|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:'L)t CROSSE BOILING WATER REACTOR (LACBWR)DAIRYLAND POWER C OO P E RAT IV E December 2, 2009 In reply, please refer to LAC-14089 DOCKET NO. 50-409 Document Control Desk US Nuclear Regulatory Commission, Washington, DC 20555-0001 | | {{#Wiki_filter:'L)t CROSSE BOILING WATER REACTOR (LACBWR) |
| | DAIRYLAND POWER C OO P E RAT IV E December 2, 2009 In reply, please refer to LAC-14089 DOCKET NO. 50-409 Document Control Desk US Nuclear Regulatory Commission, Washington, DC 20555-0001 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Dairyland Power Cooperative (DPC)La Crosse Boiling Water Reactor (LACBWR)Possession-Only License No. DPR-45 Interim Compensatory Measure Clarification | | Dairyland Power Cooperative (DPC) |
| | La Crosse Boiling Water Reactor (LACBWR) |
| | Possession-Only License No. DPR-45 Interim Compensatory Measure Clarification |
|
| |
|
| ==REFERENCE:== | | ==REFERENCE:== |
| | | (1) Letter of May 23, 2002, NRC to DPC, and attached Order EA 077 for Interim Safeguards and Security Compensatory Measures for LACBWR (2) Letter of June 10, 2002, DPC to NRC, and attached Response to Order EA-02-077 and Interim Compensatory Measures (ICM) |
| (1) Letter of May 23, 2002, NRC to DPC, and attached Order EA-02-077 for Interim Safeguards and Security Compensatory Measures for LACBWR (2) Letter of June 10, 2002, DPC to NRC, and attached Response to Order EA-02-077 and Interim Compensatory Measures (ICM)The purpose of this transmittal is to provide clarification to Dairyland Power Cooperative's ICM commitment made on June 10, 2002. Attachment 1 (Safeguards Information) contains a synopsis of the clarification. | | The purpose of this transmittal is to provide clarification to Dairyland Power Cooperative's ICM commitment made on June 10, 2002. Attachment 1 (Safeguards Information) contains a synopsis of the clarification. The corrective action report and supporting documentation for the clarification is in Attachment 2 (Safeguards Information). Attachments 1 & 2 will only be provided to listed individuals. |
| The corrective action report and supporting documentation for the clarification is in Attachment 2 (Safeguards Information). | | If you have any questions, please call Michael Brasel of my staff at (608) 689-4220. |
| Attachments 1 & 2 will only be provided to listed individuals. | | Sincerely, DAIRYLAND POWER COOPERATIVE Chuck Sans Crainte, Vice President, Generation p i-x:Yz~~I A Touchstone Energy Cooperative ___ |
| If you have any questions, please call Michael Brasel of my staff at (608) 689-4220.Sincerely, DAIRYLAND POWER COOPERATIVE Chuck Sans Crainte, Vice President, Generation p i-x:Yz~~I A Touchstone Energy Cooperative | | S4601 State Highway 35 ° Genoa, WI 54632-8846 |
| ___S4601 State Highway 35 ° Genoa, WI 54632-8846
| |
| * 608-689-2331 | | * 608-689-2331 |
| * 608-689-4200 fax | | * 608-689-4200 fax |
| * www.dairynet.com CVS: MAB: two Attachment 1: Dairyland Power Cooperative's ICM Commitment Clarification (SAFEGUARDS INFORMATION) | | * www.dairynet.com |
| Attachment 2: LACBWR Corrective Action Report 2009-70 with References (SAFEGUARDS INFORMATION) cc w/att: Kristina Banovac Project Manager U. S. Nuclear Regulatory Commission Mail Stop T-8-F5 Washington, DC 20555 Gene Bonano ISFSI Security Specialist Region III -Division of Nuclear Material Safety 2443 Warrenville Rd.Lisle, IL 60532 Douglas Garner Security Specialist Office of Nuclear Security and Incident Response Mail Stop: T4 F25M Washington, DC 20555 cc w/o att: Paul Schmidt Manager, Radiation Protection Section State of Wisconsin PO Box 2659 Madison, WI 53701-26459}}
| | |
| | CVS: MAB: two : Dairyland Power Cooperative's ICM Commitment Clarification (SAFEGUARDS INFORMATION) : LACBWR Corrective Action Report 2009-70 with References (SAFEGUARDS INFORMATION) cc w/att: Kristina Banovac Project Manager U. S. Nuclear Regulatory Commission Mail Stop T-8-F5 Washington, DC 20555 Gene Bonano ISFSI Security Specialist Region III - Division of Nuclear Material Safety 2443 Warrenville Rd. |
| | Lisle, IL 60532 Douglas Garner Security Specialist Office of Nuclear Security and Incident Response Mail Stop: T4 F25M Washington, DC 20555 cc w/o att: Paul Schmidt Manager, Radiation Protection Section State of Wisconsin PO Box 2659 Madison, WI 53701-26459}} |
|
---|
Category:Letter
MONTHYEARML24249A3202024-09-0404 September 2024 Quality Assurance Program Application to Transportation Activities Pursuant to 10 CFR 71.101(f) IR 07200046/20244012024-07-23023 July 2024 Independent Spent Fuel Storage Installation – NRC Security Inspection Report 07200046/2024401 IR 05000409/20240012024-07-17017 July 2024 NRC Inspection Report 05000409/2024001(DRSS); 07200046/2024001(DRSS) ML24193A1152024-07-0909 July 2024 Intent to Implement NAC-MPC CoC No. 1025, Amendment No. 7, Revision 1 ML24136A2432024-05-24024 May 2024 Independent Spent Fuel Storage Installation - Exemption from Select Requirements of Title 10 of the Code of Federal Regulations Part 73 ML24121A0732024-04-16016 April 2024 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML24058A1222024-02-27027 February 2024 Independent Spent Fuel Storage Installation (ISFSI) Annual Radiological Environmental Operating Report, and Changes to the Off-Site Dose Calculation Manual for 2023 ML24045A1612024-01-25025 January 2024 LACBWR ISFSI Submittal 10 CFR 50.59 and 10 CFR 72.48 Report of Changes, Tests, and Experiments ML24045A1592024-01-25025 January 2024 LACBWR ISFSI Submittal of Decommissioning Plan and Post Shutdown Decommissioning Activities Report ML24031A6432023-12-20020 December 2023 Independent Spent Fuel Storage Installation (ISFSI) - Nuclear Liability Insurance Coverage ML23341A0222023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23192A1082023-06-14014 June 2023 Possession-Only License DPR-45 - New Chief Nuclear Officer Selected ML23192A0612023-06-14014 June 2023 Possession-Only License DPR-45 - Formal Announcement of New ISFSI Manager ML23137A1552023-05-0202 May 2023 Possession-Only License DPR-45 - Financial Statement and Auditors' Report ML23130A1202023-05-0202 May 2023 Transmittal of Financial Statement and Auditors' Report ML23115A1712023-04-0404 April 2023 ISFSI - Nuclear Liability Insurance Coverage ML23115A1742023-04-0303 April 2023 Independent Spent Fuel Storage Installation, Adoption of Amendment 7 of NAC MPC Certificate of Compliance No. 72-1025 and Canister Registration ML23074A0552023-03-13013 March 2023 Decommissioning Funding Status Report for Shutdown Reactor ML23076A0402023-03-0606 March 2023 Notification of License Transfer Date from Lacrossesolutions, LLC to Dairyland Power Cooperative ML23060A0732023-02-27027 February 2023 Annual Radiological Environmental Operating Report ML23055A0282023-02-24024 February 2023 Completion of License Termination Activities and Release of Remaining Class 1 Survey Units from Possession Only License No. DPR-45 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23033A0682023-01-26026 January 2023 Proof of Financial Protection ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000409/20220012022-12-27027 December 2022 NRC Inspection Report No. 05000409/2022001(DRSS) ML22321A3132022-12-0808 December 2022 LACBWR License Transfer Order Fifth Extension Letter ML22335A0852022-11-23023 November 2022 Request for Extension of Order Approving Transfer of the License for the La Crosse Boiling Water Reactor from Lacrossesolutions, LLC, to Dairyland Power Cooperative ML22297A0042022-10-20020 October 2022 Response to October 14, 2022 Request for Additional Information for Class 1 Excavation and Basement Survey Units ML22285A0782022-10-13013 October 2022 NRC Analysis of Energy Solutions' Decommissioning Funding Status Report Docket No. 50-409 ML22278A0282022-10-12012 October 2022 Request for Confirmatory Information Letter Re to the Review of the Class 1 Survey Units ML22269A3902022-09-0707 September 2022 Response to July 5, 2022 Request for Additional Information for Class 1 Excavation and Basement Survey Units ML22230A8012022-08-16016 August 2022 Request for Extension of Order Approving Transfer of the License for the La Crosse Boiling Water Reactor from Lacrossesolutions, LLC, to Dairyland Power Cooperative ML22223A0712022-07-28028 July 2022 Response to June 5, 2022 Request for Additional Information for Class 1 Survey Areas ML22224A1172022-07-14014 July 2022 Possession-Only License DPR-45 Chief Nuclear Officer Selected ML22224A1372022-07-12012 July 2022 Quality Assurance Program Description (Oapd), Revision 31 ML22203A0932022-07-11011 July 2022 Changes to the La Crosse Boiling Water Reactor (LACBWR) ISFSI Physical Security Plan IR 07200046/20224012022-06-0101 June 2022 (Decommissioning) - Independent Spent Fuel Storage Installation Security Inspection Report 07200046/2022401 ML22146A2002022-05-24024 May 2022 Submittal of Quality Assurance Program Changes ML22122A2302022-05-24024 May 2022 Approval to Release Class 2 and Class 3 Survey Units from the Part 50 License ML22123A0822022-04-25025 April 2022 Possession-Only License DPR-45 - Financial Statement and Auditors' Report ML22068A2102022-04-20020 April 2022 Issuance of Amendment No. 77 Approving Independent Spent Fuel Storage Installation Emergency Plan, Revision 40 ML22108A0562022-03-28028 March 2022 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation ML22084A0092022-03-22022 March 2022 Annual Property Insurance Status Report ML22077A0132022-03-15015 March 2022 Report on Status of Decommissioning Funding for Shutdown Reactor ML22069A1282022-03-0808 March 2022 Lacrossesolutions, LLC, La Crosse Boiling Water Reactor (LACBWR) Annual Radiological Environmental Operating Report, Supplemental Letter ML22062B0362022-02-28028 February 2022 Annual Radiological Environmental Operating Report ML22031A1162022-01-26026 January 2022 CFR 50.59 I 10 CFR 72.48 Report of Changes, Tests, and Experiments ML22033A1472022-01-26026 January 2022 Submittal of Decommissioning Plan and Post-Shutdown Decommissioning Activities Report, and License Termination Plan Changes IR 05000409/20210012022-01-0707 January 2022 NRC Inspection Report No. 05000409/2021-001 La Crosse Boiling Water Reactor ML22010A0862022-01-0505 January 2022 Proof of Financial Protection 2024-09-04
[Table view] |
Text
'L)t CROSSE BOILING WATER REACTOR (LACBWR)
DAIRYLAND POWER C OO P E RAT IV E December 2, 2009 In reply, please refer to LAC-14089 DOCKET NO. 50-409 Document Control Desk US Nuclear Regulatory Commission, Washington, DC 20555-0001
SUBJECT:
Dairyland Power Cooperative (DPC)
La Crosse Boiling Water Reactor (LACBWR)
Possession-Only License No. DPR-45 Interim Compensatory Measure Clarification
REFERENCE:
(1) Letter of May 23, 2002, NRC to DPC, and attached Order EA 077 for Interim Safeguards and Security Compensatory Measures for LACBWR (2) Letter of June 10, 2002, DPC to NRC, and attached Response to Order EA-02-077 and Interim Compensatory Measures (ICM)
The purpose of this transmittal is to provide clarification to Dairyland Power Cooperative's ICM commitment made on June 10, 2002. Attachment 1 (Safeguards Information) contains a synopsis of the clarification. The corrective action report and supporting documentation for the clarification is in Attachment 2 (Safeguards Information). Attachments 1 & 2 will only be provided to listed individuals.
If you have any questions, please call Michael Brasel of my staff at (608) 689-4220.
Sincerely, DAIRYLAND POWER COOPERATIVE Chuck Sans Crainte, Vice President, Generation p i-x:Yz~~I A Touchstone Energy Cooperative ___
S4601 State Highway 35 ° Genoa, WI 54632-8846
CVS: MAB: two : Dairyland Power Cooperative's ICM Commitment Clarification (SAFEGUARDS INFORMATION) : LACBWR Corrective Action Report 2009-70 with References (SAFEGUARDS INFORMATION) cc w/att: Kristina Banovac Project Manager U. S. Nuclear Regulatory Commission Mail Stop T-8-F5 Washington, DC 20555 Gene Bonano ISFSI Security Specialist Region III - Division of Nuclear Material Safety 2443 Warrenville Rd.
Lisle, IL 60532 Douglas Garner Security Specialist Office of Nuclear Security and Incident Response Mail Stop: T4 F25M Washington, DC 20555 cc w/o att: Paul Schmidt Manager, Radiation Protection Section State of Wisconsin PO Box 2659 Madison, WI 53701-26459