Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:ASTPresentationSeptember16,2014 NuclearSequoyahNuclearPlant(SQN) | | {{#Wiki_filter:Sequoyah Nuclear Plant (SQN) Nuclear AST Presentation September 16, 2014 |
| TVA Nuclear Power Group 2 Introduction Introduction Purpose of Meeting
| | |
| *Discussion of AST as it pertains to RAI KAB-044 | | Introduction Purpose of Meeting |
| -Current Licensing Bases | | * Discussion of AST as it pertains to RAI KAB-044 |
| -Improved Technical Specification Impact | | - Current Licensing Bases |
| | - Improved Technical Specification Impact |
|
| |
|
| ===Introductions=== | | ===Introductions=== |
| *NRC*TVA TVA Nuclear Power Group 3 Current Licensing Bases Current Licensing Bases | | * NRC |
| *TVA-SQN-TS-02-08 submitted to NRC, January 14, 2003 | | * TVA 2 TVA Nuclear Power Group |
| -Request to modify TS 3.9.4 "Containment Building Penetrations" and Partial scope | | |
| | Current Licensing Bases |
| | * TVA-SQN-TS-02-08 submitted to NRC, January 14, 2003 |
| | - Request to modify TS 3.9.4 Containment Building Penetrations and Partial scope implementation of the alternate source term |
| | - Modified applicability requirement for the containment building equipment door (CBED) |
| | - CBED closure only required during recently irradiated fuel |
| | * NRC approval received on October 28, 2003 3 TVA Nuclear Power Group |
| | |
| | Current Licensing Basis Current wording for T/S 3.9.4 4 TVA Nuclear Power Group |
| | |
| | Current Licensing Basis |
| | * TVA and NRC recognized that the Fuel Handling Accident (FHA) within containment is the only Design Basis Accident (DBA) affected by the proposed change |
| | * TVA evaluated a FHA both inside and outside containment |
| | * NRC found that the change to replace the current accident source term used in the design basis FHA within containment with an AST was acceptable 5 TVA Nuclear Power Group |
| | |
| | Current Licensing Basis Excerpt from NRC SE 6 TVA Nuclear Power Group |
| | |
| | Current Licensing Basis Excerpt from NRC SE 7 TVA Nuclear Power Group |
| | |
| | Current Licensing Basis |
| | * Analysis done for the FHA with AST assumes that the CBED is open and that ABGTS is out of service (no filtration of releases) |
| | * TVA revised some of the assumptions in the FHA Analysis of Record (AOR) in June of 2013 |
| | - Changed the time of the CVI from 30 to 300 seconds |
| | - Changed the containment air volume for mixing from 5% to 50% |
| | - Change was done under 10 CFR 50.59 |
| | - Consequences to the FHA decreased by ~7% |
| | 8 TVA Nuclear Power Group |
| | |
| | Current Licensing Basis |
| | * Analysis done for the FHA with AST assumes that the CBED is open and that ABGTS is out of service (no filtration of releases) |
| | * TVA revised some of the assumptions in the FHA Analysis of Record (AOR) in June of 2013 |
| | - Changed the time of the CVI from 30 to 300 seconds |
| | - Changed the containment air volume for mixing from 5% to 50% |
| | - Change was done under 10 CFR 50.59 |
| | - Consequences to the FHA decreased by ~7% |
| | 9 TVA Nuclear Power Group |
| | |
| | Current Licensing Basis 10 TVA Nuclear Power Group |
| | |
| | Current Licensing Basis 11 TVA Nuclear Power Group |
|
| |
|
| implementation of the alternate source
| | Current Licensing Basis 12 TVA Nuclear Power Group |
|
| |
|
| term-Modified applicability requirement for the containment building equipment door (CBED)-CBED closure only required during "recently irradiated fuel"
| | Improved Tech Spec Impact |
| *NRC approval received on October 28, 2003 TVA Nuclear Power Group 4 Current Licensing Basis Current Licensing BasisCurrent wording for T/S 3.9.4 TVA Nuclear Power Group 5 Current Licensing Basis Current Licensing Basis
| | * Four T/S were changed in this conversation by changing the APPLICABILITY from During movement of irradiated fuel to During movement of recently irradiated fuel |
| *TVA and NRC recognized that the Fuel Handling Accident (FHA) within
| | - 3.3.6 Containment Ventilation Isolation Instrumentation |
| | - 3.3.8 Auxiliary Building Gas Treatment System Actuation Instrumentation |
| | - 3.7.12 Auxiliary Building Gas Treatment System |
| | - 3.9.4 Containment Penetrations |
| | * In none of these specifications, does SQN CTS have DURING CORE ALTERATIONS 13 TVA Nuclear Power Group |
|
| |
|
| containment is the only Design Basis Accident (DBA) affected by the proposed
| | Improved Tech Spec Impact |
| | * 3.3.6 Containment Ventilation Isolation Instrumentation 14 TVA Nuclear Power Group |
|
| |
|
| change*TVA evaluated a FHA both inside and outside containment
| | Improved Tech Spec Impact |
| *NRC found that the change to replace the current accident source term used in
| | * 3.3.8 Auxiliary Building Gas Treatment System Actuation Instrumentation 15 TVA Nuclear Power Group |
|
| |
|
| the design basis FHA within containment
| | Improved Tech Spec Impact |
| | * 3.7.12 Auxiliary Building Gas Treatment System 16 TVA Nuclear Power Group |
|
| |
|
| with an AST was acceptable TVA Nuclear Power Group 6 Current Licensing Basis Current Licensing BasisExcerpt from NRC SE TVA Nuclear Power Group 7 Current Licensing Basis Current Licensing BasisExcerpt from NRC SE TVA Nuclear Power Group 8 Current Licensing Basis Current Licensing Basis
| | Improved Tech Spec Impact |
| *Analysis done for the FHA with AST assumes that the CBED is open and that ABGTS is out of service (no filtration of releases)
| | * 3.9.4 Containment Penetrations 17 TVA Nuclear Power Group}} |
| *TVA revised some of the assumptions in the FHA Analysis of Record (AOR) in June of 2013
| |
| -Changed the time of the CVI from 30 to 300 seconds
| |
| -Changed the containment air volume for mixing from 5% to 50%-Change was done under 10 CFR 50.59
| |
| -Consequences to the FHA decreased by ~7%
| |
| TVA Nuclear Power Group 9 Current Licensing Basis Current Licensing Basis
| |
| *Analysis done for the FHA with AST assumes that the CBED is open and that ABGTS is out of service (no filtration of releases)
| |
| *TVA revised some of the assumptions in the FHA Analysis of Record (AOR) in June of 2013
| |
| -Changed the time of the CVI from 30 to 300 seconds
| |
| -Changed the containment air volume for mixing from 5% to 50%-Change was done under 10 CFR 50.59
| |
| -Consequences to the FHA decreased by ~7%
| |
| TVA Nuclear Power Group 10 Current Licensing Basis Current Licensing Basis TVA Nuclear Power Group 11 Current Licensing Basis Current Licensing Basis TVA Nuclear Power Group 12 Current Licensing Basis Current Licensing Basis TVA Nuclear Power Group 13 Improved Tech Spec Impact Improved Tech Spec Impact
| |
| *Four T/S were changed in this conversation by changing the APPLICABILITY from "During movement of irradiated fuel" to "During movement of recently irradiated fuel" | |
| -3.3.6 Containment Ventilation Isolation Instrumentation
| |
| -3.3.8 Auxiliary Building Gas Treatment System Actuation Instrumentation
| |
| -3.7.12 Auxiliary Building Gas Treatment System
| |
| -3.9.4 Containment Penetrations
| |
| *In none of these specifications, does SQN CTS have DURING CORE ALTERATIONS TVA Nuclear Power Group 14 Improved Tech Spec Impact Improved Tech Spec Impact
| |
| *3.3.6 Containment Ventilation Isolation Instrumentation TVA Nuclear Power Group 15 Improved Tech Spec Impact Improved Tech Spec Impact
| |
| *3.3.8 Auxiliary Building Gas Treatment System Actuation Instrumentation TVA Nuclear Power Group 16 Improved Tech Spec Impact Improved Tech Spec Impact
| |
| *3.7.12 Auxiliary Building Gas Treatment System TVA Nuclear Power Group 17 Improved Tech Spec Impact Improved Tech Spec Impact
| |
| *3.9.4 Containment Penetrations}}
