{{#Wiki_filter:O.WASHINGTON PUBLIC POWER SUPPLY SYSTEM PLANT PRO'URES MANUAL~~~80II,t i:-.:;I-.;..~~PROCEDURE NUMBER VOLUME NAME SECTION 1.3 TITLE+1.3.8 A OVE ACMINIST CONDUCT OF OPERAT E UIPMENT CLEARAN A T DATE 06/09/82 1.3.8.1~Pue oee This procedure provides direction for the proper method of requesting, issuing, lifting and releasing Clearance Orders (CO).The"Danger" and"Caution" tags are placed on plant equipment to provide for safety of personnel and equipment protection.
{{#Wiki_filter:O.
It must be understood that a Danger Tag Clearance Order and associated
WASHINGTON PUBLIC POWER SUPPLY SYSTEM PLANT PRO   'URES     MANUAL
,"Danger" tags represent a lifesaving procedure and SMALL BE INVIOLATE.
                                                                    ~~~80II,t         i: -.:; I-.;..~~
Violation of one of these tags or the Clearance Order procedure by anyone SHALL be sufficient cause for IMMEDIATE'ISCIPLINARY ACTION.1.3.8e 2 Discussion A.Definitions"Dan er" Ta s are those red tags and stickers-represented by A ac ments I and II respectively and are used when personnel safety is of primary concern,~t'tt yll tg d tik'tdt Attachments III and IV respectively and are used to provide temporary ins'tructions or limited-operation of equipment."Clearance Order Release" is the process of closing out a Clearance Order and thereby placing it into the"closed" section of the Clearance Order Log."Closed" Clearance Order is a Clearance Order that has been released, removed and is no longer in effect."Multi le" Clearance Order is a Clearance Order that provides work protect on for more than one purpose or job while utilizing one Clearance Order and its associated tags.PDR gD0C~83Pgg3 83PyP8p~~'
PROCEDURE NUMBER             A  OVE                      DATE 06/09/82 VOLUME NAME ACMINIST SECTION 1.3             CONDUCT OF OPERAT TITLE
: PSppp39y PDR WP.597 R1 PROCEDURE NUMBER 1.3.8 REVISION NUMBER PAGE NUMBER 1.3.8-1 of 16 t 8"Authorized Individual" shall be any permanent Supply System employee or any n v ua who s on the authorization list.The authorization list shall be maintained in the form of the Clearance Order Log and approved by-the Operations Manager.t~dt"t tddttd tt tt t t d tt~d t t."Redundant Verification" is that requirement directing a second ndividual to make an independent verification of correct equipment status for safety related equipment.
                            +1.3.8           E UIPMENT CLEARAN       A   T 1.3.8.1     ~Pue   oee This procedure provides direction for the proper method of requesting, issuing, lifting and releasing Clearance Orders (CO). The "Danger" and "Caution" tags are placed on plant equipment to provide for safety of personnel and equipment protection.
This can be accomplished from the.main control room when adequate status indication is available or by local status verification when necessary.
It must     be understood that a Danger Tag Clearance Order and associated
B.All Clearance Order Tags (RDanger" and"Caution")are placed, accounted for and removed only in conjunction with a properly authorized Clearance Order.1.The"Danger" tag is placed as an assurance that the syste, or equipment will NOT be changed from the status tagged except as provided by this procedure.
            ,
20 The"Caution" tag is placed as an assurance that the system or equipment will be operated only as provided by the instruction or limitations described on the tag.Because the two Clearance Order tags have different functions, the"Danger" tag shall have precedence and priority over a"Caution" tag.4.This-procedure allows for multiple use of-a single clearance.
              "Danger" tags represent a lifesaving procedure and SMALL BE INVIOLATE.
'hese"multiple" Clearance Orders should be used only when the boundaries are mutual, common and uncluttered.
Violation of one of these tags or the Clearance Order procedure by anyone SHALL be     sufficient cause   for IMMEDIATE'ISCIPLINARYACTION.
If any doubt exists, it is better to issue a redundant Clearance Order and associated tags.5..This procedure provides for temporarily lifting of"Danger" tags, when work is complete, for testing of component just prior to Clearance Order Release.1.3.8.3 Procedure The Clearance Order Log will be maintained in the Control Room.It consists of two loose leaf type binders, one for the"Danger" Clearance Orders and one for the"Caution" Clearance Orders.Each binder will be divided into two sections: an active section containing the Clearance Orders in effect and a closed section containing the Clearance Orders that have been closed.On a monthly basis, a person designated by the Operations Manager will review both logs and take appropriate action to clear any unnecessary Clearance Orders.dd'P.S98 PROCECUJLE NUMBER 1.3.8 REVISION NUMBER T.3.%-'F of 16  
1.3. 8e 2 Discussion A. Definitions "Dan er" Ta s are those red tags and stickers-represented by A ac ments     I and II   respectively and are used when personnel           safety is of primary concern,
~~t Closed Clearance Or ers will remain in the closed section for a minimum of'0 days from date of-closure.
                    ~t' Attachments    III and tt       yll tg IV respectively d   tik and are used
All closed Clearance Orders beyond the 30 days that are no longer needed shall be forwarded to the Plant Records Center for disposition.
                                                                                  '
A.B.~Authorit The Shift Manager is responsible for administration of the the Clearance Order Program.This responsibility cannot be delegated.
tdt to provide temporary ins'tructions or limited-operation of equipment.
Signature authority for the functioning of the Clearance Order Program may be o legated.For ur oses of this rocedure rocessin the term Shift Mana er shall nclude h s s nature esi nate un ess s ec f ed ot erw se.The authorized in iv dual accepting the Clearance Or er or continuing work'nder a Clearance Order issued to a work document is responsible for verifying a safe working condition..
                      "Clearance Order Release"       is the process of closing out a Clearance Order and thereby placing       it into the "closed" section of the Clearance Order Log.
Clearance Order Issuin Clearance Orders may be issued in one of three methods.They may be issued to an authorized individual by name, person in charge of work by a work document, or Duty Shift Manager by title.In addition, during system lineup and testing, clearance orders can be issued to a work document number or to any authorized test engineer.In the case of the latter two, the person-currently in charge of the work or the on-duty Shift Manager accepts or releases the Clearance Order.Also, during system lineup and testing, test directors may accept or release clearance orders issued t'o their assigned test enginebrs.
                      "Closed" Clearance Order is a Clearance Order that has been released, removed and   is no longer in effect.
The request for a Clearance Order is made through the Control Room, i.e., Plant Operations Department.
                      "Multi le" Clearance Order is a Clearance Order that provides work protect on for more than one purpose or job while utilizing one Clearance Order and     its associated tags.
An assigned operator will then determine the requirements to provide a safe work condition and initiate the appropriate Clearance Order Form, Attachment V or VI as directed below.These forms contain an original (white), a yellow and a pink copy.The pink copy is issued with the tags for use in processing the Clearance Order.The yellow copy is retained with the original in the active section of the log for use at the time of Clearance Order release.l.Upon receipt of a Clearance Order request the assigned operator will: a., Enter the"Equipment/System" description and the"Purpose" on the Clearance Order, b.Determine the required tag locations and the desired component status and record this information in the"Tag Location" and"Tags Hung" sections of the Clearance Order.If more than ten tags are required, an addendum will be issued (Attachment VII).The use of an addendum will be V/P 598 PROCE~Rg NUI IBER REVISION NUMBER Iod~0 P.S.P-Y of 16
83PyP8p~~'
PDR gD0C~         83Pgg3
:           PSppp39y                     PROCEDURE NUMBER     REVISION NUMBER         PAGE NUMBER PDR                  1.3.8                                         1.3.8-1 of   16 WP.597 R1


li~C~no in the"Remarks" portion of Clearance Order.Thy addendum is completed by recording additional tag locations and desired status for each component.
t "Authorized Individual"8 shall be any permanent Supply System employee or any n v ua who s on the authorization list. The authorization list shall be maintained in the form of the Clearance Order Log and approved by -the Operations Manager.
The addendum is numbered with the same number as the Clearance Order and is attached to the Clearance Order proper.Number.each tag with the Clearance Order number and the appropriate tag number shown in the"Tag Location" section of the Clearance Order.d.e.Denote on each tag the equipment name and/or piece number and required component status.Enter the work document number, authorized individual name or Shift Manager on the Clearance Order.2.f.Present the tags and Clearance Order to the duty Shift Manager.The Shift Manager.will assure that the'learance Order provides the safe conditions necessary for the protection of.personnel and will: a.Sign the"Authorized By" in the"clearance issue" section and enter the date and time.1 b.Assign an operator to hang the tags and place the equipment in the specified status.The assigned operator will thoroughly review the operational tasks required and will then: a.Position valves, breakers, switches or other devices in the status specified.
t~dt "t tddttd tt                            tt t t      d    tt    ~ d  t  t.
b.Hang the tags and initial the Clearance Order original adjacent to the designated position for each component.
            "Redundant          Verification" is that requirement directing a second ndividual to make an independent verification of correct equipment status for safety related equipment. This can be accomplished from the.
4.c.Inform the Shift Manager that the clearance has been placed.The Supply System representative responsible shall thoroughly understand the requirement necessary to accomplish the work and the limits of the clearance and shall: a~b.Verify that the Clearance Order provides a safe working condition and so signify by signature in the"Accepted By" section of the Clearance Order.This signature is not intended to prevent an assigned craftsman from further verifying safe working conditions.
main control room when adequate status indication is available or by local status verification when necessary.
Notify the control room operator of start of work.WP 598 PROCEDURE NUMBER 1.~.8 REVISION NUMBER PAGE NUMBER 1.3.8-4 of 16' C.Clearance Order Release Tags removal and Clearance Order release will be approved by the Shift Manager.It.will be.approved when the authorizated individual to whom it is issued, the person in charge of the work under a work document, or"he duty Shift Manager as the case may be,has signed the"Released By" section'of the Clearance Order original.This signature indicates that the work is complete or cancelled and that tag removal will not result in an unsafe situation.
B. All Clearance         Order Tags (RDanger" and "Caution" ) are placed, accounted for  and removed        only in conjunction with      a properly authorized Clearance Order.
l.'Upon assuring that the clearance order has been properly released and that no safety hazards exists, the Shift Manager will authorize release of the Clearance Order by: a~b.Indicating if"Redundant Verification" is required when the component is safety related.J Signing the"Authorized By" section of the Clearance Order and entering the"Date" and"Time" in the column provided.c.Having the tags removed and the equipment returned to service.A column is provided on the Clearance Order to allow the Shift Manager to specify the component status following tag removal.This column (" Return Status")should be used when the Shift Manager determines that a specific component status is needed.2.An assigned operator(s) will: a.Remove the tags.b.Return the equipment to service as required.c.Initial the space provided adjacent to"Return Status" column.d.When all tags are removed and accounted for, sign the"Tag(s)Accounted For By" section of the Clearance Order original and destroy the tags.e.When redundant verification is necessary, a second individual will verify the return status requirement and initial in the space provided in the"Dual" initial column.D.Multi le Use of Clearance Order Where more than one authorized work task is preplanned for a scheduled outage of a major piece of equipment or system, more than one clearance may be granted under a Clearance Order.The implementation of this provision requires the same procedures as described above except that the requests will normally be made in advance.WP.598 PROCEOURE NUMBER 1.3.8 REVISION NUMBER PAGE NUMBER 1.3.8-5 of 16  
: 1. The "Danger"        tag is placed as an assurance that the syste, or equipment       will NOT be    changed from the status tagged except as provided by this          procedure.
.0 Tags cannot be removed or equipment returned to service until all clearances have been released by the Shift Manager signing"Clearance Order Release Authorized'By" section.Clearance for additional work (see Section"E")may be granted under an existing Clearance Order at the discretion of the Shift Manager.When granting an additional work clearance under an existing Clearance Order, the purpose and the equipment description will be recorded in the"Remarks" section and the appropriate information and signatures recorded in the"Remarks" section and the appropriate information and signatures recorded'in the"Clearance Issue"'and"Clearance Release" sections.E.Clearance Order Chan e A change of clearance status will be utilized to allow: 1)'addicional work under an existing Clearance Order with additions to the"Tag Location" section, 2)removal of tags to allow return to ser.ice of a component or portion of a system, and 3)operation which the Shift Manager deems warrant a Clearance Order change.Due to the complicated nature of the approvals and reviews involved in ensuring safe.work conditions, under no condition will a Clearan'ce Order be changed that already has more than one work document associated with it.A change of clearance status is made only after the Shift Manager has reviewed the proposed change and determine'd that the change does not compromise the initial clearance order.If the proposed change represents a complicated shuffling of tags and/or an unwarranted opportunity for errors during the tagging process, the Shift Manager should issue a new clearance and a new'et of tags.In addition.to the Shi'ft Manager's approval, the details for the proposed change shall be reviewed with an approved by the authorized individual responsible for associated Clearance Order.His initials adjacent to the changes will signify his approval.A Clearance Order change shall be implemented as follows: 1.The addition and/or deletion of tags will be recorded in the"Tag Location" section and the changes initialed by the Shift Manager.2.A description of the change and the reason for it will be recorded"in the"Remarks" section and the entry initialed by the Shift Manager and the authorized individual responsible for the associated Clearance Order.If the change allows additional work under the existing Clearance Order, the appropriate blank in the"Clearance Issue" and"Clearance Release" section will also be completed as per Section D above.INP-598 PROCEDURE NUMBER 1.3.8 REVISION NUMBER PAGE NUMBER 1.3.8-6 of 16 F.I Tem orar LiftWi of Ta s When there would be a great advantage to performing.a brief checkout or test without'eleasing a Clearance Order, the Shift Manager and the authorized individual holding the Clearance Order can agree to temporarily lift some of the tags.Only checkout or test that should take a short time (less than one hour)are allowed.They may=not run through a shift change.If the Clearance Order is a multiple Clearance-Order tern orar liftin of the ta s is not ermitted.The temporary lift ng may be terminated at any time by either of the agreeing parties.'he sequence is as follows: l.Agreement between the Shift Manager and the authorized individual holding the Clearance Order as to need and limits of the test and tag lifting.2.An operator will'e assigned to temporarily lift the specified tags and perform"the test as directed.The assigned operator must stay in the area of the equipment or where the tags were lifted while the tags are removed.He is to have no other duties or interference.
