ML110260442: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 12/17/2010 | | issue date = 12/17/2010 | ||
| title = 2010 Monticello Nuclear Generating Plant Initial License Examination Operating Test Comments | | title = 2010 Monticello Nuclear Generating Plant Initial License Examination Operating Test Comments | ||
| author name = | | author name = Mcneil D | ||
| author affiliation = NRC/RGN-III/DRS/OB | | author affiliation = NRC/RGN-III/DRS/OB | ||
| addressee name = | | addressee name = |
Revision as of 00:22, 11 July 2019
ML110260442 | |
Person / Time | |
---|---|
Site: | Monticello |
Issue date: | 12/17/2010 |
From: | Mcneil D Operations Branch III |
To: | Northern States Power Co, Xcel Energy |
References | |
Download: ML110260442 (1) | |
Text
2010 MNGP ILT EXAMINATION OPERATING TEST COMMENTS Admin JPM e (SRO) Update performance step 3 to be critical and be more specific on the standard.
Changed step to critical and specified the standard to include using the correct side of the EAL Board for the plant Mode. CR JPM aFor performance step 3 on page
5 - update the evaluator cue for the correct suction pressure.
Updated to 5 psig.
CR JPM d For Performance Step 5 add a range of gains that is expected for the candidates to enter.
Added range of 2.44
-2.56 CR JPM e For initial conditions state that maintenance was performed on channel A1 for performance plausibility.
Added For performance step 15 add an evaluator cue to state SPDS reads 20 mr/hr.
Added CR JPM h Update candidate turnover sheet with instructor turnover sheet. Updated In-Plant JPMsNo comments on the In
-Plant JPMs Simulator CommentsThe comments for the dynamic simulator scenarios were only minor in nature, such as typographical errors and were not individually tracked. No significant changes were made.