ML18018A916: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 09/22/1978 | | issue date = 09/22/1978 | ||
| title = Letter Regarding a Condition at the Construction Site Concerning Magnetic Particle Weld Indications on Sleeves Cadwelded to the Containment Liner Knuckle Plate and Advising That the Report Will Be Provided by December 15, 1978 | | title = Letter Regarding a Condition at the Construction Site Concerning Magnetic Particle Weld Indications on Sleeves Cadwelded to the Containment Liner Knuckle Plate and Advising That the Report Will Be Provided by December 15, 1978 | ||
| author name = Rhode G | | author name = Rhode G | ||
| author affiliation = Niagara Mohawk Power Corp | | author affiliation = Niagara Mohawk Power Corp | ||
| addressee name = Carlson R | | addressee name = Carlson R | ||
| addressee affiliation = NRC/IE | | addressee affiliation = NRC/IE | ||
| docket = 05000410 | | docket = 05000410 |
Revision as of 05:43, 18 June 2019
ML18018A916 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 09/22/1978 |
From: | Rhode G Niagara Mohawk Power Corp |
To: | Robert Carlson NRC/IE |
References | |
Download: ML18018A916 (4) | |
Similar Documents at Nine Mile Point | |
---|---|
Category:Letter
MONTHYEARNMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024
[Table view]Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration NMP1L3534, License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2023-08-18018 August 2023 License Amendment Request - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 NMP1L3544, Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations2023-07-14014 July 2023 Fifth Inservice Inspection Interval, First Inservice Inspection Period 2023 Owner'S Activity Report for RFO-27 Inservice Examinations ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval NMP2L2846, Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications2023-07-0505 July 2023 Nine Mire Point Nuclear Station, Units 1 and 2, General License 30-day Cask Registration Notifications ML23192A0622023-06-30030 June 2023 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0136, Rev. 0 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 ML23131A4242023-06-23023 June 2023 Issuance of Amendment No. 249 Regarding the Revision to Technical Specification 3.3.1 to Adopt Technical Specifications Task Force Traveler TSTF-568 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3539, Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-06-0909 June 2023 Day Commitment Response - Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 2024-02-01 Category:Report MONTHYEARNMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023
[Table view]Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023 Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . NMP1L3515, Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-03-27027 March 2023 Submittal of Emergency Relief Request I5R-11 Concerning the Installation of a Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML20190A1482020-07-0808 July 2020 FAQ 20-01 NMP Scram Final Approved ML20100F6822020-04-0909 April 2020 Submittal of Analytical Evaluation of Recirculation Discharge Nozzle-to-Safe End Weld Indication ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 NMP2L2695, Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The.2018-12-0707 December 2018 Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The. NMP1L3229, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe ...2018-08-20020 August 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe ... ML18018B2922018-01-18018 January 2018 Appendix a, Justification for Continued Operation, Component Review Summary Sheet ML18018B2912018-01-18018 January 2018 Pipe Crack Task Force Report ML18018A9652018-01-18018 January 2018 Nine Mile Point, Unit 1 - Equipment Qualification Program and Tables I - Equipment Qualification Reports and Table Ii - TMI Action Plan ML18018B0122018-01-18018 January 2018 Semi-Annual Radioactive Effluent Release Report July-December 1999 ML17251A0452017-09-20020 September 2017 - Staff Assessment of Flooding Focused Evaluation (CACs No. MG0087 and MG0088) ML17109A3652017-04-13013 April 2017 Pressure and Temperature Limits Report ML17079A3842017-03-24024 March 2017 Summary of the U.S. Nuclear Regulatory Commission Staff'S Review of the Spring 2016 Steam Generator Tube Inservice Inspections ML17037A6862017-02-0606 February 2017 Table 7.2-1 ML17037A7032017-02-0606 February 2017 Table 7.2-1 (Cont'D) ML17027A0162017-01-27027 January 2017 10 CFR 50.46 Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors RS-16-178, High Frequency Supplement to Seismic Hazard Screening Report2016-11-0202 November 2016 High Frequency Supplement to Seismic Hazard Screening Report ML16231A4522016-08-30030 August 2016 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Events) ML16223A8532016-08-25025 August 2016 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Vents) RS-16-091, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2016-06-14014 June 2016 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML16160A0942016-06-0808 June 2016 ASP ANALYSIS- REJECT- Nine Mile Point Unit 1 Automatic Reactor Scram Due to Main Steam Isolation Valve Closure (LER 220-2015-004) ML15153A6602015-06-16016 June 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Re ML15028A1492015-02-11011 February 2015 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109, Severe Accident Capable Hardened Vents RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML15022A6612014-07-31031 July 2014 Stress Re-Evaluation of Nine Mile Point Unit 2 Steam Dryer at 115% CLTP, CDI Report No. 14-08NP, Revision 0, Non-proprietary Version ML14153A4102014-07-24024 July 2014 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML14167A3492014-06-20020 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (Tac. MF0249 & MF0250) ML15022A6622014-05-31031 May 2014 Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1R, C.D.I. Report No. 14-09NP, Revision 1, Non-proprietary Version ML15023A0312014-04-30030 April 2014 Computation of Cumulative Usage Factor for the 115% CLTP Power Level at Nine Mile Point Unit 2 with the Inboard RCIC Valve Closed, C.D.I. Technical Note No. 14-04NP, Revision 0, Non-proprietary Version ML14099A1962014-03-31031 March 2014 Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task. ML14064A3242014-02-28028 February 2014 000N2495-R1-NP, Rev. 0, Nine Mile Point Nuclear Station Unit 2 Comparison of Mellla+ Reference Design to Cycle 15 Design Characteristics. ML14071A4782014-02-21021 February 2014 Response to Nrc'S Request for Cashflow Statements Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments ML14351A4272014-01-31031 January 2014 000N2528-SRLR, Revision 1, Supplemental Reload Licensing Report for Nine Mile Point 2 Reload 14 Cycle 15 Extended Power Uprate (3988 Mwt) / MELLLA (99-105% Flow). ML14064A3222014-01-31031 January 2014 00N0123-SRLR, Rev. 2, Supplemental Reload Licensing Report for Nine Mile Point 2 (NMP2) Reload 14 Cycle 15 Extended Power Uprate (Epu)/Maximum Extended Load Line Limit Plus (Mellla+). ML14024A4422014-01-0707 January 2014 Submittal of Report in Accordance with 10 CFR 26.719(c)(1) Regarding Unsatisfactory Blind Performance Sample Testing ML14064A3232013-12-31031 December 2013 000N0123-FBIR-NP, Rev. 0, Fuel Bundle Information Report for Nine Mile Point 2 Reload 14 Cycle 15. ML13225A5842013-12-19019 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML13338A6642013-12-11011 December 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Nine Mile Point, Unit 2, TAC No.: MF1130 ML13338A6632013-12-11011 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Nine Mile Point, Unit 1, TAC No.: MF1129 ML13311A0542013-11-0404 November 2013 Pressure and Temperature Limits Report (PTLR) PTLR-2, Revision 0 (Draft B) ML13316B1102013-11-0101 November 2013 Attachment 9 - Global Nuclear Fuel Report GNF-0000-0156-7490-RO-NP, Gnf Additional Information Regarding the Requested Change to the Technical Specification SLMCPR, Dated August 26, 2013 (Non-proprietary) ML13311A0552013-09-30030 September 2013 Fluence Extrapolation in Support of NMP2 P-T Cure Update, MPM-913991, September 30, 2013, Attachment 3 ML13197A2222013-07-12012 July 2013 Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic ML13066A1712013-02-28028 February 2013 R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events 2023-08-04 Category:Technical MONTHYEARNMP1L3545, Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems .2023-08-0404 August 2023
[Table view]Supplemental Information Letter to Adopt TSTF-505, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b, Revision 2 and 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems . NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20100F6822020-04-0909 April 2020 Submittal of Analytical Evaluation of Recirculation Discharge Nozzle-to-Safe End Weld Indication ML19228A0232019-08-15015 August 2019 Proposed Alternative to Utilize Code Case N-879 NMP2L2695, Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The.2018-12-0707 December 2018 Supplement Information and Response to Request for Additional Information by the Office of Nuclear Reactor Regulation to Support Review of an Emergency License Amendment Request for One Time Extension to The. NMP1L3229, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe ...2018-08-20020 August 2018 Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe ... ML18018B0122018-01-18018 January 2018 Semi-Annual Radioactive Effluent Release Report July-December 1999 ML18018A9652018-01-18018 January 2018 Nine Mile Point, Unit 1 - Equipment Qualification Program and Tables I - Equipment Qualification Reports and Table Ii - TMI Action Plan ML17109A3652017-04-13013 April 2017 Pressure and Temperature Limits Report ML17037A7032017-02-0606 February 2017 Table 7.2-1 (Cont'D) ML17037A6862017-02-0606 February 2017 Table 7.2-1 RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML15022A6612014-07-31031 July 2014 Stress Re-Evaluation of Nine Mile Point Unit 2 Steam Dryer at 115% CLTP, CDI Report No. 14-08NP, Revision 0, Non-proprietary Version ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 ML15022A6622014-05-31031 May 2014 Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1R, C.D.I. Report No. 14-09NP, Revision 1, Non-proprietary Version ML15023A0312014-04-30030 April 2014 Computation of Cumulative Usage Factor for the 115% CLTP Power Level at Nine Mile Point Unit 2 with the Inboard RCIC Valve Closed, C.D.I. Technical Note No. 14-04NP, Revision 0, Non-proprietary Version ML14064A3242014-02-28028 February 2014 000N2495-R1-NP, Rev. 0, Nine Mile Point Nuclear Station Unit 2 Comparison of Mellla+ Reference Design to Cycle 15 Design Characteristics. ML14071A4782014-02-21021 February 2014 Response to Nrc'S Request for Cashflow Statements Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments ML14064A3222014-01-31031 January 2014 00N0123-SRLR, Rev. 2, Supplemental Reload Licensing Report for Nine Mile Point 2 (NMP2) Reload 14 Cycle 15 Extended Power Uprate (Epu)/Maximum Extended Load Line Limit Plus (Mellla+). ML14351A4272014-01-31031 January 2014 000N2528-SRLR, Revision 1, Supplemental Reload Licensing Report for Nine Mile Point 2 Reload 14 Cycle 15 Extended Power Uprate (3988 Mwt) / MELLLA (99-105% Flow). ML14064A3232013-12-31031 December 2013 000N0123-FBIR-NP, Rev. 0, Fuel Bundle Information Report for Nine Mile Point 2 Reload 14 Cycle 15. ML13225A5842013-12-19019 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML13338A6632013-12-11011 December 2013 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Nine Mile Point, Unit 1, TAC No.: MF1129 ML13338A6642013-12-11011 December 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Nine Mile Point, Unit 2, TAC No.: MF1130 ML13311A0542013-11-0404 November 2013 Pressure and Temperature Limits Report (PTLR) PTLR-2, Revision 0 (Draft B) ML13316B1102013-11-0101 November 2013 Attachment 9 - Global Nuclear Fuel Report GNF-0000-0156-7490-RO-NP, Gnf Additional Information Regarding the Requested Change to the Technical Specification SLMCPR, Dated August 26, 2013 (Non-proprietary) ML13311A0552013-09-30030 September 2013 Fluence Extrapolation in Support of NMP2 P-T Cure Update, MPM-913991, September 30, 2013, Attachment 3 ML13197A2222013-07-12012 July 2013 Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic ML13078A3232013-02-28028 February 2013 XGEN-2012-25-NP, Revision 1, Westinghouse Engineering Report, Technical Basis for the Inspection Frequency of the Modified Alloy 718 Jet Pump Beam, Attachment 2 ML13066A1692013-02-28028 February 2013 Units I and 2, Overall Integrated Plan for Reliable Hardened Vents ML12313A2032012-10-26026 October 2012 Attachment 1, NMP2 Extended Power Uprate, Power Ascension Test Report ML12313A2042012-10-26026 October 2012 Attachment 2, Final Steam Dryer Stress Report, Continuum Dynamics, Incorporated Report No. 12-18NP, Attachment 3, Affidavit from CDI ML12277A0902012-10-12012 October 2012 Technical Letter Report on Aging Management Program Audits at Ginna and Nine Mile Point 1 ML12284A1842012-09-30030 September 2012 Attachment 3, Final EPU Steam Dryer Load Definition CDI Report No. 12-20NP, Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point, Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1 ML12284A1852012-06-30030 June 2012 Attachment 4, Steam Dryer Limit Curves CDI Technical Note No. 12-13NP, Limit Curves with ACM Rev. 4.1 for the 100% Power Level Basis at Nine Mile Point, Unit 2, Revision 1 ML12170A8692012-06-30030 June 2012 Transition to 10 CFR 50.48(c) - NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition ML11221A0132011-08-0505 August 2011 Attachment 3, Continuum Dynamics, Inc Technical Note No. 11-17NP, Limit Curve Analysis with ACM Rev. 4.1 for Power Ascension at Nine Mile Point Unit 2, Revision 1. (Non-Proprietary) ML11208B7732011-07-0808 July 2011 Report No. 1100539.401, Rev. 1, Nine Mile Point Unit 1, Steam Dryer Support Bracket Flaw Evaluation. ML11188A1952011-06-28028 June 2011 Calculation S0VESSELM035 (SIA File No. 1100566.301), Reactor Pressure Vessel Head Weld Flaw Evaluation, Rev. 00.00 ML11171A0602011-05-31031 May 2011 Attachment 3, CDI Report No. 11-04NP, Stress Evaluation of Nine Mile Point Unit 2 Steam Dryer Using ACM Rev. 4.1 Acoustic Loads, Revision 0. (Non-Proprietary), Attachment 4, Affidavit from Continuum Dynamics, Inc ML1108803022011-03-31031 March 2011 NEDO-33636, Fuel Storage Criticality Safety Analysis of New Fuel Storage Racks - GE14, Attachment 3, (Non-Proprietary) ML1104601602011-01-31031 January 2011 Attachment 1, CDI Report No. 10-09NP, ACM Rev. 4.1: Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, Revision 3 ML12135A6232011-01-14014 January 2011 Off-Site Dose Calculation Manual (Odcm), Revision 32 ML1035003652010-12-13013 December 2010 Holtec Report No. HI-2012621 (Non-Proprietary), Criticality Safety Evaluation for the Nine Mile Point 2 Rack Installation Project ML1021702952010-07-30030 July 2010 Attachment 5, Continuum Dynamics, Inc., CDI Report No. 10-12NP, Design and Stress Evaluation of Nine Mile Point Unit 2 Steam Dryer Modifications for EPU Operation ML1021701862010-07-28028 July 2010 Attachment 4, Structural Integrity Associates, Inc., Flaw Evaluation of Indications in the Nine Mile Point Unit 2 Steam Dryer Vertical Support Plates Considering Extended Power Uprate Flow Induced Vibration Loading ML1019004492010-06-30030 June 2010 C.D.I. Report No. 10-10NP, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1, Rev. 1 ML1021701852010-06-30030 June 2010 Attachment 3, Global Nuclear Fuel - Americas, LLC, MCNP01A, Low Enriched UO2 Pin Lattice in Water Critical Benchmark Evaluations Using ENDF/B-V Nuclear Cross-Section Data, Revision 1 ML1019004482010-06-30030 June 2010 C.D.I. Report No. 10-09NP, ACM Rev. 4.1: Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, Rev. 1 (Non-Proprietary) 2023-08-04 |
Text
r gy@g rm+REGULATORY
'INFORMATlON DISTRIBUTION SYSTEM (RIDS>DISTRIBUTION FOR INCOMING MATERIAL 50-410 REC: CARLSON R T NIAGARA MOHAWK PNR ORG: RIRODE G K NIAGARA MOHAWK PWR DOCD ATE: 09l22/78 DATE RCVD: 09/27/78 DOCTYPE:,LETTER NOTARIZED:
NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 0 ADVISING CONSTRUCTION DEFICIENCY REPT CONCERNING MAGNETIC PARTICLE WELD INDICATIONS ON SLEEVES CADWELDED TO Tl-IE CONTAINMENT LINER KNUCKLE PLATE OF SUBJECT FACILITY, WILL BE SUBMITTED BY 12/15/78.PLANT NAME: NINE MILE POINT-UNIT 2 REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL: DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS I CONSTRUCTION DEFICIENCY REPORT (1,0CFR50.55E><DISTRIBUTION CODE 8019)FQR ACTION: INTERNAL: EXTERNAL: ASST DIR VASSALLO+4LTR ONLY<1)PRQJ MGR ONLY (1)I 5 E+<LTR ONLY(2)GOSSICK 5 STAFF~~h>>LTR ONLY(i>DIRECTOR DPM++LTR ONLY<1)QAB<~L'TR ONLY(1)AD FQR ENG+<LTR ONLY(1)AD FOR PLANT SYSTEMS+@LTR ONLY(STANDARDS DEV.+~LTR ONLY(1)FERD DREHER/IE4~LTR ONLY(i>LPDR S OSWEGOz NY>>+LTR ONLY<1)TERA4~+LTR ONLY(1>NSIC4~~LTR ONLY<1)ACRS CAT B>>~tLTR ONLY(ih>BR CHIEF LWR84 BC+<LTR ONLY<1)LIC ASST LWR04 LA>>>>LTR ONLY(l)h NRC PDR>>+LTR ONLY(i>OELD44LTR ONLY(1)M I PC++LTR ONLY (1)DEPUTY DIR DPM+<LTR ONLY<i)DIRECTOR DSS++LTR-ONLY(i>AD FOR REAC SFTY4%LTR ONLY<i)AD FOR SYS 8c PROJy>LTR ONLY(i>K SEYFRIT/IE4+LTR ONLY<i)DISTRIBUTION:
LTR 41 ENCL 0 SI ZF: 1P SHHHt+%%%%%%4HHl 0i+%%%0l>>88%%%3HI>>>>+4>>>>%%THE END r h I~h hJ r CONTROL NBR: 781780128 1Ã>>>>%%%%4>>>>>>%%>>%%>>>>%++%
%%%%%+%%%%%4%8 I c, I' 5 7 MIASMA"6 U MQHA'PdK-~~~L~1 NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST, SYRACUSE, N.Y.13202/TELEPHON f31 4-511 September 22, 1978 Office of Inspection and Enforcement Region I Attention:
Mr.R.T.Carlson, Chief Reactor Construction and Engineering Support Branch U.S.Nuclear Regulatory Commission
'631 Park Avenue King of Prussia, PA 19406 Cg C>C.)CA
Dear Mr.Garison:
Re: Nine Mile Point Unit 2 Docket No.50-410 On June 21, 1978, Mr.R.W.McDaughy of your staff wa's informed by telephone that.Niagara Mohawk was evaluating a condition at Nine Mile Point Unit 2 construction site which may be a reportable deficiency under 10CFR50.55(e).
This condition concerned magnetic particle weld indications on.sleeves cadwelded to the containment liner knuckle plate.By letter dated July 21, 1978, you were informed that further information was unavailable due to a work stoppage and a report would be provided by September 30, 1978 describing our evaluation of this condition.
A three-pronged investigation into this problem is underway.Investigations are in progress on a mock-up portion of the containment liner,, sister sleeves, and production, items in the field.Since the work stoppage at Unit 2 was longer than originally anticipated, our report will not be available as previously scheduled.
It is now planned that this report will be provided by December 15, 1978.Very truly yours, NIAGARA MOHAWK POWER CORPORATION Ger d K.Rho e, Vice President System Pro ect Management Xc: Director of Inspection and Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555 78i78Py28 5'~o Tt H'4 Pg~g I I~'i