| |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24037A0252024-02-0808 February 2024 Pre-Submittal Presentation - 02/08/2024 - Proposed License Amendment Request Change to the Sequoyah Nuclear Plant Technical Specifications 3.8.1 and 3.8.2 ML23345A1662023-12-13013 December 2023 Tennessee Valley Authority - Pre-submittal Meeting for Conversion of Nuclear Quality Assurance Plan from ANSI N45.2-1971 to ASME NQA-1-2015 (EPID L-2023-LRM-0103) - Slides ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML21308A4932021-11-0808 November 2021 Pre-submittal Meeting Presentation - License Amendment Request to Revise Sequoyah Operating License to Use Fire and Seismic PRA Models for 10 CFR 50.69 Risk-Informed Categorizations (EPID L-2021-LRM-0109) (Slides) ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21252A3632021-09-15015 September 2021 Pre-Submittal Meeting for License Amendment Request to Eliminate the High Negative Flux Rate Trip ML21061A0892021-03-0202 March 2021 TVA Presentation Slides for March 2, 2021, Public Meeting to Discuss Sequoyah Alternative Request ML20203M0572020-07-16016 July 2020 Updated TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20196L7922020-07-16016 July 2020 Corrected TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20196L6892020-07-16016 July 2020 TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20163A6952020-06-12012 June 2020 Bpg Presentation on TVA SCWE Final 2 ML20108E9082020-04-16016 April 2020 Presentation Slides for Sequoyah Nuclear Plant, Unit 2 - Exigent License Amendment Request TS 4.2.2, Control Rod Assemblies, Pre-Submittal Conference Call - April 16, 2020 ML20050C8662020-02-20020 February 2020 February 20, 2020 - Pre-Submittal Meeting Presentation - Permanent Operation with Control Rod H8 Removed ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20024D2112020-01-27027 January 2020 Pre-Submittal Meeting for License Amendment Request (LAR) Revised Steam Generator (SG) Inspection Intervals - January 27, 2020 ML19325C7142019-12-0202 December 2019 November 15,2019, Summary of Conference Call with Tennessee Valley Authority to Discuss Submittal of Exigent License Request (EPID L-2019-LLA-0239) for Sequoyah Nuclear Plant, Unit 1 ML19323D8882019-11-15015 November 2019 TVA Pre-submittal Presentation Slides - Exigent Amendment ML19161A2392019-06-10010 June 2019 Plants Pre-Submittal Meeting for Proposed License Amendments Hydrological Analysis Updates June 10, 2019 ML19142A2772019-05-21021 May 2019 Summary of Public Meeting - Sequoyah Nuclear Plant ML18312A3502018-11-14014 November 2018 Meeting to Discuss Proposed Technical Specification Changes Needed of Associated with the Use of Westinghouse Robust Fuel Assemblies at Sequoyah Nuclear Plant Units 1 & 2 - November 14, 2018 ML18164A3092018-06-13013 June 2018 June 6, 2018 Summary of Public Meeting - Sequoyah Nuclear Plant - Docket Nos. 50-327 and 50-328 ML17342A3642017-12-0808 December 2017 Enclosure 2, Handouts and Presentations Discussed During the November 16, 2017 ROP Working Group Public Meeting NEI 09-07, Enclosure 2, Handouts and Presentations Discussed During the November 16, 2017 ROP Working Group Public Meeting2017-12-0808 December 2017 Enclosure 2, Handouts and Presentations Discussed During the November 16, 2017 ROP Working Group Public Meeting ML17271A0162017-09-28028 September 2017 Meeting Slide for Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Review Status ML17212A8432017-08-0101 August 2017 Meeting Slides for Pre-submittal Meeting with Tennessee Valley Authority on Unbalanced Voltage License Amendment Request for TVA Nuclear Plants ML17053A0232017-02-22022 February 2017 Slides for Meeting with Tennessee Valley Authority to Discuss HEC-RAS Flood Model Project: Seismic Dam Failure Methodology ML16102A3302016-04-0404 April 2016 Presentation Slides for 04042016 Public Meeting on Resolution of TVA Flood Model Issue ML14259A1662014-09-17017 September 2014 Meeting Slides for the September 17, 2014 Public Meeting to Discuss the Dseis for License Renewal of Sequoyah Units 1 and 2 ML14262A3302014-09-16016 September 2014 9/16/2014 Meeting Slide for Sequoyah Nuclear Plant, Units 1 and 2 Regarding AST Presentation ML14107A3352014-04-16016 April 2014 Summary of Meeting with Tennessee Valley Authority to Discuss Nrc'S Reactor Oversight Process (ROP) and Nrc'S Annual Assessment of Plant Safety Performance for Period of January 1, 2013, to December 31, 2013 for Sequoyah Bar Nuclear Plant ML14101A1522014-04-11011 April 2014 Summary of Public and Closed Meeting for Tennessee Valley Authority 2013 Synergy Safety Culture Survey Results ML14090A4582014-03-31031 March 2014 Public Meeting Summary TVA Synergy Safety Culture Survey Results ML14071A1522014-03-13013 March 2014 Slide, ITS Project Electrical Systems Presentation March 13, 2014 ML14049A3372014-02-18018 February 2014 2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328 ML13361A0212013-12-27027 December 2013 License Renewal IP71002 Exit Meeting Slides and Notes from December 17, 2013 ML13210A4042013-07-30030 July 2013 Meeting Slide for 7/30-31/2013 Meeting Re. Hydrology License Amendment Requests ML13189A1352013-07-0101 July 2013 Progress Update on Improved Flood Mitigation System Project ML13182A0872013-06-27027 June 2013 Plants - 1st Quarterly Update for NTTF Recommendation 2.1, Flooding Hazard Reevaluation Report (Hrr) Extension Request ML13182A0662013-06-27027 June 2013 Plants - 1st Quarterly Update for the Improved Flood Mitigation System ML13156A0462013-06-0404 June 2013 NRC Pre-Submittal Meeting, Improved Technical Specification Conversion ML13120A1322013-04-29029 April 2013 Plants, Units 1 and 2 - NTTF Recommendation 2.1, Flooding Hazard Reevaluation Report Extension Request ML12352A2082012-12-17017 December 2012 December 3, 2012 Summary of Public Meeting Flood Mode Operation Improvement Strategy for Watts Bar and Sequoyah ML12215A4252012-09-0505 September 2012 Meeting Slides with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Units 1 and 2 Multiple Circuit Failure Modifications Appendix R (Fire Protection) ML12214A1992012-07-16016 July 2012 7/16/12 Slides of Public Meeting with TVA Regarding the Use of the Unit Station Service Transformers as a Power Supply to an Offsite Circuit for Sequoyah Nuclear Plant ML12156A0762012-05-31031 May 2012 TVA Slides for Nrc/Tva Public Meeting on May 31, 2012 ML12128A0632012-05-0303 May 2012 EOC Meeting Summary 2024-02-08
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24037A0252024-02-0808 February 2024 Pre-Submittal Presentation - 02/08/2024 - Proposed License Amendment Request Change to the Sequoyah Nuclear Plant Technical Specifications 3.8.1 and 3.8.2 ML23345A1662023-12-13013 December 2023 Tennessee Valley Authority - Pre-submittal Meeting for Conversion of Nuclear Quality Assurance Plan from ANSI N45.2-1971 to ASME NQA-1-2015 (EPID L-2023-LRM-0103) - Slides ML23291A1562023-10-18018 October 2023 NRC Pre-Submittal Meeting Watts Bar & Sequoyah LAR, TVA Presentation Slides ML23128A2882023-05-0808 May 2023 TVA Nuclear Plants -2022 EOC Media Slides ML22201A1262022-07-20020 July 2022 July 20, 2022 - Pre-submittal Meeting for Inservice Testing (IST) Program Request for Alternative for the Centrifugal Charging Pump 1B-B Testing Per ISTB-3310 (RP-12) ML22157A4132022-06-0606 June 2022 Plants - Pre-Submittal Teleconference for Proposed Amendment Request Regarding the Change for the Sequoyah and Watts Bar Nuclear Plants Technical Specification 3.4.12 Meeting Slides ML22103A0852022-04-14014 April 2022 and Watts Bar Plant Pre-submittal Meeting for Inservice Testing (IST) Program Request for Alternative for the Motor Driven Auxiliary Feedwater Pump Testing Following Maintenance During an Outage Per ISTB-3310 ML22080A1662022-03-21021 March 2022 TVA Nuclear Plants -2021 EOC Media Loop Slides for Automatic Play ML22046A2932022-02-15015 February 2022 Pre-submittal Meeting Presentation - Request for Alternative to ASME OM Code ISTC-3630 Regarding Leakage of Pressure Isolation Valves ML21308A4932021-11-0808 November 2021 Pre-submittal Meeting Presentation - License Amendment Request to Revise Sequoyah Operating License to Use Fire and Seismic PRA Models for 10 CFR 50.69 Risk-Informed Categorizations (EPID L-2021-LRM-0109) (Slides) ML21281A2282021-10-13013 October 2021 Tennessee Valley Authority Fleet Pre-Submittal Meeting for License Amendment Request to Change Emergency Action Level Scheme Presentation - October 13, 2021 (EPID L-2021-LRM-0096) (Slides) ML21252A3632021-09-15015 September 2021 Pre-Submittal Meeting for License Amendment Request to Eliminate the High Negative