| title = Beaver Valley Power Station Unit 2, Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (Swcs), SGI Level Switch SP9B6. Pages 241 - 318
| title = Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (Swcs), SGI Level Switch SP9B6. Pages 241 - 318
| author name = Guerra E M, Helffrich A L
| author name = Guerra E M, Helffrich A L
| author affiliation = Paul C. Rizzo Associates, Inc, ABS Consulting, FirstEnergy Nuclear Operating Co
| author affiliation = Paul C. Rizzo Associates, Inc, ABS Consulting, FirstEnergy Nuclear Operating Co

Latest revision as of 01:23, 18 March 2019

Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Appendix B Seismic Walkdown Checklists (Swcs), SGI Level Switch SP9B6. Pages 241 - 318
ML13008A045
Person / Time
Site: Beaver Valley
Issue date: 10/31/2012
From: Guerra E M, Helffrich A L
Paul C. Rizzo Associates, ABS Consulting, FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
LSHHSP9B6, L-12-283
Download: ML13008A045 (78)


Text

Pc-Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 241 of 379 StatusON U Seismic Walkdown Checklist (SWC)Equipment ID No. LSHHSP'Equipment Description Equip. Class 18. Instrument (on) Racks SGI LEVEL SWITCH SP9B36 Location:

Bldg.AUXB Floor El. 623 Room 502 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

This switch is inside panel C5761A.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N Y N U N/A X Y N U N/A x Y N U N/A X Y N U N/A-T- x Y N U X II L ZY Paul C. Rizzo Associates, Inc.Sheet 242 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. LSHHSPS Equipment Description Equip. Class 18. Instrument (on) Racks SGI LEVEL SWITCH SP9B6 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Adjacent panels connected at top.End panels have 3" gap and also top connected by conduit.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich Q l Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSUETA'rMS Statusto"N U Seismic Walkdown Checklist (SWC) tuQ Equipment ID No. LSHHSP9B6 Equip. Class 18. Instrument (on) Racks Equipment Description SGI LEVEL SWITCH SP9B6 Other supporting or relevant documents and photos (if any): " 033 043 1 053 9 063 SP9B9-073 Switch SP9B9-073 View of component inside cabinet General view of component I--%--< Paul C. Rizzo Associates, Inc.Sheet 244 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. LSHHSP9B6 Equip. Class 18. Instrument (on) Racks Equipment Description SG I LEVEL SWITCH SP9B6 6rbvti-u /li Oiteo at top Cabinet is bolted to adjacent cabinet at the top U --- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 245 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. LT-1402 Equipment Description Equip. Class 18. Instrument (on) Racks CC SRG TNK 1-1 SIDE I LV TRANS Location:

Bldg.AUXB Floor El. 623 Room 501 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Mounted on -24" tall HSS 6x6 cantilever rack, which is anchored to the floor by*four 1/2" diameter anchor bolts.3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?While spalling of grout pad on one side was observed, it was judged adequate since the loads are very small (-<50 lbs)5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

ILIZN Y N U N/A x Y N U N/A x Y N U N/A X Y N U N/A x Y N U X II LczQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 246 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. LT-1402 Equipment Description Equip. Class 18. Instrument (on) Racks CC SRG TNK 1-1 SIDE 1 LV TRANS Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?A ttachedflexible lines found in addequate condition.
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x Comments (Additional pages may be added as necessary)

Anchor spacing to adjacent rack found acceptable by engineering judgement and small demand loads.Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 L ' Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAWrS Sheet 247 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. LT-1402 Equipment Description CC SR(Equip. Class 18. Instrument (on) Racks I TNK 1-1 SIDE I LV TRANS Other supporting or relevant docum LT1402 Plate ID Plate of component LT 1402 General General view of component L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 248 of 379 StatusQN U Seismic Walkdown Checklist (SWC) -Equipment ID No. LT-1402 Equipment Description Equip. Class 18. Instrument (on) Racks CC SRG TNK 1-1 SIDE I LV TRANS LT1402 anchorage View of anchorage LT1402 Spalled Grout on Anchor Grout around base plate has crumbled away

[UCI-Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 249 of 379 Status N U Seismic Walkdown Checklist (SWC)Equipment ID No. LT-2787 Equipment Description Equip. Class 18. Instrument (on) Racks EDG DAY TANK 1-1 LVL TRANSMITT Location:

Bldg.AUXB Floor El. 585 Room 318 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Transmitter mounted with 4-3/8" diameter bolls to a wall mounted HSS 6x6, which is anchored to wall with 4-1/2" diameter anchor bolts.No degraded conditions found for the wall mounting supporting the transmitter.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

'I Y N U N/A X Y N U N/A X Y N U N/A X Y N U N/A--T X Y N U X II a % Paul C. Rizzo Associates, Inc.Sheet 250 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. LT-2787 Equipment Description Equip. Class 18. Instrument (on) Racks EDG DAY TANK 1-1 LVL TRANSMITTI Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 251 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. LT-2787 Equipment Description EDG D Equip. Class 18. Instrument (on) Racks AY TANK 1-1 LVL TRANSMITT Other supporting or relevant documents and photos (if any): LT2787 Plate LT2787 General ID Plate of component General view of component LCQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 252 of 379 StatusoN U Seismic Walkdown Checklist (SWC)Equipment ID No. MS101 Equipment Description Equip. Class 7. Pneumatic-Operated Valves MS 101 (MSIV SG I)Location:

Bldg.AUXB Floor El. 643 Room 601 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No degraded conditions identified

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N IZI xL I Y N U N/A x Y N U N/A x Y N U N/A I x 1 7 I I Y N U N/A I I I -7 1 x Y N U x I I L'Y Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 253 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. MS101 Equipment Description Equip. Class 7. Pneumatic-Operated Valves MS 101 (MSIV SGI)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x I Y N U N/A x Y N U N/A x Y N U x 1 1 I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich

[L7-e Paul C. Rizzo Associates, Inc.Sheet 254 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. MS101 Equipment Description MS 101 Equip. Class 7. Pneumatic-Operated Valves (MSIV SG I)orting or relevant documents and Dhotos (if any): MS101 general MS101 general2 General view of component General view of component Q O Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 255 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment IDNo. MSIOI Equipment Description Equip. Class 7. Pneumatic-Operated Valves MS 10 1 (MSIV SG 1)Ms101 attachment to steam pipe Valve connection to main steam line L --- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANIS Sheet 256 of 379 Seismic Walkdown Checklist (SWC) Status N U Equipment ID No. MS5889A Equipment Description Equip. Class 7. Pneumatic-Operated Valves AOV MS SRR9A Location:

Bldg.AUXB Floor El. 565 Room 237 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Valve on 6"pipe line with considerable weight.Pipe span -8', rigid supports on either side of valve. Valve -2'from one end 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N L I XZ I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Qcl-C Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 257 of 379 StatusON U Seismic Walkdown Checklist (SWC)Equipment ID No. MS5889A Equipment Description Equip. Class 7. Pneumatic-Operated Valves AOV MS 5889A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Attached lines found with addequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A X V N U N/A x Y N U X II Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U X II Comments (Additional pages may be added as necessary)

I Evaluated by: Date: 7/25/2012 Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 L K Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 258 of 379 StatuQ N U Seismic Walkdown Checklist (SWC)Equipment IDNo. P14-1 Equipment Description Equip. Class 5. Horizontal Pumps AFP/T- I Location:

Bldg.AUXB Floor El. 565 Room 237 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage Y 1. Is the anchorage configuration verification required (i.e., is the item one X of the 50% of SWEL items requiring such verification)?

Mounted on skid with 8-1 1/2" anchor bolts.Y 2. Is the anchorage free of bent, broken, missing or loose hardware?

IX Y 3. Is the anchorage free of corrosion that is more than mild surface X oxidation?

Y 4. Is the anchorage free of visible cracks in the concrete near the anchors? E X Y 5. Is the anchorage configuration consistent with plant documentation?

IX (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Configuration consistent with documented configuration in SQUG calculation C-CSS-P14-1 Y 6. Based on the above anchorage evaluations, is the anchorage free of X potentially adverse seismic conditions?

N Z iZ N U N/A N U N/A N U N/A N U N/A N UIZ~

L1Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 259 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment DANo. P14-I Equipment Description Equip. Class 5. Horizontal Pumps AFP/T- I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Date: 7/25/2012 Eddie M. Guerra if> /I Date: 7/25/2012 Adam L. Helffrich I -Paul C. Rizzo Associates, Inc.Sheet 260 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. P14-1 Equipment Description AFP/T-Equip. Class 5. Horizontal Pumps Other supporting or relevant documents and photos (if any): P14-1 plate ID Plate of component E0 7=oV P 14-1 general General view of component

[ --Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 261 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. P14-1 Equipment Description AFP/T-Equip. Class 5. Horizontal Pumps I P14-1 general4 General view of component P14-! anchorage Partial view of anchorage, view is typical of all anchors U c-Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 262 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. P14-2 Equipment Description Equip. Class 5. Horizontal Pumps AFP/T-2 Location:

Bldg.AUXB Floor El. 565 Room 238 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage Y 1. Is the anchorage configuration verification required (i.e., is the item one XIX of the 50% of SWEL items requiring such verification)?

Mounted on skid with eight 1 1/2" anchors.Y 2. Is the anchorage free of bent, broken, missing or loose hardware?

L X Y 3. Is the anchorage free of corrosion that is more than mild surface L X oxidation?

Y 4. Is the anchorage free of visible cracks in the concrete near the anchors? L X Y 5. Is the anchorage configuration consistent with plant documentation?

X (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

SQUG C-CSS-P14-1 and C-CSS-P14-2 calculation (page 4 of 16) identifies the configuration as 8- 1 1/2" bolts and it was confirmed in the field during walkdown inspection.

N N U N/A N U N/A N U N/A N U N/A Y N U x I I 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

--z- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANrTS Sheet 263 of 379 StatusQN U Seismic Walkdown Checklist (SWC)%-l Equipment IDNo. P14-2 Equipment Description Equip. Class 5. Horizontal Pumps AFP/T-2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

No potential interaction hazards identified in the area.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A X Y N U X II Other Adverse Conditions

11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x Comments (Additional pages may be added as necessary)

Eddie M. Guerra Evaluated by: Date: 7/25/2012 Adam L. Helffrich Date: 7/25/2012 U01? Paul C. Rizzo Associates, Inc.Sheet 264 of 379 ENGINEERS

& CONSULTANIS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. P14-2 Equipment Description AFP/T-Equip. Class 5. Horizontal Pumps 2 Other supporting or relevant documents and photos (if any): rt14-/ piate ID Plate of component E~~I A 3 P14-2 general3 General view of component L < Paul C. Rizzo Associates, Inc.Sheet 265 of 379 ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC) StatusQN U Equipment DNo. P A14-2 Equipment Description Equip. Class 5. Horizontal Pumps AFP/T-2 P1 4-2 general General view of component P 14-2 anchorage Partial view of anchorage, view is typical of all anchors LCZ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 266 of 379 StatuZY% N U Seismic Waikdown Checklist (SWC) ýEquipment ID No. P3-2 Equipment Description Equip. Class 6. Vertical Pumps Pump P3-2 Location:

Bldg.INTK Floor El. 576 Room 52 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No degraded condition found for anchorage.

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Slight corrosion found on main pipe line and on anchors due to humid environment.

Judged surface corrosion and adequate.4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configuration verified with drawing M-045-00002.

12- 1 1/2"diam bolts for square plate and8 -1 5/8" diam bolts for circum. plate.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N LX I I Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 267 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. P3-2 Equipment Description Equip. Class 6. Vertical Pumps Pump P3-2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Attached lines found with adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Date: 7/25/2012 Eddie M. Guerra , // /Date: 7/25/2012 Adam L. Helffrich Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 268 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. P3-2 Equipment Description Equip. Class 6. Vertical Pumps Pump P3-2 Other supporting or relevant documents and photos P3-2 plate ID Plate of component r--z generai General view of component P3-2 general2 General view of component

[ OQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANT'S Sheet 269 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. P3-2 Equipment Description Equip. Class 6. Vertical Pumps Pump P3-2 P3-i anchorage Partial view of anchorage, view is typical of all anchors P3-2 corrosion on bolts Surface corosion on bolts judged not significant I % Paul C. Rizzo Associates, Inc.Sheet 270 of 379 ENGINEERS

& CONSULTANTS Status:Q N U Seismic Walkdown Checklist (SWC)Equipment ID No. P372B Equipment Description Equip. Class 5. Horizontal Pumps MOTOR-DRIVEN PUMP Location:

Bldg.AUXB Floor El. 565 Room 225 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one L of the 50% of SWEL items requiring such verification)?

Motor mounted on skid with 12, 1" anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?

L 3. Is the anchorage free of corrosion that is more than mild surface L oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors? L 5. Is the anchorage configuration consistent with plant documentation?

L (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configuration verified based on SQUG calculation C-CSS-P37-2 page 4 of 5.Calc shows that 12-1 "diam anchor bolts for mounting are seismically adequate.6. Based on the above anchorage evaluations, is the anchorage free of L potentially adverse seismic conditions?

Y N x I " Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U L 4--- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANIS Sheet 271 of 379 U Seismic Walkdown Checklist (SWC) NO Equipment ID No. P372B Equipment Description Equip. Class 5. Horizontal Pumps MOTOR-DRIVEN PUMP Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Small cart nearby is not securely tied to wall, but judged not to be a potential interaction hazard.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic capacity of block walls in the area verified Block wall 2047 verified to be to be seismically adequate based on ref VBWO6-BOO1-028, Rev 4 (7/29/88).

9. Do attached lines have adequate flexibility to avoid damage?Attached lines rigidly connected to equipment.

No concern idenfledfrom potential relative movement.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions

!1. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 L CQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN'I'S Sheet 272 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. P372B Equipment Description MOTOI Equip. Class 5. Horizontal Pumps R-DRIVEN PUMP Other supporting or relevant documents and photos (if any): P372B plate ID Plate of component P372B general General view of component L ' Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN'I'S Sheet 273 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. P372B Equipment Description MOTOI Equip. Class 5. Horizontal Pumps R-DRIVEN PUMP P372B anchorage Partial view of anchorage, view is typical of all anchors P372B masonry wall Potential interaction hazard from masonry wall near unit DOQZ_ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 274 of 379 StatusQN U Seismic Walkdown Checklist (SWC) %1 Equipment ID No. P372B Equipment Description Equip. Class 5. Horizontal Pumps MOTOR-DRIVEN PUMP r-i izt unsecurea cart near unit Possible interaction with nearby cart Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 275 of 379 StatusQV N U Seismic Walkdown Checklist (SWC)1i Equipment ID No. P4-1 Equipment Description Equip. Class 0. Other Screen wash pump P4-1 Location:

Bldg.INTK Floor El. 585 Room 50 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N I X Y N U N/A X Y N U N/A X Y N U N/A X Y N U N/A X Y N U X 11 PC-- Paul C. Rizzo Associates, Inc.Sheet 276 of 379 ENGINEERS

& CONSULTANTS StatusQ.)N U Seismic Walkdown Checklist (SWC) .0 Equipment ID No. P4-1 Equipment Description Equip. Class 0. Other Screen wash pump P4-1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012

--'Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 277 of 379 Status:QN U Seismic Walkdown Checklist (SWC)Equipment ID No. P42-1 Equipment Description Equip. Class 5. Horizontal Pumps P42-1 Pump for decay heat 1-I Location:

Bldg.AUXB Floor El. 545 Room 105 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Mounted on skid with 8 -3/4" anchor bolts, 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configuration verified based on SQUG calculation C-CSS-P42-1.

Page 4 of 5 shows 8-3/4"diam anchors spaced at -38".6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N I X I I Y N U N/A X Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I LCQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 278 of 379 StatusQN U Seismic Walkdown Checklist (SWC)N-Equipment ID No. P42-1 Equipment Description Equip. Class 5. Horizontal Pumps P42-1 Pump for decay heat I -I Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Surounding piping found to be rigidly supported 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/20 12 Date: 7/25/2012 L4---- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANrS Sheet 279 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. P42-1 Equipment Description P42-1 f Equip. Class 5. Horizontal Pumps lump for decay heat I-I Other supporting or relevant documents and photos (if any): P42-1 plate ID Plate of component P42-1 general General view of component L.Q Paul C. Rizzo Associates, Inc.Sheet 280 of 379 ENGINEERS

& CONSULTANIS Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. P42-1 Equipment Description Equip. Class 5. Horizontal Pumps T42-1 Pump for decay beat I1-I 1-42-1 generail General view of component P42-1 anchorage2 Partial view of anchorage, view is typical of all anchors DCNQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 281 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. P43-2 Equipment Description Equip. Class 5. Horizontal Pumps CCW PUMP 1-2 Location:

Bldg.AUXB Floor El. 585 Room 328 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Anchored with 8-1" bolts on skid 2. Is the anchorage free of bent, broken, missing or loose hardware?No missing parts or degraded condition identified for anchorage.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configuration verified based on drawing M-046-00003.

Configuration consistent with 8-1" bolls.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N Y N U N/A X Y N U N/A X Y N U N/A X Y N U N/A X Y N U I X I I I Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 282 of 379 StatusQ N U Seismic Walkdown Checklist (SWC) %O Equipment ID No. P43-2 Equipment Description 4 Equip. Class 5. Horizontal Pumps CCW PUMP 1-2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Nozzles rigidly supported 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 I Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTIS Sheet 283 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. P43-2 Equipment Description CCW P Equip. Class 5. Horizontal Pumps UMP 1-2 Other supporting or relei (if any): P43-2 plate ID Plate of component P43-2 general General view of component L Paul C. Rizzo Associates, Inc.Sheet 284 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. P43-2 Equipment Description CCW P Equip. Class 5. Horizontal Pumps lUMP 1-2 P43-2 anchorage Partial view of anchorage, view is typical of all anchors UOQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 285 of 379 StatusQnN U Seismic Walkdown Checklist (SWC)Equipment ID No. P58-1 Equipment Description Equip. Class 5. Horizontal Pumps HPI PUMP 1-1 Location:

Bldg.AUXB Floor El. 545 Room 105 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Mounted on skid with 8 -I" anchor bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?No missing parts or degraded condition identifiedfor anchorage.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?No cracks identified on mounting grout.5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configurationv erified with drawing M-518-00023.

Mounting skid anchored with 8 -1" diam. Bolls.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N XEI Z II Y N U N/A X Y N U N/A x Y N U N/A x V N U N/A X Y N U X II LCQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 286 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. P58-1 Equipment Description Equip. Class 5. Horizontal Pumps HPI PUMP 1-1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x T I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012

[L--Y Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTrS Sheet 287 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. P58-1 Equipment Description Equip. Class 5. Horizontal Pumps HPI PUMP 1-1 Other supporting or relevant documents and photos (if any): Pn- I plate rt3-i general ID Plate of component General view of component I-'% , Paul C. Rizzo Associates, Inc.Sheet 288 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. P58-1 Equip. Class 5. Horizontal Pumps Equipment Description HPI PUMP 1-1 P58-1 general2 General view of component 0000F-P58-1 anchorage Partial view of anchorage, view is typical of all anchors QOY Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC)Sheet 289 of 379 Statue) N U Equipment ID No. PS3689D Equip. Class 18. Instrument (on) Racks Equipment Description PRESSURE SWITCH PS3689D Location:

Bldg.AUXB Floor El. 623 Room 501 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Supported on wall-mounted rack. No degraded condition identified Racks anchored with 8-1/2" bolts.Pressure switch is attached to the rack with 4-1/2" diameter bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

L I Xl Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A I I x Y N U x I I UC' Paul C. Rizzo Associates, Inc.Sheet 290 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. PS3689D Equipment Description Equip. Class 18. Instrument (on) Racks PRESSURE SWITCH PS3689D Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Attached line is flexible.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x T i I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012

[Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTIS Sheet 291 of 379 StatusQ N Ui Seismic Walkdown Checklist (SWC)Equipment ID No. PS3689D Equipment Description PRESS]Equip. Class 18. Instrument (on) Racks URE SWITCH PS3689D Other supporting or relevant documents and photos (if any): PS3689 plate ID Plate of component PS3689 general General view of component LKY Paul C. Rizzo Associates, Inc.Sheet 292 of 379 ENGINEERS

& CONSULTANTS StatusQDN U Seismic Walkdown Checklist (SWC)Equipment ID No. PS3689D Equipment Description PRESS Equip. Class 18. Instrument (on) Racks URE SWITCH PS3689D PS3689 anchorage typical Partial view of anchorage, view is typical of all anchors Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANWS Sheet 293 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. PSL 106C Equipment Description Equip. Class 18. Instrument (on) Racks PRESS SWITCH LOW FOR AFP TURB I -I INLET Location:

Bldg.AUXB Floor El. 565 Room 237 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Switch mounted on 6x6 tube section with 4-1/2" diameter bolts 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N II x Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A I II x Y N U x 1 1 I L[<Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 294 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. PSL 106C Equipment Description Equip. Class 18. Instrument (on) Racks PRESS SWITCH LOW FOR AFP TURB I-I INLET Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x T --Comments (Additional pages may be added as necessary)

Evaluated by: Date: 7/25/2012 Eddie M. Guerra Date: 7/25/2012 Adam L. Helffrich Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAN-1S Sheet 295 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. PSL 106C Equipment Description PRESS Equip. Class 18. Instrument (on) Racks SWITCH LOW FOR AFP TURB I -I INLET Other supporting or relevant documents and photos (if any): I L PSLI06C Plate and General Overall view of component and anchorage A PSL 106C General General view of component L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 296 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. PSL4928t Equipment Description Equip. Class 18. Instrument (on) Racks PRESS SWITCH PS 4929A Location:

Bldg.AUXB Floor El. 565 Room 237 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage Y N 1. Is the anchorage configuration verification required (i.e., is the item one X of the 50% of SWEL items requiring such verification)?

Switch is mounted on a cantileveredfloor mounted rack which is anchored with 4-1/2" diameter anchors.Switch is connected to the strut member, which is welded to the rack by 4-1/2" diameter channel nuts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I U -- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 297 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment ID No. PSL4928, Equipment Description Equip. Class 18. Instrument (on) Racks PRESS SWITCH PS 4928A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A x Y N U N/A X Y N U X II Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Anchor spacing to adjacent floor mounted rack is judged adequate.Y N U X II Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich z Paul C. Rizzo Associates, Inc. Sheet298of 379 ENGINEERS

& CONSULTANTS U Seismic Walkdown Checklist (SWC) tasN Equipment ID No. PSL4928A Equip. Class 18. Instrument (on) Racks Equipment Description PRESS SWITCH PS 4928A Other supporting or relevant documents and photos (if any): PSL 4928A plate ID Plate of component PSL4928A General General view of component

~Sheet 299 of 379 Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS StatusQv"N U Seismic Walkdown Checklist (SWC)Equipment ID No. PSL4928A Equip. Class 18. Instrument (on) Racks Equipment Description PRESS SWITCH PS 4928A PSL 4928A anchorage PSL 4928A Anchor Spacing View of anchorage to Adjacent Rack L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 300 of 379 StatusQ N U Seismic Walkdown Checklist (SWC)Equipment ID No. RC3701 Equipment Description Equip. Class 20. Instrument and Control Panels Relay Cabinet in Mechanical Penetration Room 4 Location:

Bldg.AUXB Floor El. 585 Room 314 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Mounted on short steel brace stand anchored with 4-1/2" bolts.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Anchorage configuration consistent with SQUG calculation C-CSS-RC3701.

4 angle-section legs anchrored with 4-1/2" bolts.6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N XZZI JIZ Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I

--- -Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 301 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. RC3701 Equipment Description Equip. Class 20. Instrument and Control Panels Relay Cabinet in Mechanical Penetration Room 4 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

No potential interaction hazards identified in the area.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9. Do attached lines have adequate flexibility to avoid damage?Attached top conduits provide lateral restraint to cabinet.10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I 1 I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra (i//f/f'Date: 7/25/2012 Date: 7/25/2012 Adam L. Helffrich L Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 302 of 379 StatusQ N U Seismic Walkdown Checklist (SWC)Equipment ID No. RC3701 Equipment Description Relay C Equip. Class 20. Instrument and Control Panels cabinet in Mechanical Penetration Room 4 Other supporting or relevant documents and photos (if any): KC3701 plate ID Plate of component RC3701 general General view of component j < Paul C. Rizzo Associates, Inc.Sheet 303 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. RC3701 Equipment Description Relay C Equip. Class 20. Instrument and Control Panels'abinet in Mechanical Penetration Room 4 RC3701 Conduits Conduits Going into Cabinet UKQ Paul C. Rizzo Associates, Inc.Sheet 304 of 379 ENGINEERS

& CONSUITAWNS Statud N U Seismic Walkdown Checklist (SWC)Al Equipment IDNo. SF1I Equipment Description Equip. Class Od. Other -check valve or manual valve BWST Supply Line to SFP Pumps Location:

Bldg.AUXB Floor El. 586'Room 304 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage I. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No degraded condition identified

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Valve found in good condition.

No signs of corrosing identified in main line.4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

EIEN Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A-I x Y N U x I I U O Y Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 305 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SFII Equipment Description Equip. Class Od. Other -check valve or manual valve BWST Supply Line to SFP Pumps Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A X Y N U X II Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 LCQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 306 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SF1 I Equipment Description BWST Equip. Class Od. Other -check valve or manual valve Supply Line to SFP Pumps J m m I Other supporting or relevant documents and photos (if any): SF I component ID SFI 1 general view ID Plate of component General view of component Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 307 of 379 Status:QDN U Seismic Walkdown Checklist (SWC)Equipment IDNo. SFI616A Equipment Description Equip. Class Od. Other -check valve or manual valve SFP Cleanup System FE 1616 KI Source Location:

Bldg.AUXB Floor El. 570'3" Room 122 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Small hand value on -1" diameter pipe.Pipe rigidly supported to wall within -10" of valve.2. Is the anchorage free of bent, broken, missing or loose hardware?Wall mounted supports found in adequate condition.

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N'~Y N U N/A x Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I LKQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 308 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. SF1616A Equipment Description Equip. Class Od. Other -check valve or manual valve SFP Cleanup System FE 1616 KI Source Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/2012 LX< Paul C. Rizzo Associates, Inc.Sheet 309 of 379 ENGINEERS

& CONSULTANTS StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. SFI616A Equipment Description SFP Ck Equip. Class Od. Other -check valve or manual valve eanup System FE 1616 KI Sourcel *Other supporting or relevant documents and photos (if any): SFI616A Plate ID Plate of component SF 16 16A General Overall view of component and anchorage Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTAINrIS Sheet 310 of 379 StatusO N U Seismic Walkdown Checklist (SWC)\J Equipment ID No. SF47 Equipment Description Equip. Class Od. Other -check valve or manual valve SFP Inlet From SFP Heat Exchangers Location:

Bldg.AUXB Floor El. 591'2.5" Room 312 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

Horizontally mounted manual valve on 410" pipe.2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N II X Y N U N/A--1 1 x Y N U N/A-FI I X Y N U N/A T I x Y N U N/A 7 x Y N U x I I L2Q Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANtS Sheet 3 11 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SF47 Equipment Description Equip. Class Od. Other -check valve or manual valve SFP Inlet From SFP Heat Exchangers Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Seismic capacity of block walls in the area verified Block walls 3257 and 3267 verified to be to be seismically adequate based on ref VBWJ6-BO01-083, Rev 2 (4/27/88) and VBWI6-BO01-084, Rev 5 (4/27/88).

