ML17009A021: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Duke                                                                        DAVE BAXTER Vice President nergy                                                                      Oconee Nuclear Station Duke Energy ONOJ VP / 7800 Rochester Highway Seneca, SC 29672 864-873-4460 864-873-4208 fax dabaxter@dukeenergy.com February 9, 2010 ATTN: Document Control Desk, Director, Spent Fuel Project Office, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001
 
==Subject:==
Duke Energy Carolinas, LLC Oconee Nuclear Site, Units 1, 2, and 3 Renewed Operating Licenses: DPR-38, 47, and 55 Docket Numbers: 50-269, 270, and 287 Registration for Use of General License Spent Fuel Cask Number 111 In accordance with 1OCFR72.212(b)(1)(ii), Duke Energy Carolinas, LLC (Duke), hereby notifies the Commission of storage of dry ftiel under Cask Certificate of Compliance 72-1004, Amendment 9. The date of storage was January 29, 2010; the Cask Load Number was 111.
The cask model is the Standardized NUHOMS 24PHB; the dry storage canister (DSC) identification number is ONS-24PHBL-HZ 111; the physical location at the Oconee ISFSI was Module E-56.
If there are any questions regarding this registration, please contact Stephen C. Newman, Oconee Regulatory Compliance Lead Engineer, at (864) 873-4388.
Sincerely, 7LLP). %LL Dave Baxter Vice President, Oconee Nuclear Station www. duke-energy. corn
 
U. S. Nuclear Regulatory Commission February 9, 2010                                  Page 2 cc:
Mr. Michael F. Weber, Director Office of Nuclear Material Safety and Safeguards Mailstop: EBB 1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. John M. Goshen, Project Manager Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards Mailstop: E3 D2M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. John Stang, Project Manager Office of Nuclear Reactor Regulation Mail Stop 0-14 H25 U.S. Nuclear Regulatory Commission Washington, D. C., 20555-0001 Mr. Cecil A. Fletcher Senior Fuel Facility Inspector USNRC, Region II Sam Nunn Atlanta Federal Center, Suite 23T85, 61 Forsyth St., SW, Atlanta, GA 30303-893 1 Mr. Luis A. Reyes USNRC Region II
        -
Sam Nunn Atlanta Federal Center, Suite 23T85, 61 Forsyth St., SW, Atlanta, GA 30303-893 1 Mr. Andy Sabisch NRC Senior Resident Inspector Oconee Nuclear Station}}

Revision as of 10:40, 30 October 2019

Site, Units 1, 2, and 3, Registration for Use of General License Spent Fuel Cask Number 111
ML17009A021
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/09/2010
From: Baxter D
Duke Energy Carolinas
To:
Document Control Desk, Division of Spent Fuel Management
GOSHEN K
References
Download: ML17009A021 (2)


Text

Duke DAVE BAXTER Vice President nergy Oconee Nuclear Station Duke Energy ONOJ VP / 7800 Rochester Highway Seneca, SC 29672 864-873-4460 864-873-4208 fax dabaxter@dukeenergy.com February 9, 2010 ATTN: Document Control Desk, Director, Spent Fuel Project Office, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Site, Units 1, 2, and 3 Renewed Operating Licenses: DPR-38, 47, and 55 Docket Numbers: 50-269, 270, and 287 Registration for Use of General License Spent Fuel Cask Number 111 In accordance with 1OCFR72.212(b)(1)(ii), Duke Energy Carolinas, LLC (Duke), hereby notifies the Commission of storage of dry ftiel under Cask Certificate of Compliance 72-1004, Amendment 9. The date of storage was January 29, 2010; the Cask Load Number was 111.

The cask model is the Standardized NUHOMS 24PHB; the dry storage canister (DSC) identification number is ONS-24PHBL-HZ 111; the physical location at the Oconee ISFSI was Module E-56.

If there are any questions regarding this registration, please contact Stephen C. Newman, Oconee Regulatory Compliance Lead Engineer, at (864) 873-4388.

Sincerely, 7LLP). %LL Dave Baxter Vice President, Oconee Nuclear Station www. duke-energy. corn

U. S. Nuclear Regulatory Commission February 9, 2010 Page 2 cc:

Mr. Michael F. Weber, Director Office of Nuclear Material Safety and Safeguards Mailstop: EBB 1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. John M. Goshen, Project Manager Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards Mailstop: E3 D2M U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mr. John Stang, Project Manager Office of Nuclear Reactor Regulation Mail Stop 0-14 H25 U.S. Nuclear Regulatory Commission Washington, D. C., 20555-0001 Mr. Cecil A. Fletcher Senior Fuel Facility Inspector USNRC, Region II Sam Nunn Atlanta Federal Center, Suite 23T85, 61 Forsyth St., SW, Atlanta, GA 30303-893 1 Mr. Luis A. Reyes USNRC Region II

-

Sam Nunn Atlanta Federal Center, Suite 23T85, 61 Forsyth St., SW, Atlanta, GA 30303-893 1 Mr. Andy Sabisch NRC Senior Resident Inspector Oconee Nuclear Station