|
|
Line 2: |
Line 2: |
| | number = ML12244A569 | | | number = ML12244A569 |
| | issue date = 08/07/2012 | | | issue date = 08/07/2012 |
| | title = Callaway, Unit 1, Enclosure 2: 401 Certification for Union Electric Callaway Unit 1, D/B/A Ameren Missouri Callaway Energy Center, NRC License Renewal Project | | | title = Enclosure 2: 401 Certification for Union Electric Callaway Unit 1, D/B/A Ameren Missouri Callaway Energy Center, NRC License Renewal Project |
| | author name = Pozzo J C | | | author name = Pozzo J C |
| | author affiliation = Ameren Missouri, Union Electric Co | | | author affiliation = Ameren Missouri, Union Electric Co |
Latest revision as of 05:47, 18 March 2019
|
---|
Category:Letter
MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] |
Text
W Ameren ULNRC-05902 Enclosure 2 Ameren Services ::::::::.::::
- .:::::::::::::::::
- .::::::::::::::::::::::: ::: ;:: :::::::::
- ::::::::::::::
- .::::::::::::::
- ::::::::::::::
August 7 , 2012 Mr. Robert Stout Missouri Department of Natural Resources Water Pollution Control Program P.O. Box 176 Jefferson City, Missouri 65102 Re: 401 Certification for Union Electric Callaway Unit 1 d/b/a Ameren Mlsaourt Callaway Energy Center NRC Ucense Renewal Project for Callaway Plant
Dear Mr. Stout:
On December 19, 2011, Ameren submitted a Ucense Renewal Application to the U.S. Nuclear Regulatory Commission (NRC) requesting a 20 year extension of the operating license for Callaway Unit 1 , Union Electric Company d/b/a Ameren Missouri Callaway Energy Center. The renewed operating license will allow Unit 1 to operate until 2044. An Environmental Report was prepared as part of this renewal application for review by NRC. A copy of the Environmental Report (Appendix E of the NRC license renewal application)
Is enclosed for your review. At this time , Ameren needs to provide documentation to NRC, that we have consulted with the Missouri Department of Natural Resources
{MDNR) to confirm that an NRC action, to renew and extend the term of Callaway's license would not violate Missouri's Water Quality Standards. As my staff discussed with you on July 30 111 it is unclear whether a new Water Quality Certification
{Certification) must be Issued or whether MDNR might instead issue a letter of approval, based on the initial Certification and the ongoing NPDES permit authorization. When Callaway Plant Unit 1 was originally licensed in the early 1980's , a Certification was obtained in accordance with 10 CSR 20-6.060 along with the Initial NPDES Permit (first Pennit 1980). Over the life of the plant timely renewal applications have been submitted and a new NPDES Permit Issued approximately every 5 years. The most recent NPDES Permit reapplication was submitted In March 2008 and the most recent NPDES Permit was issued on April 14, 2010. We hope that our NPDES permit history , in conjunction with the Environmental Review being provided today , will help with your determination as to whether or not a new Certification Is necessary for the 20 year license extension for Callaway Unit 1. Please notify Ameren of your decision in this regard, at your earliest convenience.
Ameren Missouri believes the Environmental Report included in the license renewal application and the current NPDES Permit (M0-0098001) provide all of the essential information needed for DNA's review. Due to the size and scope of the Environmental Report , we have summarized each of the references where additional i nformation Is contained within the license application package as related to Individual items noted in the 401 Certification appHcation checklist. 1) Application date: August 7 , 2012 2) Applicant's Name: Union Electric Company Callaway Unit 1, d/b/a Ameren Missouri Callaway Energy Center S t Lou is, MO 63166-6149 A m eren.com
- 3) Applicant's Address: One Ameren Plaza, 1901 Chouteau Avenue, P.O. Box 66149, Mail Code 602, and St. Louis, MO 63103. 4) Telephone and Principle Contact: 573-676-8410, David Neterer, Plant Director Callaway 5) Overall Project Description and Range: Callaway Unit 1 is located in Callaway County approximately ten miles southeast of Fulton, Missouri and 80 miles west of the St. Louis metropolitan area. The Missouri River lies approximately five miles south of the site. Callaway Unit 1 was constructed from 1979-1984 by Union Electric Company, now doing business as Ameren Missouri.
A complete description of the facility location and features can be found in the license application file in December 2011 (Appendix E, Chapter 2). Callaway Unit 1 is an 1160 MWe four-loop Westinghouse Pressurized Water Reactor which began commercial operation in December 1984. 6) Purpose of Project: within their territory.
Ameren Missouri operates Callaway Unit 1 to provide electric power to areas 7) Project Dimensions:
The license renewal consists of rellcensing the entire facility to extend the current 40 year operating license for an additional 20 years. There are no new features or plant modifications being completed to obtain this extended license. B) Site Maps and Engineering Drawings:
Site Maps are included in the Environmental Report and NPDES Permit reapplication.
- 9) Legal Description of the Project: The legal description for the license renewal is as follows: Callaway Plant Unit 1, Environmental Report for License Renewal, Facility Operating License No. NPF-30. The facility address is Callaway Energy Center, Junction Highway CC & Highway 0, P.O. Box 620, Fulton, MO 65251. 10) General Travel Directions to the Site: From Jefferson City travel approximately 25 miles east on Highway 94 to Highway CC. Turn left on Highway CC. The entrance road to Callaway is located on the right side of Highway CC approximately five miles north of highway 94 and about one mile south of Highway 0. An Ameren Missouri sign is located at this intersection.
Follow the signs to Entrance C. 11} Primary Water Bodies: Callaway Unit 1 is located approximately five miles north of the Missouri River. The Missouri River provides the primary source of cooling water for the circulating and service water systems. 12) Acreage of wetlands or linear feet of water course or stream Impacted:
This section is not applicable as Callaway Unit 1 is an existing facility and Ameren Missouri is not applying for a Federal 404 Permit. 13) Statement of cubic yards of fill to be placed: This section is not applicable as Callaway Unit 1 is an existing facility and Ameren Missouri is not applying for a Federal 404 Permit. 14} Work Initiated or completed prior to this application:
This section is not applicable as Callaway Unit 1 is an existing facility and Ameren Missouri is not applying for a Federal 404 Permit. 15) Names and addresses of all adjoining property owners: of discharge point: Mary L. Austin 4519 Holt Road Wentzville, MO 63385 Adjacent property owner downstream Date -""-3_-_?-....;;.-;La __ 'I:J-__ David W. Neterer-Plant Director Callaway 16) Signature:
- 17) Mitigation Plan: A mitigation plan as described in the application checklist is not directly applicable to the re-licensing Of Callaway Unit 1. Again , should a new 401 Water Quality CertifiCation be required for Callaway Unit 1 license renewal , we believe th i s letter along with the enclosed Environmental Report contains all necessary information. Please contact Gail Gary of my staff at 314-554-2824 should you have any questions or need additional information. Enclosure T bee: w/o attachments D. W. Neterer S. G. Kovaleski C. 0. Reasoner J. F. Small S. C. Whitworth JCP/MFB/GPG w/attachments WQ3.1.2