ML19207C214: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:am LICENSEE EVENT REPORT CONTROL S LOCK: l
{{#Wiki_filter:am LICENSEE EVENT REPORT CONTROL S LOCK: l 1
}lll1lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6 S l V l 1 l@l 0 l 0 l- l 0 l0 l0 0 l0 l- l 0l 0l@l 4 1lll2l0l@l ll@lc l0 F o i 7 8 9 LICENSEE COGE 14 1S LICENSE NUMBER 25 26 LICENSE TYPE J0 57 CAT 58 CON'T sy,] l L @l 0 l 5 l 010 l0 l 2 l 6 l7 @l 0 l8 l0 l617 19 j@] 0] 81 3l ll 7l 9l@
                                                          }   l      l    l    1 lh 6
o i 7 8 60 61 DOCK ET NUMBER 6d 6W EVENT D ATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEOUENCES h o 2l On Augus t 6,1979 durine stendv state operations at 45% thermal power and 145 MW 1 electrical power,"A" emergency diesel generator was found in a degraded mode per Fort o 3 I t.Vrain Technical Specification LCO 4.6.1.
(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) o      i 8 9 lc l0        F S l V l 114 l@l 0 l 0 l- l 0 LICENSE 1S l0 l0 NUMBER 0 l0     l- l 0l 0l@l 4LICENSE 25      26 1lll2l0l@l TYPE J0 l
This is reportable per Fort St. Vrain lS o 4 0g.l Technical Specification AC 7.5.2(b)2.
57 CAT 58 l@
When"A" diesel engine declutched"B" diesell0 isl engine also declutched.
7                            LICENSEE COGE CON'T o      i              sy,] l L @l 0 l 5 l 010 l0 l 2 l 6 l76d @l 0 l8                                 6W l0 l617 19 j@] 0]REPORT EVENT D ATE              74      75 81 3l   ll 7l 9l@
Redundant equipment was operable and available.
DATE          80 7             8                     60               61             DOCK ET NUMBER EVENT DESCRIPTION AND PROBABLE CONSEOUENCES h o     2      l On Augus t 6,1979 durine stendv state operations at 45% thermal power and 145 MW o    3        1 electrical power, "A" emergency diesel generator was found in a degraded mode per Fort Vrain Technical Specification LCO 4.6.1.                                             This is reportable per Fort St. Vrain                                         l o     4       I S t.
There wasllno af fect on public health or safety.
0g.           l Technical Specification AC 7.5.2(b)2.                                             When   "A" diesel engine declutched "B" diesel                                            l 0 is          l engine also declutched.                                 Redundant equipment was operable and available.                                               There was            l 0      7      lno af fect on public health or safety.                                                                                                                                       l 0   8 7             8 9                                                                                                                             COMP.
l0 7 0 8 7 8 9 SYSTEM CAUSE CAUSE COMP.VALVE CCCE CODE SU8 CODE COMPONENT CODE SU8 CODE SUSCODE IE ID l h lE lh dh I Di El7 i AlV!XI@ l lh dh O 9 7 8 9 10 11 12 13 18 19 2u_SE QU E NTI A L OCCU R R E N CE REPORT REVIS:ON LE EVENT YE AR REPORT NO.
SYSTEM                 CAUSE           CAUSE                                                                             VALVE CCCE                 CODE         SU8 CODE                 COMPONENT CODE                     SU8 CODE           SUSCODE 7
CCOE TYPE NO.@ sj;A RO l 71 9l-l I 0121 51 1/l 1o13I lx ll-lW j;q a 21 22 23 24 26 27 28 29 J0 31 32 ACTION FUTURE EFFECT SMUTOOWN ATT AC HM E NT N P R D-4 PRIME COMP.
O    9 8
COMPON EN T TAKEN ACTION ON PLANT METHOO HOURS SUSMITTED FORM bu8.SUPPLI E R MANUFACTURER lA l@l ZI@
IE ID l h lE lh dh I Di El7 i AlV!XI@ l lh dh 9             10         11             12               13                           18           19                 2u SE QU E NTI A L                     OCCU R R E N CE         REPORT                       REVIS:ON
IZ l@l ZI@l01010101 I Yl@lNI@lNl@llll@34 05 M 3 40 41 42 43 64 47'CAUSE DESCRIPTION AND CORRECTIVE ACTIONS ii o lA relav f ailed due to normal end o f life.
_
The unit had been tested satisfactorily I Ithe orevious month.
EVENT YE AR                                   REPORT NO.                             CCOE                   TYPE                             NO.
The relav was replaced and tested and the surveillance succern-1 i i i fully completed.
LE
I 1 2 i a lI 1 4l30'8 3 STA S% POWER OTHE R STA TUS SO RY DISCOVERY 0ESCRIPTION l E l@ l 01 4 l Sl@
                    @ sj;Aj;q a
N/AllB l@l Routine Surveillance Test ls*ACTIVITY CO TENT RELEASED CF RELEASE AMOUNT OF ACTivtTY LOCATION OF RELEASE l Z l @ l Zl@l N/A l N/A't o 7 t1 9 10 11 44 4S 80 PERSONNEL EXPOSURES NU*AB E R TYPE D ESC RIPTION 0 l 0 l 0 l@l Z l@l N/A li 7'a 9 11 12 13 80 PE RSONNE L ;NJUR'ES NLVSER OESCRIPTICN 1010 l 0 I@l N/A l, a 7 8 9 11 12 80 g .,j', o 'O sle LOSS OF QR DAM AGE TO F ACILITY g,*,u.*TvPE C E SC RIPTION
RO l 71 9 21            22 l-l 23 I 0121 51 24                26 1/l 27 1o13I 28         29 lx J0 l          l-l 31 W
%eg Zl@lN/A i 9 7 8 3'O 80l N [hlctsCRIPTICNO 7 009100 t/f/
32 EFFECT           SMUTOOWN                                   ATT AC HM E NT       N P R D-4       PRIME COMP.               COMPON EN T ACTION FUTURE                                                                                                                                                MANUFACTURER TAKEN ACTION                   ON PLANT             METHOO                     HOURS         SUSMITTED         FORM bu8.           SUPPLI E R lA l@l ZI@                       IZ   l@           lM ZI@           l01010101                 I Yl@
Py8uciT NaC use ONtY
41 lNI@                 lNl@           l        l      l 47 l@
, N/Alll ll l lll l l l l l}
                      '
2 o 7 8 3 10 68 69 80 ;[g[[J. W.Gahm (303) 785-2253 o-PHCNE: j NAME OS PREPARER
34                   05                                 3                   40                       42                   43             64 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS ii       o lA relav f ailed due to normal end o f life.                                                   The unit had been tested satisfactorily                                             I i    i      Ithe orevious month.                           The relav was replaced and tested and the surveillance succern-                                                               1 1    2      i fully completed.                                                                                                                                                             I I
,-}}
i   a l 1   4        l
  '
8 3                                                                                                                                                                             30 STA S               % POWER                           OTHE R STA TUS                 SO RY                                 DISCOVERY 0ESCRIPTION
* s l E l@ l 01 4 l Sl@                                 N/A                        l  lB l@l Routine Surveillance Test                                                         l ACTIVITY       CO TENT RELEASED CF RELEASE                           AMOUNT OF ACTivtTY                                                         LOCATION OF RELEASE t    o l Z l @ l10Zl@l N/A                                                                     l N/A                                               '
7           t1 9                               11                                             44         4S                                                                               80 PERSONNEL EXPOSURES NU*AB E R           TYPE         D ESC RIPTION l
i    7 0 l 0 l 0 l@l Z l@l N/A                                                                                                                                                 80
  '           a 9                 11       12           13 PE RSONNE L ;NJUR'ES NLVSER               OESCRIPTICN
      ,                                                                                                                                                                                          l 7
a 8 9 1010 l 0 I@l12N/A 11                                                                                                                                                         80 LOSS OF QR DAM AGE TO F ACILITY                                                                                                                   g,   g        sle
                                                                                                                                                                            *,u.,j', o 'O.*
TvPE       C E SC RIPTION                                                                                                                         %eg N/A 7
i     9 8 3 Zl@l'O                                                                                                                                                                   80 Py8uciT                                                                                                                                          NaC use ONtY 7 009100 t/f/                                                                               ,
2    o        l N [hlctsCRIPTICNO N/A                                                                                                                    l 68 69 ll ll l lll l l l l l}     80 ;
7           8 3             10 o
NAME OS PREPARER
[g[[                 -              J. W.     Gahm PHCNE:
(303) 785-2253                             j
                                                                              ,-}}

Revision as of 15:31, 19 October 2019

LER 79-025/03X-0:on 790806,during Steady State Operation at 45% Thermal Power,Emergency Diesel Generator a Found in Degraded Mode, & B Engine Also Declutched.Caused by Relay Failure Due to Normal End of Life.Relay Replaced
ML19207C214
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/31/1979
From: Gahm J
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19207C215 List:
References
LER-79-025-03X, LER-79-25-3X, NUDOCS 7909100481
Download: ML19207C214 (1)


Text

{{#Wiki_filter:am LICENSEE EVENT REPORT CONTROL S LOCK: l 1

                                                         }    l      l     l    1 lh 6

(PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) o i 8 9 lc l0 F S l V l 114 l@l 0 l 0 l- l 0 LICENSE 1S l0 l0 NUMBER 0 l0 l- l 0l 0l@l 4LICENSE 25 26 1lll2l0l@l TYPE J0 l 57 CAT 58 l@ 7 LICENSEE COGE CON'T o i sy,] l L @l 0 l 5 l 010 l0 l 2 l 6 l76d @l 0 l8 6W l0 l617 19 j@] 0]REPORT EVENT D ATE 74 75 81 3l ll 7l 9l@ DATE 80 7 8 60 61 DOCK ET NUMBER EVENT DESCRIPTION AND PROBABLE CONSEOUENCES h o 2 l On Augus t 6,1979 durine stendv state operations at 45% thermal power and 145 MW o 3 1 electrical power, "A" emergency diesel generator was found in a degraded mode per Fort Vrain Technical Specification LCO 4.6.1. This is reportable per Fort St. Vrain l o 4 I S t. 0g. l Technical Specification AC 7.5.2(b)2. When "A" diesel engine declutched "B" diesel l 0 is l engine also declutched. Redundant equipment was operable and available. There was l 0 7 lno af fect on public health or safety. l 0 8 7 8 9 COMP. SYSTEM CAUSE CAUSE VALVE CCCE CODE SU8 CODE COMPONENT CODE SU8 CODE SUSCODE 7 O 9 8 IE ID l h lE lh dh I Di El7 i AlV!XI@ l lh dh 9 10 11 12 13 18 19 2u SE QU E NTI A L OCCU R R E N CE REPORT REVIS:ON _ EVENT YE AR REPORT NO. CCOE TYPE NO. LE

                    @ sj;Aj;q a

RO l 71 9 21 22 l-l 23 I 0121 51 24 26 1/l 27 1o13I 28 29 lx J0 l l-l 31 W 32 EFFECT SMUTOOWN ATT AC HM E NT N P R D-4 PRIME COMP. COMPON EN T ACTION FUTURE MANUFACTURER TAKEN ACTION ON PLANT METHOO HOURS SUSMITTED FORM bu8. SUPPLI E R lA l@l ZI@ IZ l@ lM ZI@ l01010101 I Yl@ 41 lNI@ lNl@ l l l 47 l@

                      '

34 05 3 40 42 43 64 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS ii o lA relav f ailed due to normal end o f life. The unit had been tested satisfactorily I i i Ithe orevious month. The relav was replaced and tested and the surveillance succern- 1 1 2 i fully completed. I I i a l 1 4 l

  '

8 3 30 STA S  % POWER OTHE R STA TUS SO RY DISCOVERY 0ESCRIPTION

  • s l E l@ l 01 4 l Sl@ N/A l lB l@l Routine Surveillance Test l ACTIVITY CO TENT RELEASED CF RELEASE AMOUNT OF ACTivtTY LOCATION OF RELEASE t o l Z l @ l10Zl@l N/A l N/A '

7 t1 9 11 44 4S 80 PERSONNEL EXPOSURES NU*AB E R TYPE D ESC RIPTION l i 7 0 l 0 l 0 l@l Z l@l N/A 80

  '            a 9                 11        12            13 PE RSONNE L ;NJUR'ES NLVSER               OESCRIPTICN
     ,                                                                                                                                                                                           l 7

a 8 9 1010 l 0 I@l12N/A 11 80 LOSS OF QR DAM AGE TO F ACILITY g, g sle

                                                                                                                                                                           *,u.,j', o 'O.*

TvPE C E SC RIPTION %eg N/A 7 i 9 8 3 Zl@l'O 80 Py8uciT NaC use ONtY 7 009100 t/f/ , 2 o l N [hlctsCRIPTICNO N/A l 68 69 ll ll l lll l l l l l} 80 ; 7 8 3 10 o NAME OS PREPARER [g[[ - J. W. Gahm PHCNE: (303) 785-2253 j

                                                                             ,-}}