ML071230748: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:LIST OF REFERENCE HANDOUTS PROVIDED TO CANDIDATES FOR THE MONTICELLO INITIAL EXAMINATION FEBRUARY 2007 MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED Technical Specification 3.1.7 Bases Alarm Response Procedure C.6-005-B-15 Electrical Prints:
{{#Wiki_filter:LIST OF REFERENCE HANDOUTS PROVIDED TO CANDIDATES FOR THE MONTICELLO INITIAL EXAMINATION FEBRUARY 2007
NX-7834-67-9 NX-7834-67-10 NX-7834-67-11 NX-7834-67-13 Attached Pictures of IRM Channel #11 Related Question # 5 Revision 0 Revision 3 Revision G Revision H NIA NIA NIA 7, 8 9 Technical Specification 3.5.1 Bases Technical Specification 3.5.2 Bases Technical Specification 3.5.3 Bases Attached Picture of SBGT Controller FIC 2943 11 Revision 2 Revision 0 Revision 0 NIA 13 451 2-CM, Trouble Shooting For 250 VDC Battery System Grounds - Battery No. 13 18 Revision 9 22 REFERENCE HANDOUTS PROVIDED REVISION NUMBER Technical Specification 3.1.7 Amendment 146 Attached Picture of APRM Channel 4 1 NIA Technical Specification 3.5.1 Technical Specification 3.5.2 Technical Specification 3.5.2 Amendment 146 Page 1 of 3 MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED All of the EOP Flow Charts (with the Entry Conditions blanked out) I 26 Various Attached Picture of RBCCW Pump Switches I N/A Revision 16 N/A A.2-101, Classification of Emergencies I Revision 37 Drywell Spray Limit curve [ Figure N from C.5-1200, PRIMARY CONTAINMENT CONTROL1 31 39 44 50 Attached Picture of Reactor Recirculation System Control Board Meters Ops Man C.4-B.05.01.02.A, Figure 1, Monticello Nuclear Generating Plant Power-Flow Operating Map Ops Man C.4-C, Figure 2, Reactor Depressurization Rate Revision 12 ~~ Revision 29 Ops Man C.5.1-1000, Figure 21, Heat Capacity Temperature Limit Revision 19 Attached Picture of No. 1 Main Transformer Deluge System N/A I 59 Ops Man C.4-6.06.03.A, Figure 1, Turbine Exhaust Pressure Limits Revision 10 I 68 Revision 1 Ops Man B.9.2-06, Figure 2, Reactive Capability vs. Megawatt Load - Turbine Generator 1 N/A Steam Tables N/A NOTE: The following reference handouts are for the SRO-only examination.
 
I- Various r Revision 1 Emergency Action Level Matrix 83 4 Awl 04.01.05, Reactivity Management Program FP-OP-RM-01 Revision 8 FP-OP-RM-01, Reactivity Management Program I Revision 0 Page 2 of 3 MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED 88 89 93 Technical Specification 3.0 Technical Specification 3.4.7 Technical Specification 3.7.2 Technical Specification 3.0 Bases Technical Specification 3.4.7 Bases Technical Specification 3.7.2 Bases Technical Specification 3.4.3 Technical Specification 3.4.3 Bases 4 AWI-04.08.02, 1 OCFR50.72 and 1 OCFR73.71 Immediate Notification NUREG-1022, Event Reporting Guidelines 10 CFR 50.72 and 50.73 0289-A, Service Water Effluent Monitor Functional Test FP-G-DOC-04, Procedure Processing QF-0013, Temporary Change Request 4 AW 1-02.02.02, Procedure Reviews and Approval  
MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED Related          REFERENCE HANDOUTS PROVIDED                  REVISION Question                                                        NUMBER
~ Amendment 146 Revision 0 ~ Amendment 146 Revision 0 Revision 14 Revision 2 Revision 14 Revision 3 Revision 4 Revision 23 Page 3 of 3}}
  #
5    Technical Specification 3.1.7                          Amendment 146 Technical Specification 3.1.7 Bases                     Revision 0 Alarm Response Procedure C.6-005-B-15                   Revision 3 7, 8  Electrical Prints:
NX-7834-67-9                                           Revision G NX-7834-67-10                                           Revision H NX-7834-67-11                                             NIA NX-7834-67-13                                             NIA 9    Attached Pictures of IRM Channel #11                       NIA 11    Attached Picture of APRM Channel 4                  1    NIA 13    Technical Specification 3.5.1                          Amendment Technical Specification 3.5.2                              146 Technical Specification 3.5.2 Technical Specification 3.5.1 Bases                     Revision 2 Technical Specification 3.5.2 Bases                     Revision 0 Technical Specification 3.5.3 Bases                     Revision 0 18    Attached Picture of SBGT Controller FIC 2943             NIA 22    4512-CM, Trouble Shooting For 250 VDC Battery System   Revision 9 Grounds - Battery No. 13 Page 1 of 3
 
MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED I
I 26 Attached Picture of RBCCW Pump Switches                               N/A 31    Drywell Spray Limit curve [ Figure N from C.5-1200,               Revision 16 PRIMARY CONTAINMENT CONTROL1 39   Attached Picture of Reactor Recirculation System Control             N/A Board Meters Ops Man C.4-B.05.01.02.A, Figure 1, Monticello Nuclear             Revision 12 Generating Plant Power-Flow Operating Map                       ~~
44    Ops Man C.4-C, Figure 2, Reactor Depressurization Rate             Revision 29 50    Ops Man C.5.1-1000, Figure 21, Heat Capacity Temperature           Revision 19 Limit Attached Picture of No. 1 Main Transformer Deluge System             N/A I   59 Ops Man C.4-6.06.03.A, Figure 1, Turbine Exhaust Pressure Limits Revision 10 I   68 Ops Man B.9.2-06, Figure 2, Reactive Capability vs. Megawatt Load - Turbine Generator Revision 1 N/A   Steam Tables                                                         N/A I-r NOTE: The following reference handouts are for the SRO-only examination.
Various All of the EOP Flow Charts (with the Entry Conditions blanked      Various out)
Emergency Action Level Matrix                                     Revision 1 A.2-101, Classification of Emergencies                            Revision 37 I
83   4 A w l 04.01.05, Reactivity Management Program                   Revision 8 FP-OP-RM-01 FP-OP-RM-01, Reactivity Management Program                   I   Revision 0 Page 2 of 3
 
MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED                         ~
88   Technical Specification 3.0                                 Amendment Technical Specification 3.4.7                                 146 Technical Specification 3.7.2 Technical Specification 3.0 Bases                           Revision 0 Technical Specification 3.4.7 Bases Technical Specification 3.7.2 Bases                       ~
89  Technical Specification 3.4.3                               Amendment 146 Technical Specification 3.4.3 Bases                         Revision 0 4 AWI-04.08.02, 10CFR50.72 and 10CFR73.71 Immediate         Revision 14 Notification NUREG-1022, Event Reporting Guidelines 10 CFR 50.72 and     Revision 2 50.73 93  0289-A, Service Water Effluent Monitor Functional Test     Revision 14 FP-G-DOC-04, Procedure Processing                           Revision 3 QF-0013, Temporary Change Request                           Revision 4 4 AW 1-02.02.02, Procedure Reviews and Approval             Revision 23 Page 3 of 3}}

Revision as of 07:40, 23 November 2019

List of Reference Handouts Provided to Candidates for the Monticello Initial Examination - February 2007
ML071230748
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/03/2007
From: Valos N
NRC/RGN-III/DRS/OLB
To:
Shared Package
ML070660508 List:
References
50-263/07-301
Download: ML071230748 (4)


Text

LIST OF REFERENCE HANDOUTS PROVIDED TO CANDIDATES FOR THE MONTICELLO INITIAL EXAMINATION FEBRUARY 2007

MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED Related REFERENCE HANDOUTS PROVIDED REVISION Question NUMBER

5 Technical Specification 3.1.7 Amendment 146 Technical Specification 3.1.7 Bases Revision 0 Alarm Response Procedure C.6-005-B-15 Revision 3 7, 8 Electrical Prints:

NX-7834-67-9 Revision G NX-7834-67-10 Revision H NX-7834-67-11 NIA NX-7834-67-13 NIA 9 Attached Pictures of IRM Channel #11 NIA 11 Attached Picture of APRM Channel 4 1 NIA 13 Technical Specification 3.5.1 Amendment Technical Specification 3.5.2 146 Technical Specification 3.5.2 Technical Specification 3.5.1 Bases Revision 2 Technical Specification 3.5.2 Bases Revision 0 Technical Specification 3.5.3 Bases Revision 0 18 Attached Picture of SBGT Controller FIC 2943 NIA 22 4512-CM, Trouble Shooting For 250 VDC Battery System Revision 9 Grounds - Battery No. 13 Page 1 of 3

MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED I

I 26 Attached Picture of RBCCW Pump Switches N/A 31 Drywell Spray Limit curve [ Figure N from C.5-1200, Revision 16 PRIMARY CONTAINMENT CONTROL1 39 Attached Picture of Reactor Recirculation System Control N/A Board Meters Ops Man C.4-B.05.01.02.A, Figure 1, Monticello Nuclear Revision 12 Generating Plant Power-Flow Operating Map ~~

44 Ops Man C.4-C, Figure 2, Reactor Depressurization Rate Revision 29 50 Ops Man C.5.1-1000, Figure 21, Heat Capacity Temperature Revision 19 Limit Attached Picture of No. 1 Main Transformer Deluge System N/A I 59 Ops Man C.4-6.06.03.A, Figure 1, Turbine Exhaust Pressure Limits Revision 10 I 68 Ops Man B.9.2-06, Figure 2, Reactive Capability vs. Megawatt Load - Turbine Generator Revision 1 1 N/A Steam Tables N/A I-r NOTE: The following reference handouts are for the SRO-only examination.

Various All of the EOP Flow Charts (with the Entry Conditions blanked Various out)

Emergency Action Level Matrix Revision 1 A.2-101, Classification of Emergencies Revision 37 I

83 4 A w l 04.01.05, Reactivity Management Program Revision 8 FP-OP-RM-01 FP-OP-RM-01, Reactivity Management Program I Revision 0 Page 2 of 3

MONTICELLO 2007 WRITTEN EXAMINATION LIST OF REFERENCE HANDOUTS PROVIDED ~

88 Technical Specification 3.0 Amendment Technical Specification 3.4.7 146 Technical Specification 3.7.2 Technical Specification 3.0 Bases Revision 0 Technical Specification 3.4.7 Bases Technical Specification 3.7.2 Bases ~

89 Technical Specification 3.4.3 Amendment 146 Technical Specification 3.4.3 Bases Revision 0 4 AWI-04.08.02, 10CFR50.72 and 10CFR73.71 Immediate Revision 14 Notification NUREG-1022, Event Reporting Guidelines 10 CFR 50.72 and Revision 2 50.73 93 0289-A, Service Water Effluent Monitor Functional Test Revision 14 FP-G-DOC-04, Procedure Processing Revision 3 QF-0013, Temporary Change Request Revision 4 4 AW 1-02.02.02, Procedure Reviews and Approval Revision 23 Page 3 of 3