ML19347D432: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:, - -
{{#Wiki_filter:, - -
                                                                              .
.      .
          .
  .
O                                                  OPau1iNG DATA RteoRT
O                                                  OPau1iNG DATA RteoRT
* 50-336
* 50-336 DOCI'ET NO.
                                                                                                                        '
DOCI'ET NO.
DATE JMI COMPLEl ED llY        G.H. Ha'alett TEl.EPil0NE TP03T747-1791 X364 OPERATING STATUS f4illstone 2                                        Notes
DATE JMI COMPLEl ED llY        G.H. Ha'alett TEl.EPil0NE TP03T747-1791 X364 OPERATING STATUS f4illstone 2                                        Notes
* Items 21 & 22
* Items 21 & 22
: 1. Unit Name:
: 1. Unit Name:
February 1981                                  Cumulative are computed
February 1981                                  Cumulative are computed
                                                                                                  ,
: 2. Reporting Period:
: 2. Reporting Period:
2700 using a weighted average.                      .
2700 using a weighted average.                      .
Line 44: Line 37:
None IIOne
None IIOne
: 9. Power Level To Which Restricted.lf Any (Net MWe): -
: 9. Power Level To Which Restricted.lf Any (Net MWe): -
: 10. Reasons For Restrictions,If Any:          None
: 10. Reasons For Restrictions,If Any:          None This Month            Yr.-to-Date              Cumulatise
                                                                                        .
This Month            Yr.-to-Date              Cumulatise
     /"'N
     /"'N
()                                                            672                    1 .41 6                  45,408
()                                                            672                    1 .41 6                  45,408
Line 76: Line 67:
COMMEltCI AL UI'Elt ATION N/A                    N/A k/                                                                                          ,              .
COMMEltCI AL UI'Elt ATION N/A                    N/A k/                                                                                          ,              .
9
9
                                                                                                                          '""''
                     """"59                                            POOR BRE R                                    ht            . - wm
                     """"59                                            POOR BRE R                                    ht            . - wm


                                                        . . _.                          -. ._.          .___ _ _          . _ _ _        _    _ _ .
A\TR AGE D tlLY UN!1 POWER LE\ EL
* A\TR AGE D tlLY UN!1 POWER LE\ EL
                .                                                .
      .
                    .
             ~
             ~
D oci.EI s o. 50-336
D oci.EI s o. 50-336
            -                                -
                                                                                                           ,                usiy      Millstone 2 DA1E      3/3/81            _
                                                                                                           ,                usiy      Millstone 2 DA1E      3/3/81            _
  ,
COMPLEIED BY              G.H. Howlett TELEPilONE      (203)447-1791X3C4 MONT11                  February.
COMPLEIED BY              G.H. Howlett TELEPilONE      (203)447-1791X3C4 MONT11                  February.
                                                                                                                                                          .
.                      DAY            AVER AGE D 41LY POWER LEVEL                    DAY          AVER AGE DAILY POWER LEVEL (MWe Net)                                                    (MWe Net) j                        865                                                              862 37          _
.                      DAY            AVER AGE D 41LY POWER LEVEL                    DAY          AVER AGE DAILY POWER LEVEL
2 866                                                              862 IS 3                          866                              ,9 863 4        __
                            '
(MWe Net)                                                    (MWe Net) j                        865                                                              862
                                  -
37          _
<
2 866                                                              862 IS
* 3                          866                              ,9 863 4        __
865                              2o                            862 5                          861                                                              830
865                              2o                            862 5                          861                                                              830
_                              -                  21
_                              -                  21
Line 105: Line 82:
7                          863                                                              862
7                          863                                                              862
,                                                                                      23 A
,                                                                                      23 A
q)            a                          863                              34                            863
q)            a                          863                              34                            863 9                          863                                                              863 25
                                  '
9                          863                                                              863 25
.
:                      io-    ,
:                      io-    ,
863                              26                            863 i
863                              26                            863 i
Line 114: Line 88:
863                              27 863
863                              27 863
.                        12                          862                              ,g                            863 i
.                        12                          862                              ,g                            863 i
,                      13                          759                              29
,                      13                          759                              29 14 196                              3g 15                          855                              33
                                                                                                                        -
           .            16                          862 i
                                        ,
14 196                              3g
                                                                                                                        -
.
15                          855                              33
                                                                                                                        -
!        .
           .            16                          862
,
                                          ,
i
                                                                          .          .
                                                                                                ''
INSTRUCTIONS -
INSTRUCTIONS -
On this formst.!!st the 3seuge daily ::r.it power 1.selin MWe Net for es:h day in the repert:n; m.mth. Compuie to '            -
On this formst.!!st the 3seuge daily ::r.it power 1.selin MWe Net for es:h day in the repert:n; m.mth. Compuie to '            -
ti e r.euest whole mepwatt.
ti e r.euest whole mepwatt.
s.,
s.,
        "        '
(9i)7)
(9i)7)
..          b i
..          b i
A-                                                                                ,
A-                                                                                ,
8                                                                   *
8
,
* t                                                  -. __ .            . _          __ -                          __                  _ _
t                                                  -. __ .            . _          __ -                          __                  _ _
                                                                                                                                                             =
                                                                                                                                                             =


           ~
           ~
  '
O                                                                                                                O NY                                                      C)
_.
                                                                          .
O                                                                                                                O
                                                                                                                                            '
NY                                                      C)
                                                                         ''-                                                      m
                                                                         ''-                                                      m
                                                                                                                                       /
                                                                                                                                       /
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 1  ril l istone 2
UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 1  ril l istone 2 UNIT N AME DATE 3/4/NI COMPLETED l1Y        G.H. lic dett REPORT MONTH February TELEPHONE 1203 M 47 17nl V 364 e.
                                                                                                                                              -
UNIT N AME DATE 3/4/NI COMPLETED l1Y        G.H. lic dett REPORT MONTH February TELEPHONE 1203 M 47 17nl V 364
* e.
E C      PB    ?,J)
E C      PB    ?,J)
                                 ~                              Licensee      5"o                          Cause & Corrective
                                 ~                              Licensee      5"o                          Cause & Corrective
Line 160: Line 111:
9                      Acijon go
9                      Acijon go
                                   $    $ .E    $ s ] cc                      v> 0                          Prevent Recurrence o ";    cd yGj          Report #
                                   $    $ .E    $ s ] cc                      v> 0                          Prevent Recurrence o ";    cd yGj          Report #
                                                                                         }V c5
                                                                                         }V c5 2    810213      F    13.7      H    1          81-8        CA      SUPORT  A design deficiency was discovered in the head vent hanger installation.
                                                                                                                                                  .
2    810213      F    13.7      H    1          81-8        CA      SUPORT  A design deficiency was discovered in the head vent hanger installation.
Power was manually reduced, Main Generator was taken.off line. The reactor remained critical at 0%
Power was manually reduced, Main Generator was taken.off line. The reactor remained critical at 0%
pcwer.
pcwer.
Line 173: Line 122:
:: C O                                                    -
:: C O                                                    -
       "A
       "A
        -                                                                                                                  --
("".3 "JEEd  
("".3
        -
        "JEEd  


==SUMMARY==
==SUMMARY==
Line 182: Line 128:
         &              the outage of the 13th.
         &              the outage of the 13th.
F
F
                                                                . . .-..      .  .  .                  .
  ,
                                                                                                        .
'
    !


                            '                                      '
fate:    Itar $ T0 7 al Completed Ly: G.l!. thz!G:ECTff
fate:    Itar $ T0 7 al Completed Ly: G.l!. thz!G:ECTff
* Telephone: 203/447-19/1 0 54
* Telephone: 203/447-19/1 0 54
    .
                           -            REFUELIt!G IllFORIATIO*l REQUEST O1.          Name of facility:    f4111 stone 2
                           -            REFUELIt!G IllFORIATIO*l REQUEST O1.          Name of facility:    f4111 stone 2
: 2.      Scheduled date for next refueling shutdown:
: 2.      Scheduled date for next refueling shutdown:
Line 202: Line 141:
Licensing documentation will be provided a minimum of 90 days prior to start-up of Cycle 5 or as documented in the R. A. Clark letter to W.G. Counsil, dated 10/6/80, authorizing Cycle 4 operation.
Licensing documentation will be provided a minimum of 90 days prior to start-up of Cycle 5 or as documented in the R. A. Clark letter to W.G. Counsil, dated 10/6/80, authorizing Cycle 4 operation.
: 6. Important licensing ~ considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
: 6. Important licensing ~ considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
      "
N/A
N/A
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
  .
storage pool:
217                          (b)      216 (a)  In Core:
217                          (b)      216 (a)  In Core:
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,-
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,-
Line 212: Line 148:
667
667
: 9. The projected date of the hst refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
: 9. The projected date of the hst refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
              '
1985, Spent Fuel Pool, full core off load capability is reached.
1985, Spent Fuel Pool, full core off load capability is reached.
1987, Core Full, Spent Fuel Pool contains 648 bundles,
1987, Core Full, Spent Fuel Pool contains 648 bundles,
: n.                .
: n.                .
        ,'
_


__ -
Docket No. 50-336
Docket No. 50-336
                                                                       ,,,                          Date        3/6/81 Page ~ ~'l f 2                                            /
                                                                       ,,,                          Date        3/6/81 Page ~ ~'l f 2                                            /
Line 237: Line 169:
1/15/81        Nitrogen                Piping, Nitrogen Penetration to        Ground out weld indication and rewelded.
1/15/81        Nitrogen                Piping, Nitrogen Penetration to        Ground out weld indication and rewelded.
Safety Injection Tank #1.
Safety Injection Tank #1.
!
                                                                                                    -
\
\
.
_ _ _ - ~
_ _ _ - ~


Line 248: Line 177:
                                                               '''                        Completed 3y n H. U n ,-    _t        .__.
                                                               '''                        Completed 3y n H. U n ,-    _t        .__.
Telephone ('/n3 )4 47-1791 X? 64 -
Telephone ('/n3 )4 47-1791 X? 64 -
CORRECTIVE MAINTENANCE SUM'4ARY FOR SAFETY RELATED EQUIPMENT Report Month    January 1981 MAINTENA.,'CE ACTION
CORRECTIVE MAINTENANCE SUM'4ARY FOR SAFETY RELATED EQUIPMENT Report Month    January 1981 MAINTENA.,'CE ACTION DATE                  SYSTEM                        COMP 0NENT 1/15/81      Service Water            Piping, Service Water to Reactor      Weld repaired pipe leak.
                                                                                                      '
DATE                  SYSTEM                        COMP 0NENT 1/15/81      Service Water            Piping, Service Water to Reactor      Weld repaired pipe leak.
Building Closed Cooling Water Heat Exchanger B 1/15/81      Spent Fuel Pool          Spent Fuel Pool Coolina Pump          Rebuilt pump.
Building Closed Cooling Water Heat Exchanger B 1/15/81      Spent Fuel Pool          Spent Fuel Pool Coolina Pump          Rebuilt pump.
Cooling                  P-13A 1/18/81      Reactor Protection        R.P.S. Ch. "D" Loop 2 cold leg        Replaced I/I converter.
Cooling                  P-13A 1/18/81      Reactor Protection        R.P.S. Ch. "D" Loop 2 cold leg        Replaced I/I converter.
temp. TY 122CD 1/18/81      Reactor Protection        R.P.S. Ch. "A" Loop 1 cold leg        Replaced resistance temperature detector, temp. Tll2CA
temp. TY 122CD 1/18/81      Reactor Protection        R.P.S. Ch. "A" Loop 1 cold leg        Replaced resistance temperature detector, temp. Tll2CA 1/20/81    Service Water            2-SW-8.lC                              Replaced valve.
                                                                                                                  '
1/20/81    Service Water            2-SW-8.lC                              Replaced valve.
                                                        .
                           .                                                                                              _ _}}
                           .                                                                                              _ _}}

Revision as of 02:25, 31 January 2020

Monthly Operating Rept for Feb 1981
ML19347D432
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/03/1981
From: Howlett G
NORTHEAST UTILITIES
To:
Shared Package
ML19347D429 List:
References
NUDOCS 8103170594
Download: ML19347D432 (6)


Text

, - -

O OPau1iNG DATA RteoRT

  • 50-336 DOCI'ET NO.

DATE JMI COMPLEl ED llY G.H. Ha'alett TEl.EPil0NE TP03T747-1791 X364 OPERATING STATUS f4illstone 2 Notes

  • Items 21 & 22
1. Unit Name:

February 1981 Cumulative are computed

2. Reporting Period:

2700 using a weighted average. .

3. Licensed Thennal Power lMWt):

909 .

4. Nameplate Rating (Grow MWe):

870

5. Design Electrical!tating(Net MWe):

895

6. Maximum Dependable Capacity (Grow MWe): _
7. Masimum Dep.ndabic Capacity.INet MWe):
8. If Changts Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report,Ghe Reasons:

None IIOne

9. Power Level To Which Restricted.lf Any (Net MWe): -
10. Reasons For Restrictions,If Any: None This Month Yr.-to-Date Cumulatise

/"'N

() 672 1 .41 6 45,408

11. Hours in Reporting Period 32,245.8 672 996.5
12. Number Of liours Reactor Was Critica!

0 0 2,076.9

13. Reactor Resene Shutdown llours 30,731.2 658.3 962.2
14. Ilours Generator On-Line 468.2 0 0
15. Unit Restne Shutdown liours 75,769,524
16. Gross Thermal Energy Generated (MWH) 1.752 J 9 2.534.203 580 800 840,400 24,513,317
17. Gross Electrical Energy Generated (MWil)
18. Net Electrical Energy Generated (MWil) 560.182 806.745 __2_3.468.791 98.0 68.0 67.7
19. Unit Senice Factor 68.0 68.7
20. Unit Asailability Factor 98.0 96.5 65.9
  • 62.5
21. Unit Capacity Factor (Using MDC Net)
  • 61.3 95.8 65.5
22. Unit Capacity Factor IUsing DER Net) 23.0

~

2.0 32.0

23. Unit Forced Outage Itate
24. Shutdowns Scheduled Oser Next 6 Months IType.Date.and Duration of Eacht:

Inspection of Mechanical Snubbers 11av 1,1981,11 Days

25. If Shut Down At End Of Report Period. Estimated Date of Startup.

N/A

26. Units in Test Status IPrior o Commercial Operationi: Forecast Achiesed INITIA L CRITICA LITY 1.

N/A N/A INITI AL ELEC IRICITY

(~] .

COMMEltCI AL UI'Elt ATION N/A N/A k/ , .

9

""""59 POOR BRE R ht . - wm

A\TR AGE D tlLY UN!1 POWER LE\ EL

~

D oci.EI s o. 50-336

, usiy Millstone 2 DA1E 3/3/81 _

COMPLEIED BY G.H. Howlett TELEPilONE (203)447-1791X3C4 MONT11 February.

. DAY AVER AGE D 41LY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) (MWe Net) j 865 862 37 _

2 866 862 IS 3 866 ,9 863 4 __

865 2o 862 5 861 830

_ - 21

. 6 864 22 860

~

7 863 862

, 23 A

q) a 863 34 863 9 863 863 25

io- ,

863 26 863 i

.33 ,

863 27 863

. 12 862 ,g 863 i

, 13 759 29 14 196 3g 15 855 33

. 16 862 i

INSTRUCTIONS -

On this formst.!!st the 3seuge daily ::r.it power 1.selin MWe Net for es:h day in the repert:n; m.mth. Compuie to ' -

ti e r.euest whole mepwatt.

s.,

(9i)7)

.. b i

A- ,

8

  • t -. __ . . _ __ - __ _ _

=

~

O O NY C)

- m

/

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 1 ril l istone 2 UNIT N AME DATE 3/4/NI COMPLETED l1Y G.H. lic dett REPORT MONTH February TELEPHONE 1203 M 47 17nl V 364 e.

E C PB  ?,J)

~ Licensee 5"o Cause & Corrective

%'~ Date  ? 5 E 3y'j Event gg g"'g.

9 Acijon go

$ $ .E $ s ] cc v> 0 Prevent Recurrence o "; cd yGj Report #

}V c5 2 810213 F 13.7 H 1 81-8 CA SUPORT A design deficiency was discovered in the head vent hanger installation.