9. Do attached lines have adequate flexibility to avoid damage?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x I I I Comments (Additional pages may be added as necessary)

Evaluated by: Date: 7/25/2012 Eddie M. Guerra___________________Date:

7/25/2012 Adam L. Helffrich L0ZQ Paul C. Rizzo Associates, Inc.Sheet 312 of 379 ENGINEERS

& CONSULTANrS StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SF47 Equipment Description SFP Inl Equip. Class Od. Other -check valve or manual valve et From SFP Heat Exchancers Other supporting or relevant documents and photos (if any):* i ml SF47 plate SF47 general ID Plate of component General view of component L K Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 313 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment ID No. SF47 Equipment Description SFP lnl Equip. Class Od. Other -check valve or manual valve et From SFP Heat Exchangers Sf47 adjacent block wall Potential interaction hazard from masonry wall near unit QOY Paul C. Rizzo Associates, Inc.Sheet 314 of 379 ENGINEERS

& CONSULTANTS Statust N U Seismic Walkdown Checklist (SWC)Equipment ID No. SPI7A7 Equipment Description Equip. Class 7. Pneumatic-Operated Valves CODE SAFETY VALVE SPI7A7 Location:

Bldg.AUXB Floor El. 643 Room 602 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No degraded condition identified

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Valve and main line found with no signs of corrosion.

4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N~Y N U N/A--T-I I x Y N U N/A__T x Y N U N/A x Y N U N/A x Y N U x I I U -Q Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 315 of 379 StatusQN U Seismic Walkdown Checklist (SWC)Equipment IDNo. SPi7A7 Equipment Description Equip. Class 7. Pneumatic-Operated Valves CODE SAFETY VALVE SPI7A7 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A x Y N U N/A x Y N U N/A x Y N U x I I Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x Comments (Additional pages may be added as necessary)

Evaluated by: Date: 7/25/2012 Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012

[c- Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 316 of 379 StatusON U Seismic Walkdown Checklist (SWC)Equipment IDNo. SW1399 Equipment Description Equip. Class 8A. Motor-Operated Valves MOV SW-1399 Location:

Bldg.INTK Floor El. 566.25 Room 53 Manufacturer, Model, Etc.Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results ofjudgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?

No degraded condition identified

2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation?(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Y N II X Y N U N/A--T x Y N U N/A 7 x Y N U N/A-I x Y N U N/A F I x Y N U x I I L-% -Paul C. Rizzo Associates, Inc.Sheet 317 of 379 ENGINEERS

& CONSULTANTS Seismic Walkdown Checklist (SWC) StatusQN U Equipment IDNo. SW1399 Equipment Description Equip. Class 8A. Motor-Operated Valves MOV SW-1399 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage?Attached lines found with adequate flexibility.
10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Y N U N/A X Y N U N/A X Y N U N/A x Y N U X II Other Adverse Conditions
11. Have you looked for and found no other seismic conditions that could adversely affect the safety functions of the equipment?

Y N U x _ _F Comments (Additional pages may be added as necessary)

Evaluated by: Eddie M. Guerra Adam L. Helffrich Date: 7/25/2012 Date: 7/25/20 12 LCZQ Paul C. Rizzo Associates, Inc.ENGINEERS

& CONSULTANTS Sheet 318 of 379 Seismic Walkdown Checklist (SWC) StatusQN U Equipment IDNo. SW1399 Equipment Description Equip. Class 8A. Motor-Operated Valves MOV SW-1399 Other supporting or relevant documents and photos (if any): SW 1399 plate ID Plate of component SW 1399 general General view of component