{{#Wiki_filter:October 4, 2011  
{{#Wiki_filter:October 4, 2011 Mr. W. L. Berg President and CEO Dairyland Power Cooperative 3200 East Avenue S.
 
P.O. Box 817 La Crosse, WI 54602-0817
Mr. W. L. Berg President and CEO Dairyland Power Cooperative 3200 East Avenue S.
P.O. Box 817 La Crosse, WI 54602-0817  


==SUBJECT:==
==SUBJECT:==
LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN - FISCAL YEAR 2012  
LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN - FISCAL YEAR 2012


==Dear Mr. Berg:==
==Dear Mr. Berg:==


In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual Chapter 2561, "Decommissioning Power Reactor Inspection Program," the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for LaCrosse Boiling Water Reactor (LACBWR). The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of October 2011 through December 2012. The plan outlines how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.  
In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for LaCrosse Boiling Water Reactor (LACBWR). The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of October 2011 through December 2012. The plan outlines how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.
Because this MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY 2012, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the LACBWR inspection schedule.
We currently project the Region will conduct two inspections at LACBWR through December 2012 to evaluate spent fuel pool safety and related routine decommissioning activities. The Region will also conduct approximately four onsite inspections to evaluate preoperational and operational related Independent Spent Fuel Storage Installation (ISFSI) activities, in addition to in-office review. Following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning or ISFSI activities warrant.


Because this MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY 2012, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the LACBWR inspection schedule.
W. L. Berg                                       Security-related inspection activities will be addressed in a separate MIP.
We currently project the Region will conduct two inspections at LACBWR through  December 2012 to evaluate spent fuel pool safety and related routine decommissioning activities. The Region will also conduct approximately four onsite inspections to evaluate preoperational and operational related Independent Spent Fuel Storage Installation (ISFSI) activities, in addition to in-office review. Following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning or ISFSI activities warrant.
Inspection Procedure     Inspection Procedure Title IP  60854     Preoperational Testing of an ISFSI IP  60855     Operation of an ISFSI IP  60856     Review of 72.212(b) Evaluations IP  36801     Organization, Management and Cost Controls IP  37801     Safety Reviews, Design Changes, and Modifications IP  40801     Self-Assessment, Auditing, and Corrective Action IP  60801     Spent Fuel Pool Safety IP  62801     Maintenance and Surveillance IP  71801     Decommissioning Performance and Status Review IP  83750     Occupational Radiation Exposure IP  84750     Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750       Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/
W. L. Berg Security-related inspection activities will be addressed in a separate MIP.
reading-rm/adams.html.
Inspection Procedure Inspection Procedure Title IP  60854 Preoperational Testing of an ISFSI IP  60855 Operation of an ISFSI IP  60856 Review of 72.212(b) Evaluations IP  36801 Organization, Management and Cost Controls IP  37801 Safety Reviews, Design Changes, and Modifications IP  40801 Self-Assessment, Auditing, and Corrective Action IP  60801 Spent Fuel Pool Safety IP  62801 Maintenance and Surveillance IP  71801 Decommissioning Performance and Status Review IP  83750 Occupational Radiation Exposure IP  84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of     Radioactive Materials In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/ reading-rm/adams.html.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.
Sincerely,
Sincerely,
/RA/   Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 50-409 License No. DPR-45 cc : Michael A. Brasel, Plant Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition Wisconsin State Liaison Officer Chief, Radiation Protection Section, Division of Health, WI Department of Health and Social Services W. Berg Security-related inspection activities will be addressed in a separate MIP.
                                                /RA/
Inspection Procedure Inspection Procedure Title IP  60854 Preoperational Testing of an ISFSI IP  60855 Operation of an ISFSI IP  60856 Review of 72.212(b) Evaluations IP  36801 Organization, Management and Cost Controls IP  37801 Safety Reviews, Design Changes, and Modifications IP  40801 Self-Assessment, Auditing, and Corrective Action IP  60801 Spent Fuel Pool Safety IP  62801 Maintenance and Surveillance IP  71801  Decommissioning Performance and Status Review IP  83750  Occupational Radiation Exposure IP  84750 Radioactive Waste Treatment, and Effluent and Environmental    Monitoring IP  86750 Solid Radioactive Waste Management and Transportation of      Radioactive Materials
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 50-409 License No. DPR-45 cc :   Michael A. Brasel, Plant Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition Wisconsin State Liaison Officer Chief, Radiation Protection Section, Division of Health, WI Department of Health and Social Services


