{{#Wiki_filter:April 18, 2006Paul D. HinnenkampVice President - Operations
{{#Wiki_filter:April 18, 2006
Paul D. Hinnenkamp
Vice President - Operations
Entergy Operations, Inc.
Entergy Operations, Inc.
River Bend Station
River Bend Station
5485 US Highway 61N
5485 US Highway 61N
St. Francisville, LA
St. Francisville, LA 70775
70775SUBJECT:ACKNOWLEDGMENT OF RECEIPT OF DENIAL OF NONCITED VIOLATION IN NRC INSPECTION REPORT 05000458/2005005Dear Mr. Hinnenkamp:
SUBJECT:       ACKNOWLEDGMENT OF RECEIPT OF DENIAL OF NONCITED VIOLATION
Thank you for your letter dated March 24, 2006, in response to our February 13, 2006, letterand integrated inspection report. In your letter you contested one Green noncited violation
              IN NRC INSPECTION REPORT 05000458/2005005
concerning implementation of Technical Specification (TS) 3.4.1.A, Condition A, requiredAction A.1. The NRC inspection report concluded that a Green noncited violation of TSAction 3.4.1.A.1 occurred when River Bend Station failed to restore compliance with LimitingCondition for Operation (LCO) 3.4.1 or shut down one reactor recirculation loop within 2 hoursof determining the reactor recirculation loop flow mismatch was greater than 5 percent at powerwith greater than 70 percent rated core flow. Entergy's position is that River Bend Stationcomplied with the requirements of TS 3.4.1; therefore, a violation did not occur. You haverequested that the NRC reconsider our conclusion and find that a violation of TS 3.4.1 did notoccur.The NRC is reviewing your request and will inform you of the results of our review by separatecorrespondence.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter andyour response (if any) will be made available electronically for public inspection in the NRCPublic Document Room or from the Publicly Available Records (PARS) component of the
Dear Mr. Hinnenkamp:
NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at
Thank you for your letter dated March 24, 2006, in response to our February 13, 2006, letter
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely, /RA/Kriss M. Kennedy, ChiefProject Branch C
and integrated inspection report. In your letter you contested one Green noncited violation
Division of Reactor Projects  
concerning implementation of Technical Specification (TS) 3.4.1.A, Condition A, required
Entergy Operations, Inc.-2-Docket:   50-458License: NPF-47
Action A.1. The NRC inspection report concluded that a Green noncited violation of TS
cc:Senior Vice President and  
Action 3.4.1.A.1 occurred when River Bend Station failed to restore compliance with Limiting
  Chief Operating Officer
Condition for Operation (LCO) 3.4.1 or shut down one reactor recirculation loop within 2 hours
of determining the reactor recirculation loop flow mismatch was greater than 5 percent at power
with greater than 70 percent rated core flow. Entergys position is that River Bend Station
complied with the requirements of TS 3.4.1; therefore, a violation did not occur. You have
requested that the NRC reconsider our conclusion and find that a violation of TS 3.4.1 did not
occur.
The NRC is reviewing your request and will inform you of the results of our review by separate
correspondence.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and
your response (if any) will be made available electronically for public inspection in the NRC
Public Document Room or from the Publicly Available Records (PARS) component of the
NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                              Sincerely,
                                                      /RA/
                                              Kriss M. Kennedy, Chief
                                              Project Branch C
                                              Division of Reactor Projects
 
Entergy Operations, Inc.     -2-
Docket: 50-458
License: NPF-47
cc:
Senior Vice President and
Chief Operating Officer
Entergy Operations, Inc.
Entergy Operations, Inc.
P.O. Box 31995
P.O. Box 31995
Jackson, MS 39286-1995Vice President Operations Support
Jackson, MS 39286-1995
Vice President
Operations Support
Entergy Operations, Inc.
Entergy Operations, Inc.
P.O. Box 31995
P.O. Box 31995
Jackson, MS 39286-1995General ManagerPlant Operations
Jackson, MS 39286-1995
General Manager
Plant Operations
Entergy Operations, Inc.
Entergy Operations, Inc.
River Bend Station
River Bend Station
5485 US Highway 61N
5485 US Highway 61N
St. Francisville, LA
St. Francisville, LA 70775
70775Director - Nuclear SafetyEntergy Operations, Inc.
Director - Nuclear Safety
Entergy Operations, Inc.
River Bend Station
River Bend Station
5485 US Highway 61N
5485 US Highway 61N
St. Francisville, LA
St. Francisville, LA 70775
70775Wise, Carter, Child & Caraway
Wise, Carter, Child & Caraway
P.O. Box 651
P.O. Box 651
Jackson, MS 39205Winston & Strawn LLP1700 K Street, N.W.
Jackson, MS 39205
Washington, DC 20006-3817Manager - LicensingEntergy Operations, Inc.
Winston & Strawn LLP
1700 K Street, N.W.
Washington, DC 20006-3817
Manager - Licensing
Entergy Operations, Inc.
River Bend Station
River Bend Station
5485 US Highway 61N
5485 US Highway 61N
St. Francisville, LA
St. Francisville, LA 70775
70775
 
Entergy Operations, Inc.-3-The Honorable Charles C. Foti, Jr.Attorney General
Entergy Operations, Inc.               -3-
The Honorable Charles C. Foti, Jr.
Attorney General
Department of Justice
Department of Justice
State of Louisiana
State of Louisiana
P.O. Box 94005
P.O. Box 94005
Baton Rouge, LA 70804-9005H. Anne Plettinger
Baton Rouge, LA 70804-9005
3456 Villa Rose DriveBaton Rouge, LA 70806Bert Babers, PresidentWest Feliciana Parish Police Jury
H. Anne Plettinger
3456 Villa Rose Drive
Baton Rouge, LA 70806
Bert Babers, President
West Feliciana Parish Police Jury
P.O. Box 1921
P.O. Box 1921
St. Francisville, LA
St. Francisville, LA 70775
70775Michael E. Henry, State Liaison OfficerDepartment of Environmental Quality
Michael E. Henry, State Liaison Officer
Department of Environmental Quality
Permits Division
Permits Division
P.O. Box 4313
P.O. Box 4313
Baton Rouge, LA 70821-4313Brian AlmonPublic Utility Commission
Baton Rouge, LA 70821-4313
Brian Almon
Public Utility Commission
William B. Travis Building
William B. Travis Building
P.O. Box 13326
P.O. Box 13326
1701 North Congress Avenue
1701 North Congress Avenue
Austin, TX 78711-3326  
Austin, TX 78711-3326
Entergy Operations, Inc.-4-Electronic distribution by RIV:Regional Administrator (BSM1)DRP Director (ATH)DRS Director (DDC)DRS Deputy Director (RJC1)Senior Resident Inspector (PJA)Branch Chief, DRP/C (KMK)Senior Project Engineer, DRP/C (WCW)Team Leader, DRP/TSS (RLN1)RITS Coordinator (KEG)M. Vasquez, ACES (GMV)OEMAILSUNSI Review Completed: __kmk_     ADAMS:   Yes G No           Initials: __kmk_   Publicly Available       
 
G   Non-Publicly Available    
Entergy Operations, Inc.                     -4-
G   Sensitive   Non-SensitiveR:\_REACTORS\_RBS\2005\RB2005-05AK.wpdDAISY 33-06RIV:SPE:DRP/CC:DRP/CWCWalker;dfKMKennedy       /RA/     /RA/4/18/064/18/06OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax
Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJC1)
Senior Resident Inspector (PJA)
Branch Chief, DRP/C (KMK)
Senior Project Engineer, DRP/C (WCW)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
M. Vasquez, ACES (GMV)
OEMAIL
SUNSI Review Completed: __kmk_         ADAMS: : Yes G No       Initials: __kmk_
: Publicly Available      G Non-Publicly Available G Sensitive : Non-Sensitive
R:\_REACTORS\_RBS\2005\RB2005-05AK.wpd                                    DAISY 33-06
RIV:SPE:DRP/C          C:DRP/C
WCWalker;df            KMKennedy
       /RA/                 /RA/
4/18/06                4/18/06
OFFICIAL RECORD COPY                               T=Telephone   E=E-mail     F=Fax
}}
}}

Latest revision as of 20:40, 23 November 2019

Acknowledgment of Receipt of Denial of Noncited Violation in NRC Inspection Report 05000458/2005005
ML061080588
Person / Time
Site: River Bend Entergy icon.png
Issue date: 04/18/2006
From: Kennedy K
NRC/RGN-IV/DRP/RPB-C
To: Hinnenkamp P
Entergy Operations
References
IR-05-005
Download: ML061080588 (5)


See also: IR 05000458/2005005

Text

April 18, 2006

Paul D. Hinnenkamp

Vice President - Operations

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT: ACKNOWLEDGMENT OF RECEIPT OF DENIAL OF NONCITED VIOLATION

IN NRC INSPECTION REPORT 05000458/2005005

Dear Mr. Hinnenkamp:

Thank you for your letter dated March 24, 2006, in response to our February 13, 2006, letter

and integrated inspection report. In your letter you contested one Green noncited violation

concerning implementation of Technical Specification (TS) 3.4.1.A, Condition A, required

Action A.1. The NRC inspection report concluded that a Green noncited violation of TS

Action 3.4.1.A.1 occurred when River Bend Station failed to restore compliance with Limiting

Condition for Operation (LCO) 3.4.1 or shut down one reactor recirculation loop within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

of determining the reactor recirculation loop flow mismatch was greater than 5 percent at power

with greater than 70 percent rated core flow. Entergys position is that River Bend Station

complied with the requirements of TS 3.4.1; therefore, a violation did not occur. You have

requested that the NRC reconsider our conclusion and find that a violation of TS 3.4.1 did not

occur.

The NRC is reviewing your request and will inform you of the results of our review by separate

correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and

your response (if any) will be made available electronically for public inspection in the NRC

Public Document Room or from the Publicly Available Records (PARS) component of the

NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Kriss M. Kennedy, Chief

Project Branch C

Division of Reactor Projects

Entergy Operations, Inc. -2-

Docket: 50-458

License: NPF-47

cc:

Senior Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

General Manager

Plant Operations

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

Director - Nuclear Safety

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, MS 39205

Winston & Strawn LLP

1700 K Street, N.W.

Washington, DC 20006-3817

Manager - Licensing

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

Entergy Operations, Inc. -3-

The Honorable Charles C. Foti, Jr.

Attorney General

Department of Justice

State of Louisiana

P.O. Box 94005

Baton Rouge, LA 70804-9005

H. Anne Plettinger

3456 Villa Rose Drive

Baton Rouge, LA 70806

Bert Babers, President

West Feliciana Parish Police Jury

P.O. Box 1921

St. Francisville, LA 70775

Michael E. Henry, State Liaison Officer

Department of Environmental Quality

Permits Division

P.O. Box 4313

Baton Rouge, LA 70821-4313

Brian Almon

Public Utility Commission

William B. Travis Building

P.O. Box 13326

1701 North Congress Avenue

Austin, TX 78711-3326

Entergy Operations, Inc. -4-

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (PJA)

Branch Chief, DRP/C (KMK)

Senior Project Engineer, DRP/C (WCW)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (KEG)

M. Vasquez, ACES (GMV)

OEMAIL

SUNSI Review Completed: __kmk_ ADAMS: : Yes G No Initials: __kmk_

Publicly Available G Non-Publicly Available G Sensitive  : Non-Sensitive

R:\_REACTORS\_RBS\2005\RB2005-05AK.wpd DAISY 33-06

RIV:SPE:DRP/C C:DRP/C

WCWalker;df KMKennedy

/RA/ /RA/

4/18/06 4/18/06

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax