ML19320A298: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
          .
                                             -s
                                             -s
    ,        .,    ,
                          .
                                                                                ,
             ,o .
             ,o .
6.0- ADMINISTRATIVE CONTROLS 6.i    RESPONSIBILITY                                    .
6.0- ADMINISTRATIVE CONTROLS 6.i    RESPONSIBILITY                                    .
Line 32: Line 28:
qualifications of ANSI NIS.1-1971 for comparabic position, except
qualifications of ANSI NIS.1-1971 for comparabic position, except
                             ' for the llcalth Physics Supervtsor who shall meet or exceed the qualifications of Regulatory Guide 1.3, September 1975.
                             ' for the llcalth Physics Supervtsor who shall meet or exceed the qualifications of Regulatory Guide 1.3, September 1975.
                                                                                    .
6.4 TRAINING 6.4.1      A retraining and replacement training program for the facility staff shall be maintained
6.4 TRAINING 6.4.1      A retraining and replacement training program for the facility staff shall be maintained
~
~
                                                                                                        ,
and shall meet or exceed the requirements ,
and shall meet or exceed the requirements ,
and recommendat tons of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFis Part 55.
and recommendat tons of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFis Part 55.
Line 41: Line 35:
Manager                    on all matters related to nuclear safety.
Manager                    on all matters related to nuclear safety.
COMPOSITION 6.5.1.2    The Plant Safety Co.c.tttee shall be composed of the:
COMPOSITION 6.5.1.2    The Plant Safety Co.c.tttee shall be composed of the:
      "
O Amendment No.16                      -
O Amendment No.16                      -
117            ggo4210 7 %
117            ggo4210 7 %


                .            . .
EXECUTIVE DIRECTOR GENERATION 6 CONSTRUCTION SAFETY                                                                  ._
                                                                                                                        .
REVIEW C0kt!I1 TEE v
                                                                  -
                                              .                                                        -
                                  .
                                                                                                                      .
                                                                                                                  .
                                                                                                                      .
                                                                                                                    .
                                                                                                                  .
                                                                                                                    '
EXECUTIVE DIRECTOR GENERATION 6
* CONSTRUCTION SAFETY                                                                  ._
REVIEW
* C0kt!I1 TEE v
                                                                                                           ~
                                                                                                           ~
                                                                                                                     }
                                                                                                                     }
_
DIRECTOR      DIRECTOR          DIRECTOR                DIRECTOR    DIRECTOR          DIRECTOR GENERATION    GENERATION        GENERATION                PROJECTS    TECilNICAL 4    AD5!INISTRATIVE TECllNOLOGY  OPERATIONS        ENGINEEhlNG            ?!ANAGEPIENT ENVIRONBIENTAI. SERVICES 6 PROJECT SERVICES          SUPPORT U
DIRECTOR      DIRECTOR          DIRECTOR                DIRECTOR    DIRECTOR          DIRECTOR GENERATION    GENERATION        GENERATION                PROJECTS    TECilNICAL 4    AD5!INISTRATIVE TECllNOLOGY  OPERATIONS        ENGINEEhlNG            ?!ANAGEPIENT ENVIRONBIENTAI. SERVICES 6 PROJECT SERVICES          SUPPORT
   ,e PLANT          PLANT SAFETY                                                      -
_ _
FIANAGER    C0bS!ITTEE T
U
   ,e
                                                                                                                          .
PLANT          PLANT SAFETY                                                      -
FIANAGER    C0bS!ITTEE
                                                                                        .
T
_,_                      ..


                                                                                                                                                          ..,
                                                                                                                                              --
    *-                      -
             ..          .                    -...                                                      It ArsT CE M t'      'ER 5
             ..          .                    -...                                                      It ArsT CE M t'      'ER 5
E 9 * '.                ' NUC E AR O
E 9 * '.                ' NUC E AR O
l'L/.N T MM4AGLR                    ADMIN.
l'L/.N T MM4AGLR                    ADMIN.
SEE FIGURE 6.2-2B
SEE FIGURE 6.2-2B SE CURI T Y            ACM. BLOC. RECORDS
                                                                                                                  *
  .
SE CURI T Y            ACM. BLOC. RECORDS
( CCt.                  JANITOR A    0)                      SUPVR.
( CCt.                  JANITOR A    0)                      SUPVR.
m OPF RAT!ON            TR AININ G      PRODUCTION          E NG!NEERS          SOLOGIST SUPT.                  SUPVR,          STORE -
m OPF RAT!ON            TR AININ G      PRODUCTION          E NG!NEERS          SOLOGIST SUPT.                  SUPVR,          STORE -
LSO                                      KEEPER ASST.                  T R AINING OPER.                  COOac.
LSO                                      KEEPER ASST.                  T R AINING OPER.                  COOac.
SUPTi LSC
SUPTi LSC l                          These positions are for infornation UNITI                  UNIT 2
* l                          These positions are for infornation UNITI                  UNIT 2
* only and should be treated as such SHIFT                  SHIF T                          for this Technical Specification.                      .
* only and should be treated as such SHIFT                  SHIF T                          for this Technical Specification.                      .
SUPVR.                SUPVR.
SUPVR.                SUPVR.
_LSO                    LSO UNIT I                  UNII 2*
_LSO                    LSO UNIT I                  UNII 2*
PL AN T                  PLAN T OPER.                    OPER.
PL AN T                  PLAN T OPER.                    OPER.
LO                      LO
LO                      LO ASdi.                    ASST.
.
                                                                                                                                                        -
ASdi.                    ASST.
* FtANT                    PLANT Oftk.                    OFE R.
* FtANT                    PLANT Oftk.                    OFE R.
LO                        LO
LO                        LO M.S T E                        WASTE
                                  .
M.S T E                        WASTE
* 6 CONI CPERATCr.
* 6 CONI CPERATCr.
CONT OPEAATOR h                            J'l
CONT OPEAATOR h                            J'l e
                                          .                                            _
e
: t. v '9 E R A;lA Gi E.i                            --        --
: t. v '9 E R A;lA Gi E.i                            --        --
                                                      ..._, _
                                                                         -120-i AFtK ANSAS POWER . S LIGH T Co.                                                                                              FI G U!1 E
                                                                         -120-i AFtK ANSAS POWER . S LIGH T Co.                                                                                              FI G U!1 E
                                                                                                                 ~
                                                                                                                 ~
AkK ANSAS NUCLE AR ONE - UNIT l                                                                                            6. 2 - 2 A
AkK ANSAS NUCLE AR ONE - UNIT l                                                                                            6. 2 - 2 A
_.          _ . . _ _ _ .  .
                                                                                                                                                  ,,
                                                                           'O      O      .
                                                                           'O      O      .


                                        ,                                                                                                                    _ _ _ _ - .
                                                                                                                                        .
    ._
          *
                    ..        . .
* _
                                                       ~
                                                       ~
              .
2 l
2 l
ASS:STAN T PLANT MANAGER
ASS:STAN T PLANT MANAGER
Line 127: Line 75:
SEE FIGURE
SEE FIGURE
                 ~6.2-2A
                 ~6.2-2A
                                                                                                                        .
              '
                                                          - . _ . . .            . . -
'
_C - Dsgree or Equivalent Required CE - Engineering Degree or Equivalent Required                                          ,
_C - Dsgree or Equivalent Required CE - Engineering Degree or Equivalent Required                                          ,
M^
M^
              '
SU
SU
!.50 - Sanior Operator License Required LO - Operator License Required                                                                                            l
!.50 - Sanior Operator License Required LO - Operator License Required                                                                                            l
       . );- D2sirable but not Required ELEC.          PLANT              MECH.                          l M AIN T.        SERVICE            M A.'N T.
       . );- D2sirable but not Required ELEC.          PLANT              MECH.                          l M AIN T.        SERVICE            M A.'N T.
i                                                                                                            SUPVR            SUPVR              SUPVR
i                                                                                                            SUPVR            SUPVR              SUPVR tNS T Raf.'E NTS tt CON T R "'L S                                  ASST                                ASST
_.
tNS T Raf.'E NTS tt CON T R "'L S                                  ASST                                ASST
'                                                        (CE)SUPvs                    i                    ELECT                              YECH                    ,
'                                                        (CE)SUPvs                    i                    ELECT                              YECH                    ,
                                                                             - - .- J                        M AIN T.                            MAINT SUPvRS                            SUPVRS l                                                                  _L AsSr IaC                                                                                                      '
                                                                             - - .- J                        M AIN T.                            MAINT SUPvRS                            SUPVRS l                                                                  _L AsSr IaC                                                                                                      '
SUPVRS i
SUPVRS i
                                                        --
i 1                                        I                          l l
  ,-
TECH                                  OVALITY                PLANNING                  NUCLEAR SUPPORT                                  CONTROL                  8 SCHEO.                ENGINEER ENGINEER                                    ENGR.                    COORD (CE)                                                                                      (CE)
i
'-
1                                        I                          l
                                                                                                                                                                            -
l TECH                                  OVALITY                PLANNING                  NUCLEAR SUPPORT                                  CONTROL                  8 SCHEO.                ENGINEER ENGINEER                                    ENGR.                    COORD (CE)                                                                                      (CE)
                                              ..
HEALTH'    RADt0          CHEM                rFRrORM                CUALITY      ASST PL AN. REACTOR          COMPUTEA PHYSICS      --CHEM        6 ENVid                      ENGR-            CC'd TROL      8 SCHED          ENGR $                ENGR.
HEALTH'    RADt0          CHEM                rFRrORM                CUALITY      ASST PL AN. REACTOR          COMPUTEA PHYSICS      --CHEM        6 ENVid                      ENGR-            CC'd TROL      8 SCHED          ENGR $                ENGR.
SUPVR'      SUPVR.        SUPVR                    SUPVR                INSPECTS      COOROS
SUPVR'      SUPVR.        SUPVR                    SUPVR                INSPECTS      COOROS
Line 160: Line 95:
ow                  -        -'
ow                  -        -'
ENGRS
ENGRS
                                                                                             -121-
                                                                                             -121-A% KANSAS POWER S LIGHT CO.
_-
A% KANSAS POWER S LIGHT CO.
FUP4CTIONAL OhGANIZ ATION FOR PLANT OPE R ATIO N                                      FIGURE A! KANSAS NUCLE AR JONE- UNIT I                                      '                                                                      _
FUP4CTIONAL OhGANIZ ATION FOR PLANT OPE R ATIO N                                      FIGURE A! KANSAS NUCLE AR JONE- UNIT I                                      '                                                                      _
G.2 - 2 9
G.2 - 2 9
             -                                                                              ~
             -                                                                              ~
9  9            '4~s      -,
9  9            '4~s      -,
                                                                                                                                                  ._.


7
7 Chairman:            Assistant Plant Manager
                    '
              -
    . . . ,                                ..                                ,
Chairman:            Assistant Plant Manager
'    t                Member:              Technical Support En,:incer b                Member:              Instrumentation 6 Controls Supervisor
'    t                Member:              Technical Support En,:incer b                Member:              Instrumentation 6 Controls Supervisor
             .          Member:              Operations Superintendent      a Member:              Maintenance Superintendent Member:            Nuclear Engineer Member:              !!calth Physics Supervisor The          Plant Manager                  shall appoint an acting chair-
             .          Member:              Operations Superintendent      a Member:              Maintenance Superintendent Member:            Nuclear Engineer Member:              !!calth Physics Supervisor The          Plant Manager                  shall appoint an acting chair-
Line 180: Line 108:
                                                                                                     ~
                                                                                                     ~
QUORUM                                                                                        -
QUORUM                                                                                        -
6.5.1.5  A quorum of the PSC shall consist of the chairman and three members
6.5.1.5  A quorum of the PSC shall consist of the chairman and three members including alternates.
                ,
h      RESPONSIBILITIES 6.5.1.6  The Plant Safety Cccatttee shall be responsible for:
including alternates.
h      RESPONSIBILITIES
                                                                                                        .
6.5.1.6  The Plant Safety Cccatttee shall be responsible for:
: a.          Review of 1) all procedures required by Specification 6.8 and revisions thereto, 2) any other proposed procedures or revisions thereto as detet ained by the Plant Manager to affect nuclear safety.                          l
: a.          Review of 1) all procedures required by Specification 6.8 and revisions thereto, 2) any other proposed procedures or revisions thereto as detet ained by the Plant Manager to affect nuclear safety.                          l
   ^
   ^
Line 198: Line 122:
n0tif!Catton of the Conntsston.
n0tif!Catton of the Conntsston.
Amendment No. 16                            - 122 -
Amendment No. 16                            - 122 -
.
es % e
es % e


-
    *                  *
         , .c                              ,,
         , .c                              ,,
g.-    Revi~cw of' facility operations to detect potential nucicar safety ha:ards.
g.-    Revi~cw of' facility operations to detect potential nucicar safety ha:ards.
Line 219: Line 140:
6.5.2        Safety Review Cc=ittee (SRC) l FUNCTION                                                                                      l 6.5.2.1          The Safety Review Committee shall function to provide independent review and audit of designated activities in the areas of:
6.5.2        Safety Review Cc=ittee (SRC) l FUNCTION                                                                                      l 6.5.2.1          The Safety Review Committee shall function to provide independent review and audit of designated activities in the areas of:
: a. nucicar power plant operations
: a. nucicar power plant operations
: b. nuclear engineering                                        b y                        c. . chemistry and radiochemistry
: b. nuclear engineering                                        b y                        c. . chemistry and radiochemistry Amend.T.ent No. 16                        123 -
                                                                                                          ,
i e -
Amend.T.ent No. 16                        123 -
i
                                                      .
e -
L                                ta
L                                ta


r-
r-g
                                                                                                --
                                     ,.m l'                                                                                                      i REVIEW 6.5.2.7  The SRC shall review:
g
      *    .    -
                      *
                                     ,.m
          ,                                                              ,
l'                                                                                                      i REVIEW 6.5.2.7  The SRC shall review:
: a. The safety evaluations for 1) changes to procedures, equip-ment or systems and 2) tests or experinents completed under the provision of Section 50.39, 10 CFR, to verify that such actions did not ecnstitute an unreviewed safety question.
: a. The safety evaluations for 1) changes to procedures, equip-ment or systems and 2) tests or experinents completed under the provision of Section 50.39, 10 CFR, to verify that such actions did not ecnstitute an unreviewed safety question.
: b. Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as .lefined in.Section 50.59,-10 CFR.
: b. Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as .lefined in.Section 50.59,-10 CFR.
: c. Proposed tests or experiments which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
: c. Proposed tests or experiments which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
: d. Proposed changes in Technical Specifications or licenses.
: d. Proposed changes in Technical Specifications or licenses.
: c. Violations of applicable statutes, codes, regulations, orders,
: c. Violations of applicable statutes, codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
'
Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
: f. Significant operating abnormalitics or deviations from notr.a1 and expected perfomance of plar.t equipment that affect nucitar safety.
: f. Significant operating abnormalitics or deviations from notr.a1 and expected perfomance of plar.t equipment that affect nucitar safety.
: g. Reportable occurrences requiring 24 hour notification to the Commission.
: g. Reportable occurrences requiring 24 hour notification to the Commission.
Line 248: Line 157:
AUDITS
AUDITS
                                                                                                     ~
                                                                                                     ~
  '
6.5.2.8  Audits of facility activities shall be perfomed under the cogni:ance of the SRC. These audits shall encompass:                            i
6.5.2.8  Audits of facility activities shall be perfomed under the cogni:ance of the SRC. These audits shall encompass:                            i
     ,                    a. The conformance of facility operation to        provisions
     ,                    a. The conformance of facility operation to        provisions contained within the Technical Specifications and applicabic        - ,
,
contained within the Technical Specifications and applicabic        - ,
f license conditions at Icast once per year,
f license conditions at Icast once per year,
: b. The perfomance and retraining of all members of the plant                  l management and operations staff, and the perfomance, training, and qualificat. ions of ne.< members of the entire plant staff at least once per year.
: b. The perfomance and retraining of all members of the plant                  l management and operations staff, and the perfomance, training, and qualificat. ions of ne.< members of the entire plant staff at least once per year.
Line 260: Line 166:
l Amendment No. Ic                  - 125 -        ow        w        .  :2 1
l Amendment No. Ic                  - 125 -        ow        w        .  :2 1
I-
I-
              -
                                                                                                        ,


                                                                                                      --
                      *
   . ,.      .                          -s                                  s
   . ,.      .                          -s                                  s
: d. metallurgy
: d. metallurgy
Line 276: Line 178:
f V
f V
In his absence, the Chaiman shall appoint an Acting Chairman.            ~
In his absence, the Chaiman shall appoint an Acting Chairman.            ~
ALTERNATES 6.5.2.3  All alternate members shall be appointed in writing by the SRC Chaiman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in SRC                      1
ALTERNATES 6.5.2.3  All alternate members shall be appointed in writing by the SRC Chaiman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in SRC                      1 activities at any one time.                                                    I 1
.
activities at any one time.                                                    I 1
CONSULTANTS 6.5.2.4    Consultants shall be utili:cd as determined by the SRC Chaiman                !
CONSULTANTS 6.5.2.4    Consultants shall be utili:cd as determined by the SRC Chaiman                !
to provide expert advice to the SRC.                                          '
to provide expert advice to the SRC.                                          '
l b'EETING FREQUENCY 0
l b'EETING FREQUENCY 0
99 0 F gg D3NA Mb      c
99 0 F gg D3NA Mb      c i
                                                                                              '
6                            I 6.5.2.5    The SRC shall meet at least once per ca'lendar quarter during the iaitial year of factlity operation following fuel loading and at least once per six months thereaf ter.
i
                                                                        ,
6                            I 6.5.2.5    The SRC shall meet at least once per ca'lendar quarter during the iaitial year of factlity operation following fuel loading and at
                                          -
least once per six months thereaf ter.
               -QUORUM 6.5.2.6    A quorum of SRC thall consist of the Chaiman or his designated                i alternate and four .cmbers including alternates. No more than        l G                  a minority of the queram shall have line responsibility for l
               -QUORUM 6.5.2.6    A quorum of SRC thall consist of the Chaiman or his designated                i alternate and four .cmbers including alternates. No more than        l G                  a minority of the queram shall have line responsibility for l
I cperation of the factlity, k.endment No. 16                      - 124 -
I cperation of the factlity, k.endment No. 16                      - 124 -
Line 294: Line 189:


t\
t\
'
                    *      *
            , ...                            _ ,,
,%-
'
  - >[                          c.      Th; Facility Security Plan and impicmenting procedurcs at W                                  least once per two years.
  - >[                          c.      Th; Facility Security Plan and impicmenting procedurcs at W                                  least once per two years.
h                  f.      Any other arca of facility operation considered appropriate by the SRC or the Executive Director Generation 6 Construction j
h                  f.      Any other arca of facility operation considered appropriate by the SRC or the Executive Director Generation 6 Construction j
(EDG6C).
(EDG6C).
AUTHORITY 6'.S.2.9 The SRC shall report to and advise the Executive Director, Generation 5 Construction (EDGSC) within~ 30 days following each meeting. ~
AUTHORITY 6'.S.2.9 The SRC shall report to and advise the Executive Director, Generation 5 Construction (EDGSC) within~ 30 days following each meeting. ~
                                                                                    .
RECORDS 6.5.2.10 Records of SRC _ activities shall be prepared, approved and dis-
RECORDS 6.5.2.10 Records of SRC _ activities shall be prepared, approved and dis-
                             ,    tributed as indicated below:
                             ,    tributed as indicated below:
Line 309: Line 198:
: b. Reports of reviews encompassed by Section 6.S.2.7 e, f, g and h above, shall be prepared, approved and forwarded to  ,
: b. Reports of reviews encompassed by Section 6.S.2.7 e, f, g and h above, shall be prepared, approved and forwarded to  ,
the Executive Director, Generation & Construction      (EDGSC)
the Executive Director, Generation & Construction      (EDGSC)
                                                                                                          -
Githin 30 days followi.sg ' completion of the review.
Githin 30 days followi.sg ' completion of the review.
                                                                                                    '
: c. Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Etecutivo Director, Generation 6 Construction        l (EDGr,C) and to the management tvositions respon'sible for the areas audited within 30 days aftpr completion of the. audit.            .
: c. Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Etecutivo Director, Generation 6 Construction        l (EDGr,C) and to the management tvositions respon'sible for the areas audited within 30 days aftpr completion of the. audit.            .
6.6    REPORTABl.E OCCURRENCE ACTION 6.6.1    The following actions shall be taken for Reportable Occurrences:              ,
6.6    REPORTABl.E OCCURRENCE ACTION 6.6.1    The following actions shall be taken for Reportable Occurrences:              ,
Line 320: Line 207:
: a. The facility shall be placed in at least hot shutdown within one hour,
: a. The facility shall be placed in at least hot shutdown within one hour,
: b. The Nucicar Regulatory Ccr.ission shall be notified and a report subnit ted pursuant to the requirements of 10 CFR 50.36 y                          and-Specificatten o.12.3.1
: b. The Nucicar Regulatory Ccr.ission shall be notified and a report subnit ted pursuant to the requirements of 10 CFR 50.36 y                          and-Specificatten o.12.3.1
_
                                                           - 126 -
                                                           - 126 -
Amendme  n t No.16
Amendme  n t No.16
_ _ . .
                                                                                                                     ]
                                                                                                                     ]


                                                               ~
                                                               ~
p
p L
'
6.8 PROCEDURES 6.8.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:
                        *
        .-. , . .  -
                                          , , ,
_
L
* 6.8 PROCEDURES 6.8.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:
: a. The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, November,1972.          *
: a. The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, November,1972.          *
: b. Refueling operations.
: b. Refueling operations.
Line 343: Line 222:
6.8.3 Temporary changes to procedures of 6.8.1 above may be made provided:                                                                  .
6.8.3 Temporary changes to procedures of 6.8.1 above may be made provided:                                                                  .
b'                a. The intent of the original procedure is not altered.
b'                a. The intent of the original procedure is not altered.
                                                                                                    .
: b. The change is approved by two members of the plant staff, at least one of wnom holds a Senior Reactor Operator's i,                              License on the unit affected.
: b. The change is approved by two members of the plant staff, at least one of wnom holds a Senior Reactor Operator's i,                              License on the unit affected.
: c. Tne e.hange is documented, reviewed by the PSC and approved l                              by the Plant >Ianager                within 14 days of l                              implemensation.
: c. Tne e.hange is documented, reviewed by the PSC and approved l                              by the Plant >Ianager                within 14 days of l                              implemensation.
!'                                                                                                      ;
!'                                                                                                      ;
,
1 0**D              T
                                                                                                  ,
1
* 0**D              T
                                                                                             }f f o      '
                                                                                             }f f o      '
od      o    syn              I l
od      o    syn              I l
                                                                                                        ,
i Amendment No. 16                        -
i Amendment No. 16                        -
127 -
127 -
i
i O-                                                                                              1 I
:                                                                                                        !
                                                                                                       -1 i}}
O-                                                                                              1 I
                                                                                                       -1
_ . , .
i}}

Revision as of 05:17, 1 February 2020

Proposed Tech Specs Change for Tech Specs 6.0-6.8 Re Reorganization in Generation & Const Dept,Plant Organization & Safety Review Committee Members
ML19320A298
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/20/1978
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19320A291 List:
References
NUDOCS 8004210578
Download: ML19320A298 (10)


Text

-

-s

,o .

6.0- ADMINISTRATIVE CONTROLS 6.i RESPONSIBILITY .

6.1.1 The Plant Manager shall be responsible for overall facility operation. in his absence, the Assistant Plant Manager of Power Plant shall assume all responsiisility and perform all dutics of the Plant Manager- If both the Plant Manager and his assistant are, absent, these respon-sibilities and duties are assu:aed by the Operations Superintendent

-followed by the Technical Support Engineer.

6.2 ORCANIZATION OFFSITE 6.2.1 The of fsite organi:ation for facility management and technical support shall be as shown on Figure 6.2-1.

FACILITY STAFF 6.2.2 The Facility organi:ation shall be as shown on Figurc 6.2-2A and 6.2-2B and each on dut y shift shall be composed of at least the minimum shift crew composition shown in Tabic 6.2-1.

6.3 FACIL1'IY STAFF QUALIFICATIONS L.a 6.3.1 Each member of the facility staff shall meet or exceed the minimum .

qualifications of ANSI NIS.1-1971 for comparabic position, except

' for the llcalth Physics Supervtsor who shall meet or exceed the qualifications of Regulatory Guide 1.3, September 1975.

6.4 TRAINING 6.4.1 A retraining and replacement training program for the facility staff shall be maintained

~

and shall meet or exceed the requirements ,

and recommendat tons of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFis Part 55.

6.5 REVIEW AND AUDIT 6.5.1 Plant Safety Corr.ittee (PSC) Function 6.5.1.1 The. Plant Safet y Co:ait tee shall functicn to advise the Plant -

Manager on all matters related to nuclear safety.

COMPOSITION 6.5.1.2 The Plant Safety Co.c.tttee shall be composed of the:

O Amendment No.16 -

117 ggo4210 7 %

EXECUTIVE DIRECTOR GENERATION 6 CONSTRUCTION SAFETY ._

REVIEW C0kt!I1 TEE v

~

}

DIRECTOR DIRECTOR DIRECTOR DIRECTOR DIRECTOR DIRECTOR GENERATION GENERATION GENERATION PROJECTS TECilNICAL 4 AD5!INISTRATIVE TECllNOLOGY OPERATIONS ENGINEEhlNG  ?!ANAGEPIENT ENVIRONBIENTAI. SERVICES 6 PROJECT SERVICES SUPPORT U

,e PLANT PLANT SAFETY -

FIANAGER C0bS!ITTEE T

.. . -... It ArsT CE M t' 'ER 5

E 9 * '. ' NUC E AR O

l'L/.N T MM4AGLR ADMIN.

SEE FIGURE 6.2-2B SE CURI T Y ACM. BLOC. RECORDS

( CCt. JANITOR A 0) SUPVR.

m OPF RAT!ON TR AININ G PRODUCTION E NG!NEERS SOLOGIST SUPT. SUPVR, STORE -

LSO KEEPER ASST. T R AINING OPER. COOac.

SUPTi LSC l These positions are for infornation UNITI UNIT 2

  • only and should be treated as such SHIFT SHIF T for this Technical Specification. .

SUPVR. SUPVR.

_LSO LSO UNIT I UNII 2*

PL AN T PLAN T OPER. OPER.

LO LO ASdi. ASST.

  • FtANT PLANT Oftk. OFE R.

LO LO M.S T E WASTE

  • 6 CONI CPERATCr.

CONT OPEAATOR h J'l e

t. v '9 E R A;lA Gi E.i -- --

-120-i AFtK ANSAS POWER . S LIGH T Co. FI G U!1 E

~

AkK ANSAS NUCLE AR ONE - UNIT l 6. 2 - 2 A

'O O .

~

2 l

ASS:STAN T PLANT MANAGER

  • CE (LSO) _

SEE FIGURE

~6.2-2A

_C - Dsgree or Equivalent Required CE - Engineering Degree or Equivalent Required ,

M^

SU

!.50 - Sanior Operator License Required LO - Operator License Required l

. );- D2sirable but not Required ELEC. PLANT MECH. l M AIN T. SERVICE M A.'N T.

i SUPVR SUPVR SUPVR tNS T Raf.'E NTS tt CON T R "'L S ASST ASST

' (CE)SUPvs i ELECT YECH ,

- - .- J M AIN T. MAINT SUPvRS SUPVRS l _L AsSr IaC '

SUPVRS i

i 1 I l l

TECH OVALITY PLANNING NUCLEAR SUPPORT CONTROL 8 SCHEO. ENGINEER ENGINEER ENGR. COORD (CE) (CE)

HEALTH' RADt0 CHEM rFRrORM CUALITY ASST PL AN. REACTOR COMPUTEA PHYSICS --CHEM 6 ENVid ENGR- CC'd TROL 8 SCHED ENGR $ ENGR.

SUPVR' SUPVR. SUPVR SUPVR INSPECTS COOROS

_]._ (CE )

ASST HEALTH bA

  • 3~ ASST.

PHYS 3CS O (,OVouTER

- SUPVRS c #

ow - -'

ENGRS

-121-A% KANSAS POWER S LIGHT CO.

FUP4CTIONAL OhGANIZ ATION FOR PLANT OPE R ATIO N FIGURE A! KANSAS NUCLE AR JONE- UNIT I ' _

G.2 - 2 9

- ~

9 9 '4~s -,

7 Chairman: Assistant Plant Manager

' t Member: Technical Support En,:incer b Member: Instrumentation 6 Controls Supervisor

. Member: Operations Superintendent a Member: Maintenance Superintendent Member: Nuclear Engineer Member:  !!calth Physics Supervisor The Plant Manager shall appoint an acting chair-

. man in the absence of the Assistant Plant Manager ALTERNATES 6.5.l.3 All alternate mecers shall be appointed in writing by the PSC Chaiman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in PSC activities at any one time.

MEETING FREQUENCY 6.5.1.4 The PSC shall meet at Icast once per calendar month and as con-vened by the PSC Chai=an or. his designated alternate.

~

QUORUM -

6.5.1.5 A quorum of the PSC shall consist of the chairman and three members including alternates.

h RESPONSIBILITIES 6.5.1.6 The Plant Safety Cccatttee shall be responsible for:

a. Review of 1) all procedures required by Specification 6.8 and revisions thereto, 2) any other proposed procedures or revisions thereto as detet ained by the Plant Manager to affect nuclear safety. l

^

b. Review of all preposed tests and experiments that affect -

nuclear safety.

-c. Review of all proposed changes to the Appendix "A" Tech-nical Specifications.

d. Revice of all propared changes or modifications to plant systems or equipment that af fect nuclear safety.

e, .

Investigation of all violations of the Technical Specificatio,s including the preparation and forwarding of reports covering l evaluation and recommendations to prevent recurrence to the l

- Plant Manager. l 1

f. Review of those Reportable Occurrences requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

n0tif!Catton of the Conntsston.

Amendment No. 16 - 122 -

es % e

, .c ,,

g.- Revi~cw of' facility operations to detect potential nucicar safety ha:ards.

h. Perfomance of .special reviews and investigations and reports thercon as requested by the Plant Stanager l
i. Review of the Plant Security Plan and impicmenting procedures and shall submit recomended changes to the Plant blanager l
j. Review of the Emer,;cacy Plan and impicmenting procedures and shall submit recomended changes to the Plant'llanager Alm!ORITY 6.5.1.7.1 The Plant Safety Committee shall:
a. Recommend to the Plant ?!anager. written approval or disapproval of items considered under 6.5.1.6(a) through (d) above,
b. Render determinations in writing with regard to whether or not cach item considered under 6.5.1.b(a) through (c) above constitutes an unreviewed safety question.
6. 5.1. 7. 2 In the event of a disagreement between the recommendations of

(# the Plant Safety Comittee and the actions contemplated by the Plant stanager , the course detemined by the Plant Flana--

ger to be more conservative will be followed. Records of l .

the disagreement will be sent for review to the Dirdctor, Generation Operations, or 5 tanager, Nuelcar Operations and the Chairman of the Safety Review Committee by the Plant Planager on the next working day.

RECORDS ,

6.5.1.8 The Plant safety Comittee shall maintain written minutes of each '

meeting and copics shall be provided to the Chaiman of the Safety Rcview Comittee by the Plant Flanager l

6.5.2 Safety Review Cc=ittee (SRC) l FUNCTION l 6.5.2.1 The Safety Review Committee shall function to provide independent review and audit of designated activities in the areas of:

a. nucicar power plant operations
b. nuclear engineering b y c. . chemistry and radiochemistry Amend.T.ent No. 16 123 -

i e -

L ta

r-g

,.m l' i REVIEW 6.5.2.7 The SRC shall review:

a. The safety evaluations for 1) changes to procedures, equip-ment or systems and 2) tests or experinents completed under the provision of Section 50.39, 10 CFR, to verify that such actions did not ecnstitute an unreviewed safety question.
b. Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as .lefined in.Section 50.59,-10 CFR.
c. Proposed tests or experiments which involve an unreviewed safety question as defined in Section 50.59, 10 CFR.
d. Proposed changes in Technical Specifications or licenses.
c. Violations of applicable statutes, codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance.
f. Significant operating abnormalitics or deviations from notr.a1 and expected perfomance of plar.t equipment that affect nucitar safety.
g. Reportable occurrences requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification to the Commission.

U

h. Reports and meeting minutes of the PSC. -

AUDITS

~

6.5.2.8 Audits of facility activities shall be perfomed under the cogni:ance of the SRC. These audits shall encompass: i

, a. The conformance of facility operation to provisions contained within the Technical Specifications and applicabic - ,

f license conditions at Icast once per year,

b. The perfomance and retraining of all members of the plant l management and operations staff, and the perfomance, training, and qualificat. ions of ne.< members of the entire plant staff at least once per year.
c. The results of all actions taken to correct deficiencies occurring in facility equipment, structures, systems or method of operation tnat affect nuclear safety at least once per six months.
d. The Facility Energency Plan and implementing procedures at Icast I once per two years.

v om- m -

l Amendment No. Ic - 125 - ow w . :2 1

I-

. ,. . -s s

d. metallurgy

- . c. instrumentation and control

f. radiological' safety *
g. . mechanical and cicctrical engineering
h. environmental considerations i, other appropriate ficid:, required by the. unique characteristics of the nuclear pcwcr plant COMPOSITION 6.5.2.2 The SRC shall be composed of the:

Chaiman: . Direction, Generation Operations Member: Director, Generation Technology Member: Director, Technical 6 Environmental Services Member: Manager of Safety Member: Arkansa -

Member:

Manager,s Nuclear One technical . Plant Manager Analysis Member: Arkansas Nuclear One Nucicar lingineer Member: Director, Generation Engineering Member: Radiation and ifcalth Physics Censultant Member: Nuclear Safety Consultant ,

f V

In his absence, the Chaiman shall appoint an Acting Chairman. ~

ALTERNATES 6.5.2.3 All alternate members shall be appointed in writing by the SRC Chaiman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in SRC 1 activities at any one time. I 1

CONSULTANTS 6.5.2.4 Consultants shall be utili:cd as determined by the SRC Chaiman  !

to provide expert advice to the SRC. '

l b'EETING FREQUENCY 0

99 0 F gg D3NA Mb c i

6 I 6.5.2.5 The SRC shall meet at least once per ca'lendar quarter during the iaitial year of factlity operation following fuel loading and at least once per six months thereaf ter.

-QUORUM 6.5.2.6 A quorum of SRC thall consist of the Chaiman or his designated i alternate and four .cmbers including alternates. No more than l G a minority of the queram shall have line responsibility for l

I cperation of the factlity, k.endment No. 16 - 124 -

f

t\

- >[ c. Th; Facility Security Plan and impicmenting procedurcs at W least once per two years.

h f. Any other arca of facility operation considered appropriate by the SRC or the Executive Director Generation 6 Construction j

(EDG6C).

AUTHORITY 6'.S.2.9 The SRC shall report to and advise the Executive Director, Generation 5 Construction (EDGSC) within~ 30 days following each meeting. ~

RECORDS 6.5.2.10 Records of SRC _ activities shall be prepared, approved and dis-

, tributed as indicated below:

a. Minutes of each SRC meeting shall be prepared, approved and forwarded to the Executive' Director, Gene ration G Construction (EDGGC)within 30 days'following ea'ch meeting.
b. Reports of reviews encompassed by Section 6.S.2.7 e, f, g and h above, shall be prepared, approved and forwarded to ,

the Executive Director, Generation & Construction (EDGSC)

Githin 30 days followi.sg ' completion of the review.

c. Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Etecutivo Director, Generation 6 Construction l (EDGr,C) and to the management tvositions respon'sible for the areas audited within 30 days aftpr completion of the. audit. .

6.6 REPORTABl.E OCCURRENCE ACTION 6.6.1 The following actions shall be taken for Reportable Occurrences: ,

a. The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.12.
b. Each Reportabic Occurrence requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification to ' '

the. Commission shall be reviewed by the PSC and submitted to the '

SRC and the Manager,. Nuclear Operations by the Plant Manager 6.7 SAFETY LIMIT VIOL \ TION J 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:

a. The facility shall be placed in at least hot shutdown within one hour,
b. The Nucicar Regulatory Ccr.ission shall be notified and a report subnit ted pursuant to the requirements of 10 CFR 50.36 y and-Specificatten o.12.3.1

- 126 -

Amendme n t No.16

]

~

p L

6.8 PROCEDURES 6.8.1 Written procedures shall be established, implemented and maintained covering the activities referenced below:

a. The applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, November,1972. *
b. Refueling operations.
c. Surveillance and test activities of safety related equipment.
d. Security Plan implementation.
e. Emergency Plan implementation.

6.8.2 Each procedure of 6.8.1 above, and changes thereto, shall be reviewed by the PSC and approved by the Plant blanager prior to implementation and reviewe 2 periodically as set forth in administrative procedures.

6.8.3 Temporary changes to procedures of 6.8.1 above may be made provided: .

b' a. The intent of the original procedure is not altered.

b. The change is approved by two members of the plant staff, at least one of wnom holds a Senior Reactor Operator's i, License on the unit affected.
c. Tne e.hange is documented, reviewed by the PSC and approved l by the Plant >Ianager within 14 days of l implemensation.

!'  ;

1 0**D T

}f f o '

od o syn I l

i Amendment No. 16 -

127 -

i O- 1 I

-1 i