MONTHYEARML23317A2012023-11-22022 November 2023 (External_Sender) Supplement - Byron Security Rule Exemption Request ISFSI Docket No. Reference ML23321A2012023-11-17017 November 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (L-2023-LLR-0062) ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23305A2992023-11-0101 November 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 2, Relief Request I4R-24 ML23304A0202023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Byron 1 & 2 - Exemption from Security Rule (L-2023-LLE-0027) ML23272A0602023-09-29029 September 2023 NRR E-mail Capture - NRC Acceptance Review of Byron, Unit 1, Relief Request I4R-25 ML23187A0092023-07-0606 July 2023 NRR E-mail Capture - NRC Acceptance Review of Byron and Braidwood Request to Adopt TSTF-370 ML23069A0332023-03-0606 March 2023 Email to K. Lueshen Byron and Braidwood Commitment 10 - Request for Additional Information Set 1 ML23115A2412023-01-20020 January 2023 NRR E-mail Capture - Preliminary RAIs Related to L-2022-LLA-0131 - Byron, Unit 2, Reinsertion of an Accident Tolerant Fuel Lead Test Assembly ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22284A1022022-10-0606 October 2022 NRR E-mail Capture - NRC Acceptance Review for Byron, Unit 2, License Amendment Request (LAR) to Reinsert an Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) (L-2022-LLA-0131) ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22189A0602022-07-0707 July 2022 NRR E-mail Capture - Draft RAI for Byron/Braidwood TSTF-501 ML22136A2722022-05-16016 May 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron Adoption of TSTF-501 ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22116A0242022-04-25025 April 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 ML22105A0722022-04-15015 April 2022 NRR E-mail Capture - Braidwood/Byron Verbal Authorization for Proposed Alternative I4R-15/I4R-21 ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22091A0842022-02-24024 February 2022 NRR E-mail Capture - Braidwood and Byron - Withdrawal of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML23089A0152022-01-0505 January 2022 NRR E-mail Capture - NRC Acceptance Review of Byron - Proposed Alternative for Examinations of Categories B-B, B-D, and C-A SG Welds and Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21272A1492021-09-29029 September 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood and Byron - Proposed Alternative for Examinations of Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0042021-08-26026 August 2021 NRR E-mail Capture - NRC Acceptance Review - Braidwood/Byron/Clinton - Adoption of TSTF-273, Safety Function Determination Program Clarifications ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21203A3112021-07-21021 July 2021 NRR E-mail Capture - Final Byron Permanently Defueled Technical Specifications (PDTS) - Second Round RAI ML21189A1602021-07-0808 July 2021 NRR E-mail Capture - Request for Additional Information - Braidwood, Byron, and Ginna - Amendment to Address the Issues in Westinghouse NSALs ML21189A1612021-07-0808 July 2021 NRR E-mail Capture - Second Round Request for Additional Information - Byron Permanently Defueled Technical Specification Amendment ML21154A0172021-06-0202 June 2021 NRR E-mail Capture - Acceptance Review of Byron - Proposed Alternative for Exam of Pzr Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Shell Welds ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21123A2442021-05-0303 May 2021 NRR E-mail Capture - NRC Acceptance Review of Braidwood/Byron/Ginna - Application to Address the Issues Identified in Westinghouse Documents NSAL-09-5 and NSAL-15-1 (L-2021-LLA-0066) ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21081A0792021-03-19019 March 2021 Acceptance Review for Byron Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation ML21081A0972021-03-19019 March 2021 Acceptance Review for Byron Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis-External Events (EPID L-2021-JLD-0004) (E-mail) ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21036A1102021-02-0404 February 2021 NRR E-mail Capture - Draft RAIs for Byron Station, Unit Nos. 1 and 2, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21033A5372021-02-0101 February 2021 Email transmission- 01-29-2021, FEMA Letter to Governor of Commonwealth of PA Regarding Implementation of TMI EP Exemptions ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML21004A1452020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Relief Requests Braidwood I4R-11 and Byron I4R-18 2023-09-29
[Table view] |
Text
NRR-PMDAPEm Resource From: Zurawski, Lisa M:(GenCo-Nuc) <lisa.zurawski@exeloncorp.com>
Sent: Friday, December 02, 2016 2:50 PM To: Hughey, John Cc: Distel, David J:(GenCo-Nuc); Merkle, Donald:(GenCo-Nuc); Spitzer, Douglas J:(GenCo-Nuc); Kuchenbecker, James P:(Contractor - GenCo-Nuc)
Subject:
[External_Sender] NRC question about qualification temperature of the Spent Fuel Pool Instrumentation The NRC questioned:
Area heatup limits provided to NRC for this area are based on the design basis room maximum limits of 133°F normal and 140°F abnormal conditions, not Extended Loss of Alternating Current Power (ELAP) calculated temperatures, and these values are very close to the Westinghouse Spent Fuel Pool Instrumentation (SFPI) qualification temperature of 140F under the Fukushima ELAP conditions.
The NRC is requesting a qualitative engineering judgement evaluation to support the 140F value for SFPI qualification being adequate when the design basis abnormal temperature is 140°F in this area. NRC requested a discussion of the ELAP condition and whether FLEX-backed ventilation is or could be provided and whether area doors are or could be provided.