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.
W. Berg                                                                    Security-related inspection activities will be addressed in a separate MIP.
Sincerely, /RA/ Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 50-409 License No. DPR-45 cc : Michael A. Brasel, Plant Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition Wisconsin State Liaison Officer Chief, Radiation Protection Section, Division of Health,   WI Department of Health and Social Services DISTRIBUTION:
Inspection Procedure                Inspection Procedure Title IP    60854              Preoperational Testing of an ISFSI IP    60855              Operation of an ISFSI IP    60856              Review of 72.212(b) Evaluations IP    36801              Organization, Management and Cost Controls IP    37801              Safety Reviews, Design Changes, and Modifications IP    40801              Self-Assessment, Auditing, and Corrective Action IP    60801              Spent Fuel Pool Safety IP    62801              Maintenance and Surveillance IP    71801              Decommissioning Performance and Status Review IP    83750              Occupational Radiation Exposure IP    84750              Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750                  Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.
See next page *See previous concurrence DOCUMENT NAME: G:\DNMSIII\Work in progress\MIP - LACBWR MIP FY12.doc   Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS RIII DNMS E RIII DNMS   NAME PJLee:jm PJL JETapp JET CALipa CAL DATE 09/28/11 09/23/11 10/04 /11 OFFICIAL RECORD COPY
We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.
Sincerely,
                                                                          /RA/
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 50-409 License No. DPR-45 cc :         Michael A. Brasel, Plant Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition Wisconsin State Liaison Officer Chief, Radiation Protection Section, Division of Health, WI Department of Health and Social Services DISTRIBUTION:
See next page
*See previous concurrence DOCUMENT NAME: G:\DNMSIII\Work in progress\MIP - LACBWR MIP FY12.doc Publicly Available                           Non-Publicly Available                   Sensitive               Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl N" = No copy OFFICE           RIII DNMS                           RIII DNMS                   E     RIII DNMS NAME             PJLee:jm PJL                         JETapp JET                       CALipa CAL DATE             09/28/11                             09/23/11                           10/04 /11 OFFICIAL RECORD COPY


Letter to W. L. Berg from Christine A. Lipa dated October 4th, 2011  
Letter to W. L. Berg from Christine A. Lipa dated October 4th, 2011


==SUBJECT:==
==SUBJECT:==
LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN - FISCAL YEAR 2012  
LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN - FISCAL YEAR 2012 DISTRIBUTION:
 
Bruce Watson John Hickman Dominick Orlando Cynthia Pederson Anne Boland Patrick Louden Allan Barker Harral Logaras John Giessner Karla Stoedter Viktoria Mitlyng Prema Chandrathil MCID}}
DISTRIBUTION
: Bruce Watson John Hickman Dominick Orlando Cynthia Pederson  
 
Anne Boland Patrick Louden Allan Barker Harral Logaras John Giessner Karla Stoedter Viktoria Mitlyng Prema Chandrathil MCID}}

Latest revision as of 14:47, 12 November 2019

Mip - LACBWR FY12 Lacrosse Master Inspection Plan
ML11279A076
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/04/2011
From: Christine Lipa
NRC/RGN-III/DNMS/MCID
To: Berg W
Dairyland Power Cooperative
References
Download: ML11279A076 (4)


Text

October 4, 2011 Mr. W. L. Berg President and CEO Dairyland Power Cooperative 3200 East Avenue S.

P.O. Box 817 La Crosse, WI 54602-0817

SUBJECT:

LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN - FISCAL YEAR 2012

Dear Mr. Berg:

In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for LaCrosse Boiling Water Reactor (LACBWR). The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of October 2011 through December 2012. The plan outlines how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.

Because this MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY 2012, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the LACBWR inspection schedule.

We currently project the Region will conduct two inspections at LACBWR through December 2012 to evaluate spent fuel pool safety and related routine decommissioning activities. The Region will also conduct approximately four onsite inspections to evaluate preoperational and operational related Independent Spent Fuel Storage Installation (ISFSI) activities, in addition to in-office review. Following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning or ISFSI activities warrant.

W. L. Berg Security-related inspection activities will be addressed in a separate MIP.

Inspection Procedure Inspection Procedure Title IP 60854 Preoperational Testing of an ISFSI IP 60855 Operation of an ISFSI IP 60856 Review of 72.212(b) Evaluations IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 62801 Maintenance and Surveillance IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/

reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.

Sincerely,

/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 50-409 License No. DPR-45 cc : Michael A. Brasel, Plant Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition Wisconsin State Liaison Officer Chief, Radiation Protection Section, Division of Health, WI Department of Health and Social Services

W. Berg Security-related inspection activities will be addressed in a separate MIP.

Inspection Procedure Inspection Procedure Title IP 60854 Preoperational Testing of an ISFSI IP 60855 Operation of an ISFSI IP 60856 Review of 72.212(b) Evaluations IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 62801 Maintenance and Surveillance IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.

Sincerely,

/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 50-409 License No. DPR-45 cc : Michael A. Brasel, Plant Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition Wisconsin State Liaison Officer Chief, Radiation Protection Section, Division of Health, WI Department of Health and Social Services DISTRIBUTION:

See next page

  • See previous concurrence DOCUMENT NAME: G:\DNMSIII\Work in progress\MIP - LACBWR MIP FY12.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl N" = No copy OFFICE RIII DNMS RIII DNMS E RIII DNMS NAME PJLee:jm PJL JETapp JET CALipa CAL DATE 09/28/11 09/23/11 10/04 /11 OFFICIAL RECORD COPY

Letter to W. L. Berg from Christine A. Lipa dated October 4th, 2011

SUBJECT:

LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN - FISCAL YEAR 2012 DISTRIBUTION:

Bruce Watson John Hickman Dominick Orlando Cynthia Pederson Anne Boland Patrick Louden Allan Barker Harral Logaras John Giessner Karla Stoedter Viktoria Mitlyng Prema Chandrathil MCID