ML18018A916

From kanterella
Jump to navigation Jump to search
Letter Regarding a Condition at the Construction Site Concerning Magnetic Particle Weld Indications on Sleeves Cadwelded to the Containment Liner Knuckle Plate and Advising That the Report Will Be Provided by December 15, 1978
ML18018A916
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/22/1978
From: Rhode G
Niagara Mohawk Power Corp
To: Robert Carlson
NRC/IE
References
Download: ML18018A916 (4)


Text

r g rm+

gy@

REGULATORY 'INFORMATlON DISTRIBUTION SYSTEM (RIDS>

DISTRIBUTION FOR INCOMING MATERIAL 50-410 REC: CARLSON R T ORG: RIRODE G K DOCD ATE: 09l22/78 NIAGARA MOHAWK PNR NIAGARA MOHAWK PWR DATE RCVD: 09/27/78 DOCTYPE:,LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 0 ADVISING CONSTRUCTION DEFICIENCY REPT CONCERNING MAGNETIC PARTICLE WELD INDICATIONS ON SLEEVES CADWELDED TO Tl-IE CONTAINMENT LINER KNUCKLE PLATE OF SUBJECT FACILITY, WILL BE SUBMITTED BY 12/15/78.

PLANT NAME: NINE MILE POINT UNIT 2 REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL:

DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS I

CONSTRUCTION DEFICIENCY REPORT ( 1,0CFR50. 55E >

< DISTRIBUTION CODE 8019)

FQR ACTION: ASST DIR VASSALLO+4LTR ONLY< 1) BR CHIEF LWR84 BC+<LTR ONLY< 1)

PRQJ MGR ONLY (1 ) LIC ASST LWR04 LA>>>>LTR ONLY(l) h INTERNAL: NRC PDR>>+LTR ONLY(i>

I 5 E+<LTR ONLY(2) OELD44LTR ONLY( 1)

GOSSICK 5 STAFF~~h>>LTR ONLY(i> M I PC++LTR ONLY ( 1 )

DIRECTOR DPM++LTR ONLY< 1) DEPUTY DIR DPM+<LTR ONLY<i)

QAB<~L'TR ONLY(1) DIRECTOR DSS++LTR -ONLY(i>

AD FQR ENG+<LTR ONLY(1) AD FOR REAC SFTY4%LTR ONLY<i)

AD FOR PLANT SYSTEMS+@LTR ONLY( AD FOR SYS 8c PROJy>LTR ONLY(i>

STANDARDS DEV. +~LTR ONLY( 1) K SEYFRIT/IE4+LTR ONLY<i)

FERD DREHER/IE4~LTR ONLY(i>

EXTERNAL: LPDR S OSWEGOz NY>>+LTR ONLY < 1 )

TERA4~+LTR ONLY(1>

NSIC4~~LTR ONLY<1)

ACRS CAT B>>~tLTR ONLY(ih>

r h I

~h hJ r DISTRIBUTION: LTR 41 ENCL 0 CONTROL NBR: 781780128 SI ZF: 1P Ã 1

SHHHt+%%%%%%4HHl 0i+%%%0l >>88%%% 3HI >>>>+4>>>>%% THE END >>>>%%%%4>>>>>>%%>>%%>>>>%++% %%%%%+%%%%%4%8

I c,

I

7 MIASMA "65 U MQHA'PdK

~~~L~ 1 NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST, SYRACUSE, N.Y. 13202/TELEPHON f31 4- 511 September 22, 1978 Cg Office of Inspection and Enforcement C >

Region I Attention: Mr. R. T. Carlson, Chief Reactor Construction and Engineering C.)

Support Branch U. S. Nuclear Regulatory Commission

'631 Park Avenue King of Prussia, PA 19406 CA

Dear Mr. Garison:

Re: Nine Mile Point Unit 2 Docket No. 50-410 On June 21, 1978, Mr. R. W. McDaughy of your staff wa's informed by telephone that. Niagara Mohawk was evaluating a condition at Nine Mile Point Unit 2 construction site which may be a reportable deficiency under 10CFR50.55(e). This condition concerned magnetic particle weld indications on .

sleeves cadwelded to the containment liner knuckle plate.

By letter dated July 21, 1978, you were informed that further information was unavailable due to a work stoppage and a report would be provided by September 30, 1978 describing our evaluation of this condition.

A three-pronged investigation into this problem is underway. Investigations are in progress on a mock-up portion of the containment liner,, sister sleeves, and production, items in the field. Since the work stoppage at Unit 2 was longer than originally anticipated, our report will not be available as previously scheduled. It is now planned that this report will be provided by December 15, 1978.

Very truly yours, NIAGARA MOHAWK POWER CORPORATION Ger d K. Rho e, Vice President System Pro ect Management Xc: Director of Inspection and Enforcement 78i78Py28 U. S. Nuclear Regulatory Commission 5'~