-4352 November 16, 2015 Mr. Ernest Harkness Site Vice President, Nuclear FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, 10 Center Road, A
-4352 November 16, 2015 Mr. Ernest Harkness Site Vice President, Nuclear FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, 10 Center Road, A
-PY-A 290 Perry, OH 44081
-PY-A 290 Perry, OH 44081
-0097
-0097 SUBJECT: PERRY NUCLEAR POWER PLANT, UNIT 1 - NRC SECURITY BASELINE INSPECTION REPORT 05000440/201540 8
 
SUBJECT: PERRY NUCLEAR POWER PLANT, UNIT 1 - NRC SECURITY BASELINE INSPECTION REPORT 05000440/201540 8


==Dear Mr. Harkness:==
==Dear Mr. Harkness:==

Revision as of 21:01, 17 May 2019

IR 05000440/2015408; on 10/05/2015 - 10/08/2015; Perry Nuclear Power Plant, Unit 1; Routine Security Baseline Inspection - (Cover Letter Only)
ML15320A545
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/16/2015
From: Orth S K
Plant Support Branch II
To: Harkness E
FirstEnergy Nuclear Operating Co
References
IR 2015408
Download: ML15320A545 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532

-4352 November 16, 2015 Mr. Ernest Harkness Site Vice President, Nuclear FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, 10 Center Road, A

-PY-A 290 Perry, OH 44081

-0097 SUBJECT: PERRY NUCLEAR POWER PLANT, UNIT 1 - NRC SECURITY BASELINE INSPECTION REPORT 05000440/201540 8

Dear Mr. Harkness:

On October 8, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Perry Nuclear Power Plant, Unit 1. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 8, 2015, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations

, and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No NRC-identified or self

-revealing findings were identified during this inspection. However, one licensee-identified violation, which was determined to be of very

-low security significance (Green), is listed in this report. The NRC is treating the violation as a Non-Cited Violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the subject or severity of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555

-0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555

-0001; and the NRC Resident Inspector at the Perry Nuclear Power Plant

. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Enclosure contains Sensitive Unclassified Non

-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. However, the material enclosed herewith contains Security

-Related Information in accordance with 10 CFR 2.390(d)(1)

and its disclosure to unauthorized individuals could present a security vulnerability.

Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security

-Related Information is necessary to provide an acceptable response, please mark your entire response "Security

-Related Information

-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA Joseph Maynen Acting for/

Steven K. Orth, Chief Plant Support Branch

Division of Reactor Safety Docket No. 50

-440 License No. NPF

-58 Nonpublic Enclosure:

IR 05000440/

201540 8 w/Attachment:

Supplemental Information cc w/encl: M. Bear, Radiological Branch Ohio Emergency Management Agency DISTRIBUTION w/encl

N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR R. McKinley, RI B. Desai, RII C. Pederson, RIII D. Roberts, RIII M. Haire, RIV cc w/o encl: Distribution via LISTSERV