{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY  
{{#Wiki_filter:UNITED STATES
COMMISSION  
                                      NUCLEAR REGULATORY COMMISSION
REGION I 475 ALLENDALE  
                                                      REGION I
ROAD KING OF PRUSSIA, PENNSYLVANIA  
                                              475 ALLENDALE ROAD
19406-1415  
                                    KING OF PRUSSIA, PENNSYLVANIA 19406-1415
David A. Heacock President  
                                                  May n, 2010
and Chief Nuclear Officer Dominion Resources  
David A. Heacock
5000 Dominion Boulevard  
President and Chief Nuclear Officer
Glen Allen, VA 23060-6711  
Dominion Resources
May n, 2010 SUBJECT: NRC INSPECTION  
5000 Dominion Boulevard
REPORT NO. 05000245/2010007, DOMINION RESOURCES, DOMINION NUCLEAR CONNECTICUT, MILLSTONE  
Glen Allen, VA 23060-6711
POWER STATION (UNIT 1), WATERFORD, CONNECTICUT  
SUBJECT:       NRC INSPECTION REPORT NO. 05000245/2010007, DOMINION
Dear Mr. Heacock: On May 11, 2010, the NRC issued inspection  
                RESOURCES, DOMINION NUCLEAR CONNECTICUT, MILLSTONE POWER
report, No. 05000247/2010007, documenting  
                STATION (UNIT 1), WATERFORD, CONNECTICUT
an NRC inspection  
Dear Mr. Heacock:
of an examination  
On May 11, 2010, the NRC issued inspection report, No. 05000247/2010007, documenting an
of your licensed activities  
NRC inspection of an examination of your licensed activities as they relate to radiation safety.
as they relate to radiation  
After the report was issued, an error was noted in the inspection number for pages i and ii. We
safety. After the report was issued, an error was noted in the inspection  
have corrected these pages and have enclosed the corrected copy to this letter. Please replace
number for pages i and ii. We have corrected  
this Section of the report with the enclosed pages.
these pages and have enclosed the corrected  
We apologize for any inconvenience or problems this error may have caused you.
copy to this letter. Please replace this Section of the report with the enclosed pages. We apologize  
                                                Sincerely,
for any inconvenience  
                                              ~~-->-.2)' Q~~..,
or problems this error may have caused you. Enclosure:  
                                                    dith A. Joustra, Chief
As stated. Distribution  
                                                Decommissioning Branch
via ListServ cc: State of Connecticut  
                                                Division of Nuclear Materials Safety
Sincerely,
Enclosure:
dith A. Joustra, Chief Decommissioning
As stated.
Branch Division of Nuclear Materials
Distribution via ListServ
Safety 
cc:
David A. Heacock President  
State of Connecticut
and Chief Nuclear Officer Dominion Resources  
 
5000 Dominion Boulevard  
                                                              May 17, 2010
Glen Allen, VA 23060-6711  
David A. Heacock
May 17, 2010 SUBJECT: NRC INSPECTION  
President and Chief Nuclear Officer
REPORT NO. 05000245/2010007, DOMINION RESOURCES, DOMINION NUCLEAR CONNECTICUT, MILLSTONE  
Dominion Resources
POWER STATION (UNIT 1), WATERFORD, CONNECTICUT  
5000 Dominion Boulevard
Dear Mr. Heacock: On May 11, 2010, the NRC issued inspection  
Glen Allen, VA 23060-6711
report, No. 05000247/2010007, documenting  
SUBJECT:             NRC INSPECTION REPORT NO. 05000245/2010007, DOMINION
an NRC inspection  
                      RESOURCES, DOMINION NUCLEAR CONNECTICUT, MILLSTONE POWER
of an examination  
                      STATION (UNIT 1), WATERFORD, CONNECTICUT
of your licensed activities  
Dear Mr. Heacock:
as they relate to radiation  
On May 11, 2010, the NRC issued inspection report, No. 05000247/2010007, documenting an
safety. After the report was issued, an error was noted in the inspection  
NRC inspection of an examination of your licensed activities as they relate to radiation safety.
number for pages i and ii. We have corrected  
After the report was issued, an error was noted in the inspection number for pages i and ii. We
these pages and have enclosed the corrected  
have corrected these pages and have enclosed the corrected copy to this letter. Please replace
copy to this letter. Please replace this Section of the report with the enclosed pages. We apologize  
this Section of the report with the enclosed pages.
for any inconvenience  
We apologize for any inconvenience or problems this error may have caused you.
or problems this error may have caused you. Enclosure:
                                                                  Sincerely,
As stated. Distribution
                                                                  IRA!
via ListServ cc: State of Connecticut
                                                                  Judith A. Joustra, Chief
Sincerely, IRA! Judith A. Joustra, Chief Decommissioning  
                                                                  Decommissioning Branch
Branch Division of Nuclear Materials  
                                                                  Division of Nuclear Materials Safety
Safety DOCUMENT NAME: T:IDNMSIWordDocslCurrentlMisc  
Enclosure:
LetterlCorrection  
As stated.
Letter.ldpr*21.2010007.0511201  
Distribution via ListServ
O.doc SUNSI Review Complete:  
cc:
KModes After declaring  
State of Connecticut
this document "An Official Agency Record" it will be released to the Public. To receive a coPy of this document, indicate in the box: "e" ;; COpy w/o attach/enel  
DOCUMENT NAME: T:IDNMSIWordDocslCurrentlMisc LetterlCorrection Letter.ldpr*21.2010007.0511201 O.doc
uE" = COpy wi attach/encl  
SUNSI Review Complete: KModes
OFFICE DNMS/RI IN DNMS/RI IN DNMS/RI I NAME LKauffrnan.JAJ  
After declaring this document "An Official Agency Record" it will be released to the Public.
For KModes/KDM  
To receive a coPy of this document, indicate in the box: "e" ;; COpy w/o attach/enel uE" = COpy wi attach/encl ~N" :;; No coPy
JJoustra/JAJ  
OFFICE           DNMS/RI                 IN   DNMS/RI                 IN   DNMS/RI         I                           I
DATE 05/17/2010  
NAME             LKauffrnan.JAJ For           KModes/KDM                   JJoustra/JAJ
05/14/2010  
DATE             05/17/2010                   05/14/2010                   5117110
5117110 ML 101370003  
ML 101370003
OFFICIAL RECORD COpy :;; No coPy I 
                                                    OFFICIAL RECORD COpy
U.S. NUCLEAR REGULATORY  
 
COMMISSION  
                  U.S. NUCLEAR REGULATORY COMMISSION
REGION I Inspection  
                                      REGION I
No. Docket No. License No. Licensee:
                                INSPECTION REPORT
Location:
Inspection No.           05000245/2010007
Inspection
Docket No.               05000245
Dates: Date Follow up Information
License No.               DPR-21
Received:
Licensee:                Dominion Nuclear Connecticut, I.nc.
Inspectors:
Location:                Millstone Power Station, Unit 1 (U1)
Approved By: INSPECTION
                          Rope Ferry Road
REPORT 05000245/2010007
                          Waterford, CT 06385
05000245 DPR-21 Dominion Nuclear Connecticut, I.nc. Millstone  
Inspection Dates:        March 15 - 16, 201 0 (on-site)
Power Station, Unit 1 (U1) Rope Ferry Road Waterford, CT 06385 March 15 -16, 201 0 (on-site)  
                        April 12, 2010 (telephone)
April 12, 2010 (telephone)  
Date Follow up
March 17,23, and 29, 2010 Kathy Modes Senior Health Physicist  
Information Received:    March 17,23, and 29, 2010
Decommissioning  
Inspectors:              Kathy Modes
Branch Division of Nuclear Materials  
                          Senior Health Physicist
Safety Laurie A. Kauffman Health Physicist  
                          Decommissioning Branch
Decommissioning  
                          Division of Nuclear Materials Safety
Branch Division of Nuclear Materials  
                          Laurie A. Kauffman
Safety Judith A. Joustra, Chief Decommissioning  
                          Health Physicist
Branch Division of Nuclear Materials  
                          Decommissioning Branch
Safety 
                          Division of Nuclear Materials Safety
SUMMARY OF FINDINGS Dominion Nuclear Connecticut, Inc. NRC Inspection  
Approved By:              Judith A. Joustra, Chief
Report No. 05000245/2010007  
                          Decommissioning Branch
A routine announced  
                          Division of Nuclear Materials Safety
safety inspection  
 
was conducted  
                                    SUMMARY OF FINDINGS
from March 15-16,2010, at Millstone  
                                Dominion Nuclear Connecticut, Inc.
Power Station Unit  
                          NRC Inspection Report No. 05000245/2010007
1 (U 1). The inspection  
A routine announced safety inspection was conducted from March 15-16,2010, at
reviewed operations, maintenance, and plant support activities  
Millstone Power Station Unit 1 (U 1). The inspection reviewed operations, maintenance, and
associated  
plant support activities associated with U 1 while in SAFSTOR status. The inspector also
with U 1 while in SAFSTOR status. The inspector  
reviewed additional information provided by the licensee dated March 17, 23, and 29, 2010 as
also reviewed additional  
part of this inspection. Within the scope of this inspection, no safety concerns or violations were
information  
identified.
provided by the licensee dated March 17, 23, and 29, 2010 as part of this inspection.  
There are no ongoing decommissioning activities being conducted at Millstone U 1.
Within the scope of this inspection, no safety concerns or violations were  
Facilities Management and Control
identified.  
The only changes expected to the licensee's program are personnel changes due to a reduction
There are no ongoing decommissioning  
in force. Retention of personnel with knowledge of plant functions and operations will meet the
activities  
staffing requirements required in their Technical Specifications Section 6.2.2. The NRC will
being conducted  
continue to review the knowledge management transfer during future inspections. Regarding
at Millstone  
transfer and sale of non-safety related systems and components, the licensee maintained a
U 1. Facilities  
comprehensive record of each transfer and sale.
Management  
Spent Fuel Pool Safety
and Control The only changes expected to the licensee's  
The licensee adequately maintained safety-related systems and components necessary for the
program are personnel  
safe operation of the Spent Fuel Pool.
changes due to a reduction  
Inspections of Final Surveys
in force. Retention  
The licensee's implementation of its radiation survey program was adequate. The licensee
of personnel  
continued to survey the buildings in order to identify areas of contamination and minimize the
with knowledge  
spread of contamination. The licensee had no near term plans to decontaminate the buildings
of plant functions  
and pursue decommissioning at this time. The licensee plans to continue in the SAFSTOR
and operations  
program until 2048.
will meet the staffing requirements  
Independent Spent Fuel Storage Installation (lSFSI) Construction and Component
required in their Technical  
Fabrication
Specifications  
After a formal assessment of spent fuel storage options in 2007, the licensee concluded that
Section 6.2.2. The NRC will continue to review the knowledge  
they would keep the Millstone U1 fuel in the Spent Fuel Pool, in a SAFSTOR status, until 2048.
management  
Based on the results of this inspection, the licensee maintained the fuel and Spent Fuel Pool,
transfer during future inspections.  
along with the necessary support infrastructure, in an adequate manner and satisfied the
Regarding  
requirements of a SAFSTOR site.
transfer and sale of non-safety  
                                                  11
related systems and components, the licensee maintained  
a comprehensive  
record of each transfer and sale. Spent Fuel Pool Safety The licensee adequately  
maintained  
safety-related  
systems and components  
necessary  
for the safe operation  
of the Spent Fuel Pool. Inspections  
of Final Surveys The licensee's  
implementation  
of its radiation  
survey program was adequate.  
The licensee continued  
to survey the buildings  
in order to identify areas of contamination  
and minimize the spread of contamination.  
The licensee had no near term plans to decontaminate  
the buildings  
and pursue decommissioning  
at this time. The licensee plans to continue in the SAFSTOR program until 2048. Independent  
Spent Fuel Storage Installation (lSFSI) Construction  
and Component  
Fabrication  
After a formal assessment  
of spent fuel storage options in 2007, the licensee concluded  
that they would keep the Millstone  
U1 fuel in the Spent Fuel Pool, in a SAFSTOR status, until 2048. Based on the results of this inspection, the licensee maintained  
the fuel and Spent Fuel Pool, along with the necessary  
support infrastructure, in an adequate manner and satisfied  
the requirements  
of a SAFSTOR site. 11
}}
}}

Latest revision as of 19:11, 13 November 2019

IR 05000245-10-007, on 03/15-16/2010 & 04/12/2010, Dominion Resources, Dominion Nuclear Connecticut, Millstone Power Station (Unit 1), Waterford, Connecticut, Transmittal Letter (Corrected Copy)
ML101370003
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/17/2010
From: Joustra J
Decommissioning Branch I
To: Heacock D
Dominion Resources
References
FOIA/PA-2011-0115 IR-10-007
Download: ML101370003 (4)


See also: IR 05000245/2010007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD

KING OF PRUSSIA, PENNSYLVANIA 19406-1415

May n, 2010

David A. Heacock

President and Chief Nuclear Officer

Dominion Resources

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT: NRC INSPECTION REPORT NO. 05000245/2010007, DOMINION

RESOURCES, DOMINION NUCLEAR CONNECTICUT, MILLSTONE POWER

STATION (UNIT 1), WATERFORD, CONNECTICUT

Dear Mr. Heacock:

On May 11, 2010, the NRC issued inspection report, No. 05000247/2010007, documenting an

NRC inspection of an examination of your licensed activities as they relate to radiation safety.

After the report was issued, an error was noted in the inspection number for pages i and ii. We

have corrected these pages and have enclosed the corrected copy to this letter. Please replace

this Section of the report with the enclosed pages.

We apologize for any inconvenience or problems this error may have caused you.

Sincerely,

~~-->-.2)' Q~~..,

dith A. Joustra, Chief

Decommissioning Branch

Division of Nuclear Materials Safety

Enclosure:

As stated.

Distribution via ListServ

cc:

State of Connecticut

May 17, 2010

David A. Heacock

President and Chief Nuclear Officer

Dominion Resources

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT: NRC INSPECTION REPORT NO. 05000245/2010007, DOMINION

RESOURCES, DOMINION NUCLEAR CONNECTICUT, MILLSTONE POWER

STATION (UNIT 1), WATERFORD, CONNECTICUT

Dear Mr. Heacock:

On May 11, 2010, the NRC issued inspection report, No. 05000247/2010007, documenting an

NRC inspection of an examination of your licensed activities as they relate to radiation safety.

After the report was issued, an error was noted in the inspection number for pages i and ii. We

have corrected these pages and have enclosed the corrected copy to this letter. Please replace

this Section of the report with the enclosed pages.

We apologize for any inconvenience or problems this error may have caused you.

Sincerely,

IRA!

Judith A. Joustra, Chief

Decommissioning Branch

Division of Nuclear Materials Safety

Enclosure:

As stated.

Distribution via ListServ

cc:

State of Connecticut

DOCUMENT NAME: T:IDNMSIWordDocslCurrentlMisc LetterlCorrection Letter.ldpr*21.2010007.0511201 O.doc

SUNSI Review Complete: KModes

After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a coPy of this document, indicate in the box: "e" ;; COpy w/o attach/enel uE" = COpy wi attach/encl ~N" :;; No coPy

OFFICE DNMS/RI IN DNMS/RI IN DNMS/RI I I

NAME LKauffrnan.JAJ For KModes/KDM JJoustra/JAJ

DATE 05/17/2010 05/14/2010 5117110

ML 101370003

OFFICIAL RECORD COpy

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

INSPECTION REPORT

Inspection No. 05000245/2010007

Docket No. 05000245

License No. DPR-21

Licensee: Dominion Nuclear Connecticut, I.nc.

Location: Millstone Power Station, Unit 1 (U1)

Rope Ferry Road

Waterford, CT 06385

Inspection Dates: March 15 - 16, 201 0 (on-site)

April 12, 2010 (telephone)

Date Follow up

Information Received: March 17,23, and 29, 2010

Inspectors: Kathy Modes

Senior Health Physicist

Decommissioning Branch

Division of Nuclear Materials Safety

Laurie A. Kauffman

Health Physicist

Decommissioning Branch

Division of Nuclear Materials Safety

Approved By: Judith A. Joustra, Chief

Decommissioning Branch

Division of Nuclear Materials Safety

SUMMARY OF FINDINGS

Dominion Nuclear Connecticut, Inc.

NRC Inspection Report No. 05000245/2010007

A routine announced safety inspection was conducted from March 15-16,2010, at

Millstone Power Station Unit 1 (U 1). The inspection reviewed operations, maintenance, and

plant support activities associated with U 1 while in SAFSTOR status. The inspector also

reviewed additional information provided by the licensee dated March 17, 23, and 29, 2010 as

part of this inspection. Within the scope of this inspection, no safety concerns or violations were

identified.

There are no ongoing decommissioning activities being conducted at Millstone U 1.

Facilities Management and Control

The only changes expected to the licensee's program are personnel changes due to a reduction

in force. Retention of personnel with knowledge of plant functions and operations will meet the

staffing requirements required in their Technical Specifications Section 6.2.2. The NRC will

continue to review the knowledge management transfer during future inspections. Regarding

transfer and sale of non-safety related systems and components, the licensee maintained a

comprehensive record of each transfer and sale.

Spent Fuel Pool Safety

The licensee adequately maintained safety-related systems and components necessary for the

safe operation of the Spent Fuel Pool.

Inspections of Final Surveys

The licensee's implementation of its radiation survey program was adequate. The licensee

continued to survey the buildings in order to identify areas of contamination and minimize the

spread of contamination. The licensee had no near term plans to decontaminate the buildings

and pursue decommissioning at this time. The licensee plans to continue in the SAFSTOR

program until 2048.

Independent Spent Fuel Storage Installation (lSFSI) Construction and Component

Fabrication

After a formal assessment of spent fuel storage options in 2007, the licensee concluded that

they would keep the Millstone U1 fuel in the Spent Fuel Pool, in a SAFSTOR status, until 2048.

Based on the results of this inspection, the licensee maintained the fuel and Spent Fuel Pool,

along with the necessary support infrastructure, in an adequate manner and satisfied the

requirements of a SAFSTOR site.

11