IR 05000327/2009404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML092960060
| number = ML092960060
| issue date = 10/23/2009
| issue date = 10/23/2009
| title = Sequoyah Nuclear Plant - NRC Security Inspection Report 05000327-09-404, 05000328-09-404
| title = NRC Security Inspection Report 05000327-09-404, 05000328-09-404
| author name = Ernstes M E
| author name = Ernstes M E
| author affiliation = NRC/RGN-II/DRS/PSB2
| author affiliation = NRC/RGN-II/DRS/PSB2

Revision as of 20:42, 16 April 2019

NRC Security Inspection Report 05000327-09-404, 05000328-09-404
ML092960060
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/23/2009
From: Ernstes M E
NRC/RGN-II/DRS/PSB2
To: Swafford P D
Tennessee Valley Authority
References
IR-09-404
Download: ML092960060 (4)


Text

October 23, 2009

Mr. Preston Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000327/2009404 AND 05000328/2009404

Dear Mr. Swafford:

On October 9, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant. In addition we completed an inspection of the Independent Spent Fuel Storage Installation (ISFSI). The purpose of this inspection was to evaluate whether the protection of the ISFSI was in compliance with the Sequoyah Physical Security Plan for the ISFSI and the additional security measures imposed by the NRC Order dated October 16, 2002. The enclosed inspection report documents the inspection results, which were discussed on October 9, 2009, with Mr. T. Cleary and other members of your staff.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission

=s rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the TVA 2 enclosure, and in accordance with 10 CFR 2.390, a copy of this letter

=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC

=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this letter, please contact us.

Sincerely,Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79

Enclosure:

NRC Security Inspection Report 05000327/2009404 AND 05000328/2009404

w/Attachment:

Supplemental Information

cc w/encl.: (See page 3) TVA 3 cc w/Encl: Timothy P. Cleary Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy-Daisy, TN 37384-2000 Christopher R. Church Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy-Daisy, TN 37384-2000 Thomas Coutu Vice President Nuclear Support Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

Larry E. Nicholson General Manager Performance Improvement Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Michael A. Purcell Senior Licensing Manager Nuclear Power Group Tennessee Valley Authority 4K Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

Beth A. Wetzel Manager Licensing and Industry Affairs Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000

Patrick J. Asendorf General Manager Nuclear Emergency Services Tennessee Valley Authority 6B Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Christopher E. Glover Manager Nuclear Security Operations Tennessee Valley Authority 6B Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Nick C. Eggemeyer Site Security Manager Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Soddy Daisy, TN 37384-2000

_________________________ x SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII:DRP RII:DRP SIGNATURE /RA/ /RA/ /RA/ NAME MErnstes J. Wallo E. Guthrie DATE 10/23/2009 10/222009 10/22/2009 E-MAIL COPY? YESNO YESNO YESNO YESNO YESNO YESNO