Flux Rate Trip ML21197A0022021-08-0505 August 2021 N-769-6 Relief Pre-Submittal TVA Presentation August 2021 ML21111A0202021-04-21021 April 2021 TVA Slides for April 21, 2021 Public Meeting to Discuss Planned Sequoyah Amendment Request ML21096A1002021-04-0606 April 2021 Annual Assessments ML21061A0892021-03-0202 March 2021 TVA Presentation Slides for March 2, 2021, Public Meeting to Discuss Sequoyah Alternative Request ML20196L7922020-07-16016 July 2020 Corrected TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20203M0572020-07-16016 July 2020 Updated TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20196L6892020-07-16016 July 2020 TVA Non-Proprietary Slides for Open Session of July 16, 2020, Partially Closed Public Meeting to Discuss Sequoyah License Amendment Request ML20175A0552020-06-23023 June 2020 TVA Slides for June 23, 2020, Emergency Plan Change Presubmittal Meeting ML20163A6952020-06-12012 June 2020 Bpg Presentation on TVA SCWE Final 2 ML20112F5302020-04-21021 April 2020 TVA Nuclear Plants -2019 EOC Media Loop Slides for Automatic Play (Final) ML20108E9082020-04-16016 April 2020 Presentation Slides for Sequoyah Nuclear Plant, Unit 2 - Exigent License Amendment Request TS 4.2.2, Control Rod Assemblies, Pre-Submittal Conference Call - April 16, 2020 ML20050C8662020-02-20020 February 2020 February 20, 2020 - Pre-Submittal Meeting Presentation - Permanent Operation with Control Rod H8 Removed ML20049G1822020-02-18018 February 2020 February 20, 2020 - Pre-submittal Meeting Presentation - Transition to Westinghouse Fuel ML20024D2112020-01-27027 January 2020 Pre-Submittal Meeting for License Amendment Request (LAR) Revised Steam Generator (SG) Inspection Intervals - January 27, 2020 ML19325C7142019-12-0202 December 2019 November 15,2019, Summary of Conference Call with Tennessee Valley Authority to Discuss Submittal of Exigent License Request (EPID L-2019-LLA-0239) for Sequoyah Nuclear Plant, Unit 1 ML19323D8882019-11-15015 November 2019 TVA Pre-submittal Presentation Slides - Exigent Amendment ML19161A2392019-06-10010 June 2019 Plants Pre-Submittal Meeting for Proposed License Amendments Hydrological Analysis Updates June 10, 2019 ML19164A2032019-05-30030 May 2019 OEDO-19-00288-TVA Sequoyah Leadership Forum Power Point ML19142A2772019-05-21021 May 2019 Summary of Public Meeting - Sequoyah Nuclear Plant ML18312A3502018-11-14014 November 2018 Meeting to Discuss Proposed Technical Specification Changes Needed of Associated with the Use of Westinghouse Robust Fuel Assemblies at Sequoyah Nuclear Plant Units 1 & 2 - November 14, 2018 ML18164A3092018-06-13013 June 2018 June 6, 2018 Summary of Public Meeting - Sequoyah Nuclear Plant - Docket Nos. 50-327 and 50-328 ML17271A0162017-09-28028 September 2017 Meeting Slide for Tennessee Valley Authority (TVA) Hydrology Precipitation Model Topical Report Review Status ML17212A8432017-08-0101 August 2017 Meeting Slides for Pre-submittal Meeting with Tennessee Valley Authority on Unbalanced Voltage License Amendment Request for TVA Nuclear Plants ML17053A0232017-02-22022 February 2017 Slides for Meeting with Tennessee Valley Authority to Discuss HEC-RAS Flood Model Project: Seismic Dam Failure Methodology ML16102A3302016-04-0404 April 2016 Presentation Slides for 04042016 Public Meeting on Resolution of TVA Flood Model Issue ML14259A1662014-09-17017 September 2014 Meeting Slides for the September 17, 2014 Public Meeting to Discuss the Dseis for License Renewal of Sequoyah Units 1 and 2 ML14262A3302014-09-16016 September 2014 9/16/2014 Meeting Slide for Sequoyah Nuclear Plant, Units 1 and 2 Regarding AST Presentation ML14101A1522014-04-11011 April 2014 Summary of Public and Closed Meeting for Tennessee Valley Authority 2013 Synergy Safety Culture Survey Results ML14071A1522014-03-13013 March 2014 Slide, ITS Project Electrical Systems Presentation March 13, 2014 ML14049A3372014-02-18018 February 2014 2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328 ML13361A0212013-12-27027 December 2013 License Renewal IP71002 Exit Meeting Slides and Notes from December 17, 2013 ML13210A4042013-07-30030 July 2013 Meeting Slide for 7/30-31/2013 Meeting Re. Hydrology License Amendment Requests ML13189A1352013-07-0101 July 2013 Progress Update on Improved Flood Mitigation System Project ML13156A0462013-06-0404 June 2013 NRC Pre-Submittal Meeting, Improved Technical Specification Conversion ML13120A1322013-04-29029 April 2013 Plants, Units 1 and 2 - NTTF Recommendation 2.1, Flooding Hazard Reevaluation Report Extension Request ML13115A0202013-04-23023 April 2013 Public Meeting Summary - Regulatory Conference / Enforcement Conference Sequoyah Nuclear Plant ML12352A2082012-12-17017 December 2012 December 3, 2012 Summary of Public Meeting Flood Mode Operation Improvement Strategy for Watts Bar and Sequoyah ML12215A4252012-09-0505 September 2012 Meeting Slides with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Units 1 and 2 Multiple Circuit Failure Modifications Appendix R (Fire Protection) 2024-02-08
[Table view] |
Text
Sequoyah Nuclear Plant (SQN) Nuclear AST Presentation September 16, 2014
Introduction Purpose of Meeting
- Discussion of AST as it pertains to RAI KAB-044
- Current Licensing Bases
- Improved Technical Specification Impact
Introductions
Current Licensing Bases
- TVA-SQN-TS-02-08 submitted to NRC, January 14, 2003
- Request to modify TS 3.9.4 Containment Building Penetrations and Partial scope implementation of the alternate source term
- Modified applicability requirement for the containment building equipment door (CBED)
- CBED closure only required during recently irradiated fuel
- NRC approval received on October 28, 2003 3 TVA Nuclear Power Group
Current Licensing Basis Current wording for T/S 3.9.4 4 TVA Nuclear Power Group
Current Licensing Basis
- TVA and NRC recognized that the Fuel Handling Accident (FHA) within containment is the only Design Basis Accident (DBA) affected by the proposed change
- TVA evaluated a FHA both inside and outside containment
- NRC found that the change to replace the current accident source term used in the design basis FHA within containment with an AST was acceptable 5 TVA Nuclear Power Group
Current Licensing Basis Excerpt from NRC SE 6 TVA Nuclear Power Group
Current Licensing Basis Excerpt from NRC SE 7 TVA Nuclear Power Group
Current Licensing Basis
- Analysis done for the FHA with AST assumes that the CBED is open and that ABGTS is out of service (no filtration of releases)
- TVA revised some of the assumptions in the FHA Analysis of Record (AOR) in June of 2013
- Changed the time of the CVI from 30 to 300 seconds
- Changed the containment air volume for mixing from 5% to 50%
- Change was done under 10 CFR 50.59
- Consequences to the FHA decreased by ~7%
8 TVA Nuclear Power Group
Current Licensing Basis
- Analysis done for the FHA with AST assumes that the CBED is open and that ABGTS is out of service (no filtration of releases)
- TVA revised some of the assumptions in the FHA Analysis of Record (AOR) in June of 2013
- Changed the time of the CVI from 30 to 300 seconds
- Changed the containment air volume for mixing from 5% to 50%
- Change was done under 10 CFR 50.59
- Consequences to the FHA decreased by ~7%
9 TVA Nuclear Power Group
Current Licensing Basis 10 TVA Nuclear Power Group
Current Licensing Basis 11 TVA Nuclear Power Group
Current Licensing Basis 12 TVA Nuclear Power Group
Improved Tech Spec Impact
- Four T/S were changed in this conversation by changing the APPLICABILITY from During movement of irradiated fuel to During movement of recently irradiated fuel
- 3.3.6 Containment Ventilation Isolation Instrumentation
- 3.3.8 Auxiliary Building Gas Treatment System Actuation Instrumentation
- 3.7.12 Auxiliary Building Gas Treatment System
- 3.9.4 Containment Penetrations
- In none of these specifications, does SQN CTS have DURING CORE ALTERATIONS 13 TVA Nuclear Power Group
Improved Tech Spec Impact
- 3.3.6 Containment Ventilation Isolation Instrumentation 14 TVA Nuclear Power Group
Improved Tech Spec Impact
Improved Tech Spec Impact
Improved Tech Spec Impact
- 3.9.4 Containment Penetrations 17 TVA Nuclear Power Group