IR 05000298/2016403: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 22: | Line 22: | ||
Mr. Oscar Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 | Mr. Oscar Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 | ||
Brownville, NE 68321 | Brownville, NE 68321 SUBJECT: COOPER NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000298/2016403 | ||
SUBJECT: COOPER NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000298/2016403 | |||
==Dear Mr. Limpias:== | ==Dear Mr. Limpias:== | ||
Line 35: | Line 33: | ||
Enforcement; Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Cooper Nuclear Station. | Enforcement; Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Cooper Nuclear Station. | ||
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, SEC URITY-RELATED INFORMATION SEC URITY-RELATED INFORMATION Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV and the NRC Resident Inspector at Cooper Nuclear Station. | If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, UNITED STATESNUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511 SEC URITY-RELATED INFORMATION SEC URITY-RELATED INFORMATION Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV and the NRC Resident Inspector at Cooper Nuclear Station. | ||
A cross-cutting aspect was assigned to the finding in the area of human performance. | A cross-cutting aspect was assigned to the finding in the area of human performance. | ||
Line 57: | Line 55: | ||
ML16327A596 Entire Report SUNSI Review By: CJewett ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: | ML16327A596 Entire Report SUNSI Review By: CJewett ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: | ||
MD 3.4 A.3 Cover Letter Only SUNSI Review By: CJewett ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE PSI: PSB1 PSI: PSB1 C: PSB1 C:PBC C: PSB1 NAME CJewett AMeyen MHaire GWarnick MHaire SIGNATURE E-mail E-mail E-mail /RA/ /RA/ | MD 3.4 A.3 Cover Letter Only SUNSI Review By: CJewett ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE PSI: PSB1 PSI: PSB1 C: PSB1 C:PBC C: PSB1 NAME CJewett AMeyen MHaire GWarnick MHaire SIGNATURE E-mail E-mail E-mail /RA/ /RA/ | ||
DATE 11/21/16 11/21/16 11/21/16 11/21/16 11/21/16 SEC URITY-RELATED INFORMATION SEC URITY-RELATED INFORMATION Letter to Oscar from Mark S. Haire, dated November 22, 2016 | DATE 11/21/16 11/21/16 11/21/16 11/21/16 11/21/16 SEC URITY-RELATED INFORMATION SEC URITY-RELATED INFORMATION Letter to Oscar from Mark S. Haire, dated November 22, 2016 | ||
SUBJECT: COOPER NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000298/2016403 Distribution w/enclosure: | SUBJECT: COOPER NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000298/2016403 Distribution w/enclosure: |
Revision as of 08:57, 17 May 2019
ML16327A596 | |
Person / Time | |
---|---|
Site: | Cooper |
Issue date: | 11/22/2016 |
From: | Haire M S Plant Support Branch-1 |
To: | Limpias O A Nebraska Public Power District (NPPD) |
References | |
IR 2016403 | |
Download: ML16327A596 (4) | |
Text
" " November 22, 2016
Mr. Oscar Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98
Brownville, NE 68321 SUBJECT: COOPER NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000298/2016403
Dear Mr. Limpias:
On October 14, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Cooper Nuclear Station and the NRC inspector discussed the results of this inspection with you and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.
The NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violation or significance of the non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC, 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of
Enforcement; Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Cooper Nuclear Station.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, UNITED STATESNUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511 SEC URITY-RELATED INFORMATION SEC URITY-RELATED INFORMATION Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV and the NRC Resident Inspector at Cooper Nuclear Station.
A cross-cutting aspect was assigned to the finding in the area of human performance.
Specifically, Cooper Nuclear Station failed to ensure individuals used a consistent, systematic approach to make decisions on equipment required to be considered target set components, and failed to ensure risk insights were incorporated as appropriate [H.13].
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety
Docket No. 50-298 License No. DPR-46
Nonpublic Enclosure:
Inspection Report 05000298/2016403 w/Attachment: Supplemental Information
cc w/o enclosure: Electronic Distribution
ML16327A596 Entire Report SUNSI Review By: CJewett ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:
MD 3.4 A.3 Cover Letter Only SUNSI Review By: CJewett ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE PSI: PSB1 PSI: PSB1 C: PSB1 C:PBC C: PSB1 NAME CJewett AMeyen MHaire GWarnick MHaire SIGNATURE E-mail E-mail E-mail /RA/ /RA/
DATE 11/21/16 11/21/16 11/21/16 11/21/16 11/21/16 SEC URITY-RELATED INFORMATION SEC URITY-RELATED INFORMATION Letter to Oscar from Mark S. Haire, dated November 22, 2016
SUBJECT: COOPER NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000298/2016403 Distribution w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov) Senior Resident Inspector (Patricia.Voss@nrc.gov)
Resident Inspector (Christopher.Henderson@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer (Cale.Young@nrc.gov)
Project Engineer (Lindsay.Brandt@nrc.gov)
Administrative Assistant (Amy.Elam@nrc.gov)
Distribution w/o enclosure: Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Thomas.Wengert@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
SAIC (Gayle.Walker@nrc.gov)
RSLO (Bill.Maier@nrc.gov)
RidsOeMailCenter Resource