From:
Rick Ennis Sent:
Monday, February 02, 2009 11:35 AM To:
Jeff Keenan Cc:
Carl Schulten; Marshall David; Karl Feintuch; Paul Duke
Subject:
Acceptance Review for TAC ME0341 - Hope Creek CLIIP on Mode Change Limitations
- Jeff, By letter dated January 5, 2009 (ADAMS Accession No. ML090130384), PSEG Nuclear LLC submitted a license amendment request for Hope Creek Generating Station. The proposed amendment would modify Technical Specification (TS) requirements for mode change limitations in TS 3.0.4 and 4.0.4, using the Consolidated Line Item Improvement Process (CLIIP) described in Nuclear Regulatory Commission (NRC) approved Technical Specification Task Force (TSTF) change TSTF-359, Revision 9.
The purpose of this e-mail is to provide the results of the NRC staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1420.
Richard B. Ennis, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties (3D27D29AB75BCD4BAE913B63CBFBBEDFB5F55A6E5D)
Subject:
Acceptance Review for TAC ME0341 - Hope Creek CLIIP on Mode Change
Limitations Sent Date: 02/02/2009 11:35:14 AM Received Date: 02/02/2009 11:35:14 AM From: Rick Ennis Created By: Rick.Ennis@nrc.gov Recipients:
Jeff.Keenan@pseg.com (Jeff Keenan)
Tracking Status: None Carl.Schulten@nrc.gov (Carl Schulten)
Tracking Status: None Marshall.David@nrc.gov (Marshall David)
Tracking Status: None Karl.Feintuch@nrc.gov (Karl Feintuch)
Tracking Status: None Paul.Duke@pseg.com (Paul Duke)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 13152 02/02/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: