| {{#Wiki_filter:.. Public Service Electric and Gas Company | | {{#Wiki_filter:.. |
| * Louis F. Storz Public Service Electric and Gas Company P.O. Box 236, Hancocks Brid9e, NJ 08038 609-339-5700 Senior Vice President
| | Public Service |
| -Nuclear Operations U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 OCT 301996 LR-N"96344 ASSURANCE OF EQUIPMENT OPERABILITY AND CONTAINMENT NRC GENERIC LETTER 96-06, 30 DAY RESPONSE SALEM GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Gentlemen; Public Service Electric and Gas (PSE&G) has evaluated the information requested in the referenced Generic Letter. The potential for waterhammer, two-phase flow and thermally induced overpressurization associated with the post accident operation of the Containment Fan Coil Units (CFCU) was previously identified by PSE&G as applicable to the Salem Units. This information and relevant corrective actions were identified in Licensee Event Report (LER) 272/96-020, dated September 18, 1996 (LR-N96286). | | * Electric and Gas Company Louis F. Storz Public Service Electric and Gas Company P.O. Box 236, Hancocks Brid9e, NJ 08038 609-339-5700 Senior Vice President - Nuclear Operations OCT 301996 LR-N"96344 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ASSURANCE OF EQUIPMENT OPERABILITY AND CONTAINMENT NRC GENERIC LETTER 96-06, 30 DAY RESPONSE SALEM GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Gentlemen; Public Service Electric and Gas (PSE&G) has evaluated the information requested in the referenced Generic Letter. The potential for waterhammer, two-phase flow and thermally induced overpressurization associated with the post accident operation of the Containment Fan Coil Units (CFCU) was previously identified by PSE&G as applicable to the Salem Units. This information and relevant corrective actions were identified in Licensee Event Report (LER) 272/96-020, dated September 18, 1996 (LR-N96286). |
| As noted in this LER, waterhammer and two phase flow are of concern to CFCU operation during the beginning of some accidents prior to the automatic isolation of non-essential service water loads. These conditions have been addressed through reanalysis of the affected accidents and submittal of License Change Request 96-13, dated October 25, 1996 (LR-N96287). | | As noted in this LER, waterhammer and two phase flow are of concern to CFCU operation during the beginning of some accidents prior to the automatic isolation of non-essential service water loads. These conditions have been addressed through reanalysis of the affected accidents and submittal of License Change Request 96-13, dated October 25, 1996 (LR-N96287). As committed in LER 272/96-020, PSE&G will install overpressure protection on the affected portions of CFCU service water piping to address thermally induced overpressurization. These modifications will be completed prior to restart of the affected unit. PSE&G has evaluated the information contained in LER 272/96-020 and believes it to be sufficient to address the Generic Letter 96-06 120 day response requirement relative to waterhammer, two-phase flow and thermally induced overpressurization as these conditions relate to CFCU operation. |
| As committed in LER 272/96-020, PSE&G will install overpressure protection on the affected portions of CFCU service water piping to address thermally induced overpressurization. | | PSE&G's analysis of thermally i.nduced overpressurization in the remainder of_ piping systems located inside containment is in progress. A total of 119 lines penetrate each of the Salem containment buildings, of which 87 lines are not affected due to either the existence of installed relief capability, internal temperatures greater than the peak accident temperature, lines normally in-service during an accident, lines connected to saturated systems (i.e. steam generators) or lines being gas filled. PSE&G's evaluation of the remaining 32 lines is nearing completion for Salem Unit 2. Corrective \ |
| These modifications will be completed prior to restart of the affected unit. PSE&G has evaluated the information contained in LER 272/96-020 and believes it to be sufficient to address the Generic Letter 96-06 120 day response requirement relative to waterhammer, two-phase flow and thermally induced overpressurization as these conditions relate to CFCU operation. | | action to address inoperability will consist of either procedural revisions |
| PSE&G's analysis of thermally i.nduced overpressurization in the remainder of_ piping systems located inside containment is in progress. | | / |
| A total of 119 lines penetrate each of the Salem containment buildings, of which 87 lines are not affected due to either the existence of installed relief capability, internal temperatures greater than the peak accident temperature, lines normally in-service during an accident, lines connected to saturated systems (i.e. steam generators) or lines being gas filled. PSE&G's evaluation of the remaining 32 lines is nearing completion for Salem Unit 2. Corrective | | 9611130268 961030 PDR ADOCK 05000272 1 |
| \ action to address inoperability will consist of either procedural revisions
| | A--f> |
| / 9611130268 961030 1 11 ( PDR ADOCK 05000272 A--f> c/ P PDR /\v II\. Printed on Recycled Paper Document Control Desk LR-N96344 2 | | 11c/ ( |
| * OCT 3o1996 to require partial draining of the affected piping prior to final isolation or physical modification to restore compliance. | | P PDR /\v II\. Printed on |
| Related analysis for Unit 1 will be completed by January 27, 1997. In accordance with the guidance of Generic Letter 91-18, corrective actions to address operability concerns will be completed prior to startup from the current refueling outages. As required by Generic Letter 96-06, a submittal summarizing the results of PSE&G's analysis relating to thermally induced overpressurization will be provided by January 27, 1997. If you have any questions regarding this information, please feel free to contact us. '-;/" Sincerely, 7 , v Affidavit C Mr. Hubert J. Miller, Administrator | | ~ Recycled Paper |
| -Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. L. Olshan, Licensing Project Manager -Salem U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. C. Marschall (X24) USNRC Senior Resident Inspector | | |
| -Salem Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering 33 Arctic parkway CN 415 Trenton, NJ 08625 95-4933 | | Document Control Desk 2 |
| * REF: LR-N96344 STATE OF NEW JERSEY SS. COUNTY OF SALEM L. F. Storz, being duly sworn according to law deposes and says: I am Senior Vice President | | * OCT 3o1996 LR-N96344 to require partial draining of the affected piping prior to final isolation or physical modification to restore compliance. Related analysis for Unit 1 will be completed by January 27, 1997. In accordance with the guidance of Generic Letter 91-18, corrective actions to address operability concerns will be completed prior to startup from the current refueling outages. As required by Generic Letter 96-06, a submittal summarizing the results of PSE&G's analysis relating to thermally induced overpressurization will be provided by January 27, 1997. |
| -Nuclear Operations of Public Service Electric and Gas Company -and as such, I find the matters set forth in the above referenced letter, concerning Salem Generating Station, Unit 1 and 2, is true to the best of my knowledge, information and belief. Subscribed and S&orn to before me 1996 Notary Public of New Jersey * . *_My Commissipn expires on N K/MBEl1lY JO BROWN Y Comm1.rnon | | If you have any questions regarding this information, please feel free to contact us. |
| * .1 21 -' " "!ln | | Sincerely, ~ |
| | ~ '-;/" |
| | ~~.; 7 , v Affidavit C Mr. Hubert J. Miller, Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. L. Olshan, Licensing Project Manager - Salem U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. C. Marschall (X24) |
| | USNRC Senior Resident Inspector - Salem Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering 33 Arctic parkway CN 415 Trenton, NJ 08625 95-4933 |
| | * REF: LR-N96344 STATE OF NEW JERSEY SS. |
| | COUNTY OF SALEM L. F. Storz, being duly sworn according to law deposes and says: |
| | I am Senior Vice President - Nuclear Operations of Public Service Electric and Gas Company - and as such, I find the matters set forth in the above referenced letter, concerning Salem Generating Station, Unit 1 and 2, is true to the best of my knowledge, information and belief. |
| | Subscribed and S&orn to before me thi~day of[;/-~~ 1996 Notary Public of New Jersey |
| | * . *_My Commissipn expires on N K/MBEl1lY JO BROWN |
| | ~~~~M=O~TA=R~~yP~ffilBHUC~omF~N~Eww~Jt~H~sE=y~ |
| | Y Comm1.rnon f\nirn~ * . |
| | - ' " "!ln121 |
| * 1998}} | | * 1998}} |
Similar Documents at Salem |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M2101999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML18107A5601999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys IR 05000272/19990071999-09-28028 September 1999 Forwards Insp Repts 50-272/99-07 & 50-306/99-07 on 990721- 0831.One Potentially Safety Significant Issue Identified Dealing with Control Room Special Ventilation System.Four Addl Issues of Low Safety Significance Identified ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML18107A5421999-09-22022 September 1999 Forwards Discharge Monitoring Rept for Salem Generating Station for Aug 1999.Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML18107A5321999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources. ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments ML18107A5331999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML18107A5231999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 ML18107A4981999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5181999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves ML18107A4921999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4861999-08-19019 August 1999 Forwards NPDES Discharge Monitoring Rept, for Salem Generating Station for Month of Jul 1999.Rept Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4831999-08-18018 August 1999 Submits Licensee Comments on NRC 990730 Ltr Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML18107A4531999-07-20020 July 1999 Forwards Discharge Monitoring Rept for Salem Generating Station, for June 1999.Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection ML18107A4431999-07-0606 July 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S98-17 Re Permissible Enrichment Values for New Fuel Storage & Has No Comments ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 ML18107A4181999-06-30030 June 1999 Submits Response to NRC Request for Info Re Y2K Readiness at Npps,Per GL 98-01,suppl 1.Disclosure Encl ML20209B6751999-06-29029 June 1999 Ack Receipt of from Dr Powell in Response to NRC Re Fitness for Duty.Attachment 2 of Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML18107A4091999-06-22022 June 1999 Forwards Discharge Monitoring Rept for May 1999,containing Info as Required by Permit NJ0005622.Rept Prepared Specifically for EPA & Nj Dept of Environ Protection ML18107A4061999-06-21021 June 1999 Provides Supplemental Info to Proposed License Amend, Modifying TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Info Re Acceptance Criterion Discussed ML18107A3691999-06-11011 June 1999 Forwards Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1.Original Submittal Contained Typo for year-to-date Value for Numbers of Hours Generator Was on Line (Service Hours) ML18107A3641999-06-0404 June 1999 Requests Enforcement Discretion for TS 3/4.6.2.3 Re Containment Cooling Sys for Salem Generating Station,Unit 1 ML18107A3561999-06-0303 June 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S99-05 & Has No Comments ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A3301999-05-24024 May 1999 Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves ML18107A3371999-05-21021 May 1999 Forwards NPDES Discharge Monitoring for Salem Generating Station for Apr 1999, Containing Info as Required by Permit NJ0005622 ML18107A3291999-05-20020 May 1999 Forwards Redacted Response to NRC 990322 RAI Re Notification of Licensed Operator That Tested Positive for Alcohol. Attachment 2 Withheld,Per 10CFR2.790(a)(6) ML18107A3031999-05-18018 May 1999 Provides Summary of Changes to NRC Commitments That Have Been Made But Not Reported by Other Means,Iaw with NEI Process for Managing NRC Commitments ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness ML18107A2951999-05-12012 May 1999 Submits SG Tube Plugging Rept,Per Plant TS 4.4.6.5.a.Total of 47 Tubes Were Plugged During SG Tube Insps,Which Were Completed During Plant Tenth RFO ML18107A2861999-05-11011 May 1999 Forwards Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. COLR Rept Was Received by Util as Part of Reload SE ML18107A2481999-04-29029 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Salem & Hope Creek Generating Stations. Rept Summarizes Results of Radiological Environ Surveillance Program for 1998 ML18107A2511999-04-27027 April 1999 Submits 30-day Fuel Clad Temp Rept for Salem Generating Station,Units 1 & 2.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Plant Large & Small LOCA & Small Break LOCA Analyses ML18107A2631999-04-26026 April 1999 Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements ML18107A2371999-04-26026 April 1999 Forwards Corrected Response to NRC RAI Re Licensee Request for Change to TS Permissible Enrichment Values for New Fuel Storage.Incorrect Attachment Was Provided with Util 990412 Ltr to Nrc.Encl Supersedes 990412 Submittal 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML18107A5601999-10-18018 October 1999 Submits 30-day Fuel Clad Temp Rept,Iaw 10CFR50.46.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Salem Generating Station Large & Small Break LOCA Analyses ML18107A5531999-10-0808 October 1999 Forwards Summary Rept of Plant Startup & Power Ascension Testing for Sgs,Unit 2 Cycle 11,per Requirements of TS 6.9.1.1 ML18107A5561999-10-0707 October 1999 Requests Relief Associated with Containment Examinations at Hope Creek & Salem Generating Stations.Attachment 1 Includes Proposed Alternatives & Supporting Justification for Relief Requests ML18107A5501999-10-0505 October 1999 Provides Current Status of Pse&G Actions Re GL 98-01, Y2K Readiness of Computer Sys at Npps, for Salem Nuclear Generating Station,Units 1 & 2 & Hope Creek Nuclear Generating Station ML18107A5521999-10-0505 October 1999 Encourages NRC to Support Abb Combustion Engineering Nuclear Power Request for Priority Review of Generic TR Re Crossflow Ultrasonic Flow Measurement Sys ML18107A5591999-10-0505 October 1999 Informs That Nj Dept of Environ Protection Has No Comments on License Change Request S99-07 for Sgs,Units 1 & 2 ML18107A5341999-09-22022 September 1999 Provides Data Re Operator Licensing Exam for Salem & Hope Creek Station,In Response to NRC Form 536 (7-1999) ML20212B3631999-09-14014 September 1999 Forwards Rev 13 to Salem - Hope Creek Security Plan,Iaw 10CFR50.54(p).Summary of Proposed Changes to Plan,Encl. Encl Withheld ML18107A5321999-09-13013 September 1999 Forwards Revised 10CFR50.92 Evaluation to Clarify Util Response to Question Number 1 Re Amend to Modify TS 3/4 8.1, AC Power Sources. ML18107A5331999-09-13013 September 1999 Provides Notification That PSEG Intends to Utilize ASME Code Case N-481 During Second ISI Interval at Sgs Units 1 & 2 ML18107A5351999-09-13013 September 1999 Informs That NRC Has Reviewed Pse&G Request Proposing to Modify TS Which Allow EDG to Be Operated for 24 Surveillance Test During Any Mode,Iaw 10CFR50.91(b) & Has No Comments ML18107A5231999-09-0808 September 1999 Forwards Salem Generating Station Semiannual Radioactive Effluent Release Rept for Jan-June 1999. Rept Summarizes Liquid & Gaseous Releases & Solid Waste Shipments from Salem Generating Station for Period of Jan-June 1999 ML18107A5221999-09-0808 September 1999 Requests Approval to Use ASME Code Case N546,which Provides Alternative Qualification Requirements That Allow Personnel Most Familiar with Walkdown of Plant Sys,Like License Operators to Perform VT-2 Examinations ML18107A5061999-08-26026 August 1999 Provides First Feedback from Observation of NRC Insp Under Pilot Nuclear Power Plant Insp Program.Attached Are Completed Insp Feedback Forms for Procedure 71111, Attachment 21 & Procedure 71151 ML18107A5181999-08-26026 August 1999 Forwards Ninety Day Rept for ISI Activities Conducted at Sgs,Unit 2 During Ninth Extended Outage & Tenth Refueling Outage.List of Encl,Provided ML18107A4981999-08-26026 August 1999 Forwards Response to NOV That Resulted from Predecisional Enforcement Conference Conducted on 990624.Corrective Actions:Communications to Supervisors Reinforced Employee Right & Duty to Raise Nuclear Safety Issues ML18107A5051999-08-24024 August 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Request IAW Requirements of 10CFR50.91(b) & Has No Comments Re Amend to FOL Change Request S99-02 to Modify TS Re Penetration Valves ML18107A4921999-08-23023 August 1999 Provides Suppl Info Re 971024 Amend Request to Modify TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Util Withdraws from Request All Proposed Changes Associated with Filter Testing,Per Issuance of GL 99-02 ML18107A4911999-08-20020 August 1999 Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars ML18107A4831999-08-18018 August 1999 Submits Licensee Comments on NRC 990730 Ltr Which Provided Notification of Close Out of TAC Numbers MA0567 & MA0568 Re GL 92-01,Rev 1,Suppl 1 ML18107A4801999-08-13013 August 1999 Requests That Pse&Gs Contact in NUREG-0383, Directory of Compliance for Radioactive Matl Packages, Be Changed ML18107A4751999-08-0505 August 1999 Forwards Fitness for Duty Performance Data Rept for Six Month Period Ending 990630 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML18107A4431999-07-0606 July 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S98-17 Re Permissible Enrichment Values for New Fuel Storage & Has No Comments ML18107A4181999-06-30030 June 1999 Submits Response to NRC Request for Info Re Y2K Readiness at Npps,Per GL 98-01,suppl 1.Disclosure Encl ML18107A4131999-06-25025 June 1999 Provides Further Clarification of Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting Station SBO & Loca/Loop Loading Requirements,Per Util 990426 Ltr & Discussion with NRC ML18107A4061999-06-21021 June 1999 Provides Supplemental Info to Proposed License Amend, Modifying TS 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. Info Re Acceptance Criterion Discussed ML18107A3691999-06-11011 June 1999 Forwards Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1.Original Submittal Contained Typo for year-to-date Value for Numbers of Hours Generator Was on Line (Service Hours) ML18107A3641999-06-0404 June 1999 Requests Enforcement Discretion for TS 3/4.6.2.3 Re Containment Cooling Sys for Salem Generating Station,Unit 1 ML18107A3561999-06-0303 June 1999 Informs That Nj Dept of Environ Protection Bureau of Nuclear Engineering Has Reviewed Pse&G License Change Request S99-05 & Has No Comments ML18107A3611999-05-27027 May 1999 Forwards Responses to NRC 990301 & 990323 RAIs for Salem & Hope Creek Generating Stations Relating to GL 96-05 ML18107A3301999-05-24024 May 1999 Forwards Suppl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves. Encl Contains Methodology Used in Determination of Pressure Locking Susceptibility of PORVs Block Valves ML18107A3291999-05-20020 May 1999 Forwards Redacted Response to NRC 990322 RAI Re Notification of Licensed Operator That Tested Positive for Alcohol. Attachment 2 Withheld,Per 10CFR2.790(a)(6) ML18107A3031999-05-18018 May 1999 Provides Summary of Changes to NRC Commitments That Have Been Made But Not Reported by Other Means,Iaw with NEI Process for Managing NRC Commitments ML18107A2891999-05-13013 May 1999 Forwards Rev 36 to Pse&G Nuclear Business Unit Emergency Plan. Rev 36 Incorporates Changes to Section 1-3,6 & 7 & 9-17.Attached Copy Includes All Sections of EP for Completeness ML18107A2951999-05-12012 May 1999 Submits SG Tube Plugging Rept,Per Plant TS 4.4.6.5.a.Total of 47 Tubes Were Plugged During SG Tube Insps,Which Were Completed During Plant Tenth RFO ML18107A2861999-05-11011 May 1999 Forwards Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. COLR Rept Was Received by Util as Part of Reload SE ML18107A2481999-04-29029 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Salem & Hope Creek Generating Stations. Rept Summarizes Results of Radiological Environ Surveillance Program for 1998 ML18107A2511999-04-27027 April 1999 Submits 30-day Fuel Clad Temp Rept for Salem Generating Station,Units 1 & 2.Rept Describes Changes to Calculated Peak Clad Temp (PCT) for Plant Large & Small LOCA & Small Break LOCA Analyses ML18107A2371999-04-26026 April 1999 Forwards Corrected Response to NRC RAI Re Licensee Request for Change to TS Permissible Enrichment Values for New Fuel Storage.Incorrect Attachment Was Provided with Util 990412 Ltr to Nrc.Encl Supersedes 990412 Submittal ML18107A2631999-04-26026 April 1999 Provides Clarification on Licensing & Design Basis for 125 Vdc Battery Margins for Sgs & HCGS for Meeting SBO & Loca/ LOOP Loading Requirements ML18107A2411999-04-22022 April 1999 Forwards Draft Revised Pages 4.1 & 4.2 of Nuclear Business Unit Emergency Plan for Hope Creek & Salem Generating Stations.Changes Are Noted in Italics ML18107A1841999-04-14014 April 1999 Forwards PSEG Annual Rept for 1998, & PECO Annual Rept for 1998. Stockholders Annual Rept of Each Owner & Cash Flow Statements Showing 1998 Actual & 1999 Projected Cash Flow with Explanation Encl ML18107A1981999-04-12012 April 1999 Responds to 990312 RAI Re Request for Change to TSs Permissible Enrichment Values for New Fuel Storage,Which Was Submitted on 990202 ML18107A1691999-04-12012 April 1999 Forwards Proprietary & non-proprietary Epips,Including Rev 17 to EPIP 807,rev 1 to NC.EP-EP.ZZ-0801(Q) & Rev 2 to NC.EP-EP.ZZ-0806(Q) & Revised EPIPs Table of Contents. Proprietary Info Withheld ML20205K4541999-04-0808 April 1999 Forwards Revised Info Re 990330 NRC Nuclear Power Reactor Licensee Financial Qualifications & Decommissioning Funding Assurance Status Rept ML18106B1491999-04-0505 April 1999 Forwards Drafts of Proposed Changes to Pages 4.1 & 4.2 of Emergency Plan,Which Are Contained on Page 4.2 & Noted in Italics & Underlined ML20205F8981999-03-31031 March 1999 Provides Info Re Status of Decommissioning Funding for LGS, Units 1 & 2,PBAPS,Units 1,2 & 3 & Sgs,Units 1 & 2,per Requirements of 10CFR50.75(f)(1) ML18106B1431999-03-31031 March 1999 Forwards Pse&G Rept on Financial Min Assurance for Period Ending 981231 for Hope Creek,Salem,Units 1 & 2 & Pbaps,Units 2 & 3,IAW 10CFR50.75 ML18107A2201999-03-30030 March 1999 Forwards Final Exercise Rept for 980303,full-participation Plume Exposure Pathway Exercise & 980505-07, full-participation Ingestion Pathway Exercise of Offsite Radiological Emergency Response for Salem & Hope Creek 1999-09-08
[Table view] |
Text
..
Public Service
- Electric and Gas Company Louis F. Storz Public Service Electric and Gas Company P.O. Box 236, Hancocks Brid9e, NJ 08038 609-339-5700 Senior Vice President - Nuclear Operations OCT 301996 LR-N"96344 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ASSURANCE OF EQUIPMENT OPERABILITY AND CONTAINMENT NRC GENERIC LETTER 96-06, 30 DAY RESPONSE SALEM GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Gentlemen; Public Service Electric and Gas (PSE&G) has evaluated the information requested in the referenced Generic Letter. The potential for waterhammer, two-phase flow and thermally induced overpressurization associated with the post accident operation of the Containment Fan Coil Units (CFCU) was previously identified by PSE&G as applicable to the Salem Units. This information and relevant corrective actions were identified in Licensee Event Report (LER) 272/96-020, dated September 18, 1996 (LR-N96286).
As noted in this LER, waterhammer and two phase flow are of concern to CFCU operation during the beginning of some accidents prior to the automatic isolation of non-essential service water loads. These conditions have been addressed through reanalysis of the affected accidents and submittal of License Change Request 96-13, dated October 25, 1996 (LR-N96287). As committed in LER 272/96-020, PSE&G will install overpressure protection on the affected portions of CFCU service water piping to address thermally induced overpressurization. These modifications will be completed prior to restart of the affected unit. PSE&G has evaluated the information contained in LER 272/96-020 and believes it to be sufficient to address the Generic Letter 96-06 120 day response requirement relative to waterhammer, two-phase flow and thermally induced overpressurization as these conditions relate to CFCU operation.
PSE&G's analysis of thermally i.nduced overpressurization in the remainder of_ piping systems located inside containment is in progress. A total of 119 lines penetrate each of the Salem containment buildings, of which 87 lines are not affected due to either the existence of installed relief capability, internal temperatures greater than the peak accident temperature, lines normally in-service during an accident, lines connected to saturated systems (i.e. steam generators) or lines being gas filled. PSE&G's evaluation of the remaining 32 lines is nearing completion for Salem Unit 2. Corrective \
action to address inoperability will consist of either procedural revisions
/
9611130268 961030 PDR ADOCK 05000272 1
A--f>
11c/ (
P PDR /\v II\. Printed on
~ Recycled Paper
Document Control Desk 2
- OCT 3o1996 LR-N96344 to require partial draining of the affected piping prior to final isolation or physical modification to restore compliance. Related analysis for Unit 1 will be completed by January 27, 1997. In accordance with the guidance of Generic Letter 91-18, corrective actions to address operability concerns will be completed prior to startup from the current refueling outages. As required by Generic Letter 96-06, a submittal summarizing the results of PSE&G's analysis relating to thermally induced overpressurization will be provided by January 27, 1997.
If you have any questions regarding this information, please feel free to contact us.
Sincerely, ~
~ '-;/"
~~.; 7 , v Affidavit C Mr. Hubert J. Miller, Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. L. Olshan, Licensing Project Manager - Salem U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Mr. C. Marschall (X24)
USNRC Senior Resident Inspector - Salem Mr. K. Tosch, Manager IV Bureau of Nuclear Engineering 33 Arctic parkway CN 415 Trenton, NJ 08625 95-4933
COUNTY OF SALEM L. F. Storz, being duly sworn according to law deposes and says:
I am Senior Vice President - Nuclear Operations of Public Service Electric and Gas Company - and as such, I find the matters set forth in the above referenced letter, concerning Salem Generating Station, Unit 1 and 2, is true to the best of my knowledge, information and belief.
Subscribed and S&orn to before me thi~day of[;/-~~ 1996 Notary Public of New Jersey
- . *_My Commissipn expires on N K/MBEl1lY JO BROWN
~~~~M=O~TA=R~~yP~ffilBHUC~omF~N~Eww~Jt~H~sE=y~
Y Comm1.rnon f\nirn~ * .
- ' " "!ln121