Byron Stations Response:
Spent Fuel Pool Level instrument components are located in EQ Zone A11. Per Calculation BYR01-068, Revision 2 (Environmental Parameters of EQ Zones), EQ Zone A11 is a Mild Zone with maximum normal temperature of 133 °F. EQ Zone A11 does not have a temperature for accident conditions, however, Note 14 of the calculation addresses conditions of Loss of Coolant Accident (LOCA) and Loss of Offsite Power (LOOP) as follows: Under conditions of LOCA and LOOP, maximum temperature will increase during 2-hour period due to HVAC systems operation using available electrical power sources and with consideration of equipment heat loads for event mitigation. Maximum temperatures during this condition are: 140 Degrees F for Zone A11. The bounding value of 140 °F is determined in Calculation VA-102, Revision 5 (Auxiliary Building Energy Load Calculations for Elevations 330 346, 364, 383 401 & 426 in Abnormal Condition), which determines temperatures for multiple locations within EQ Zone A11, as follows:
EQ Zone A11 Locations Unit 1 and Unit 2 Electrical Penetration Area (El 426) Calculated Temperature = 127.1 °F Unit 1 and Unit 2 Electrical Penetration Area (El 414) Calculated Temperature = 125.3 °F Unit 1 and Unit 2 Electrical Equipment Room (El 414) Calculated Temperature = 138.2 °F Unit 1 and Unit 2 Motor Driven Auxiliary Feedwater Pump Rooms Calculated Temperature = 135.8 °F Unit 1 and Unit 2 Diesel Driven Auxiliary Feedwater Pump Rooms Calculated Temperature = 133.0 °F SFP Level electronics are located as follows:
Primary SFP Level Loop: Unit 1 Auxiliary Building 426 Electrical Penetration Area, plant coordinates U-15 (Test Report 0FC-001, Rev 1 and Drawing 6E-1-3352, Rev CL)
Secondary SFP Level Loop: Unit 2 Auxiliary Building 426 Electrical Penetration Area, plant coordinates U-21 (Test Report 0FC-002, Rev 1 and Drawing 6E-2-3552, Sh 3, Rev BW)
Therefore, the Primary and Secondary SFP Level electronics are located in Unit 1 and Unit 2 Electrical Penetration Areas, El 426. The calculated temperature of this location is 127.1 °F during conditions of LOCA 1
and LOOP for a 2-hour period, which is below the stated 140 °F maximum temperature for Zone A11 (140 F bounds all locations above in EQ Zone A11).
The LOCA and LOOP conditions described above include heat loads from electrical equipment and liquid systems that will not exist during an ELAP. During an ELAP event, there will be no heat loads from electrical equipment or liquid systems in the area. The heat generated from the Spent Fuel Pool has to conduct to 426 Electrical Penetration Areas, which includes a 3 foot concrete wall. There is a significant heat sink in the 426 Electrical Penetration areas from the containment wall and surrounding Auxiliary Building walls. There is also a significant heat sink from the Fuel Handling Building walls and ceiling. Due to the lack of heat sources in the area of the instruments, barriers between the Fuel Handling Building and instrument areas, and the large heat sink that will dissipate heat, the 140 °F rating of the SFP Level instrumentation is adequate.
Lisa Zurawski Byron Station Principal Regulatory Engineer 815-406-2991 Lisa.Zurawski@exeloncorp.com This Email message and any attachment may contain information that is proprietary, legally privileged, confidential and/or subject to copyright belonging to Exelon Corporation or its affiliates ("Exelon"). This Email is intended solely for the use of the person(s) to which it is addressed. If you are not an intended recipient, or the employee or agent responsible for delivery of this Email to the intended recipient(s), you are hereby notified that any dissemination, distribution or copying of this Email is strictly prohibited. If you have received this message in error, please immediately notify the sender and permanently delete this Email and any copies.
Exelon policies expressly prohibit employees from making defamatory or offensive statements and infringing any copyright or any other legal right by Email communication. Exelon will not accept any liability in respect of such communications. -EXCIP 2
Hearing Identifier: NRR_PMDA Email Number: 3196 Mail Envelope Properties (DD36716564A86A4B8BFB3CA6B9EED3EFA8C3F28C)
Subject:
[External_Sender] NRC question about qualification temperature of the Spent Fuel Pool Instrumentation Sent Date: 12/2/2016 2:50:04 PM Received Date: 12/2/2016 2:50:08 PM From: Zurawski, Lisa M:(GenCo-Nuc)
Created By: lisa.zurawski@exeloncorp.com Recipients:
"Distel, David J:(GenCo-Nuc)" <David.Distel@exeloncorp.com>
Tracking Status: None "Merkle, Donald:(GenCo-Nuc)" <Donald.Merkle@exeloncorp.com>
Tracking Status: None "Spitzer, Douglas J:(GenCo-Nuc)" <douglas.spitzer@exeloncorp.com>
Tracking Status: None "Kuchenbecker, James P:(Contractor - GenCo-Nuc)" <James.Kuchenbecker@exeloncorp.com>
Tracking Status: None "Hughey, John" <John.Hughey@nrc.gov>
Tracking Status: None Post Office: exchm-ccc-21.exelonds.com Files Size Date & Time MESSAGE 4932 12/2/2016 2:50:08 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: