, 2nd, 3rd, 4th, Other)

Current inspection period (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 1989 Edition, No Addenda Date and revision of inspection plans: March 30, 2006 / ISI Program Plan, Rev. 3 No. IP3-RPT-UNSPEC-03247 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans 2001 Edition, 2003 Addenda_

Code Cases used: N-532-4, N-661 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b)the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 3R155 conform to the requirements of Section XI.

(refueling outage number)

Signed_ _ __u_ __T

'Owner dr wner' s Designee, Title Date (oSI(2' CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by _HSB-CT of Hartford, Connecticut__ have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

z::~ "zzCommissions /; /'&!// .ZW,4/ ,,

Inspector's Signature National Board, State, Province, arid Endorsements Date __________ _

3R15 Refueling Outage IP3 Owner Activity Report Third Period ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Categpry ano, t Item Number,~ -- Itemn Des-crftion Ealato Dscitin j E-A / E1.11 Accessible Surface Areas of the CR-IP3-2009-805 - During ISI of the VC liner and moisture barrier, pitting and corrosion on stainless steel Containment Liner jacketing, missing caulking, missing/loose attachments and missing/peeling paint were noted. Engineering evaluated the conditions and the conditions were accepted as is.

E-A / E1.30 Accessible Surface Areas of the CR-IP3-2009-805 - During ISI of the VC liner and moisture barrier, pitting and corrosion on stainless steel Containment Moisture Barrier jacketing, missing caulking, missing/loose attachments and missing/peeling paint were noted. Engineering evaluated the conditions and the conditions were accepted as is.

6/12/2009 OAR-1

31115 Refueling Outage IP3 Owner Activity Report Third Period ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class *" ", ;Item Description " . '""...'

Item ."' +' . .. e... t.o.. o Deepariphoeaon, of. W.o..... -i ':' .... .... o....;

.. "eted"/J Number',

3 SWN-38 Repair pipe wall on down stream elbow 10/19/07 07-3-34 3 36SWP Repair leak at vacuum breaker union 10/26/07 07-3-35 3 32FCU Replace vent pipe on FCU motor cooler 6/11/08 08-3-07 3 Line-408 Replace Tee, pipe &flange D/S of SWN-38 and weld buildup on pipe wall 4/1/09 08-3-86 3 SWN-29 Replace inlet flange and repair pipe wall as necessary 4/4/09 09-3-09 1 RC-R-514-U Replace missing u-bolt on support 4/14/09 09-3-75 3 Line-1220 Repair pin hole in pipe wall 4/12/09 09-3-86 6/24/2009 OAR-1