Mip - LACBWR FY12 Lacrosse Master Inspection Plan
ML11279A076
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/04/2011
From: Christine Lipa
NRC/RGN-III/DNMS/MCID
To: Berg W
Dairyland Power Cooperative
References
Download: ML11279A076 (4)


Text

October 4, 2011 Mr. W. L. Berg President and CEO Dairyland Power Cooperative 3200 East Avenue S.

P.O. Box 817 La Crosse, WI 54602-0817

SUBJECT:

LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN - FISCAL YEAR 2012

Dear Mr. Berg:

In accordance with U.S. Nuclear Regulatory Commission (NRC) Inspection Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for LaCrosse Boiling Water Reactor (LACBWR). The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for the period of October 2011 through December 2012. The plan outlines how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.

Because this MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY 2012, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that this MIP remains current, we request that you keep the Materials Control, ISFSI, and Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the LACBWR inspection schedule.

We currently project the Region will conduct two inspections at LACBWR through December 2012 to evaluate spent fuel pool safety and related routine decommissioning activities. The Region will also conduct approximately four onsite inspections to evaluate preoperational and operational related Independent Spent Fuel Storage Installation (ISFSI) activities, in addition to in-office review. Following is a list of the inspection procedures we expect to use during our inspections. The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning or ISFSI activities warrant.

W. L. Berg Security-related inspection activities will be addressed in a separate MIP.

Inspection Procedure Inspection Procedure Title IP 60854 Preoperational Testing of an ISFSI IP 60855 Operation of an ISFSI IP 60856 Review of 72.212(b) Evaluations IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 62801 Maintenance and Surveillance IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/

reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.

Sincerely,

/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 50-409 License No. DPR-45 cc : Michael A. Brasel, Plant Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition Wisconsin State Liaison Officer Chief, Radiation Protection Section, Division of Health, WI Department of Health and Social Services

W. Berg Security-related inspection activities will be addressed in a separate MIP.

Inspection Procedure Inspection Procedure Title IP 60854 Preoperational Testing of an ISFSI IP 60855 Operation of an ISFSI IP 60856 Review of 72.212(b) Evaluations IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 62801 Maintenance and Surveillance IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Jeremy Tapp of my staff at (630) 829-9862.

Sincerely,

/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 50-409 License No. DPR-45 cc : Michael A. Brasel, Plant Manager B. D. Burks, P.E., Director, Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission Spark Burmaster, Coulee Region Energy Coalition Wisconsin State Liaison Officer Chief, Radiation Protection Section, Division of Health, WI Department of Health and Social Services DISTRIBUTION:

See next page

  • See previous concurrence DOCUMENT NAME: G:\DNMSIII\Work in progress\MIP - LACBWR MIP FY12.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl N" = No copy OFFICE RIII DNMS RIII DNMS E RIII DNMS NAME PJLee:jm PJL JETapp JET CALipa CAL DATE 09/28/11 09/23/11 10/04 /11 OFFICIAL RECORD COPY

Letter to W. L. Berg from Christine A. Lipa dated October 4th, 2011

SUBJECT:

LA CROSSE BOILING WATER REACTOR MASTER INSPECTION PLAN - FISCAL YEAR 2012 DISTRIBUTION:

Bruce Watson John Hickman Dominick Orlando Cynthia Pederson Anne Boland Patrick Louden Allan Barker Harral Logaras John Giessner Karla Stoedter Viktoria Mitlyng Prema Chandrathil MCID