Power was manually reduced, Main Generator was taken.off line. The reactor remained critical at 0%

pcwer.

Corrective actions were taken and subsequent normal power operations

  • were resumed.

i T

C -

r C

i

C O -

"A

("".3 "JEEd

SUMMARY

The unit operatgd at or near 100% of rated thermal power throughout the reporting period except for

& the outage of the 13th.

F

fate: Itar $ T0 7 al Completed Ly: G.l!. thz!G:ECTff

  • Telephone: 203/447-19/1 0 54

- REFUELIt!G IllFORIATIO*l REQUEST O1. Name of facility: f4111 stone 2

2. Scheduled date for next refueling shutdown:

Commenced refuel outage flovember 28, 1981.

3. Schedule date for restart following refueling: January 16, 1982
4. Will refueling or resumption of operation thereafter require a technical specification change or other license cmendment? .

It is not anticipated that Cycle 5 operations will require Technical Specification changes or other License amendments.

5. Scheduled date(s) for submitting licensing action and -

supporting information:

Licensing documentation will be provided a minimum of 90 days prior to start-up of Cycle 5 or as documented in the R. A. Clark letter to W.G. Counsil, dated 10/6/80, authorizing Cycle 4 operation.

6. Important licensing ~ considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

217 (b) 216 (a) In Core:

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,-

in number of fuel assemblies:

667

9. The projected date of the hst refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1985, Spent Fuel Pool, full core off load capability is reached.

1987, Core Full, Spent Fuel Pool contains 648 bundles,

n. .

Docket No. 50-336

,,, Date 3/6/81 Page ~ ~'l f 2 /

,) Unit Name liillstor -'

Completed By G.ll. liowin t Telephone (203)44/-l/91x364 -

CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Report Month January 1981 COMPONENT MAINTENANCE ACTION DATE SYSTEM Emergency ~ Diesel Jacket Water Cooling Pump P-8CB Rebuilt pump motor.

1/3/81 Generator Main Steam Snubber #413019 Replaced snubber (see LER 81-3) 1/6/81 Main Steam Main Steam Isolation Valve Weld repaired gasket surface, replaced gasket 1/6/81 and machined valve bushing.

2-MS-64 1/10/81 Feedwater #2 Steam Generator Emerg. Feed Rebuilt valve.

Control Valve 2-FW-43A Reactor Coolant Pressurizer Safety Valve 2-RC-200 Replaced valve.

1/11/81

~

Enclosure Building Filters.t29A & B Changed out charcoal filters.

1/11/81 Filtration Safety Injection Safety Injection, test header Rebuilt valve, reset valves set pressure and 1/12/81 relief valve. 2-SI-466 tested. (See LER 81-2) 1/13/81 Reactor Coolant Pressurizer Safety Valve 2-RC-201 Rebuilt valve.

1/15/81 Nitrogen Piping, Nitrogen Penetration to Ground out weld indication and rewelded.

Safety Injection Tank #1.

\

_ _ _ - ~

Docket No. 50-336 Date 3/6/31 Page "sof 2 '

'_ ') Unit l'ame :lillstor ' '

Completed 3y n H. U n ,- _t .__.

Telephone ('/n3 )4 47-1791 X? 64 -

CORRECTIVE MAINTENANCE SUM'4ARY FOR SAFETY RELATED EQUIPMENT Report Month January 1981 MAINTENA.,'CE ACTION DATE SYSTEM COMP 0NENT 1/15/81 Service Water Piping, Service Water to Reactor Weld repaired pipe leak.

Building Closed Cooling Water Heat Exchanger B 1/15/81 Spent Fuel Pool Spent Fuel Pool Coolina Pump Rebuilt pump.

Cooling P-13A 1/18/81 Reactor Protection R.P.S. Ch. "D" Loop 2 cold leg Replaced I/I converter.

temp. TY 122CD 1/18/81 Reactor Protection R.P.S. Ch. "A" Loop 1 cold leg Replaced resistance temperature detector, temp. Tll2CA 1/20/81 Service Water 2-SW-8.lC Replaced valve.

. _ _