| | number = ML13190A316 | | | number = ML13190A316 |
| | issue date = 06/26/2013 | | | issue date = 06/26/2013 |
| | title = Catawba, Units 1 and 2, McGuire, Units 1 and 2, Oconee, Units 1, 2, and 3, Capability to Perform Multi-Unit Dose Assessment Capability | | | title = McGuire, Units 1 and 2, Oconee, Units 1, 2, and 3, Capability to Perform Multi-Unit Dose Assessment Capability |
| | author name = Annacone M J | | | author name = Annacone M J |
| | author affiliation = Duke Energy Carolinas, LLC | | | author affiliation = Duke Energy Carolinas, LLC |
McGuire, Units 1 and 2, Oconee, Units 1, 2, and 3, Capability to Perform Multi-Unit Dose Assessment CapabilityML13190A316 |
Person / Time |
---|
Site: |
Oconee, Mcguire, Catawba, McGuire |
---|
Issue date: |
06/26/2013 |
---|
From: |
Annacone M J Duke Energy Carolinas |
---|
To: |
Document Control Desk, Office of Nuclear Reactor Regulation |
---|
References |
---|
Download: ML13190A316 (3) |
|
|
---|
Category:Letter
MONTHYEARIR 05000414/20240922024-11-20020 November 2024 NRC Inspection Report 05000414/2024092 ML24313A0102024-11-13013 November 2024 – NRC Examination Results Summary - Examination Report 05000413/2024301 and 05000414/2024301 ML24311A1882024-11-0808 November 2024 Request to Remove Document from Public Availability and Withhold Proprietary Information from Public Disclosure, Mcguire Nuclear Station, Unit No. 1 05000269/LER-2022-001-01, Ultrasonic Examination Indication Identifies Degraded Reactor Coolant System Pressure Boundary2024-11-0707 November 2024 Ultrasonic Examination Indication Identifies Degraded Reactor Coolant System Pressure Boundary ML24304A9602024-11-0505 November 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations IR 05000413/20240032024-11-0404 November 2024 Integrated Inspection Report 05000413/2024003 and 05000414/2024003 IR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 ML24305A1492024-11-0404 November 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report (O2R31) IR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24297A6222024-10-11011 October 2024 PCA Letter to NRC Catawba Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000413/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000413/2024011 and 05000414/2024011 ML24255A8312024-09-23023 September 2024 Project Manager Assignment ML24261B9782024-09-19019 September 2024 Notification of an NRC Fire Protection Team Inspection NRC Inspection Report 05000413-2024010, 05000414-2024010 and Request for Information ML24257A1492024-09-16016 September 2024 Operator Licensing Examination Approval 05000413/2024301 and 05000414/2024301 IR 05000414/20240912024-09-0505 September 2024 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter-NRC Inspection Report 05000414-2024091 IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) ML24235A1542024-08-22022 August 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000413-2024402 and 05000414-2024402) IR 05000413/20240022024-08-0808 August 2024 Integrated Inspection Report 05000413-2024002 and 05000414-2024002 and Apparent Violation ML24220A1092024-08-0808 August 2024 – Operator Licensing Examination Approval 05000269/2024301, 05000270/2024301, and 05000287/2024301 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000413/20244032024-08-0101 August 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000413/2024403; 05000414/2024403 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) ML24178A0552024-06-26026 June 2024 Requalification Program Inspection – Catawba Nuclear Station IR 05000414/20240902024-06-24024 June 2024 NRC Inspection Report 05000414/2024090 and Preliminary White Finding and Apparent Violation ML24170A8632024-06-11011 June 2024 Flowserve June 11, 2024, Part 21 Notification - Redacted Version for Publishing IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) ML24144A1162024-05-28028 May 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000413/20240012024-05-10010 May 2024 Integrated Inspection Report 05000413/2024001 and 05000414/2024001 and Apparent Violation IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 2024-09-05
[Table view] |
Text
DUKE Michae J. Annacone 526 South Church Street ENERGY, Charlotte, NC 28202 Mailing Address: Mail Code EC07H / P.O. Box 1006 Charlotte, NC 28201-1006 980-373-2544 704-382-6056 fax June 26, 2013 1 0CFR50.4 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Catawba Nuclear Station (CNS), Units 1 and 2 Docket Numbers 50-413 and 50-414 Renewed License Numbers NPF-35 and NPF-52 McGuire Nuclear Station (MNS), Units 1 and 2 Docket Numbers 50-369 and 50-370 Renewed License Numbers NPF-9 and NPF-17 Oconee Nuclear Station (ONS), Units 1, 2, and 3 Docket Numbers 50-269, 50-270, and 50-287 Renewed License Numbers DPR-38, DPR-47, and DPR-55
Subject:
Duke Energy Carolinas, LLC, Capability to Perform Multi-Unit Dose Assessment Capability
Reference:
- 1. Nuclear Energy Institute (NEI) Letter, Commitment for Implementation of Multi-Unit Dose Assessment Capability;.
Pollock to Wiggins; dated March 14, 2013 (ADAMS Accession Number ML13073A522)
- 2. NRC Letter, Industry Implementation of Multi-Unit Dose Assessment Capability, Wiggins to Pollock; dated February 27, 2013 (ADAMS Accession Number ML13029A632)
In accordance with Reference 1, Duke Energy Carolinas, LLC, hereby provides the following information concerning the capability to perform offsite dose assessment during an event involving multiple release points (e.g., releases from reactor containments and spent fuel pools)at the Catawba, McGuire, and Oconee Nuclear Stations: 1. Summary of current capability to perform multi-unit/multi-source dose assessment.
In the event of a multi-source or multi.-unit release accident, dose assessors would take the following actions: Qualified dose assessors responding to the onsite Technical Support Center (TSC) and the offsite Emergency Operations Facility (EOF) located in Charlotte, North Carolina, initiate dose assessment functions within 75 minutes of a declared emergency.
Radioactive releases are modeled using the computer software program Raddose V and procedure SH/0/B/2005/001, Emergency Response Offsite Dose Projections.
U. S. Nuclear Regulatory Commission June 26, 2013 Page 2 The components of the Raddose V program used by dose assessors allows for evaluating up to five concurrent release pathways for each calculated step. For each release pathway, one out of ten accident types can be specified, including a loss of coolant accident (LOCA), steam generator tube rupture, LOCA outside containment, and a fuel handling accident.Each accident type can model accident spectrums associated with normal reactor coolant, fuel gap releases or core melt. Raddose V can also model other onsite radiation monitors including unit vent low, high, and high-high range monitors concurrently.
Other onsite units can be also modeled using a direct isotopic sample entry (pCi/ml) or release rate, if known (Ci/sec).The Raddose V program determines source term and calculates projected offsite dose to the public on a per unit basis. Therefore, in order to perform multi-unit dose assessments, the Raddose V program must be run from more than one computer workstation and the results summed together.
Currently, the Raddose V program is installed on multiple computer workstations located within each station's TSC and the EOF.2. Anticipated schedule to establish multi-unit/multi-source dose assessment capability on an interim and/or permanent basis if required.Duke Energy has the capability to perform multi-unit/multi-source dose assessments.
Notwithstanding, procedural enhancements have been identified that, when implemented, will strengthen that capability.
The identified procedural enhancements are expected to be implemented by December 31, 2014.3. A description of the administrative process that will be used to track completion of key actions (e.g., commitment tracking or corrective action program and tracking identifiers).
No key actions or milestones were identified.
The procedural enhancements identified in response to Item 2, however, will be tracked within the corrective action program as Problem Investigation Program (PIP) G-13-0585.
This letter does not contain any new or revised regulatory commitments.
Any actions discussed in this letter should be considered intended or planned enhancement actions.Should you have any questions concerning the content of this letter, please contact Michael Austin, at 980-373-4134 (michaelaustin@duke-energy.com).
Sincerely, Michael J. Annacone, Vice President
-Organizational Effectiveness
&Regulatory Affairs U. S. Nuclear Regulatory Commission June 26, 2013 Page 3 xc: V.M. McCree, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257 John Boska, Project Manager (ONS)U.S. Nuclear Regulatory Commission One White Flint North, Mailstop O-8G9A 11555 Rockville Pike Rockville, MD 20852-2738 J.S. Kim, Project Manager (MNS and CNS)U.S. Nuclear Regulatory Commission One White Flint North, Mailstop O-8C2A 11555 Rockville Pike Rockville, MD 20852-2738 E. L. Crowe NRC Senior Resident Inspector Oconee Nuclear Station J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station G. A. Hutto, III NRC Senior Resident Inspector Catawba Nuclear Station Justin Folkwein American Nuclear Insurers 95 Glastonbury Blvd., Suite 300 Glastonbury, CT 06033-4453 Ms. Sue Perkins-Grew, NEI Nuclear Energy Institute 1201 F St., NW, Suite 1100 Washington, DC 20004-1218