ML093480201: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:'L)t CROSSE BOILING WATER REACTOR (LACBWR)DAIRYLAND POWER C OO P E RAT IV E December 2, 2009 In reply, please refer to LAC-14089 DOCKET NO. 50-409 Document Control Desk US Nuclear Regulatory Commission, Washington, DC 20555-0001
{{#Wiki_filter:'L)t CROSSE BOILING WATER REACTOR (LACBWR)
DAIRYLAND POWER C OO P E RAT IV           E December 2, 2009 In reply, please refer to LAC-14089 DOCKET NO. 50-409 Document Control Desk US Nuclear Regulatory Commission, Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Dairyland Power Cooperative (DPC)La Crosse Boiling Water Reactor (LACBWR)Possession-Only License No. DPR-45 Interim Compensatory Measure Clarification
Dairyland Power Cooperative (DPC)
La Crosse Boiling Water Reactor (LACBWR)
Possession-Only License No. DPR-45 Interim Compensatory Measure Clarification


==REFERENCE:==
==REFERENCE:==
 
(1)   Letter of May 23, 2002, NRC to DPC, and attached Order EA                                         077 for Interim Safeguards and Security Compensatory Measures for LACBWR (2)   Letter of June 10, 2002, DPC to NRC, and attached Response to Order EA-02-077 and Interim Compensatory Measures (ICM)
(1) Letter of May 23, 2002, NRC to DPC, and attached Order EA-02-077 for Interim Safeguards and Security Compensatory Measures for LACBWR (2) Letter of June 10, 2002, DPC to NRC, and attached Response to Order EA-02-077 and Interim Compensatory Measures (ICM)The purpose of this transmittal is to provide clarification to Dairyland Power Cooperative's ICM commitment made on June 10, 2002. Attachment 1 (Safeguards Information) contains a synopsis of the clarification.
The purpose of this transmittal is to provide clarification to Dairyland Power Cooperative's ICM commitment made on June 10, 2002. Attachment 1 (Safeguards Information) contains a synopsis of the clarification. The corrective action report and supporting documentation for the clarification is in Attachment 2 (Safeguards Information). Attachments 1 & 2 will only be provided to listed individuals.
The corrective action report and supporting documentation for the clarification is in Attachment 2 (Safeguards Information).
If you have any questions, please call Michael Brasel of my staff at (608) 689-4220.
Attachments 1 & 2 will only be provided to listed individuals.
Sincerely, DAIRYLAND POWER COOPERATIVE Chuck Sans Crainte, Vice President, Generation p i-x:Yz~~I A Touchstone Energy Cooperative ___
If you have any questions, please call Michael Brasel of my staff at (608) 689-4220.Sincerely, DAIRYLAND POWER COOPERATIVE Chuck Sans Crainte, Vice President, Generation p i-x:Yz~~I A Touchstone Energy Cooperative
S4601 State Highway 35 ° Genoa, WI 54632-8846
___S4601 State Highway 35 ° Genoa, WI 54632-8846
* 608-689-2331
* 608-689-2331
* 608-689-4200 fax
* 608-689-4200 fax
* www.dairynet.com CVS: MAB: two Attachment 1: Dairyland Power Cooperative's ICM Commitment Clarification (SAFEGUARDS INFORMATION)
* www.dairynet.com
Attachment 2: LACBWR Corrective Action Report 2009-70 with References (SAFEGUARDS INFORMATION) cc w/att: Kristina Banovac Project Manager U. S. Nuclear Regulatory Commission Mail Stop T-8-F5 Washington, DC 20555 Gene Bonano ISFSI Security Specialist Region III -Division of Nuclear Material Safety 2443 Warrenville Rd.Lisle, IL 60532 Douglas Garner Security Specialist Office of Nuclear Security and Incident Response Mail Stop: T4 F25M Washington, DC 20555 cc w/o att: Paul Schmidt Manager, Radiation Protection Section State of Wisconsin PO Box 2659 Madison, WI 53701-26459}}
 
CVS: MAB: two : Dairyland Power Cooperative's ICM Commitment Clarification (SAFEGUARDS INFORMATION) : LACBWR Corrective Action Report 2009-70 with References (SAFEGUARDS INFORMATION) cc w/att:     Kristina Banovac Project Manager U. S. Nuclear Regulatory Commission Mail Stop T-8-F5 Washington, DC 20555 Gene Bonano ISFSI Security Specialist Region III - Division of Nuclear Material Safety 2443 Warrenville Rd.
Lisle, IL 60532 Douglas Garner Security Specialist Office of Nuclear Security and Incident Response Mail Stop: T4 F25M Washington, DC 20555 cc w/o att:   Paul Schmidt Manager, Radiation Protection Section State of Wisconsin PO Box 2659 Madison, WI 53701-26459}}

Latest revision as of 00:32, 14 November 2019

Dairyland Power Cooperative - Interim Compensatory Measure Clarification
ML093480201
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/02/2009
From: Crainte C
Dairyland Power Cooperative
To:
Document Control Desk, NRC/FSME
References
LAC-14089
Download: ML093480201 (2)


Text

'L)t CROSSE BOILING WATER REACTOR (LACBWR)

DAIRYLAND POWER C OO P E RAT IV E December 2, 2009 In reply, please refer to LAC-14089 DOCKET NO. 50-409 Document Control Desk US Nuclear Regulatory Commission, Washington, DC 20555-0001

SUBJECT:

Dairyland Power Cooperative (DPC)

La Crosse Boiling Water Reactor (LACBWR)

Possession-Only License No. DPR-45 Interim Compensatory Measure Clarification

REFERENCE:

(1) Letter of May 23, 2002, NRC to DPC, and attached Order EA 077 for Interim Safeguards and Security Compensatory Measures for LACBWR (2) Letter of June 10, 2002, DPC to NRC, and attached Response to Order EA-02-077 and Interim Compensatory Measures (ICM)

The purpose of this transmittal is to provide clarification to Dairyland Power Cooperative's ICM commitment made on June 10, 2002. Attachment 1 (Safeguards Information) contains a synopsis of the clarification. The corrective action report and supporting documentation for the clarification is in Attachment 2 (Safeguards Information). Attachments 1 & 2 will only be provided to listed individuals.

If you have any questions, please call Michael Brasel of my staff at (608) 689-4220.

Sincerely, DAIRYLAND POWER COOPERATIVE Chuck Sans Crainte, Vice President, Generation p i-x:Yz~~I A Touchstone Energy Cooperative ___

S4601 State Highway 35 ° Genoa, WI 54632-8846

  • 608-689-2331
  • 608-689-4200 fax
  • www.dairynet.com

CVS: MAB: two : Dairyland Power Cooperative's ICM Commitment Clarification (SAFEGUARDS INFORMATION) : LACBWR Corrective Action Report 2009-70 with References (SAFEGUARDS INFORMATION) cc w/att: Kristina Banovac Project Manager U. S. Nuclear Regulatory Commission Mail Stop T-8-F5 Washington, DC 20555 Gene Bonano ISFSI Security Specialist Region III - Division of Nuclear Material Safety 2443 Warrenville Rd.

Lisle, IL 60532 Douglas Garner Security Specialist Office of Nuclear Security and Incident Response Mail Stop: T4 F25M Washington, DC 20555 cc w/o att: Paul Schmidt Manager, Radiation Protection Section State of Wisconsin PO Box 2659 Madison, WI 53701-26459