{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY | {{#Wiki_filter:UNITED STATES | ||
COMMISSION | NUCLEAR REGULATORY COMMISSION | ||
REGION I 475 ALLENDALE | REGION I | ||
475 ALLENDALE ROAD | |||
19406-1415 | KING OF PRUSSIA, PENNSYLVANIA 19406-1415 | ||
David A. Heacock President | May n, 2010 | ||
and Chief Nuclear Officer Dominion Resources | David A. Heacock | ||
5000 Dominion Boulevard | President and Chief Nuclear Officer | ||
Glen Allen, VA 23060-6711 | Dominion Resources | ||
5000 Dominion Boulevard | |||
REPORT NO. 05000245/2010007, DOMINION RESOURCES, DOMINION NUCLEAR CONNECTICUT, MILLSTONE | Glen Allen, VA 23060-6711 | ||
SUBJECT: NRC INSPECTION REPORT NO. 05000245/2010007, DOMINION | |||
Dear Mr. Heacock: On May 11, 2010, the NRC issued inspection | RESOURCES, DOMINION NUCLEAR CONNECTICUT, MILLSTONE POWER | ||
report, No. 05000247/2010007, documenting | STATION (UNIT 1), WATERFORD, CONNECTICUT | ||
Dear Mr. Heacock: | |||
of an examination | On May 11, 2010, the NRC issued inspection report, No. 05000247/2010007, documenting an | ||
of your licensed activities | NRC inspection of an examination of your licensed activities as they relate to radiation safety. | ||
as they relate to radiation | After the report was issued, an error was noted in the inspection number for pages i and ii. We | ||
safety. After the report was issued, an error was noted in the inspection | have corrected these pages and have enclosed the corrected copy to this letter. Please replace | ||
number for pages i and ii. We have corrected | this Section of the report with the enclosed pages. | ||
these pages and have enclosed the corrected | We apologize for any inconvenience or problems this error may have caused you. | ||
copy to this letter. Please replace this Section of the report with the enclosed pages. We apologize | Sincerely, | ||
for any inconvenience | ~~-->-.2)' Q~~.., | ||
or problems this error may have caused you. Enclosure: | dith A. Joustra, Chief | ||
As stated. Distribution | Decommissioning Branch | ||
via ListServ cc: State of Connecticut | Division of Nuclear Materials Safety | ||
Enclosure: | |||
As stated. | |||
Distribution via ListServ | |||
cc: | |||
David A. Heacock President | State of Connecticut | ||
and Chief Nuclear Officer Dominion Resources | |||
5000 Dominion Boulevard | May 17, 2010 | ||
Glen Allen, VA 23060-6711 | David A. Heacock | ||
President and Chief Nuclear Officer | |||
REPORT NO. 05000245/2010007, DOMINION RESOURCES, DOMINION NUCLEAR CONNECTICUT, MILLSTONE | Dominion Resources | ||
5000 Dominion Boulevard | |||
Dear Mr. Heacock: On May 11, 2010, the NRC issued inspection | Glen Allen, VA 23060-6711 | ||
report, No. 05000247/2010007, documenting | SUBJECT: NRC INSPECTION REPORT NO. 05000245/2010007, DOMINION | ||
RESOURCES, DOMINION NUCLEAR CONNECTICUT, MILLSTONE POWER | |||
of an examination | STATION (UNIT 1), WATERFORD, CONNECTICUT | ||
of your licensed activities | Dear Mr. Heacock: | ||
as they relate to radiation | On May 11, 2010, the NRC issued inspection report, No. 05000247/2010007, documenting an | ||
safety. After the report was issued, an error was noted in the inspection | NRC inspection of an examination of your licensed activities as they relate to radiation safety. | ||
number for pages i and ii. We have corrected | After the report was issued, an error was noted in the inspection number for pages i and ii. We | ||
these pages and have enclosed the corrected | have corrected these pages and have enclosed the corrected copy to this letter. Please replace | ||
copy to this letter. Please replace this Section of the report with the enclosed pages. We apologize | this Section of the report with the enclosed pages. | ||
for any inconvenience | We apologize for any inconvenience or problems this error may have caused you. | ||
or problems this error may have caused you. | Sincerely, | ||
IRA! | |||
Judith A. Joustra, Chief | |||
Sincerely, IRA! Judith A. Joustra, Chief Decommissioning | Decommissioning Branch | ||
Division of Nuclear Materials Safety | |||
Enclosure: | |||
LetterlCorrection | As stated. | ||
Letter.ldpr*21.2010007.0511201 | Distribution via ListServ | ||
O.doc SUNSI Review Complete: | cc: | ||
State of Connecticut | |||
this document "An Official Agency Record" it will be released to the Public. To receive a coPy of this document, indicate in the box: "e" ;; COpy w/o attach/enel | DOCUMENT NAME: T:IDNMSIWordDocslCurrentlMisc LetterlCorrection Letter.ldpr*21.2010007.0511201 O.doc | ||
uE" = COpy wi attach/encl | SUNSI Review Complete: KModes | ||
OFFICE DNMS/RI IN DNMS/RI IN DNMS/RI I NAME LKauffrnan.JAJ | After declaring this document "An Official Agency Record" it will be released to the Public. | ||
For KModes/KDM | To receive a coPy of this document, indicate in the box: "e" ;; COpy w/o attach/enel uE" = COpy wi attach/encl ~N" :;; No coPy | ||
JJoustra/JAJ | OFFICE DNMS/RI IN DNMS/RI IN DNMS/RI I I | ||
DATE 05/17/2010 | NAME LKauffrnan.JAJ For KModes/KDM JJoustra/JAJ | ||
05/14/2010 | DATE 05/17/2010 05/14/2010 5117110 | ||
ML 101370003 | |||
OFFICIAL RECORD COpy | OFFICIAL RECORD COpy | ||
U.S. NUCLEAR REGULATORY | |||
COMMISSION | U.S. NUCLEAR REGULATORY COMMISSION | ||
REGION I Inspection | REGION I | ||
No. Docket No. License No. | INSPECTION REPORT | ||
Inspection No. 05000245/2010007 | |||
Docket No. 05000245 | |||
License No. DPR-21 | |||
Licensee: Dominion Nuclear Connecticut, I.nc. | |||
Location: Millstone Power Station, Unit 1 (U1) | |||
Rope Ferry Road | |||
Waterford, CT 06385 | |||
Inspection Dates: March 15 - 16, 201 0 (on-site) | |||
Power Station, Unit 1 (U1) Rope Ferry Road Waterford, CT 06385 March 15 -16, 201 0 (on-site) | April 12, 2010 (telephone) | ||
April 12, 2010 (telephone) | Date Follow up | ||
March 17,23, and 29, 2010 Kathy Modes Senior Health Physicist | Information Received: March 17,23, and 29, 2010 | ||
Decommissioning | Inspectors: Kathy Modes | ||
Senior Health Physicist | |||
Decommissioning Branch | |||
Decommissioning | Division of Nuclear Materials Safety | ||
Laurie A. Kauffman | |||
Health Physicist | |||
Decommissioning Branch | |||
Division of Nuclear Materials Safety | |||
SUMMARY OF FINDINGS Dominion Nuclear Connecticut, Inc. NRC Inspection | Approved By: Judith A. Joustra, Chief | ||
Report No. 05000245/2010007 | Decommissioning Branch | ||
A routine announced | Division of Nuclear Materials Safety | ||
safety inspection | |||
was conducted | SUMMARY OF FINDINGS | ||
from March 15-16,2010, at Millstone | Dominion Nuclear Connecticut, Inc. | ||
Power Station Unit | NRC Inspection Report No. 05000245/2010007 | ||
1 (U 1). The inspection | A routine announced safety inspection was conducted from March 15-16,2010, at | ||
reviewed operations, maintenance, and plant support activities | Millstone Power Station Unit 1 (U 1). The inspection reviewed operations, maintenance, and | ||
associated | plant support activities associated with U 1 while in SAFSTOR status. The inspector also | ||
with U 1 while in SAFSTOR status. The inspector | reviewed additional information provided by the licensee dated March 17, 23, and 29, 2010 as | ||
part of this inspection. Within the scope of this inspection, no safety concerns or violations were | |||
information | identified. | ||
provided by the licensee dated March 17, 23, and 29, 2010 as part of this inspection. | There are no ongoing decommissioning activities being conducted at Millstone U 1. | ||
Within the scope of this inspection, no safety concerns or violations were | Facilities Management and Control | ||
identified. | The only changes expected to the licensee's program are personnel changes due to a reduction | ||
There are no ongoing decommissioning | in force. Retention of personnel with knowledge of plant functions and operations will meet the | ||
activities | staffing requirements required in their Technical Specifications Section 6.2.2. The NRC will | ||
being conducted | continue to review the knowledge management transfer during future inspections. Regarding | ||
at Millstone | transfer and sale of non-safety related systems and components, the licensee maintained a | ||
U 1. Facilities | comprehensive record of each transfer and sale. | ||
Management | Spent Fuel Pool Safety | ||
and Control The only changes expected to the licensee's | The licensee adequately maintained safety-related systems and components necessary for the | ||
program are personnel | safe operation of the Spent Fuel Pool. | ||
changes due to a reduction | Inspections of Final Surveys | ||
in force. Retention | The licensee's implementation of its radiation survey program was adequate. The licensee | ||
of personnel | continued to survey the buildings in order to identify areas of contamination and minimize the | ||
with knowledge | spread of contamination. The licensee had no near term plans to decontaminate the buildings | ||
of plant functions | and pursue decommissioning at this time. The licensee plans to continue in the SAFSTOR | ||
and operations | program until 2048. | ||
will meet the staffing requirements | Independent Spent Fuel Storage Installation (lSFSI) Construction and Component | ||
required in their Technical | Fabrication | ||
Specifications | After a formal assessment of spent fuel storage options in 2007, the licensee concluded that | ||
Section 6.2.2. The NRC will continue to review the knowledge | they would keep the Millstone U1 fuel in the Spent Fuel Pool, in a SAFSTOR status, until 2048. | ||
management | Based on the results of this inspection, the licensee maintained the fuel and Spent Fuel Pool, | ||
transfer during future inspections. | along with the necessary support infrastructure, in an adequate manner and satisfied the | ||
Regarding | requirements of a SAFSTOR site. | ||
transfer and sale of non-safety | 11 | ||
related systems and components, the licensee maintained | |||
record of each transfer and sale. Spent Fuel Pool Safety The licensee adequately | |||
maintained | |||
safety-related | |||
systems and components | |||
necessary | |||
for the safe operation | |||
of the Spent Fuel Pool. Inspections | |||
of Final Surveys The licensee's | |||
implementation | |||
of its radiation | |||
survey program was adequate. | |||
The licensee continued | |||
to survey the buildings | |||
in order to identify areas of contamination | |||
and minimize the spread of contamination. | |||
The licensee had no near term plans to decontaminate | |||
the buildings | |||
and pursue decommissioning | |||
at this time. The licensee plans to continue in the SAFSTOR program until 2048. Independent | |||
Spent Fuel Storage Installation (lSFSI) Construction | |||
and Component | |||
Fabrication | |||
After a formal assessment | |||
of spent fuel storage options in 2007, the licensee concluded | |||
U1 fuel in the Spent Fuel Pool, in a SAFSTOR status, until 2048. Based on the results of this inspection, the licensee maintained | |||
the fuel and Spent Fuel Pool, along with the necessary | |||
support infrastructure, in an adequate manner and satisfied | |||
of a SAFSTOR site. 11 | |||
}} | }} |
Latest revision as of 19:11, 13 November 2019
ML101370003 | |
Person / Time | |
---|---|
Site: | Millstone ![]() |
Issue date: | 05/17/2010 |
From: | Joustra J Decommissioning Branch I |
To: | Heacock D Dominion Resources |
References | |
FOIA/PA-2011-0115 IR-10-007 | |
Download: ML101370003 (4) | |
See also: IR 05000245/2010007
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD
KING OF PRUSSIA, PENNSYLVANIA 19406-1415
May n, 2010
David A. Heacock
President and Chief Nuclear Officer
Dominion Resources
5000 Dominion Boulevard
Glen Allen, VA 23060-6711
SUBJECT: NRC INSPECTION REPORT NO. 05000245/2010007, DOMINION
RESOURCES, DOMINION NUCLEAR CONNECTICUT, MILLSTONE POWER
STATION (UNIT 1), WATERFORD, CONNECTICUT
Dear Mr. Heacock:
On May 11, 2010, the NRC issued inspection report, No. 05000247/2010007, documenting an
NRC inspection of an examination of your licensed activities as they relate to radiation safety.
After the report was issued, an error was noted in the inspection number for pages i and ii. We
have corrected these pages and have enclosed the corrected copy to this letter. Please replace
this Section of the report with the enclosed pages.
We apologize for any inconvenience or problems this error may have caused you.
Sincerely,
~~-->-.2)' Q~~..,
dith A. Joustra, Chief
Decommissioning Branch
Division of Nuclear Materials Safety
Enclosure:
As stated.
Distribution via ListServ
cc:
State of Connecticut
May 17, 2010
David A. Heacock
President and Chief Nuclear Officer
Dominion Resources
5000 Dominion Boulevard
Glen Allen, VA 23060-6711
SUBJECT: NRC INSPECTION REPORT NO. 05000245/2010007, DOMINION
RESOURCES, DOMINION NUCLEAR CONNECTICUT, MILLSTONE POWER
STATION (UNIT 1), WATERFORD, CONNECTICUT
Dear Mr. Heacock:
On May 11, 2010, the NRC issued inspection report, No. 05000247/2010007, documenting an
NRC inspection of an examination of your licensed activities as they relate to radiation safety.
After the report was issued, an error was noted in the inspection number for pages i and ii. We
have corrected these pages and have enclosed the corrected copy to this letter. Please replace
this Section of the report with the enclosed pages.
We apologize for any inconvenience or problems this error may have caused you.
Sincerely,
IRA!
Judith A. Joustra, Chief
Decommissioning Branch
Division of Nuclear Materials Safety
Enclosure:
As stated.
Distribution via ListServ
cc:
State of Connecticut
DOCUMENT NAME: T:IDNMSIWordDocslCurrentlMisc LetterlCorrection Letter.ldpr*21.2010007.0511201 O.doc
SUNSI Review Complete: KModes
After declaring this document "An Official Agency Record" it will be released to the Public.
To receive a coPy of this document, indicate in the box: "e" ;; COpy w/o attach/enel uE" = COpy wi attach/encl ~N" :;; No coPy
OFFICE DNMS/RI IN DNMS/RI IN DNMS/RI I I
NAME LKauffrnan.JAJ For KModes/KDM JJoustra/JAJ
DATE 05/17/2010 05/14/2010 5117110
OFFICIAL RECORD COpy
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
INSPECTION REPORT
Inspection No. 05000245/2010007
Docket No. 05000245
License No. DPR-21
Licensee: Dominion Nuclear Connecticut, I.nc.
Location: Millstone Power Station, Unit 1 (U1)
Rope Ferry Road
Waterford, CT 06385
Inspection Dates: March 15 - 16, 201 0 (on-site)
April 12, 2010 (telephone)
Date Follow up
Information Received: March 17,23, and 29, 2010
Inspectors: Kathy Modes
Senior Health Physicist
Decommissioning Branch
Division of Nuclear Materials Safety
Laurie A. Kauffman
Health Physicist
Decommissioning Branch
Division of Nuclear Materials Safety
Approved By: Judith A. Joustra, Chief
Decommissioning Branch
Division of Nuclear Materials Safety
SUMMARY OF FINDINGS
Dominion Nuclear Connecticut, Inc.
NRC Inspection Report No. 05000245/2010007
A routine announced safety inspection was conducted from March 15-16,2010, at
Millstone Power Station Unit 1 (U 1). The inspection reviewed operations, maintenance, and
plant support activities associated with U 1 while in SAFSTOR status. The inspector also
reviewed additional information provided by the licensee dated March 17, 23, and 29, 2010 as
part of this inspection. Within the scope of this inspection, no safety concerns or violations were
identified.
There are no ongoing decommissioning activities being conducted at Millstone U 1.
Facilities Management and Control
The only changes expected to the licensee's program are personnel changes due to a reduction
in force. Retention of personnel with knowledge of plant functions and operations will meet the
staffing requirements required in their Technical Specifications Section 6.2.2. The NRC will
continue to review the knowledge management transfer during future inspections. Regarding
transfer and sale of non-safety related systems and components, the licensee maintained a
comprehensive record of each transfer and sale.
Spent Fuel Pool Safety
The licensee adequately maintained safety-related systems and components necessary for the
safe operation of the Spent Fuel Pool.
Inspections of Final Surveys
The licensee's implementation of its radiation survey program was adequate. The licensee
continued to survey the buildings in order to identify areas of contamination and minimize the
spread of contamination. The licensee had no near term plans to decontaminate the buildings
and pursue decommissioning at this time. The licensee plans to continue in the SAFSTOR
program until 2048.
Independent Spent Fuel Storage Installation (lSFSI) Construction and Component
Fabrication
After a formal assessment of spent fuel storage options in 2007, the licensee concluded that
they would keep the Millstone U1 fuel in the Spent Fuel Pool, in a SAFSTOR status, until 2048.
Based on the results of this inspection, the licensee maintained the fuel and Spent Fuel Pool,
along with the necessary support infrastructure, in an adequate manner and satisfied the
requirements of a SAFSTOR site.
11