Turkey Point Aquifer Withdrawals and Canal Maintenance Hello Briana, There are two aquifers below the Cooling Canal System (CCS). The shallow aquifer is call the Biscayne Aquifer (approximately 90 feet deep)  The deeper aquifer is called the Floridan Aquifer. There is a confining layer between the two aquifers. The current approved temporary water withdr awals are approximately 5 MGD from the Floridan Aquifer. The future withdrawals that FPL will request approval for from the South Florida Water Management District will be 14 MGD from the Floridan Aquifer. FPL also received temporary approval for an additional 30 MGD withdrawal from the saline portion of the Biscayne Aquifer. FPL has not utilized the 30 MGD withdrawal.
Turkey Point Aquifer Withdrawals and Canal Maintenance Hello Briana, There are two aquifers below the Cooling Canal System (CCS). The shallow aquifer is call the Biscayne Aquifer (approximately 90 feet deep)  The deeper aquifer is called the Floridan Aquifer. There is a confining layer between the two aquifers. The current approved temporary water withdr awals are approximately 5 MGD from the Floridan Aquifer. The future withdrawals that FPL will request approval for from the South Florida Water Management District will be 14 MGD from the Floridan Aquifer. FPL also received temporary approval for an additional 30 MGD withdrawal from the saline portion of the Biscayne Aquifer. FPL has not utilized the 30 MGD withdrawal.
FPL is evaluating the longer term solution to improve the conditions of the CCS. Potential solutions are increase in aeration and demucking the bottom of the canals.
FPL is evaluating the longer term solution to improve the conditions of the CCS. Potential solutions are increase in aeration and demucking the bottom of the canals.
: Thanks, Stacy M. Foster Manager, Environmental Licensing and Permitting  
: Thanks, Stacy M. Foster Manager, Environmental Licensing and Permitting  



Revision as of 21:58, 27 April 2019

2014/07/24 Turkey Point 3 & 4 La - Turkey Point Aquifer Withdrawals and Canal Maintenance
ML15128A634
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/24/2014
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
15-935-02-LA-BD01
Download: ML15128A634 (2)


Text

1 TurkeyPointLANPEm Resource From:Foster, Stacy [Stacy.Foster@fpl.com]

Sent: Thursday, July 24, 2014 1:26 PM To: Grange, Briana Cc:Gless, Jodie

Subject:

Turkey Point Aquifer Withdrawals and Canal Maintenance Hello Briana, There are two aquifers below the Cooling Canal System (CCS). The shallow aquifer is call the Biscayne Aquifer (approximately 90 feet deep) The deeper aquifer is called the Floridan Aquifer. There is a confining layer between the two aquifers. The current approved temporary water withdr awals are approximately 5 MGD from the Floridan Aquifer. The future withdrawals that FPL will request approval for from the South Florida Water Management District will be 14 MGD from the Floridan Aquifer. FPL also received temporary approval for an additional 30 MGD withdrawal from the saline portion of the Biscayne Aquifer. FPL has not utilized the 30 MGD withdrawal.

FPL is evaluating the longer term solution to improve the conditions of the CCS. Potential solutions are increase in aeration and demucking the bottom of the canals.

Thanks, Stacy M. Foster Manager, Environmental Licensing and Permitting

Florida Power & Light Company 700 Universe Blvd.

Juno Beach, FL 33408 W 561-691-7065 C 772-285-5653

Hearing Identifier: TurkeyPoint_LA_NonPublic Email Number: 38 Mail Envelope Properties (DB61AAA52A82164FBED293EE231B12911B6A4B18)

Subject:

Turkey Point Aquifer Withdrawals and Canal Maintenance Sent Date: 7/24/2014 1:26:24 PM Received Date: 7/24/2014 1:26:26 PM From: Foster, Stacy Created By: Stacy.Foster@fpl.com Recipients: "Gless, Jodie" <Jodie.Gless@fpl.com>

Tracking Status: None "Grange, Briana" <Briana.Grange@nrc.gov>

Tracking Status: None Post Office: GOXSA1707.fplu.fpl.com

Files Size Date & Time MESSAGE 1076 7/24/2014 1:26:26 PM

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: