ML18283A080: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML18283A080
| number = ML18283A080
| issue date = 10/10/2018
| issue date = 10/10/2018
| title = Project - NRC Initial Operator Licensing Examination Approval 05000498/2018301 and 05000499/2018301
| title = NRC Initial Operator Licensing Examination Approval 05000498/2018301 and 05000499/2018301
| author name = Gaddy V G
| author name = Gaddy V G
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB

Revision as of 03:24, 18 April 2019

NRC Initial Operator Licensing Examination Approval 05000498/2018301 and 05000499/2018301
ML18283A080
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/10/2018
From: Vincent Gaddy
Operations Branch IV
To: Powell G T
South Texas
References
IR 2018301
Download: ML18283A080 (3)


See also: IR 05000498/2018301

Text

October 10, 2018

Mr. G. T. Powell

President and CEO

STP Nuclear Operating Company

P.O. Box 289

Wadsworth, TX 77483

SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

- NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL

05000498/2018301 AND 05000499/2018301

Dear Mr. Powell

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at South Texas Project Electric Generating Station, Units 1 and 2

. The U.S. Nuclear Regulatory Commission (NRC) has approved the subject examinations, and you may administer the written examination, in accordance

with Revision 11 of NUREG

-1021, "Operator Licensing Examination Standards for Power Reactors," on November 7, 2018. The NRC staff will administer the operating tests during the week of October 2 2, 2018. The list of applicants approved to take the examination has been provided to Adrian Culver , Initial Training Supervisor

. The examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility.

Based on this review, I have concluded that

the examination meets the guidelines of NUREG

-1021 for content, operational, and discrimination validity.

By administering this examination, you also agree that it meets NUREG-1021 guidelines and is appropriate for measuring the qualifications of licensed operator applicants at your facility.

If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 817

-200-1159.

G.T. Powell

2 Please contact your Chief Examiner, John Kirkla

nd , at 817-200-1 771, if you have any questions

or identify any errors or changes in the license level (reactor operator

or senior reactor operator) or type of examination (partial or

complete written examination

or operating test, or both) specified for each applicant

approved to take the examination

. Sincerely, /RA/ Vincent G. Gaddy, Chief Operations Branch

Division of Reactor Safety

Docket Nos. 50

-498; 50-499 License Nos. NPF

-76; NPF-80

G.T. Powell

3 SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION

- NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000498/2018301 AND 05000499/2018301

- DATED OCTOBER 10, 2018

DISTRIBUTION:

KKennedy, RA

SMorris, DRA

AVegel, DRP

MHay, DRP MShaffer, DRS

RLantz, DRS

DCylkowski, RC

NTaylor, DRP

DProulx, DRP

JMelfi, DRP

ECombs, DRP

FSanchez, DRP

JChoate, DRP

LReyna, DRP

CCook, RIV/OEDO

VDricks, ORA

JWeil, OCA

LRegner, NRR

AMoreno, RIV/CAO

BMaier, RSLO

GMiller, IPAT

PJayroe, IPAT

MHerrera, DRMA

ADAMS ACCESSION

NUMBER: ML18283A080

X SUNSI Review

ADAMS: Non-Publicly Available

X Non-Sensitive Keyword: By: JCK X Yes No X Publicly Available

Sensitive OFFICE OB:SOE OB:BC NAME JKirkland VGaddy SIGNATURE /RA/ /RA/ DATE 10/10/18 10/10/18 OFFICIAL RECORD COPY