ML061320150: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 01/10/2006
| issue date = 01/10/2006
| title = E-mail from R. Lavera of Entergy to Various, Regarding Sample Summary Sheets
| title = E-mail from R. Lavera of Entergy to Various, Regarding Sample Summary Sheets
| author name = LaVera R
| author name = Lavera R
| author affiliation = Entergy Nuclear Northeast, Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Northeast, Entergy Nuclear Operations, Inc
| addressee name = Colville R, Croulet D, Deeds P, Drake R, Durfee M, English C, Evers B, Hinrichs G, Jones T R, Kulaga J, LaVera R, Leach D, Mayer D, McMullin K, Morin K, Nuta D A, Peters J, Rutkoske M, Sachatello R, Santis H, Skonieczny J, Smith D
| addressee name = Colville R, Croulet D, Deeds P, Drake R, Durfee M, English C, Evers B, Hinrichs G, Jones T, Kulaga J, Lavera R, Leach D, Mayer D, Mcmullin K, Morin K, Nuta D, Peters J, Rutkoske M, Sachatello R, Santis H, Skonieczny J, Smith D
| addressee affiliation = NRC/FSME
| addressee affiliation = NRC/FSME
| docket = 05000003, 05000247, 05000286
| docket = 05000003, 05000247, 05000286

Revision as of 19:19, 13 July 2019

E-mail from R. Lavera of Entergy to Various, Regarding Sample Summary Sheets
ML061320150
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/10/2006
From: Ronald Lavera
Entergy Nuclear Northeast, Entergy Nuclear Operations
To: Colville R, Croulet D, Deeds P, Drake R, Durfee M, English C, Evers B, Hinrichs G, Jones T, Kulaga J, Ronald Lavera, Leach D, Mayer D, Mcmullin K, Morin K, Nuta D, Peters J, Rutkoske M, Sachatello R, Santis H, Skonieczny J, Danni Smith
NRC/FSME
References
FOIA/PA-2006-0140
Download: ML061320150 (13)


Text

Unknown Sent: Tuesday, January 10, 2006 6:25 AM Summary sheets for January 9th 2006.From: Lavera, Ron Sent: Monday, January 09, 2006 4:50 PM To: Bob Evers; Christopher English; David Smith; Don Leach; Don Mayer; Donald Croulet; Dragos Nuta; Gary Hinrichs;Hank Santis; James Peters; Joe Kulaga; John Skonieczny; Kathy McMullin; Kenneth Morin; Michael Durfee; Michael Rutkoske; Paul Deeds; Richard Colville; Richard Drake; Ron Lavera; Ronald Sachatello; T. R. Jones

Subject:

Sample Summary Sheets Please see the attached sample summary sheets for Jan. 91 2006.Thanks Ron FAR RLaVera@entergy.com

<mailto:RLaVera

@ enterqy.com>

914-736-8433 914-736-8419 FAX Indian Point 3 Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.Indian Point Energy Center 295 Broadway, Suite 3 P.O. Box 308 Buchanan, NY 10511-0308

+4l Page 1 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th Man-holes (Storm Drains)ID Date Location Sample Results MH-1 12/21/2005 North of IP-2 Turb. Too dry to sample_ 1-4-06 Bldg. by Water ND/HTO MH-2 12/16/2005 River Front 651 pCiAi MH-2A 1/4/2006.

y IP-2 EDG3Y ND/HTO MH-3 11/10/2005 North of IP-2 Turbine 1,950 pCi/A 12/8/2005 Building 894 pCi/I 12/16/05 651 pCi/A 12/20/2005 2,330 pcin_ 1/4/2006 3,450 pCiAi MH-4 12/16/2005 Transformer Yard 4,370 pCi/A 1/4/2006 3,070 pCiAi M:FH-4A 12/21/2005 IP-2 Condenser Tube 2,730 pCi/l 1/4/2006 removal pit 3,380 pCi/A M:H-5 11/10/2005' ux Feed Bldg) 2,390 pCi/l 12/8/2005 2,020 pCiA 12/20/2005 6,920 pCiAl 1/4/2006 _ 3,480 pCi/A M:H-6 11/10/2005 Transformer Yard 51,300 pCi/l 12/8/2005 37,100 pCi/l 12/16/2005 12,200 pCiA_ 1/4/2006' 13,100 pCiAl M:H-7 12/19/2005 Transformer Yard 5,340 pCi/l 1/4/2006 8,140 pCiA MJH-8 12/16/2005 Transformer Yard 4,510 pCi/l 1/4/2006 5,740 pCiA MEI-9 12/16/2005 MOB Hill -80' 2,140 pCiA MEI-10 12/16/2005 MOB Hill -80' 2,940 pCi/i MEI-12 1-4-06 West of IP-2 Turb.Bldg. by river NDJHTO MHI-14 1/4/06 ND/HTO ME-I-17 12/16/2005 Transformer Yard 1,710 pCiA M]IH-18 12/16/2005 Transfonner Yard 854 pCiA MEI-19 12/16/2005 Transformer Yard 1,800 pCiA MEI-A4 10/18/2005 IP-3 Manhole Located east of the.IP-3 Monitor Tank ND/HTO M:H-B8 10/18/2005 IP-3 Manhole located west of the north end 959 pCi/A I~rct Stacy Page 1 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th of the IP-3 turbine hall over the discharge canal CB-4 1/4/2006 By IP-2 RWST 39 1,010 pCi/l CI3-24 1/4/2006 By IP-2 Sec. Bldg 822 pCi/l ID Date Location Sample Results M7W-30 11/22/2005 FSB Leakage Area -464, 000 to 600, 000 pCi/l.Note: Well developmen HTO%DT completed MW-31 12/30/2005 Outside MOB 4,060 pCi/l HTO 1/5/2006 3,050 pCi/l HTO MIW-33 12/15/2005 Transforner Yard 142,000 pCi/l HTO 12/19/2005 199,000 pCi/l HTO 12/29/2005 220,000 pCi/Q HTO 01/06/2006 189,000 pCi/l HTO MTW-34 12/13/2005 Transformer Yard 63,900 pCi/l HTO 12/19/2005 121,000 pCi/l HTO 12/29/2005 147,000 pCi/l HTO 1/06/2006 159,000 pCi/I HTO MW-35 12/13/2005 Transformer Yard 42,300 pCi/l HTO 12/19/2005 76,000 pCi/l HTO 12/29/2005 80,500 pCi/l HTO 1 1/6/2006 1 1 95,400 pCi/l HTO ID Date Location Sample Results MW-38 12/2/2005 End of IP-3 15000 pCi/l HTO -False Discharge Canal Positive due to sample Concrete contamination.

12/5/2005 ND/HTO 12/6/2005 ND/HTO 12/8/2005 985 pCi/l IPEC 12/8/2005 701 pCi/l NYSDEC 12-30-05 ND/HTO ebol Stacy Page 2 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th ID Date Location Sample Results MW-11l 9/28/2005 Transformer Yard 212,000 pCi/Q HTO 10/5/2005 188,000 pCi/Q HTO 10/14/2005 6820 pCi/l HTO(rain)10/14/2005 6320 pCi/Q HTO (back-up)10/21/2005 284,000 pCi/Q HTO 10/21/2005 267,000 pCi/l HTO DEC 10/28/2005 218,000 pCi/l HTO 11/4/2005 302,000 pCiQ HOT 11/10/2005 246,000 pCi/l HTO 11/18/2005 171,000 pCi/Q HTO 11/22/2005 180,000 pCiQ HTO 12/02/2005 125,000 pCiQ HTO 12/08/2005 270,000 pCiQ HTO 12/15/2005 296,000 pCi/l HTO 12/19/2005 192,000 pC/I HTO 12/29/2005 212,000 pC/I HTO 1/6/2006 113,000 pC/Q HTO ID Date Location Sample Results RVW-101 12/8/2005 U2 Warehouse ND/HTO 12/8/2005 ND/HTO DEC MW-l05 12/8/2005 Mtce. Training ND/HTO 12/8/2005 96 pCi/Q DEC MIW-107 9/28/2005 NEM ND/HTO 12/8/2005 ND/HTO 12/8/2005 ND/HTO DEC MW-108 9/29/2005 GT-1 ND/HTO 11/3/05 ND/HTO MV[W-109 9/28/2005 GT-1 ND/HTO 11/04/2005 ND/HTO Stacy Page 3 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th ID Date Location Sample Results U3-I 10/6/2005 U3 Discharge Canal 417 pCi/l HTO 10/21/2005 ND/HTO 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO 12-30-05 ND/HTO U3-2 10/6/2005 U3 Discharge Canal 960 pCi/I HTO 10/21/2005 ND/HTO 10/21/2005 512 pCi/l HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO 12-30-05 ND/HTO U3-3 10/6/2005 U3 Discharge Canal 439 pCiA HTO 10/21/2005 ND/HTO 10/21/2005 ND/HTO DEC 10/28/2005 ND/HTO 11/4/2005 ND/HTO 11/10/2005 471 pCi/I HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 ND/HTO_ 12-30-05 ND/HTO U3-4 10/16/2005 U3 Condensate 406 pCi/I HTO 10/21/2005 Polisher 399 pCi/I HTO 10/21/2005 344 pCi/I HTO DEC 10/28/2005 405 pCi/Q HTO 11/4/2005 ND/HTO 11/10/2005 ND/HTO 11/18/2005 ND/HTO 12/2/05 ND/HTO 12/15/2005 399 pCiAIHTO_, 12-30-05 442 pCiA/HTO U3-T1 10/6/2005 U3 South Turbine 703 pCiA HTO_ 10/21/2005 ND/HTO Stacy Page 4 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th 10/28/2005 ND/HTO 11/4/2005 NDJHTO 11/10/2005 563 pCi/I HTO 11/18/2005 ND/HTO 12/2/05 498 pCi/i HTO 12/15/2005 ND/HTO 12-30-05 529 pCi/i HTO U3-T2 10/7/2005 U3 North Turbine 1,590 pCi/i HTO 10/21/2005 1,470 pCi/I HTO 10/21/2005 1,420 pCi/l HTO DEC 10/28/2005 1,280 pCiII HTO 11/4/2005 1,190 pCi/l HTO 11/10/2005 1,640 pCi/i HTO 11/18/2005 1,130 pCi/I HTO 12/2/05 1,329 pCi/l HTO 12/15/05 1,290 pCi/l HTO_ 12-30-05 1,685 pCi/i HTO ID Date Location Sample Results 12/06/2005 Lafarge Property.

ND/HTO Well-I 12/06/2005 North East Well -ND/HTO DEC Farthest from river 12/06/2005 Lafarge Property.

N/TO Well-3 12/06/2005 North West Well -ND DEC closest to river ND/HTO DEC Stacy Page 5 of 6 On-Site Monitoring Wells Sorted by Well Location Executive Summary January 9th MW-111, MW-33, MW-34 & MW-35 Tritium 350,000 300,000 250,000 ZI:-S° 200,000.2= 150,000._-100,000 50,000 0 A II__ -__ I A_T_ .#O N_Pr.0 U r!, .-rf,*j *.0 n i I I I I I I I I i i I I* MW-111 pCi/I HTO--MW-33 pCi/l HTO-U- MW-34 pCi/I HTO-1 -MW-35 pCi/l HTO l to oo o t to o o o o O oa 0 0 0 0 0) 0 0) 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 ) ' o 0 0 0 Date 0 C'!uz g5 0 to to to o o o 0 0 0 0 o 0 0 0 0! N! Q C C'!7 c ,-i _q Stacy Page 6 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th Date ID Location Sample Results 9/28-29/2005 MW-107 NEM ND/HTO MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO MW- 11 Transformer Yard 212,000 pCi/l HTO 10/5/2005 MW-111 Transformer Yard 188,000 pCi/l HTO 10/6/2005 U3-1 U3 Discharge Canal 417 pCi/l HTO U3-2 U3 Discharge Canal 960 pCi/l HTO U3-3 U3 Discharge Canal 439 pCi/l HTO 10/7/2005 U3-T1 U3 South Turbine 703 pCi/l HTO U3-T2 U3 North Turbine 1,590 pCi/I HTO MW-1Il Transformer Yard 188,000 pCi/I HTO 10/14/2005 MW-111 Transformer Yard 6,820 pCi/Il HTO (rain)MW-111 Transformer Yard 6,320 pCi/I HTO (back-up)10/16/2005 U3-4 U3 Condensate Polisher 406 pCi/I HTO 10/18/2005 MH-B8 IP-3 Manhole IP-3 Disch 959 pCi/l HTO Canal MH-A4 East of IP-3 Monitor ND/HTO Tank 10/21/2005 MW-111 Transformer Yard 284,000 pCi/l HTO 267,000 pCi/l HTO DEC 10/21/2005 U3-1 U3 Discharge Canal ND/HTO U3-1 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal ND/HTO DEC U3-2 U3 Discharge Canal 512 pCi/l HTO DEC U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 399 pCi/l HTO U3-4 U3 Condensate Polisher 344 pCi/l HTO DEC U3-T1 U3 South Turbine ND/HTO U3-T1 U3 South Turbine ND/HTO DEC U3-T2 U3 North Turbine 1,470 pCi/l HTO U3-T2 U3 North Turbine 1,420 pCi/I HTO DEC 10128/2005 MW-111 Transformer Yard 218,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO Stacy Page 1 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher 405 pCi/i HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,280 pCi/l HTO 11/4/2005 MW-111 Transformner Yard 302,000 pCi/l HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,190 pCi/I HTO Date ID Location Sample Results 1113-4/2005 MW-108 GT-1 ND/HTO MW-109 GT-1 ND/HTO 11/10/2005 MW-1il Transformer Yard 246,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal 471 pCi/l HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 563 pCi/l HTO U3-T2 U3 North Turbine 1,640 pCi/l HTO MH-6 Transformer Yard 51,300 pCi/l HTO 11/18/2005 MW-ll1 Transformer Yard 171,000 pCi/I HTO U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,130 pCi/l HTO 11/22/2005 MW-I 11 Transformer Yard 180,000 pCi/I HTO 12/02/2005 MW-111 Transformer Yard 125,000 pCi/I HTO MW-38 End of IP-3 Discharge ND/HTO Canal Concrete U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO Stacy Page 2 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Condensate Polisher ND/HTO U3-T1 U3 South Turbine 498 pCiQI HTO U3-T2 U3 North Turbine 1,130 pCi/I HTO 12/5/2005 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/6/2005 MW-38 End of IP-3 Discharge ND/HTO Canal Concrete 12/8/2005 MW-101 U2 Warehouse ND/HTO MW-105 Maintenance Training ND/HTO MW-107 NEM ND/HTO MW-38 End of IP-3 Discharge 985 pCi/Q HTO MW-38 Canal Concrete 701 pCi/l HTODEC 12/08/2005 MW- 11 Transformer Yard 270,000 pCi/l HTO MH-3 North of IP-2 Turb. 894 pCi/i HTO MH-5 Transformer Yard 2,020 pCi/A HTO MH-6 Transformer Yard 37,100 pCi/Q HTO MW-38 End of IP-3 Discharge 985 pCi/l HTO Canal Concrete 701 pCiQ HTO DEC MW-101 EOF ND/HTO MW-101 EOF ND/HTO DEC MW-105 Maint. Train. Facil ND/HTO MW-105 Maint. Train. Facil 96 pCi/Q HTO DEC MW-107 NEM Well ND/HTO MW-107 NEM Well ND/HTO 12/13/2005 MW-34 Transformer Yard 63,900 pCi/l HTO MW-35 Transformner Yard 42,300 pCi/l HTO 12/15/2005 U3-1 U3 Discharge Canal ND/HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 399 pCiQ HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,290 pCi/l HTO MW-33 Transformer Yard 142,000 pCi/I HTO MW-111 Transformer Yard 296,000 pCi/l HTO 12/16/2005 MH-19 Transformer Yard 1,800 pCi/l HTO MH-18 Transforrner Yard 854 pCi/l HTO MH-17 Transformer Yard 1,710 pCi/l HTO MH-10 Transformer Yard 2,940 pCi/l HTO MH-9 Transformer Yard 2,140 pCi/I HTO MH-8 Transformer Yard 4,510 pCi/l HTO MH-6 Transformer Yard 12,200 pCi/I HTO Stacy Page 3 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th MH-4 Transformer Yard 4,320 pCi/I HTO MH-3 North of IP-2 Turb 651 pCi/l HTO 12/19/2005 MW-33 Transformer Yard 199,000 pCi/l HTO MW-34 Transformer Yard 121,000 pCi/l HTO MW-35 Transformer Yard 76,000 pCi/I HTO MW-111 Transformer Yard 192,000 pCi/l HTO MH-3 North of IP-2 Turb. 2,330 pCi/I HTO MH-5 CIn ABFP Bldg._ 6,920 pCi/I HTO MH-7 Transformer Yard 5,340 pCi/l HTO 12/19/2005 Discharge Hudson River <MDA pCi/l HTO Canal 12,/20/2005 MH-3 /Outside of Turbine BldI 2,330 pCi/I HTO MH-5 EAux Feed Bldg. -t 6,920 pCi/I HTO 12/21/2005 MH-4A Condensor Tube Pull Pit 2,730 pCi/l HTO MH-i River Front Dry -No Sample Taken.12/29/2005 MW-111 MOB 212,000 pCi/l HTO MW-33 Transformer Yard 220,000 pCi/I HTO MW-34 Transformer Yard 147,000 pCi/i HTO MW-35 Transformer Yard 80,500 pCi/l HTO 12/30/2005 MW-31 MOB 4,060 pCi/l HTO U3-1 U3 Discharge Canal 651 pCi/l HTO U3-2 U3 Discharge Canal ND/HTO U3-3 U3 Discharge Canal ND/HTO U3-4 U3 Discharge Canal 442 pCi/l HTO U3-TI U3 South Turbine ND/HTO U3-T2 U3 North Turbine 1,690 pCi/l HTO MW-31 Outside MOB 4,060 pCi/l HTO MW-38 End of IP-3 Discharge ND/HTO Canal Concrete al$F eove 1/4/2006 MH-2A CB-4 CB-24 MH-I MH-2 MH-3 MH-4 MH-4A MH-5 MH-6 MH-7 MH-8 MH-12 MH-14)Ty IP-2 EDGIb Wy IP-2 RWST3a 1 3y IP-2 Security Bldg, North of IP-2 Turb. Bldg.North of IP-2 Turb. Bldg.North of IP-2 Turb. Bldg Between Turb. & ABFP IP-2 Cond. Tube Pit EP-2 ABFP Bldg IP-2 TransformetrYard IP-2 Transformer Yard IP-2 Transformer Yard North End IP-2 Turb.North End IP-2 Turb.ND/HTO 1,010 pCi/l HTO 651 pCi/l HTO ND/HTO ND/HTO\3,070 pCi/l HTO 3,380 pCi/I HTO 3,480 pCi/l HTO 13,100 pCi/l HTO 8,140 pCi/I HTO 5,740 pCi/l HTO ND/HTO ND/HTO Stacy Page 4 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th 1/5/2006 MW-31 MOB 3,050 pCi/I HTO 1/6/2006 MW-111 Transformer Yard 113,740 pCi/I HTO MW-33 Transformer Yard 189,000 pCi/i HTO MW-34 Transformer Yard 159,000 pCi/I HTO MW-3_ .Transfo __erYard95,4000pCi/I HTO Stacy Page 5 of 6 On-Site Monitoring Wells Sorted by Date Executive Summary January 9 th Monitoring Wells / Locations Off-Site Date Location Results 10/18/2005 Croton Reservoir ND/HTO -Gamma Camp Field Reservoir ND/HTO -Gamma 10/20/2005 Gypsum Outfall ND/HTO -Gamma Algonquin ND/HTO- Gamma 5 th Street Well ND/HTO -Gamma 10/25/2005 Rock Quarry ND/HTO -Gamma 1.1/8/2005 5 th Street Well ND/HTO -Gamma 11/30/2005 Gypsum Outfall ND/HTO 11/30/2005 Algonquin ND/HTO 5 th Street Well ND/HTO Rock Quarry ND/HTO Croton Reservoir ND/HTO Camp Field Reservoir ND/HTO 1'2/6/2005 Gypsum Plant Well #1 ND/HTO Gypsum Plant Well #2 ND/HTO 12/13/2005 Algonquin Outfall ND/HTO Gypsum Outfall ND/HTO= Rock Quarry ND/HTO Stacy Page 6 of 6