O OPau1iNG DATA RteoRT 50-336 DOCI'ET NO.
DATE JMI COMPLEl ED llY G.H. Ha'alett TP03T747-1791 X364 TEl.EPil0NE OPERATING STATUS f4illstone 2 Notes
- Items 21 & 22
- 1. Unit Name:
Cumulative are computed February 1981
- 2. Reporting Period:
using a weighted average.
2700
- 3. Licensed Thennal Power lMWt):
909
- 4. Nameplate Rating (Grow MWe):
870
- 5. Design Electrical!tating(Net MWe):
895
- 6. Maximum Dependable Capacity (Grow MWe): _
- 7. Masimum Dep.ndabic Capacity.INet MWe):
- 8. If Changts Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report,Ghe Reasons:
None IIOne
- 9. Power Level To Which Restricted.lf Any (Net MWe): -
- 10. Reasons For Restrictions,If Any:
None This Month Yr.-to-Date Cumulatise
/"'N
()
672 1.41 6 45,408
- 11. Hours in Reporting Period 672 996.5 32,245.8
- 12. Number Of liours Reactor Was Critica!
0 0
2,076.9
- 13. Reactor Resene Shutdown llours 658.3 962.2 30,731.2
- 14. Ilours Generator On-Line 0
0 468.2
- 15. Unit Restne Shutdown liours
- 16. Gross Thermal Energy Generated (MWH) 1.752 J 9 2.534.203 75,769,524 580 800 840,400 24,513,317
- 17. Gross Electrical Energy Generated (MWil) 560.182 806.745
__2_3.468.791
- 18. Net Electrical Energy Generated (MWil) 98.0 68.0 67.7
- 19. Unit Senice Factor 98.0 68.0 68.7
- 20. Unit Asailability Factor 62.5 96.5 65.9
- 21. Unit Capacity Factor (Using MDC Net) 95.8 65.5 61.3
- 22. Unit Capacity Factor IUsing DER Net)
~
2.0 32.0 23.0
- 23. Unit Forced Outage Itate
- 24. Shutdowns Scheduled Oser Next 6 Months IType.Date.and Duration of Eacht:
Inspection of Mechanical Snubbers 11av 1,1981,11 Days N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup.
- 26. Units in Test Status IPrior o Commercial Operationi:
Forecast Achiesed 1.
INITIA L CRITICA LITY N/A N/A INITI AL ELEC IRICITY
(~]
N/A N/A k/
COMMEltCI AL UI'Elt ATION 9
""""59 POOR BRE R ht
. - wm
A\\TR AGE D tlLY UN!1 POWER LE\\ EL
~
50-336 D oci.EI s o.
Millstone 2 usiy DA1E 3/3/81 COMPLEIED BY G.H. Howlett TELEPilONE (203)447-1791X3C4 MONT11 February.
DAY AVER AGE D 41LY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 865 862 j
37 866 862 2
IS 3
866 863
,9 4
865 862 2o 5
861 830 21 6
864 860 22
~
863 862 7
23 A
a 863 863 4
3 q) 863 863 9
25 io-863 863 26 863 863 i
.33 27 862 863 12
,g i
13 759 29 196 14 3g 15 855 33 16 862 i
INSTRUCTIONS -
On this formst.!!st the 3seuge daily ::r.it power 1.selin MWe Net for es:h day in the repert:n; m.mth. Compuie to '
ti e r.euest whole mepwatt.
s.,
(9i)7) b i
A-8 t
=
~
O NY C)
O DOCKET NO. 50 1
/
m UNITSHUTDOWNS AND POWER REDUCTIONS ril l istone 2 UNIT N AME DATE 3/4/NI COMPLETED l1Y G.H. lic dett i
REPORT MONTH February TELEPHONE 1203 M 47 17nl V 364 e.
E C
PB
?,J)
?
5 E
3y'j Licensee 5"o g"'g.
Cause & Corrective
~
Event gg 9
Acijon go
%'~
Date
$.E s ] cc
}V Prevent Recurrence yGj Report #
v> 0 o ";
cd c5 2
810213 F
13.7 H
1 81-8 CA SUPORT A design deficiency was discovered in the head vent hanger installation.
Power was manually reduced, Main Generator was taken.off line.
The reactor remained critical at 0%
pcwer.
Corrective actions were taken and subsequent normal power operations were resumed.
i TC C
r
- C i
O "A
("".3 "JEEd
SUMMARY
- The unit operatgd at or near 100% of rated thermal power throughout the reporting period except for the outage of the 13th.
F
fate:
Itar $ T0 7 al Completed Ly: G.l!. thz!G:ECTff Telephone:
203/447-19/1 0 54 REFUELIt!G IllFORIATIO*l REQUEST O
1.
Name of facility:
f4111 stone 2 2.
Scheduled date for next refueling shutdown:
Commenced refuel outage flovember 28, 1981.
3.
Schedule date for restart following refueling: January 16, 1982 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license cmendment?
It is not anticipated that Cycle 5 operations will require Technical Specification changes or other License amendments.
5.
Scheduled date(s) for submitting licensing action and supporting information:
Licensing documentation will be provided a minimum of 90 days prior to start-up of Cycle 5 or as documented in the R. A. Clark letter to W.G. Counsil, dated 10/6/80, authorizing Cycle 4 operation.
Important licensing ~ considerations associated with refueling, e.g., new or 6.
different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
In Core:
217 (b) 216 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned,-
in number of fuel assemblies:
667 9.
The projected date of the hst refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1985, Spent Fuel Pool, full core off load capability is reached.
1987, Core Full, Spent Fuel Pool contains 648 bundles, n.
Docket No. 50-336 Date 3/6/81 Page ~ ~'l f 2
,)
Unit Name liillstor -'
/
Completed By G.ll. liowin t Telephone (203)44/-l/91x364 -
CORRECTIVE MAINTENANCE
SUMMARY
FOR SAFETY RELATED EQUIPMENT Report Month January 1981 MAINTENANCE ACTION DATE SYSTEM COMPONENT 1/3/81 Emergency ~ Diesel Jacket Water Cooling Pump P-8CB Rebuilt pump motor.
Generator 1/6/81 Main Steam Snubber #413019 Replaced snubber (see LER 81-3) 1/6/81 Main Steam Main Steam Isolation Valve Weld repaired gasket surface, replaced gasket 2-MS-64 and machined valve bushing.
1/10/81 Feedwater
- 2 Steam Generator Emerg. Feed Rebuilt valve.
Control Valve 2-FW-43A 1/11/81 Reactor Coolant Pressurizer Safety Valve 2-RC-200 Replaced valve.
~
1/11/81 Enclosure Building Filters.t29A & B Changed out charcoal filters.
Filtration 1/12/81 Safety Injection Safety Injection, test header Rebuilt valve, reset valves set pressure and relief valve.
2-SI-466 tested.
(See LER 81-2) 1/13/81 Reactor Coolant Pressurizer Safety Valve 2-RC-201 Rebuilt valve.
1/15/81 Nitrogen Piping, Nitrogen Penetration to Ground out weld indication and rewelded.
Safety Injection Tank #1.
\\
- ~
Docket No. 50-336 Date 3/6/31 Page "sof 2
'_ ')
Unit l'ame :lillstor Completed 3y n H.
U n,-
_t Telephone
('/n3 )4 47-1791 X? 64 -
CORRECTIVE MAINTENANCE SUM'4ARY FOR SAFETY RELATED EQUIPMENT Report Month January 1981 DATE SYSTEM COMP 0NENT MAINTENA.,'CE ACTION 1/15/81 Service Water Piping, Service Water to Reactor Weld repaired pipe leak.
Building Closed Cooling Water Heat Exchanger B 1/15/81 Spent Fuel Pool Spent Fuel Pool Coolina Pump Rebuilt pump.
Cooling P-13A 1/18/81 Reactor Protection R.P.S. Ch. "D" Loop 2 cold leg Replaced I/I converter.
temp.
TY 122CD 1/18/81 Reactor Protection R.P.S. Ch. "A" Loop 1 cold leg Replaced resistance temperature detector, temp.
Tll2CA 1/20/81 Service Water 2-SW-8.lC Replaced valve.
.