20    The        "Caution" tag  is placed as an assurance that the system or equipment        will be  operated only as provided by the instruction or limitations        described on the tag.
3.After the test, the assigned operator will insure the components are returned to their tagged position and the tags replaced.1.3.8.4 Attachments A.B.C.D.E.F.G.H.I.Attachment Attachment Attachment Attachment Attachment Attachment Attachment Attachment Attachment I II III IV V VI VII VIII VIIII-Red Danger Tag Red Danger Sticker (iate~)Yellow Caution Tag Yellow Caution Sticker (tate<)Danger Tag Clearance Order Caution Tag Clearance Order Danger Tag Clearance Order Addendum Caution Tag Clearance Order Addendum Clearance Order Flow Path WP 59B PROCEDURE NUMBER 1.3.8 REVISION NUMBER 1.&#xc3;8-7 of 16
Because the two Clearance Order tags have different functions, the "Danger" tag shall have precedence and priority over a "Caution" tag.
~I~l~~r".l: r>>'a l r1-~I;~'L.t:;.DO.NOT REMOVE THIS TAG-,,.;";NITHOUT PROPER AVTHORITY,.:
: 4. This -procedure allows for multiple use of- a single clearance.
l~\j~~j".}We>>W~'v~~r~>>}j j~,-TAG NO.'.:;CLEARANCE ORDER NO..EQU}PMENT NO.', REQU}REDSTATU5 r I,,'c"'.UNAUTHORIZED PLACEMENT OR',':.,'.'-..REMOVAL OF THIS TAG.SILL BE-.'"'".'.""'CAUSE FOR'DISCIPLINARY ACTION'"-':
                                "multiple" Clearance Orders should be used only when the         'hese boundaries are mutual, common and uncluttered.
''.;:.4.'...'
If        any doubt exists,    it is  better to issue    a  redundant Clearance Order and associated tags.
.~.'"'-'E 8'0}Y H E R::" 5 I 9 E'ttachment I WP.598 PROCEDURE NUMBER 1.3.8 REVISION NUMBER PAGE NUMBER 1.3.8-8 of 16 S I~a>
: 5.  . This procedure provides for temporarily lifting of "Danger" tags, when work is complete, for testing of component just prior to Clearance Order Release.
LATER Attachment II WP 598 PROCEDURE NUMBER 1.3.8 REVISION NUMBER PAGE NUMBER 1.3.8-9 of'6 TAG NO.'EQUII'IIJIENT STATUS.REASON: Q g F OT U g~g8[lghTAGGING AUTHORITYI DATE Attachment I I I WP 598 PROCEDURE NUMBER 1.3.8 REVISION NUMBER PAGE NUMBER 1.3.8-10 of 16 LATER Attachment IV PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER WP.598 1.3.8 4 1.3.8-11 of 16 tg
1.3.8.3    Procedure The Clearance           Order Log  will be  maintained in the Control Room. It consists of  two loose          leaf type binders,    one for the "Danger" Clearance Orders and one for the "Caution" Clearance Orders.                 Each binder will be divided into two sections: an active section containing the Clearance Orders in effect and a closed section containing the Clearance Orders that have been closed.
<~>>'WASHIACTOX PLeBLlC PON'ER SUPPLY SYSTEM'I DANGER TAG CI.I:Alt A.'1'CE ONllElt OAVES: Q<>~r>>C>>e1 IS r S 1 L<+VRrL>>RC~)g~v e~~V VI h TAC LCCATIOIe I lee LeeI r.~SITIOH]INITIAL TAGS Pil~"VED RCTVRIe STATVS I IIIITIAL 10 CLEARANCE ISSUE CLEARANCE RELEASE 0ATC TWC U<D TO AVTIIORIXCO ST ACCEPTED SY RCLCASC IY OATS TI IRC O$1'I C OOC C'~P S~\Y~DAT TIMES REDUNDANT VERIF I CA: 10N REOUIRED: I In%)SIRAIIAS rALI1I Accceeeeerco>>or ce>>re>>4 I~ICATC Attachment V WP-Sge PROCEOURE NUMBER 1.3.8 REYISION NUMBER PAGE NUMBER 1.3.8-12 of 16 4'~~~I'I I 8 R 8 S 5 R 8 I Ii I e~''0~
On a  monthly basis, a person designated by the Operations Manager will review both logs and take appropriate action to clear any unnecessary Clearance Orders.
5 O'ASH!ACTOR PDBLJC Fbi'EP.SlTtLY SY~t..'Il DANGER TAG.CI.EAllANCE()lll>Ell Al)DE';L'l)Uil C O.NO~I I r T*C LOCATION l Tr..,C IIIINI~OZI JION I INITIAL OF'I I TIa II".%3I:I ACTVPI4 5TATVS, INITIAI 0 CN A A II5%>5~'I Attachment VII WP-598 PROCEDURE NUMBER 1.3.8 REVISION NUMBER PAGE NUMBER 1.3.8-14 of 16  
PROCECUJLE NUMBER    REVISION NUMBER dd'P.S98 T.3.%-'F of      16 1.3.8
~~~~  
 
~g ili ARANCE ORDER FLOW PATH Clearance Order Issuin Clearance Order Releasin REQUESTER Any permanent Supply System employee or authorized individual.
~  ~
Presents request to Control Room.Clearance Order Holder h When work completed and Clearance Order to be released informs Control Room and signs original and yellow copy of Clearance Order.I Assi ned 0 erator I'Determines clearance requirements I and prepares Clearance Order and l tags..I Verifies and reviews Clearance Order.Authorizes equipment to be removed from service and placement of tags by signing"Authorized By." Returns Clearance Order to Control Room for hanging tags, I I I Determines any additional instru'-I tions applicable to the release of the Clearance Order, signs"Release Authorized By" section on o;iginal copy of Clearance Order, returns to Control Room for removal.t , Contro Room Assigns Operator(s) to remove tags using yellow copy as field copy;Control Room Assi ned 0 erator s Assigns Operator to place Clearance Order in effect using pink copy.Control Room retains original and'yellow copy.Has assigned operator sign original and yellow copy for"Tags Hung By".Destroy'pink copy.Clearance Order Holder Reviews Clearance Order and any add-tional instructions, removes tags and initials Clearance Order in"Tags Removed" section, signs original"Accounted For By" section when all tags are removed,.accounted for and destroyed.
t Closed Clearance Or ers will remain in the closed section for a minimum days from date of-closure. All closed Clearance Orders beyond the 30 days that are no longer needed shall be forwarded to the Plant Records of'0 Center for disposition.
Informs the'ontrol Room that Clearance Order is removed.Review the Clearance Order and tags, and signs"Accepted By" column of'riginal.Control Room Control Room Verifies all signatures completed on, original, destroys yellow copy, informs Shift Manager.and files in the inactive section.Files original and yellow copy in Active Clearance Order Section.Informs Shift Manager, that Clearance 0-der is in effect.VIP 598 PROCECVRE NIJI ABBR PREVISION NVMBER I 4!PS GE NVIViB=R 1.3.8-16 of 16}}
A.  ~Authorit The  Shift Manager  is responsible for administration of    the the Clearance Order Program.        This responsibility cannot be delegated.
Signature authority for the functioning of the Clearance Order Program may be o legated.      For ur oses of this rocedure rocessin the term Shift Mana er shall nclude h s s nature esi nate un ess s ec f ed ot erw se. The authorized in iv dual accepting the Clearance Or er or continuing work'nder a Clearance Order issued to a work document is responsible for verifying a safe working condition..
B. Clearance Order Issuin Clearance Orders may be issued in one of three methods. They may be issued to an authorized individual by name, person in charge of work by a work document, or Duty Shift Manager by title. In addition, during system lineup and testing, clearance orders can be issued to a work document number    or to any authorized test engineer.
In the case of the latter two, the person-currently in charge of the work or the on-duty Shift Manager accepts or releases the Clearance Order. Also, during system lineup and testing, test directors may accept or release clearance orders issued t'o their assigned test enginebrs.
The  request for a Clearance Order is made through the Control Room, i.e., Plant Operations Department. An assigned operator will then determine the requirements to provide a safe work condition and initiate the appropriate Clearance Order Form, Attachment V or VI as directed below. These forms contain an original (white), a yellow and a pink copy. The pink copy is issued with the tags for use in processing the Clearance Order. The yellow copy is retained with the original in the active section of the log for use at the time of Clearance Order release.
: l. Upon  receipt of  a Clearance    Order request the assigned operator will:
a., Enter    the "Equipment/System" description and the "Purpose" on the Clearance Order,
: b. Determine the required tag locations and the desired component status and record this information in the "Tag Location" and "Tags Hung" sections of the Clearance Order. If more than ten tags are required, an addendum will be issued (Attachment VII). The use of an addendum will be PROCE~Rg NUI IBER    REVISION NUMBER Iod ~ 0                                P.S.P-Y of     16 V/P 598
 
li ~
no    in the "Remarks" portion of          Clearance Order. Thy addendum is completed by recording additional tag locations and desired status for each component.        The addendum is numbered with the same number as the Clearance Order and is attached to the Clearance Order proper.
C~  Number. each    tag with the Clearance Order number and the appropriate tag number shown in the "Tag Location" section of the Clearance Order.
: d. Denote on each tag the equipment name and/or piece number and required component status.
: e. Enter the work document number, authorized individual          name  or Shift Manager on the Clearance Order.
: f. Present the tags and Clearance Order to the duty Shift Manager.
: 2. The Shift  Manager. will assure that the'learance      Order provides the safe conditions necessary      for the protection of. personnel    and will:
: a. Sign the "Authorized By"      in the "clearance issue" section      and enter the date and time.
1
: b. Assign an operator to hang the tags and place the equipment in the specified status.
The assigned    operator will thoroughly    review the operational tasks required and  will then:
: a. Position valves, breakers, switches or other devices in the status specified.
: b. Hang  the tags and initial the Clearance Order original adjacent to the designated position for each component.
: c. Inform the Shift Manager that the clearance has been placed.
: 4. The Supply System    representative responsible shall thoroughly understand the requirement necessary to accomplish the work and the limits of the clearance and shall:
a~  Verify that the Clearance Order provides a safe working condition and so signify by signature in the "Accepted By" section of the Clearance Order. This signature is not intended to prevent an assigned craftsman from further verifying safe working conditions.
: b. Notify the control    room  operator of  start of   work.
PROCEDURE NUMBER    REVISION NUMBER      PAGE NUMBER WP 598 1.~.8                                      1.3.8-4 of 16'
 
C. Clearance Order Release Tags removal and Clearance Order release will be approved by the Shift Manager. It. will be. approved when the authorizated individual to whom it  is issued, the person in charge of the work under a work document, or "he duty Shift Manager as the case may be,has signed the "Released By" section'of the Clearance Order original. This signature indicates that the work is complete or cancelled and that tag removal will not result in an unsafe situation.
: l.   'Upon assuring      that the clearance order has been properly released and  that    no  safety hazards exists, the Shift Manager will authorize release of the Clearance Order by:
a~    Indicating    if "Redundant Verification" is required is safety related.
when  the component J
: b. Signing the "Authorized By" section of the Clearance Order and entering the "Date" and "Time" in the column provided.
: c. Having the tags removed and the equipment returned to service. A column is provided on the Clearance Order             to allow the Shift Manager to specify the component status following tag removal. This column ("Return Status" ) should be used when the Shift Manager determines that a specific component status is needed.
: 2. An assigned operator(s)      will:
: a. Remove    the tags.
: b. Return the equipment to service as required.
: c. Initial the space    provided adjacent to "Return Status" column.
: d. When all tags are      removed and accounted    for, sign the "Tag(s)
Accounted For By" section      of the Clearance Order original and destroy the tags.
: e. When  redundant  verification is necessary,     a second  individual will verify the return      status requirement    and initial in    the space provided in the "Dual"      initial column.
D. Multi le  Use  of Clearance    Order Where more    than one authorized work task is preplanned for a scheduled outage  of  a  major piece of equipment or system, more than one clearance may be granted under a Clearance Order.           The implementation of this provision requires the same procedures as described above except that the requests will normally be made in advance.
PROCEOURE NUMBER    REVISION NUMBER      PAGE NUMBER 1.3.8                                    1.3.8-5 of    16 WP.598
 
                                  .                              0 Tags cannot be removed or equipment returned to service until                all clearances have been released by the Shift Manager signing "Clearance Order Release Authorized'By" section.
Clearance   for additional    work (see Section "E") may be granted under an existing Clearance Order at the discretion of the Shift Manager. When granting an additional work clearance under an existing Clearance Order, the purpose and the equipment description will be recorded in the "Remarks" section and the appropriate information and signatures recorded in the "Remarks" section and the appropriate information and signatures recorded'in the "Clearance Issue" 'and "Clearance Release" sections.
E. Clearance Order Chan      e A change    of clearance status will be utilized to allow:             1)'addicional work under an    existing Clearance Order with additions to          the "Tag Location" section, 2) removal of tags to allow return to              ser.ice of  a component or portion of a system, and 3) operation which              the  Shift Manager deems warrant a Clearance          Order change.
Due  to the complicated nature of the approvals and reviews involved in ensuring safe. work conditions, under no condition will a Clearan'ce Order be changed that already has more than one work document associated with it.
A  change  of clearance status is      made only after the Shift Manager has reviewed the proposed change        and  determine'd that the change does not compromise the    initial    clearance order.     If  the proposed change represents a complicated shuffling of tags and/or an unwarranted opportunity for errors during the tagging process, the Shift Manager should issue a new clearance and a new'et of tags. In addition.to the Shi'ft Manager's approval, the details for the proposed change shall be reviewed with an approved by the authorized individual responsible for associated Clearance Order. His initials adjacent to the changes                will signify his approval.
A  Clearance Order change shall be implemented as follows:
: 1. The addition and/or deletion of tags will be recorded in the "Tag Location" section and the changes initialed by the Shift Manager.
: 2. A description of the change and the reason for          it "in the "Remarks" section and the entry initialed by the Shift will be recorded Manager and the authorized individual responsible for the associated Clearance Order.
If the  change allows    additional work under the existing Clearance Order, the appropriate blank in the "Clearance Issue" and "Clearance Release" section      will also    be completed as per Section D above.
PROCEDURE NUMBER      REVISION NUMBER       PAGE NUMBER 1.3.8                                       1.3.8-6 of   16 INP-598
 
I F. Tem  orar  LiftWi    of  Ta s When  there would be    a  great advantage to performing.a brief checkout or test without'eleasing a Clearance Order, the Shift Manager and the authorized individual holding the Clearance Order can agree to temporarily    lift some of the tags.       Only checkout or test that should take a short time (less than one hour) are allowed. They may=not run through a shift change.         If  the Clearance Order is a multiple Clearance-Order tern orar liftin          of  the ta s is not ermitted. The temporary lift  ng may be terminated      at  any time by either of the agreeing parties.
                'he    sequence  is as  follows:
: l. Agreement between the      Shift Manager and the authorized      individual holding the Clearance Order as to need and          limits of the test    and tag  lifting.
: 2. An  operator will'e assigned to temporarily          lift  the specified tags and perform"the test as      directed. The  assigned  operator must stay in the area of the equipment        or where  the  tags  were  lifted while the tags are removed. He is to have          no  other  duties  or interference.
: 3. After the test, the assigned operator will insure the components are returned to their tagged position and the tags replaced.
1.3.8.4  Attachments A. Attachment I          Red Danger Tag B. Attachment    II      Red Danger Sticker        (iate~)
C. Attachment    III      Yellow Caution Tag D. Attachment IV          Yellow Caution Sticker (tate<)
E. Attachment V          Danger Tag Clearance Order F. Attachment VI          Caution Tag Clearance Order G. Attachment VII          Danger Tag Clearance Order Addendum H. Attachment VIII        Caution Tag Clearance Order Addendum I. Attachment   VIIII-   Clearance Order Flow Path PROCEDURE NUMBER      REVISION NUMBER 1.3.8                                   1.&#xc3;8-7 of   16 WP 59B
 
                                            ~ l
                              ~ I r".l:
r>>'a l
                                              ~ ~                                                                       -~
r1        I
    ; ~ 'L.
:;.DO.NOT REMOVE THIS TAG -,,.;";
t        NITHOUT PROPER AVTHORITY,.:
We>>    W l     ~
                                                                  \j
                                                            ~        ~
j".}
                                                                                        ~'v~
                                                                                            ~
                                                                                              ~
                                                                                              >>}
r j                j ~
r        I,,
                                                                      'c"'.
UNAUTHORIZED PLACEMENT OR
                                                          ',': .,'.'-.. REMOVALOF THIS TAG.SILL BE-.'" '"
          ,
            -
TAG NO. '.:;
                                                              .'.  ""'CAUSE FOR 'DISCIPLINARYACTION'"-':
CLEARANCE ORDER NO.
              . EQU}PMENT NO.
                                                                                  '
                                                                                                  ''.;:.4.'...'        .  ~
                                                                                                                            .
                                                              '"'-'                  0} Y H E R::" 5 I 9
          ', REQU}REDSTATU5                                                  E 8                                      E
                                                                                                                              'ttachment I
PROCEDURE NUMBER                  REVISION NUMBER          PAGE NUMBER WP.598 1.3.8                                                1.3.8-8 of                16
 
I S  ~ a>
 
LATER Attachment  II PROCEDURE NUMBER  REVISION NUMBER PAGE NUMBER WP 598 1.3.8                          1.3.8-9  of'6
 
TAG NO.
                                  '
EQUII'IIJIENT STATUS.
REASON:
TAGGING AUTHORITYI QgF    Ug~
g8 [ lgh OT                                        DATE Attachment I I I PROCEDURE NUMBER    REVISION NUMBER      PAGE NUMBER WP 598 1.3.8                                1.3.8-10 of 16
 
LATER Attachment IV PROCEDURE NUMBER  REVISION NUMBER PAGE NUMBER 1.3.8              4        1.3.8-11 of 16 WP.598
 
tg
<
  ~
        >>
                                                'WASHIACTOX PLeBLlC PON'ER SUPPLY SYSTEM'I DANGER TAG                                      OAVES:
CI.I:AltA.'1'CE ONllElt r
Q < > ~ r>>C>>e1 IS S 1 L <+
VRrL>>RC
          ~
            )g  ~    v  e ~~        VI h LeeI r.
V                                              I  lee                                  TAGS Pil~"VED TAC LCCATIOIe                            ~SITIOH    ]  INITIAL RCTVRIe STATVS I IIIITIAL 10 CLEARANCE ISSUE                                        CLEARANCE RELEASE 0ATC            TWC            U<D TO          AVTIIORIXCOST      ACCEPTED SY        RCLCASC  IY        OATS      TIIRC
                                                            \
O$ 1'I
                                                          ~
C  OOC    C'~ P  S                  Y~                            DAT                  TIMES REDUNDANT VERIF I CA: 10N REOUIRED:                I In%)
SIRAIIAS rALI1IAccceeeeerco>>or        ce>>                                                                        ICATC re>> 4I~
Attachment        V PROCEOURE NUMBER              REYISION NUMBER                PAGE NUMBER WP-Sge                                                            1.3.8                                                1.3.8-12 of    16
 
4' I'    I  I
    ~ ~ ~
8 R
8 S
5 R
8 I
Ii          ' '
I  e
          ~
0 ~
 
5 O'ASH!ACTOR PDBLJC Fbi'EP. SlTtLY SY~t..'Il DANGER TAG
                                    .CI.EAllANCE()lll>EllAl)DE';L'l)Uil C  O.NO    ~                                                                  OF 'I I I I r                              l    Tr..,C IIIINI            TIa  II".%3I:I T*C LOCATION                        ~ OZIJION    I INITIAL ACTVPI4 5TATVS, INITIAI 0 CN A A II5
        %>  5 ~ 'I Attachment VII PROCEDURE NUMBER          REVISION NUMBER                PAGE NUMBER 1.3.8                                                  1.3.8-14 of 16 WP-598
 
~ ~ ~ ~
~ g  ili ARANCE ORDER FLOW PATH Clearance Order Issuin                                Clearance Order Releasin REQUESTER                                      Clearance Order Holder                    h Any permanent    Supply System employee              When  work completed and Clearance or authorized individual. Presents              Order to be released informs Control request to Control Room.                            Room and    signs original and yellow copy  of Clearance Order.
I  '          Assi ned 0 erator I                                                    I Determines clearance requirements                I I  and prepares Clearance Order and                  I Determines any additional          instru'-
l  tags.                                            I tions applicable to the release of
        .I                                                      the Clearance Order, signs "Release Authorized By" section on o;iginal copy of Clearance Order, returns to Control Room for removal.
Verifies  and reviews Clearance Order.
Authorizes equipment to be removed                                              t from service and placement of tags                                , Contro  Room by signing "Authorized By." Returns Clearance Order to Control Room for                Assigns Operator(s) to remove tags hanging tags,                                      using yellow copy as field copy; Control  Room                                  Assi ned 0 erator s Assigns Operator to place Clearance                Reviews Clearance Order and any add-Order in effect using pink copy.                    tional instructions, removes tags Control  Room  retains original  and                and initials Clearance Order in
          'yellow copy. Has assigned operator              "Tags Removed" section, signs sign original and yellow copy for                  original "Accounted For By" section "Tags Hung By". Destroy'pink copy.                when  all  tags are removed,.accounted for  and  destroyed. Informs the Room  that Clearance Order      'ontrol is  removed.
Clearance Order Holder Review the Clearance Order and tags, and signs "Accepted By" column of                                    Control    Room
            'riginal.
Verifies all signatures completed on, original, destroys yellow copy, informs Shift Manager. and files in Control  Room                        the inactive section.
Files original  and yellow copy in Active Clearance Order Section.
Informs Shift Manager, that Clearance 0-der is in effect.
PROCECVRE NIJI ABBR    PREVISION NVMBER          PS GE NVIViB=R I
4            !
1.3.8-16 of        16 VIP 598}}

Revision as of 15:59, 29 October 2019

Rev 4 to Procedure 1.3.8, Equipment Clearance & Tagging.
ML17277A539
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/09/1982
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17277A534 List:
References
RTR-NUREG-0892, RTR-NUREG-892 1.3.8, NUDOCS 8304080423
Download: ML17277A539 (19)


Text

O.

WASHINGTON PUBLIC POWER SUPPLY SYSTEM PLANT PRO 'URES MANUAL

~~~80II,t i: -.:; I-.;..~~

PROCEDURE NUMBER A OVE DATE 06/09/82 VOLUME NAME ACMINIST SECTION 1.3 CONDUCT OF OPERAT TITLE

+1.3.8 E UIPMENT CLEARAN A T 1.3.8.1 ~Pue oee This procedure provides direction for the proper method of requesting, issuing, lifting and releasing Clearance Orders (CO). The "Danger" and "Caution" tags are placed on plant equipment to provide for safety of personnel and equipment protection.

It must be understood that a Danger Tag Clearance Order and associated

,

"Danger" tags represent a lifesaving procedure and SMALL BE INVIOLATE.

Violation of one of these tags or the Clearance Order procedure by anyone SHALL be sufficient cause for IMMEDIATE'ISCIPLINARYACTION.

1.3. 8e 2 Discussion A. Definitions "Dan er" Ta s are those red tags and stickers-represented by A ac ments I and II respectively and are used when personnel safety is of primary concern,

~t' Attachments III and tt yll tg IV respectively d tik and are used

'

tdt to provide temporary ins'tructions or limited-operation of equipment.

"Clearance Order Release" is the process of closing out a Clearance Order and thereby placing it into the "closed" section of the Clearance Order Log.

"Closed" Clearance Order is a Clearance Order that has been released, removed and is no longer in effect.

"Multi le" Clearance Order is a Clearance Order that provides work protect on for more than one purpose or job while utilizing one Clearance Order and its associated tags.

83PyP8p~~'

PDR gD0C~ 83Pgg3

PSppp39y PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER PDR 1.3.8 1.3.8-1 of 16 WP.597 R1

t "Authorized Individual"8 shall be any permanent Supply System employee or any n v ua who s on the authorization list. The authorization list shall be maintained in the form of the Clearance Order Log and approved by -the Operations Manager.

t~dt "t tddttd tt tt t t d tt ~ d t t.

"Redundant Verification" is that requirement directing a second ndividual to make an independent verification of correct equipment status for safety related equipment. This can be accomplished from the.

main control room when adequate status indication is available or by local status verification when necessary.

B. All Clearance Order Tags (RDanger" and "Caution" ) are placed, accounted for and removed only in conjunction with a properly authorized Clearance Order.

1. The "Danger" tag is placed as an assurance that the syste, or equipment will NOT be changed from the status tagged except as provided by this procedure.

20 The "Caution" tag is placed as an assurance that the system or equipment will be operated only as provided by the instruction or limitations described on the tag.

Because the two Clearance Order tags have different functions, the "Danger" tag shall have precedence and priority over a "Caution" tag.

4. This -procedure allows for multiple use of- a single clearance.

"multiple" Clearance Orders should be used only when the 'hese boundaries are mutual, common and uncluttered.

If any doubt exists, it is better to issue a redundant Clearance Order and associated tags.

5. . This procedure provides for temporarily lifting of "Danger" tags, when work is complete, for testing of component just prior to Clearance Order Release.

1.3.8.3 Procedure The Clearance Order Log will be maintained in the Control Room. It consists of two loose leaf type binders, one for the "Danger" Clearance Orders and one for the "Caution" Clearance Orders. Each binder will be divided into two sections: an active section containing the Clearance Orders in effect and a closed section containing the Clearance Orders that have been closed.

On a monthly basis, a person designated by the Operations Manager will review both logs and take appropriate action to clear any unnecessary Clearance Orders.

PROCECUJLE NUMBER REVISION NUMBER dd'P.S98 T.3.%-'F of 16 1.3.8

~ ~

t Closed Clearance Or ers will remain in the closed section for a minimum days from date of-closure. All closed Clearance Orders beyond the 30 days that are no longer needed shall be forwarded to the Plant Records of'0 Center for disposition.

A. ~Authorit The Shift Manager is responsible for administration of the the Clearance Order Program. This responsibility cannot be delegated.

Signature authority for the functioning of the Clearance Order Program may be o legated. For ur oses of this rocedure rocessin the term Shift Mana er shall nclude h s s nature esi nate un ess s ec f ed ot erw se. The authorized in iv dual accepting the Clearance Or er or continuing work'nder a Clearance Order issued to a work document is responsible for verifying a safe working condition..

B. Clearance Order Issuin Clearance Orders may be issued in one of three methods. They may be issued to an authorized individual by name, person in charge of work by a work document, or Duty Shift Manager by title. In addition, during system lineup and testing, clearance orders can be issued to a work document number or to any authorized test engineer.

In the case of the latter two, the person-currently in charge of the work or the on-duty Shift Manager accepts or releases the Clearance Order. Also, during system lineup and testing, test directors may accept or release clearance orders issued t'o their assigned test enginebrs.

The request for a Clearance Order is made through the Control Room, i.e., Plant Operations Department. An assigned operator will then determine the requirements to provide a safe work condition and initiate the appropriate Clearance Order Form, Attachment V or VI as directed below. These forms contain an original (white), a yellow and a pink copy. The pink copy is issued with the tags for use in processing the Clearance Order. The yellow copy is retained with the original in the active section of the log for use at the time of Clearance Order release.

l. Upon receipt of a Clearance Order request the assigned operator will:

a., Enter the "Equipment/System" description and the "Purpose" on the Clearance Order,

b. Determine the required tag locations and the desired component status and record this information in the "Tag Location" and "Tags Hung" sections of the Clearance Order. If more than ten tags are required, an addendum will be issued (Attachment VII). The use of an addendum will be PROCE~Rg NUI IBER REVISION NUMBER Iod ~ 0 P.S.P-Y of 16 V/P 598

li ~

no in the "Remarks" portion of Clearance Order. Thy addendum is completed by recording additional tag locations and desired status for each component. The addendum is numbered with the same number as the Clearance Order and is attached to the Clearance Order proper.

C~ Number. each tag with the Clearance Order number and the appropriate tag number shown in the "Tag Location" section of the Clearance Order.

d. Denote on each tag the equipment name and/or piece number and required component status.
e. Enter the work document number, authorized individual name or Shift Manager on the Clearance Order.
f. Present the tags and Clearance Order to the duty Shift Manager.
2. The Shift Manager. will assure that the'learance Order provides the safe conditions necessary for the protection of. personnel and will:
a. Sign the "Authorized By" in the "clearance issue" section and enter the date and time.

1

b. Assign an operator to hang the tags and place the equipment in the specified status.

The assigned operator will thoroughly review the operational tasks required and will then:

a. Position valves, breakers, switches or other devices in the status specified.
b. Hang the tags and initial the Clearance Order original adjacent to the designated position for each component.
c. Inform the Shift Manager that the clearance has been placed.
4. The Supply System representative responsible shall thoroughly understand the requirement necessary to accomplish the work and the limits of the clearance and shall:

a~ Verify that the Clearance Order provides a safe working condition and so signify by signature in the "Accepted By" section of the Clearance Order. This signature is not intended to prevent an assigned craftsman from further verifying safe working conditions.

b. Notify the control room operator of start of work.

PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER WP 598 1.~.8 1.3.8-4 of 16'

C. Clearance Order Release Tags removal and Clearance Order release will be approved by the Shift Manager. It. will be. approved when the authorizated individual to whom it is issued, the person in charge of the work under a work document, or "he duty Shift Manager as the case may be,has signed the "Released By" section'of the Clearance Order original. This signature indicates that the work is complete or cancelled and that tag removal will not result in an unsafe situation.

l. 'Upon assuring that the clearance order has been properly released and that no safety hazards exists, the Shift Manager will authorize release of the Clearance Order by:

a~ Indicating if "Redundant Verification" is required is safety related.

when the component J

b. Signing the "Authorized By" section of the Clearance Order and entering the "Date" and "Time" in the column provided.
c. Having the tags removed and the equipment returned to service. A column is provided on the Clearance Order to allow the Shift Manager to specify the component status following tag removal. This column ("Return Status" ) should be used when the Shift Manager determines that a specific component status is needed.
2. An assigned operator(s) will:
a. Remove the tags.
b. Return the equipment to service as required.
c. Initial the space provided adjacent to "Return Status" column.
d. When all tags are removed and accounted for, sign the "Tag(s)

Accounted For By" section of the Clearance Order original and destroy the tags.

e. When redundant verification is necessary, a second individual will verify the return status requirement and initial in the space provided in the "Dual" initial column.

D. Multi le Use of Clearance Order Where more than one authorized work task is preplanned for a scheduled outage of a major piece of equipment or system, more than one clearance may be granted under a Clearance Order. The implementation of this provision requires the same procedures as described above except that the requests will normally be made in advance.

PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 1.3.8 1.3.8-5 of 16 WP.598

. 0 Tags cannot be removed or equipment returned to service until all clearances have been released by the Shift Manager signing "Clearance Order Release Authorized'By" section.

Clearance for additional work (see Section "E") may be granted under an existing Clearance Order at the discretion of the Shift Manager. When granting an additional work clearance under an existing Clearance Order, the purpose and the equipment description will be recorded in the "Remarks" section and the appropriate information and signatures recorded in the "Remarks" section and the appropriate information and signatures recorded'in the "Clearance Issue" 'and "Clearance Release" sections.

E. Clearance Order Chan e A change of clearance status will be utilized to allow: 1)'addicional work under an existing Clearance Order with additions to the "Tag Location" section, 2) removal of tags to allow return to ser.ice of a component or portion of a system, and 3) operation which the Shift Manager deems warrant a Clearance Order change.

Due to the complicated nature of the approvals and reviews involved in ensuring safe. work conditions, under no condition will a Clearan'ce Order be changed that already has more than one work document associated with it.

A change of clearance status is made only after the Shift Manager has reviewed the proposed change and determine'd that the change does not compromise the initial clearance order. If the proposed change represents a complicated shuffling of tags and/or an unwarranted opportunity for errors during the tagging process, the Shift Manager should issue a new clearance and a new'et of tags. In addition.to the Shi'ft Manager's approval, the details for the proposed change shall be reviewed with an approved by the authorized individual responsible for associated Clearance Order. His initials adjacent to the changes will signify his approval.

A Clearance Order change shall be implemented as follows:

1. The addition and/or deletion of tags will be recorded in the "Tag Location" section and the changes initialed by the Shift Manager.
2. A description of the change and the reason for it "in the "Remarks" section and the entry initialed by the Shift will be recorded Manager and the authorized individual responsible for the associated Clearance Order.

If the change allows additional work under the existing Clearance Order, the appropriate blank in the "Clearance Issue" and "Clearance Release" section will also be completed as per Section D above.

PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 1.3.8 1.3.8-6 of 16 INP-598

I F. Tem orar LiftWi of Ta s When there would be a great advantage to performing.a brief checkout or test without'eleasing a Clearance Order, the Shift Manager and the authorized individual holding the Clearance Order can agree to temporarily lift some of the tags. Only checkout or test that should take a short time (less than one hour) are allowed. They may=not run through a shift change. If the Clearance Order is a multiple Clearance-Order tern orar liftin of the ta s is not ermitted. The temporary lift ng may be terminated at any time by either of the agreeing parties.

'he sequence is as follows:

l. Agreement between the Shift Manager and the authorized individual holding the Clearance Order as to need and limits of the test and tag lifting.
2. An operator will'e assigned to temporarily lift the specified tags and perform"the test as directed. The assigned operator must stay in the area of the equipment or where the tags were lifted while the tags are removed. He is to have no other duties or interference.
3. After the test, the assigned operator will insure the components are returned to their tagged position and the tags replaced.

1.3.8.4 Attachments A. Attachment I Red Danger Tag B. Attachment II Red Danger Sticker (iate~)

C. Attachment III Yellow Caution Tag D. Attachment IV Yellow Caution Sticker (tate<)

E. Attachment V Danger Tag Clearance Order F. Attachment VI Caution Tag Clearance Order G. Attachment VII Danger Tag Clearance Order Addendum H. Attachment VIII Caution Tag Clearance Order Addendum I. Attachment VIIII- Clearance Order Flow Path PROCEDURE NUMBER REVISION NUMBER 1.3.8 1.Ã8-7 of 16 WP 59B

~ l

~ I r".l:

r>>'a l

~ ~ -~

r1 I

~ 'L.
.DO.NOT REMOVE THIS TAG -,,.;";

t NITHOUT PROPER AVTHORITY,.:

We>> W l ~

\j

~ ~

j".}

~'v~

~

~

>>}

r j j ~

r I,,

'c"'.

UNAUTHORIZED PLACEMENT OR

',': .,'.'-.. REMOVALOF THIS TAG.SILL BE-.'" '"

,

-

TAG NO. '.:;

.'. ""'CAUSE FOR 'DISCIPLINARYACTION'"-':

CLEARANCE ORDER NO.

. EQU}PMENT NO.

'

.;:.4.'...' . ~

.

'"'-' 0} Y H E R::" 5 I 9

', REQU}REDSTATU5 E 8 E

'ttachment I

PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER WP.598 1.3.8 1.3.8-8 of 16

I S ~ a>

LATER Attachment II PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER WP 598 1.3.8 1.3.8-9 of'6

TAG NO.

'

EQUII'IIJIENT STATUS.

REASON:

TAGGING AUTHORITYI QgF Ug~

g8 [ lgh OT DATE Attachment I I I PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER WP 598 1.3.8 1.3.8-10 of 16

LATER Attachment IV PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 1.3.8 4 1.3.8-11 of 16 WP.598

tg

<

~

>>

'WASHIACTOX PLeBLlC PON'ER SUPPLY SYSTEM'I DANGER TAG OAVES:

CI.I:AltA.'1'CE ONllElt r

Q < > ~ r>>C>>e1 IS S 1 L <+

VRrL>>RC

~

)g ~ v e ~~ VI h LeeI r.

V I lee TAGS Pil~"VED TAC LCCATIOIe ~SITIOH ] INITIAL RCTVRIe STATVS I IIIITIAL 10 CLEARANCE ISSUE CLEARANCE RELEASE 0ATC TWC U<D TO AVTIIORIXCOST ACCEPTED SY RCLCASC IY OATS TIIRC

\

O$ 1'I

~

C OOC C'~ P S Y~ DAT TIMES REDUNDANT VERIF I CA: 10N REOUIRED: I In%)

SIRAIIAS rALI1IAccceeeeerco>>or ce>> ICATC re>> 4I~

Attachment V PROCEOURE NUMBER REYISION NUMBER PAGE NUMBER WP-Sge 1.3.8 1.3.8-12 of 16

4' I' I I

~ ~ ~

8 R

8 S

5 R

8 I

Ii ' '

I e

~

0 ~

5 O'ASH!ACTOR PDBLJC Fbi'EP. SlTtLY SY~t..'Il DANGER TAG

.CI.EAllANCE()lll>EllAl)DE';L'l)Uil C O.NO ~ OF 'I I I I r l Tr..,C IIIINI TIa II".%3I:I T*C LOCATION ~ OZIJION I INITIAL ACTVPI4 5TATVS, INITIAI 0 CN A A II5

%> 5 ~ 'I Attachment VII PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 1.3.8 1.3.8-14 of 16 WP-598

~ ~ ~ ~

~ g ili ARANCE ORDER FLOW PATH Clearance Order Issuin Clearance Order Releasin REQUESTER Clearance Order Holder h Any permanent Supply System employee When work completed and Clearance or authorized individual. Presents Order to be released informs Control request to Control Room. Room and signs original and yellow copy of Clearance Order.

I ' Assi ned 0 erator I I Determines clearance requirements I I and prepares Clearance Order and I Determines any additional instru'-

l tags. I tions applicable to the release of

.I the Clearance Order, signs "Release Authorized By" section on o;iginal copy of Clearance Order, returns to Control Room for removal.

Verifies and reviews Clearance Order.

Authorizes equipment to be removed t from service and placement of tags , Contro Room by signing "Authorized By." Returns Clearance Order to Control Room for Assigns Operator(s) to remove tags hanging tags, using yellow copy as field copy; Control Room Assi ned 0 erator s Assigns Operator to place Clearance Reviews Clearance Order and any add-Order in effect using pink copy. tional instructions, removes tags Control Room retains original and and initials Clearance Order in

'yellow copy. Has assigned operator "Tags Removed" section, signs sign original and yellow copy for original "Accounted For By" section "Tags Hung By". Destroy'pink copy. when all tags are removed,.accounted for and destroyed. Informs the Room that Clearance Order 'ontrol is removed.

Clearance Order Holder Review the Clearance Order and tags, and signs "Accepted By" column of Control Room

'riginal.

Verifies all signatures completed on, original, destroys yellow copy, informs Shift Manager. and files in Control Room the inactive section.

Files original and yellow copy in Active Clearance Order Section.

Informs Shift Manager, that Clearance 0-der is in effect.

PROCECVRE NIJI ABBR PREVISION NVMBER PS GE NVIViB=R I

4  !

1.3.8-16 of 16 VIP 598