| {{#Wiki_filter:1 NRR-PMDAPEm Resource From:Zurawski, Lisa M:(GenCo-Nuc) <lisa.zurawski@exeloncorp.com> | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Zurawski, Lisa M:(GenCo-Nuc) <lisa.zurawski@exeloncorp.com> |
| Sent: Wednesday, September 28, 2016 9:17 AM To: Hughey, John; Distel, David J:(GenCo-Nuc); Merkle, Donald:(GenCo-Nuc) | | Sent: Wednesday, September 28, 2016 9:17 AM To: Hughey, John; Distel, David J:(GenCo-Nuc); Merkle, Donald:(GenCo-Nuc) |
| Cc:Spitzer, Douglas J:(GenCo-Nuc) | | Cc: Spitzer, Douglas J:(GenCo-Nuc) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| [External_Sender] Response to Ques tions Regarding Byron Station's FIPJohn - | | [External_Sender] Response to Questions Regarding Byron Station's FIP John - |
| You asked about the Byron Hoses and Cables. Byron conforms to Method #2 of the NRC letter from Jack Davis to Joseph Pollock, NEI Vice President dated May 18, 2015 (ML15125A442). Byron has spare cabling and hose of sufficient length and sizing to replace the single longest run needed to support any single FLEX strategy. | | You asked about the Byron Hoses and Cables. Byron conforms to Method #2 of the NRC letter from Jack Davis to Joseph Pollock, NEI Vice President dated May 18, 2015 (ML15125A442). Byron has spare cabling and hose of sufficient length and sizing to replace the single longest run needed to support any single FLEX strategy. |
| | You asked of our description of long term boration strategy. As stated as the answer to question 3.2.1.1.D in Byrons Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), dated February 27,2015, Calculation BYR 14-129 / BRW-14-0212-M, RWST Usage During FLEX Scenarios has been completed to determine the need and timing of additional Phase 3 boration equipment. This calculation states that with all the scenarios run the RWSTs will provide borated water for a minimum of 33.6 hours (enough time to get equipment from the SAFER location). Additionally, Byron has BFSG-50, FLEX Support Equipment Operation Unit - 0. Attachment G of 0BFSG-50 provides steps to refill the RWST from 1) Cross-tie from the other unit, 2) Portable boration / makeup skid, and 3) Boric Acid Storage Tank. |
| | Lisa Zurawski Byron Station Principal Regulatory Engineer 815-406-2991 Lisa.Zurawski@exeloncorp.com This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Email to the intended recipient(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete this Email and any copies. |
| | Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP 1 |
|
| |
|
| You asked of our description of long term boration strategy. As stated as the answer to question 3.2.1.1.D in Byron's Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), dated February 27,2015, Calculation BYR 14-129 / BRW-14-0212-M, RWST Usage During FLEX Scenarios has been completed to determine the need and timing of additional Phase 3 boration equipment. This calculation states that with all the scenarios run the RWSTs will provide borated water for a minimum of 33.6 hours (enough time to get equipment from the SAFER location). Additionally, Byron has BFSG-50, FLEX Support Equipment Operation Unit - 0. Attachment G of 0BFSG-50 provides steps to refill the RWST from 1) Cross-tie from the other unit, 2) Portable boration / makeup skid, and 3) Boric Acid Storage Tank.
| | Hearing Identifier: NRR_PMDA Email Number: 3085 Mail Envelope Properties (DD36716564A86A4B8BFB3CA6B9EED3EFA8B85FC8) |
| | |
| Lisa Zurawski Byron Station Principal Regulatory Engineer 815-406-2991 Lisa.Zurawski@exeloncorp.com This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Ema il to the intended recipien t(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete th is Email and any copies.
| |
| Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP Hearing Identifier: NRR_PMDA Email Number: 3085 Mail Envelope Properties (DD36716564A86A4B8BFB3CA6B9EED3EFA8B85FC8)
| |
|
| |
|
| ==Subject:== | | ==Subject:== |
| [External_Sender] Response to Questions Regarding Byron Station's FIP Sent Date: 9/28/2016 9:16:54 AM Received Date: 9/28/2016 9:17:10 AM From: Zurawski, Lisa M:(GenCo-Nuc) | | [External_Sender] Response to Questions Regarding Byron Station's FIP Sent Date: 9/28/2016 9:16:54 AM Received Date: 9/28/2016 9:17:10 AM From: Zurawski, Lisa M:(GenCo-Nuc) |
| Created By: lisa.zurawski@exeloncorp.com Recipients: "Spitzer, Douglas J:(GenCo-Nuc)" <douglas.spitzer@exeloncorp.com> Tracking Status: None "Hughey, John" <John.Hughey@nrc.gov> | | Created By: lisa.zurawski@exeloncorp.com Recipients: |
| Tracking Status: None "Distel, David J:(GenCo-Nuc)" <David.Distel@exeloncorp.com> Tracking Status: None "Merkle, Donald:(GenCo-Nuc)" <Donald.Merkle@exeloncorp.com> Tracking Status: None | | "Spitzer, Douglas J:(GenCo-Nuc)" <douglas.spitzer@exeloncorp.com> |
| | | Tracking Status: None "Hughey, John" <John.Hughey@nrc.gov> |
| Post Office: exchm-ccc-21.exelonds.com Files Size Date & Time MESSAGE 2298 9/28/2016 9:17:10 AM | | Tracking Status: None "Distel, David J:(GenCo-Nuc)" <David.Distel@exeloncorp.com> |
| | | Tracking Status: None "Merkle, Donald:(GenCo-Nuc)" <Donald.Merkle@exeloncorp.com> |
| Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:}} | | Tracking Status: None Post Office: exchm-ccc-21.exelonds.com Files Size Date & Time MESSAGE 2298 9/28/2016 9:17:10 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
Similar Documents at Byron |
---|
Category:E-Mail
MONTHYEARML24282A7042024-10-0808 October 2024 NRR E-mail Capture - Acceptance Reviews of Relief Requests Associated with the Fifth Inservice Inspection Interval at Byron and Braidwood Stations ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24180A0042024-06-28028 June 2024 NRR E-mail Capture - Acceptance Review for Braidwood and Byron - Request for Exemption from 10 CFR 50.46 and Appendix K (L-2024-LLE-0019) ML24180A0032024-06-28028 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment for Transition to Framatome Gaia Fuel (L-2024-LLA-0072) ML24176A0182024-06-20020 June 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Remove Extraneous Detail Related to Beacon ML24170A3912024-06-18018 June 2024 NRR E-mail Capture - Revision of Estimated Hours to Complete Review of Byron/Braidwood Amendment to Revise TS 3.7.15, 3.7.16, and 4.3.1 (L-2023-LLA-0136) ML24141A2452024-05-20020 May 2024 NRR E-mail Capture - NRC Acceptance Review of Byron/Braidwood Amendment to Delete Technical Specification 5.6.5.b.5 (L-2024-LLA-0055) ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24053A3382024-02-22022 February 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23317A2012023-11-22022 November 2023 (External_Sender) Supplement - Byron Security Rule Exemption Request ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23305A2992023-11-0101 November 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 2, Relief Request I4R-24 ML23304A0202023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Byron 1 & 2 - Exemption from Security Rule (L-2023-LLE-0027) ML23272A0602023-09-29029 September 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 1, Relief Request I4R-25 ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22284A1022022-10-0606 October 2022 NRR E-mail Capture - NRC Acceptance Review for Byron, Unit 2, License Amendment Request (LAR) to Reinsert an Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) (L-2022-LLA-0131) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0152022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Byron - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21154A0172021-06-0202 June 2021 NRR E-mail Capture - Acceptance Review of Byron - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21123A2442021-05-0303 May 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood/Byron/Ginna - Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5 and NSAL-15-1 (L-2021-LLA-0066) 2024-09-06
[Table view] |
Text
NRR-PMDAPEm Resource From: Zurawski, Lisa M:(GenCo-Nuc) <lisa.zurawski@exeloncorp.com>
Sent: Wednesday, September 28, 2016 9:17 AM To: Hughey, John; Distel, David J:(GenCo-Nuc); Merkle, Donald:(GenCo-Nuc)
Cc: Spitzer, Douglas J:(GenCo-Nuc)
Subject:
[External_Sender] Response to Questions Regarding Byron Station's FIP John -
You asked about the Byron Hoses and Cables. Byron conforms to Method #2 of the NRC letter from Jack Davis to Joseph Pollock, NEI Vice President dated May 18, 2015 (ML15125A442). Byron has spare cabling and hose of sufficient length and sizing to replace the single longest run needed to support any single FLEX strategy.
You asked of our description of long term boration strategy. As stated as the answer to question 3.2.1.1.D in Byrons Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), dated February 27,2015, Calculation BYR 14-129 / BRW-14-0212-M, RWST Usage During FLEX Scenarios has been completed to determine the need and timing of additional Phase 3 boration equipment. This calculation states that with all the scenarios run the RWSTs will provide borated water for a minimum of 33.6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> (enough time to get equipment from the SAFER location). Additionally, Byron has BFSG-50, FLEX Support Equipment Operation Unit - 0. Attachment G of 0BFSG-50 provides steps to refill the RWST from 1) Cross-tie from the other unit, 2) Portable boration / makeup skid, and 3) Boric Acid Storage Tank.
Lisa Zurawski Byron Station Principal Regulatory Engineer 815-406-2991 Lisa.Zurawski@exeloncorp.com This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Email to the intended recipient(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete this Email and any copies.
Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP 1
Hearing Identifier: NRR_PMDA Email Number: 3085 Mail Envelope Properties (DD36716564A86A4B8BFB3CA6B9EED3EFA8B85FC8)
Subject:
[External_Sender] Response to Questions Regarding Byron Station's FIP Sent Date: 9/28/2016 9:16:54 AM Received Date: 9/28/2016 9:17:10 AM From: Zurawski, Lisa M:(GenCo-Nuc)
Created By: lisa.zurawski@exeloncorp.com Recipients:
"Spitzer, Douglas J:(GenCo-Nuc)" <douglas.spitzer@exeloncorp.com>
Tracking Status: None "Hughey, John" <John.Hughey@nrc.gov>
Tracking Status: None "Distel, David J:(GenCo-Nuc)" <David.Distel@exeloncorp.com>
Tracking Status: None "Merkle, Donald:(GenCo-Nuc)" <Donald.Merkle@exeloncorp.com>
Tracking Status: None Post Office: exchm-ccc-21.exelonds.com Files Size Date & Time MESSAGE 2298 9/28/2016 9:17:10 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: