| {{#Wiki_filter:From: Ennis, Rick Sent: Thursday, December 31, 2009 10:38 AM To: Jeff Keenan Cc: Erin West; Paul Duke; Feintuch, Karl; Lingam, Siva | | {{#Wiki_filter:From: Ennis, Rick Sent: Thursday, December 31, 2009 10:38 AM To: Jeff Keenan Cc: Erin West; Paul Duke; Feintuch, Karl; Lingam, Siva |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance Review for TAC ME2815 - Hope Creek - License Amendment Request Regarding Control Rod Scram Times - TSTF-460 Jeff, By letter dated December 1, 2009 (ADAMS Accession No. ML093430242), PSEG Nuclear LLC (PSEG) submitted a license amendment request for Hope Creek Generating Station (HCGS). | | Acceptance Review for TAC ME2815 - Hope Creek - License Amendment Request Regarding Control Rod Scram Times - TSTF-460 |
| The proposed amendment would revise the HCGS Technical Specifications (TSs) to change the required frequency of testing control rod scram times from "at least once per 120 days of POWER OPERATION" to "at least once per 200 days of POWER OPERATION." This change is based on TS Task Force (TSTF) change traveler TSTF-460, Revision 0, "Control Rod Scram Time Testing Frequency." TSTF-460 has been approved generically by the Nuclear Regulatory Commission (NRC) for incorporation into the boiling water reactor (BWR) Standard TS (STS); NUREG-1433 (BWR/4) and NUREG-1434 (BWR/6). The NRC staff published a notice announcing the availability of this proposed TS change using the consolidated line item improvement process (CLIIP) in the Federal Register on August 23, 2004 (69 FR 51864). Since HCGS has not adopted the STS, PSEG has proposed variations from the CLIIP to ensure consistency with NUREG-1433, Revision 3, "Standard Technical Specifications, General Electric Plants, BWR/4." The changes to align with NUREG-1433 involve the adoption of a revised control rod scram time test methodology and an establishment of a category of operable but "slow" control rods. | | : Jeff, By letter dated December 1, 2009 (ADAMS Accession No. ML093430242), PSEG Nuclear LLC (PSEG) submitted a license amendment request for Hope Creek Generating Station (HCGS). |
| The purpose of this e-mail is to provide the results of the NRC staff | | The proposed amendment would revise the HCGS Technical Specifications (TSs) to change the required frequency of testing control rod scram times from at least once per 120 days of POWER OPERATION to at least once per 200 days of POWER OPERATION. This change is based on TS Task Force (TSTF) change traveler TSTF-460, Revision 0, Control Rod Scram Time Testing Frequency. TSTF-460 has been approved generically by the Nuclear Regulatory Commission (NRC) for incorporation into the boiling water reactor (BWR) Standard TS (STS); |
| =s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | | NUREG-1433 (BWR/4) and NUREG-1434 (BWR/6). The NRC staff published a notice announcing the availability of this proposed TS change using the consolidated line item improvement process (CLIIP) in the Federal Register on August 23, 2004 (69 FR 51864). Since HCGS has not adopted the STS, PSEG has proposed variations from the CLIIP to ensure consistency with NUREG-1433, Revision 3, Standard Technical Specifications, General Electric Plants, BWR/4. The changes to align with NUREG-1433 involve the adoption of a revised control rod scram time test methodology and an establishment of a category of operable but slow control rods. |
| | The purpose of this e-mail is to provide the results of the NRC staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
| The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff's detailed technical review by separate correspondence. | | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence. |
|
| |
|
| If you have any questions, please contact me at (301) 415-1420. | | If you have any questions, please contact me at (301) 415-1420. |
| Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | | Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties (9E28710E0B702149AEC66397286364401AA8A6E486) |
| | |
| E-mail Properties Mail Envelope Properties (9E28710E0B702149AEC66397286364401AA8A6E486) | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance Review for TAC ME2850 - Hope Creek - License Amendment Request Regarding Control Rod Scram Times - TSTF-460 Sent Date: 12/31/2009 10:38:16 AM Received Date: 12/31/2009 10:38:16 AM From: Ennis, Rick | | Acceptance Review for TAC ME2850 - Hope Creek - License Amendment Request Regarding Control Rod Scram Times - TSTF-460 Sent Date: 12/31/2009 10:38:16 AM Received Date: 12/31/2009 10:38:16 AM From: Ennis, Rick Created By: Rick.Ennis@nrc.gov Recipients: |
| | |
| Created By: Rick.Ennis@nrc.gov | |
| | |
| Recipients: | |
| Jeff.Keenan@pseg.com (Jeff Keenan) | | Jeff.Keenan@pseg.com (Jeff Keenan) |
| Tracking Status: None erin.west@pseg.com (Erin West) | | Tracking Status: None erin.west@pseg.com (Erin West) |
| Tracking Status: None Paul.Duke@pseg.com (Paul Duke) | | Tracking Status: None Paul.Duke@pseg.com (Paul Duke) |
| Tracking Status: None | | Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl) |
| | | Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva) |
| Karl.Feintuch@nrc.gov (Feintuch, Karl) Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva) | | Tracking Status: None Post Office: |
| Tracking Status: None | | HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 15816 12/31/2009 Options Expiration Date: |
| | | Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} |
| Post Office: | |
| HQCLSTR01.nrc.gov | |
| | |
| Files Size Date & Time | |
| | |
| MESSAGE 15816 12/31/2009 | |
| | |
| Options Expiration Date: | |
| Priority: olImportanceNormal ReplyRequested: False Return Notification: False | |
| | |
| Sensitivity: olNormal Recipients received:}} | |
Letter Sequence Acceptance Review |
---|
TAC:ME2815, Control Rod SCRAM Time Testing Frequency (Approved, Closed) |
|
MONTHYEARML0934302422009-12-0101 December 2009 License Amendment Request to Adopt TSTF-460, Revision 0, Control Rod Scram Times. Project stage: Request ML0936501192009-12-31031 December 2009 Acceptance Review for TAC ME2815 - Hope Creek - License Amendment Request Regarding Control Rod Scram Times - TSTF-460 Project stage: Acceptance Review LR-N10-0257, Supplement to License Amendment Request H09-06 to Adopt TSTF-460, Revision 0, Control Rod Scram Times.2010-07-23023 July 2010 Supplement to License Amendment Request H09-06 to Adopt TSTF-460, Revision 0, Control Rod Scram Times. Project stage: Supplement LR-N10-0310, Supplement to License Amendment Request H09-06 to Adopt TSTF-460, Rev. 0, Control Rod Scram Times.2010-08-19019 August 2010 Supplement to License Amendment Request H09-06 to Adopt TSTF-460, Rev. 0, Control Rod Scram Times. Project stage: Supplement ML1022503952010-09-27027 September 2010 Issuance of Amendment Control Rod Scram Times Project stage: Approval 2010-07-23
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML17222A1182017-08-16016 August 2017 Acceptance of Requested Licensing Action License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML17122A3322017-05-0404 May 2017 Acceptance of Requested Licensing Action Revise and Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report ML14350A6902014-12-16016 December 2014 Acceptance Review_ Hope Creek License Amendment Request to Use TSTF-522 (MF5331) ML1222602222012-08-10010 August 2012 NRC Acceptance Review for Salem-Hope Creek Cyber Security Plan Implementation of Milestone No. 6 ML1206506682012-03-0505 March 2012 Acceptance Review for TAC ME8113 - Hope Creek Generating Station - Miscellaneous Administrative and Editorial Changes ML1135402152011-12-20020 December 2011 Acceptance Review for TACs ME7651-53 - Hope Creek and Salem 1 and 2 - Exemption from 10 CFR Part 26 Work Hour Controls During Severe Weather Conditions ML1032200792010-11-18018 November 2010 Acceptance Review for TACs ME4883, ME4884 and ME4885 - Hope Creek and Salem 1 and 2 - Emergency Action Level Changes ML1010308772010-04-13013 April 2010 Acceptance Review for TAC ME3545- Hope Creek - License Amendment Request - TSTF-425 ML1002800042010-01-28028 January 2010 Acceptance Review for TAC ME2949 - Hope Creek - License Amendment Request Regarding Use of ITAs for Cobalt-60 Production ML1000603672010-01-0606 January 2010 Acceptance Review for TACs ME2525, ME2526 and ME2527 - Hope Creek and Salem 1 and 2 - Exemption from Part 73 ML0936501192009-12-31031 December 2009 Acceptance Review for TAC ME2815 - Hope Creek - License Amendment Request Regarding Control Rod Scram Times - TSTF-460 ML0934104842009-12-0707 December 2009 Acceptance Review for TAC ME2560 - Hope Creek - License Amendment Request Regarding SRs for ISI and IST ML0928200062009-10-0909 October 2009 Acceptance Review Email Relief Request HC-RR-I3R-06 ML0926403672009-09-21021 September 2009 Acceptance Review for TAC ME2209 - Hope Creek Amendment Request - TSTF-475 ML0903303852009-02-0202 February 2009 Acceptance Review for TAC ME0341 - Hope Creek CLIIP on Mode Change Limitations ML0824800132008-09-0404 September 2008 Acceptance Review for TACs MD9199, MD9200 and MD9201 - Request to Use Delta Protection Respiratory Protection Equipment for Hope Creek and Salem 2017-08-16
[Table view] Category:E-Mail
MONTHYEARML24253A1942024-09-0909 September 2024 NRR E-mail Capture - Final Eeeb RAI - Hope Creek Amendment to Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24240A2092024-08-27027 August 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Relief Request VR-04, SSW Rupture Disc Replacement ML24197A1022024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Lift Settings for Reactor Coolant System Safety Relief Valves ML24163A1632024-06-11011 June 2024 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS to Change Surveillance Interval to Accommodate 24-Month Fuel Cycle ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23129A7892023-05-0909 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise Trip and Standby Auto-Start Logic Associated with Safety Related HVAC Trains ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML22194A0522022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review - Hope Creek, Salem 1 and 2 - Relocate Staff Qualification Requirements to Licensee Quality Assurance Topical Report ML22038A1552022-02-0404 February 2022 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML22021A7012022-01-21021 January 2022 NRR E-mail Capture - Acceptance Review - Hope Creek -Relief Request HC-I4R-220 Regarding Partial Penetration Nozzle Repairs (L-2022-LLR-0003) ML22006A3212022-01-0606 January 2022 NRR E-mail Capture - Final RAI - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML21334A1182021-11-30030 November 2021 NRR E-mail Capture - Acceptance Review - Hope Creek -Revise SRs for Electric Power Monitor Channels for RPS and Power Range Neutron Monitoring System ML21154A0102021-05-28028 May 2021 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Limits for Ultimate Heat Sink ML20295A4922020-10-21021 October 2020 NRR E-mail Capture - Hope Creek - Final RAI Revise ECCS TS with Respect to HPCI System Inoperability (L-2020-LLA-0131) ML20293A1832020-10-19019 October 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML20289A7062020-10-15015 October 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise Low Pressure Safety Limit to Address GE Part-21 Safety Communication SC05-03 ML20246G5952020-09-0202 September 2020 Acceptance Review - Hope Creek - Adopt TSTF-427, Allowance for Non TS Barrier Degradation ML20191A0202020-07-0202 July 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise ECCS TS with Respect to HPCI System Inoperability ML20153A3782020-06-0101 June 2020 NRR E-mail Capture - Acceptance Review - Hope Creek - Revise TS Actions for Suppression Pool Cooling ML20006E2802020-01-0606 January 2020 NRR E-mail Capture - Acceptance Review - Hope Creek: LAR Regarding Proposed Adoption of 10 CFR 50.69, Risk- Informed Categorization and Treatment of SSCs for Nuclear Power Plants ML19280A0002019-10-0303 October 2019 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Final RAI Emergency Plan Staffing Requirements (L-2019-LLA-0145) ML19267A1622019-09-24024 September 2019 NRR E-mail Capture - Hope Creek - Acceptance Review: Alternative for Exam of ASME Section XI, Exam Category B-G-1, Item Number B6.40, Threads in Flange (L-2019-LLR-0090) ML19226A3932019-08-14014 August 2019 NRR E-mail Capture - Salem 1 & 2, Hope Creek - Acceptance Review: Delete License Conditions Related to Decommissioning Trust Provisions and License Transfer ML19198A0992019-07-17017 July 2019 NRR E-mail Capture - Salem 1 & 2, Hope Creek - Acceptance Review: Changes to Emergency Plan Staffing ML19186A3842019-07-0505 July 2019 NRR E-mail Capture - Acceptance Review - Hope Creek, Revise TS to Adopt TSTF-563, Revise Instrumentation Testing Definition ML19123A2172019-05-0303 May 2019 NRR E-mail Capture - Re Acceptance Review - Hope Creek, Revise TS to Adopt TSTF-564, Safety Limit MCPR ML19081A1532019-03-22022 March 2019 NRR E-mail Capture - Acceptance Review: Hope Creek - Revise TS to Adopt TSTF-546 (L-2019-LLA-0032) ML19046A2382019-02-15015 February 2019 NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request to Use ASME Code Case OMN-17 (L-2019-LLR-0010) ML18323A0252018-11-16016 November 2018 NRR E-mail Capture - Acceptance Review: Hope Creek - Remote Shutdown System I & C Amendment (L-2018-LLA-0295) ML18288A2512018-10-15015 October 2018 NRR E-mail Capture - Acceptance Review Result: Hope Creek-Relief Request Associated with Third 10-Year ISI Interval (L-2018-LLR-0124) ML18271A0342018-09-13013 September 2018 Receipt of Stephen Comley, We the People, September 6, 11 and 12 2018 Voicemail and Email ML18263A1442018-09-12012 September 2018 NRR E-mail Capture - Final RAI from Apla: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18250A3142018-09-0606 September 2018 NRR E-mail Capture - Final RAI: Revise Technical Specifications to Increase Inverter AOT Extension (L-2018-LLA-0101) ML18206A7302018-07-27027 July 2018 (50-272, 50-311, 50-354), Transmittal Email 26.717 Updates ML18201A1112018-07-20020 July 2018 NRR E-mail Capture - Acceptance Review Results: Hope Creek, Salem 1 & 2 Revise TS to Adopt TSTF-529 (L-2018-LLA-0185) ML18150A6912018-05-30030 May 2018 NRR E-mail Capture - Hope Creek - Final RAI Revise TS to Adopt TSTF-542 ML18128A3862018-05-0808 May 2018 NRR E-mail Capture - Acceptance Review Results: Hope Creek Revise Inverter AOT TS Actions (L-2018-LLA-0101) ML18122A2392018-05-0202 May 2018 NRR E-mail Capture - Acceptance Review Results: Revise Emergency Diesel Generator Technical Specifications Action to Remove Salem Unit 3 Gas Turbine Generator (L-2018-LLA-0079) ML17348A6242017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Human Factors Associated with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17348A9972017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Steam Dryer Analysis with the Hope Creek Measurement Uncertainty Recapture Uprate Request (L-2017-LLS-002) ML17349A0812017-12-14014 December 2017 NRR E-mail Capture - Final Request for Additional Information for Reactor Systems Branch (Srxb) - Hope Creek Mur ML17340B2682017-12-0606 December 2017 NRR E-mail Capture - Notification to State of New Jersey of Impending License Amendment Issuance for Hope Creek (MF9501; EPID L-2017-LLA-0183) ML17338A2742017-12-0404 December 2017 NRR E-mail Capture - State of New Jersey: Notification of Impending Amendment Issuance for Hope Creek - Relocate Pressure-Temperature Limits Curves to the Pressure-Temperature Limits Report 2024-09-09
[Table view] |
Text
From: Ennis, Rick Sent: Thursday, December 31, 2009 10:38 AM To: Jeff Keenan Cc: Erin West; Paul Duke; Feintuch, Karl; Lingam, Siva
Subject:
Acceptance Review for TAC ME2815 - Hope Creek - License Amendment Request Regarding Control Rod Scram Times - TSTF-460
- Jeff, By letter dated December 1, 2009 (ADAMS Accession No. ML093430242), PSEG Nuclear LLC (PSEG) submitted a license amendment request for Hope Creek Generating Station (HCGS).
The proposed amendment would revise the HCGS Technical Specifications (TSs) to change the required frequency of testing control rod scram times from at least once per 120 days of POWER OPERATION to at least once per 200 days of POWER OPERATION. This change is based on TS Task Force (TSTF) change traveler TSTF-460, Revision 0, Control Rod Scram Time Testing Frequency. TSTF-460 has been approved generically by the Nuclear Regulatory Commission (NRC) for incorporation into the boiling water reactor (BWR) Standard TS (STS);
NUREG-1433 (BWR/4) and NUREG-1434 (BWR/6). The NRC staff published a notice announcing the availability of this proposed TS change using the consolidated line item improvement process (CLIIP) in the Federal Register on August 23, 2004 (69 FR 51864). Since HCGS has not adopted the STS, PSEG has proposed variations from the CLIIP to ensure consistency with NUREG-1433, Revision 3, Standard Technical Specifications, General Electric Plants, BWR/4. The changes to align with NUREG-1433 involve the adoption of a revised control rod scram time test methodology and an establishment of a category of operable but slow control rods.
The purpose of this e-mail is to provide the results of the NRC staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
If you have any questions, please contact me at (301) 415-1420.
Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties (9E28710E0B702149AEC66397286364401AA8A6E486)
Subject:
Acceptance Review for TAC ME2850 - Hope Creek - License Amendment Request Regarding Control Rod Scram Times - TSTF-460 Sent Date: 12/31/2009 10:38:16 AM Received Date: 12/31/2009 10:38:16 AM From: Ennis, Rick Created By: Rick.Ennis@nrc.gov Recipients:
Jeff.Keenan@pseg.com (Jeff Keenan)
Tracking Status: None erin.west@pseg.com (Erin West)
Tracking Status: None Paul.Duke@pseg.com (Paul Duke)
Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)
Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 15816 12/31/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: