ML13003A048: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 9: Line 9:
| docket = 05000272, 05000311
| docket = 05000272, 05000311
| license number = DPR-070, DPR-075
| license number = DPR-070, DPR-075
| contact person = Hughey J D NRR/DORL/LPL1-2
| contact person = Hughey J NRR/DORL/LPL1-2
| case reference number = TAC ME9095, TAC ME9096
| case reference number = TAC ME9095, TAC ME9096
| package number = ML13003A042
| package number = ML13003A042

Revision as of 10:36, 22 June 2019

E-mail Draft Request for Additional Information
ML13003A048
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/02/2013
From:
Office of Nuclear Reactor Regulation
To:
Hughey J NRR/DORL/LPL1-2
Shared Package
ML13003A042 List:
References
TAC ME9095, TAC ME9096
Download: ML13003A048 (1)


Text

DRAFT DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING SALEM GENERATING STATION, UNIT 1 AND 2 DELETION OF CONDITION FOR INOPERABLE CAACS/CREACS ISOLATION DAMPERS DOCKET NUMBERS: 50-272 AND 50-311 (TAC NOS. ME9095 AND ME9096)

By letter dated July 17, 2012, PSEG submitted a license amendment request for Salem Generating Station Units 1 and 2 (ADAMS Accession No. ML12199A426), to revise Technical Specification (TS) 3/4.7.6.1 (Unit 1) and 3/4.7.6 (Unit 2), "Control Room Emergency Air Conditioning System," by removing the separate action for securing an inoperable Control Area Air Conditioning and Control Room Emergency Air Conditioning System isolation damper in the closed position and entering the actions for an inoperable control room envelope boundary.

The NRC staff has reviewed the information submitted by the licensee, and based on this review, determined the following information is required to complete the evaluation.

RAI 1: Salem Unit 1 TS 6.18 and Unit 2 TS 6.17 contain the Control Room Envelope (CRE) Habitability Program. Element "a" of the program requires a definition of the CRE and CRE boundary. The amendment request did not discuss the current definition of the CRE, whether or not the isolation dampers in question are defined as part of the CRE boundary, or whether or not the CRE was being redefined.

Please clarify whether or not the isolation dampers are currently defined as part of the CRE boundary.