{{#Wiki_filter:PLANT SYSTEMS ULTIMATE HEAT SINK LIMITING CONOITION FOR OPERATION 3.7.1.3 The ultimate heat sink consisting of two separate spray ponds shall be OPERABLE with: Dmtmn o.a.A minimum water level at elevation 432 ft 9 in.Mean Sea L'evel, USGS datum, and b.A water temperature of less than or equal to 77 F.c.A maximum average sediment depth of less than or equal to 0.5 ft on the floors of the spray ponds.APPLICABILITY:
{{#Wiki_filter:PLANT SYSTEMS ULTIMATE HEAT SINK LIMITING CONOITION     FOR OPERATION Da<676 3.7.1.3   The ultimate heat sink consisting of two separate spray ponds                                             shall be OPERABLE with:
OPERATIONAL CONOITIONS I, 2, 3', 4, 5, and*.ACTION: Da<676 With the b.c d.requirements of the above specification not satisfied:
Dmtmn o.
In OPERATIONAL CONOITIOH 1,~.2, or 3, be in at least HOT SHUTDOWN within 12 hours and in COLO SHUTDOWN within the next 24 hours.w~~)In OPERATIONAL CONOITIO(>4 or 5, declare the SW system inoperable and take the ACTION-"r'equired by Specification 3.7.1.1.(g gc j,0j'~y~Q
: a. A minimum water USGS datum, and level at elevation   432 ft 9 in. Mean Sea L'evel,
~i'd%mC ihopcnrCb 6 In QPERATIQNAL coNQITICN*, declare the system inoperable and sprg P'ake the ACTION required by Specification 3.7.1.1.The provisions of Specification 3.0.3 are not applicable.
: b. A water temperature of less than or equal to 77 F.
With the average sediment depth of either of the spray ponds greater than or equal to 0.5 ft but less than 1.0 ft, the ponds shall be cleaned within 30 days to reduce the average sediment depth to less than or equal to 0.1 ft.SURVEILLANCE REOUIREMEHTS 4.7.1.3 The ultimate heat sink shall be determined OPERABLE at least once per: a.24 hours by verifying the water temperature and water level to be within their limits.b.92 days by verifying that the average sediment depth in each of the spray ponds is less than or equal to 0.5 ft.When handling irradiated fuel in he secondarv containment, WASHINGTON NUCLEA~R UNIT 2 86033i0270 86032i PDR ADOCK 05000397, P PDR 3/4 7-4 ATTACHMENT I Safet Evaluation of Standi Service Mater Cross-Connection In order to allow for infrequent maintenance of submerged steel structural supports and piping in the ultimate heat sink (UHS)spray ponds, it is necessary that we drain the ponds one at a time during a refueling outage.The present system design results in the service water (SM)pumps taking suction on one pond, providing cooling water to plant room coolers and essential equipment, returning cooling water to the other pond for spray cooling, and returning water to the pump suction in the first pond via a 30 inch siphon.This mode of operation precludes draining of a pond for maintenance.
: c. A maximum on average sediment depth of less than or equal to 0.5 the floors of the spray ponds.
A design change is planned that will allow the return of water to the pond from which it was drawn., The change involves the cross connection of the return piping via a removable spool piece, and the blockage of the siphon with inflatable plugs.One pond can be drained with this cross connection capability in place.The safety implications of the cross connection focus in four areas: I)redundancy requirements of the SW system, 2)UHS water inventory requirements, 3)UHS cooling water temperature limitations, and 4)severe natural phenomena.
ft APPLICABILITY: OPERATIONAL CONOITIONS         I, 2, 3', 4, 5, and *.
Redundanc Re uirements The intended use of the cross connection is only during the"star" mode defined in the Technical Specifications, that is, with the reactor shut down, in refueling mode, with the vessel head off and cavity flooded at least 22 feet above the vessel flange.In.this mode the technical specifications require only that one SW division be operable, and that alternate means be shown to be available within one hour if that division is lost.With one spray pond drained and the siphon plugged with inflatable plugs, it is possible to restore the division associated with the drained pond in a very short time.The water level in the full pond is above the highest point of the siphon, so flow will proceed automatically through the siphon if the inflatable plugs are deflated.Since the siphon plugs can be deflated from the edge of the pond, that flow can be established quickly.Within one hour the previously inoperable division could be brought on line.UHS Water Inventor Mith one pond drained, the water inventory is approximately half of that normally available.
ACTION:
However, the severe heat loads associated with the aesign basis accident can not occur in>the refueling mode and considerably less water is required.An evaluation was done to determine the length of time the water in one pond would last if cooling were requi red without makeup and without2offsite power.Heat loads associated with previously analyzed accidents were used including diesel generators, decay heat from the core, decay heat from the fuel pool, and from auxiliaries (room coolers, etc.).Design basis drift loss and leakage were assumed.The results of our evaluation indicate that the water inventory of one pond would last over 22 days.
With the requirements of the above specification not           satisfied:
ATTACHMENT I Contd.While the normal 30 day inventory requirement is not met in this mode of operation, the probability of significant radioactive release is extremely small with the plant shut down in the refueling mode.We would have free movement about the site and have documented experience that with freedom of movement, makeup water can be provided.For example, temporary pipe lines from the river have, in the past, been installed in about 3 days.In addition, one tower makeup pump (12,500 gpm each)can be powered by emergency diesels if piping remains intact.The 22 day inventory provides adequate time to provide makeup via temporary or installed systems.Long term cooling water supply can be assured.UHS Coolin Water Tem erature The safety analyses reported in the FSAR were performed under the worst 2 case meteorological conditions and using severe heat loads associated with a design basis accident.In providing the cross-connection during refueling and draining one pond, we have not diminished the heat dissipation capability of the system.Heat dissipation in the sprays is a function of flow rate and meteorological conditions, and the worst case analysis for cooling water temperatures reported in the FSAR used one SW division operable.The effect of the reduction in inventory is a more rapid response to heat load changes.Since the plant is not under-going a rapid transient accident in the case we are evaluating here, the importance of the response time is minimal.The heat loads are relatively stable during the cross connection operation which will be several days after shutdown.Long term p)ant heat loads during refueling are bounded by those reported in the FSAR for the accident case, and temperature of cooling water would therefore be the same or lower.Our conclusion is that the maximum temperature reported in the FSAR is bounding for the intended use of the SW cross connection.
In OPERATIONAL CONOITIOH 1,~.2,     or 3, be in at least HOT SHUTDOWN within   12 hours and in COLO   SHUTDOWN   within the next 24 hours.
Severe Natural Phenomena The major natural phenomena affecting the UHS spray ponds are earthquakes and tornados.If an SSE were to occur during cross-connection use, the operable SW division would continue to serve the plant and the emergency diesel generators.
w ~~)
Makeup from the river would potentially be lost due to loss of the Seismic Category II pipe line, but the previous evaluations indicate cooling would continue.Temporary lines could be installed in the 22 days cooling that the inventory would provide.If a tornado were to damage the spray headers or remove some water, the emergency diesel power connection to the tower makeup pumps on the river would assure sufficient cool river water to pryvide essentially once through cooling, the same as described in the FSAR.
: b. In OPERATIONAL CONOITIO(>4 or 5, declare the         SW system inoperable and take the ACTION-"r'equired by Specification         3.7.1.1.
ATTACHMENT I Contd.Conclusion It is our conclusion from the evaluation performed that the cross connection meets safety requirements and that it can be installed when the plant is in refueling mode"star" as described in the Technical Specifications.
(g gc j,0j'~y~Q ~ i'd% mC ihopcnrCb 6 c    In QPERATIQNAL coNQITICN *,     declare the       system inoperable and     sprg the ACTION required by     Specification 3.7. 1.1.     The provisions P'ake of Specification 3.0.3 are not applicable.
Supply System Calculation ME-02-85-75
: d. With the average sediment depth of either of the spray ponds greater than or equal to 0.5     ft but less than 1.0 ft, the ponds shall be cleaned within 30 days to reduce the average sediment depth to less than or equal to 0. 1 ft.
-"Evaluation of SSl<Cross Connection" FSAR Section 9.2.5 ATTACHMENT II Standby Service Water Flow Paths Cross Connection Locatio 30" Si Pond B Pond A Pump Division B Return Pump See Detail A A Pumphouse B Pumphouse DETAIL A Division B Return Grade El.Div.A Return O~p Cil I CD O~p U)I)~f O C/l CD O Cil CD Flanged removable Spool Piece and Valve.All piping is 18"P.NOTE: Nor~ally spool piece cross connection and valve are removed and connections to return line are blind flanged.During outage when draining a pond (plant in mode"*")the spool piece may be installed to allow aligning valves so B return can go to B pond and vice versa for A.*Division A Return runs underground between ponds.}}
SURVEILLANCE REOUIREMEHTS 4.7. 1.3   The ultimate heat sink shall     be determined   OPERABLE   at least once per:
: a. 24 hours by verifying the water temperature         and water level to   be within their limits.
: b. 92 days by   verifying that the average sediment depth in         each of the spray   ponds is less than or equal to 0.5 ft.
When   handling irradiated fuel in       he secondarv   containment, WASHINGTON NUCLEAR
                        ~
UNIT 2           3/4 7-4 86033i0270 86032i PDR   ADOCK     05000397, P                     PDR
 
ATTACHMENT I Safet   Evaluation of Standi   Service Mater Cross-Connection In order to allow for infrequent maintenance of submerged steel structural supports and piping in the ultimate heat sink (UHS) spray ponds,       it necessary that we drain the ponds one at a time during a refueling outage.
is The present system design results in the service water (SM) pumps taking suction on one pond, providing cooling water to plant room coolers and essential equipment, returning cooling water to the other pond for spray cooling, and returning water to the pump suction in the first pond via a 30 inch siphon. This mode of operation precludes draining of a pond for maintenance. A design change is planned that will allow the return of water to the pond from which     it was drawn., The change involves the cross connection of the return piping via a removable spool piece, and the blockage of the siphon with inflatable plugs. One pond can be drained with this cross connection capability in place.
The   safety implications of the cross connection focus in four areas:
I) redundancy requirements of the SW system, 2) UHS water inventory requirements, 3) UHS cooling water temperature limitations, and 4) severe natural phenomena.
Redundanc     Re uirements The intended use     of the cross connection is only during the "star" mode   defined in the Technical Specifications, that is, with the reactor shut down, in refueling mode, with the vessel head off and cavity flooded at least 22 feet above the vessel flange. In .this mode the technical specifications require only that one SW division be operable, and that alternate means be shown to be available within one hour is lost.
if  that division With one spray pond drained and the siphon plugged with inflatable plugs, it is possible to restore the division associated with the drained pond in a very short time. The water level in the full pond is above the highest point of the siphon, so flow will proceed automatically through the siphon   if the inflatable plugs are deflated. Since the siphon plugs can be deflated from the edge of the pond, that flow can be established quickly. Within one hour the previously inoperable division could be brought on line.
UHS Water Inventor Mith one pond drained, the water inventory is approximately half of that normally available. However, the severe heat loads associated with the aesign basis accident can not occur in>the refueling mode and considerably less water is required. An evaluation was done to determine the length of time the water in one pond would last makeup and without2offsite power.
if cooling were requi red without Heat loads associated with previously analyzed accidents were used including diesel generators, decay heat from the core, decay heat from the fuel pool, and from auxiliaries (room coolers, etc.). Design basis drift loss and leakage were assumed. The results of our evaluation indicate that the water inventory of one pond would last over 22 days.
 
ATTACHMENT   I Contd.
While the normal 30 day inventory requirement is not met in this mode of operation, the probability of significant radioactive release is extremely small with the plant shut down in the refueling mode. We would have free movement about the site and have documented experience that with freedom of movement, makeup water can be provided. For example, temporary pipe lines from the river have, in the past, been installed in about 3 days. In addition, one tower makeup pump (12,500 gpm each) can be powered by emergency diesels       if piping remains intact.
The 22 day   inventory provides adequate time to provide makeup via temporary or   installed systems. Long term cooling water supply can       be assured.
UHS Coolin Water   Tem erature 2
The safety analyses reported in the FSAR were performed under the worst case meteorological conditions and using severe heat loads associated with a design basis accident. In providing the cross-connection during refueling and draining one pond, we have not diminished the heat dissipation capability of the system. Heat dissipation in the sprays is a function of flow rate and meteorological conditions, and the worst case analysis for cooling water temperatures reported in the FSAR used one SW division operable.       The effect of the reduction in inventory is a more rapid response to heat load changes.         Since the plant is not under-going a rapid transient accident in the case we are evaluating here, the importance of the response time is minimal. The heat loads are relatively stable during the cross connection operation which will be several days after shutdown.
Long term   p)ant heat loads during refueling are bounded by those reported in the FSAR for the accident case, and temperature of cooling water would therefore be the same or lower.
Our conclusion   is that the   maximum temperature reported in the FSAR is bounding   for the intended   use of the SW cross connection.
Severe Natural Phenomena The major natural   phenomena   affecting the UHS spray ponds are earthquakes and tornados. If an SSE were to occur during cross-connection use, the operable SW division would continue to serve the plant and the emergency diesel generators. Makeup from the river would potentially be lost due to loss of the Seismic Category II pipe line, but the previous evaluations indicate cooling would continue. Temporary lines could be installed in the 22 days cooling that the inventory would provide. If a tornado were to damage the spray headers or remove some water, the emergency diesel power connection to the tower makeup pumps on the river would assure sufficient cool river water to pryvide essentially once through cooling, the same as described in the FSAR .
 
ATTACHMENT I Contd.
Conclusion It is our conclusion from the evaluation performed that the cross connection meets safety requirements and that it can be installed when the plant is in refueling mode "star" as described in the Technical Specifications.
Supply System Calculation ME-02-85 "Evaluation of SSl< Cross Connection" FSAR Section 9.2.5
 
ATTACHMENT     II Standby Service Water Flow Paths Cross Connection Locatio Pond B 30"       Si Pond A B Pumphouse Division B Return Pump See Detail A A Pumphouse Pump DETAIL A Division B Return                                                         O    O Grade El.     ~
O p      ~
O p
C/l  Cil Cil     U)
I
                                                  ~
                                                    )
I f
CD  CD Div. A Return                  CD Flanged removable Spool Piece and Valve. All piping is 18"P.
NOTE:   Nor~ally spool piece cross connection and valve are removed and connections to return line are blind flanged.           During outage when draining a pond (plant in mode "*") the spool piece may be installed to allow aligning valves so B return can go to B pond and vice versa for A.
* Division   A Return runs underground between ponds.}}

Latest revision as of 15:21, 29 October 2019

Proposed Changes to Tech Spec 3.7.1.3 Re UHS to Allow Reliance on Single Spray Pond for DHR During Operational Condition Mode Star.
ML17278A679
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/21/1986
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17278A678 List:
References
TAC-61014, NUDOCS 8603310270
Download: ML17278A679 (5)


Text

PLANT SYSTEMS ULTIMATE HEAT SINK LIMITING CONOITION FOR OPERATION Da<676 3.7.1.3 The ultimate heat sink consisting of two separate spray ponds shall be OPERABLE with:

Dmtmn o.

a. A minimum water USGS datum, and level at elevation 432 ft 9 in. Mean Sea L'evel,
b. A water temperature of less than or equal to 77 F.
c. A maximum on average sediment depth of less than or equal to 0.5 the floors of the spray ponds.

ft APPLICABILITY: OPERATIONAL CONOITIONS I, 2, 3', 4, 5, and *.

ACTION:

With the requirements of the above specification not satisfied:

In OPERATIONAL CONOITIOH 1,~.2, or 3, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

w ~~)

b. In OPERATIONAL CONOITIO(>4 or 5, declare the SW system inoperable and take the ACTION-"r'equired by Specification 3.7.1.1.

(g gc j,0j'~y~Q ~ i'd% mC ihopcnrCb 6 c In QPERATIQNAL coNQITICN *, declare the system inoperable and sprg the ACTION required by Specification 3.7. 1.1. The provisions P'ake of Specification 3.0.3 are not applicable.

d. With the average sediment depth of either of the spray ponds greater than or equal to 0.5 ft but less than 1.0 ft, the ponds shall be cleaned within 30 days to reduce the average sediment depth to less than or equal to 0. 1 ft.

SURVEILLANCE REOUIREMEHTS 4.7. 1.3 The ultimate heat sink shall be determined OPERABLE at least once per:

a. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the water temperature and water level to be within their limits.
b. 92 days by verifying that the average sediment depth in each of the spray ponds is less than or equal to 0.5 ft.

When handling irradiated fuel in he secondarv containment, WASHINGTON NUCLEAR

~

UNIT 2 3/4 7-4 86033i0270 86032i PDR ADOCK 05000397, P PDR

ATTACHMENT I Safet Evaluation of Standi Service Mater Cross-Connection In order to allow for infrequent maintenance of submerged steel structural supports and piping in the ultimate heat sink (UHS) spray ponds, it necessary that we drain the ponds one at a time during a refueling outage.

is The present system design results in the service water (SM) pumps taking suction on one pond, providing cooling water to plant room coolers and essential equipment, returning cooling water to the other pond for spray cooling, and returning water to the pump suction in the first pond via a 30 inch siphon. This mode of operation precludes draining of a pond for maintenance. A design change is planned that will allow the return of water to the pond from which it was drawn., The change involves the cross connection of the return piping via a removable spool piece, and the blockage of the siphon with inflatable plugs. One pond can be drained with this cross connection capability in place.

The safety implications of the cross connection focus in four areas:

I) redundancy requirements of the SW system, 2) UHS water inventory requirements, 3) UHS cooling water temperature limitations, and 4) severe natural phenomena.

Redundanc Re uirements The intended use of the cross connection is only during the "star" mode defined in the Technical Specifications, that is, with the reactor shut down, in refueling mode, with the vessel head off and cavity flooded at least 22 feet above the vessel flange. In .this mode the technical specifications require only that one SW division be operable, and that alternate means be shown to be available within one hour is lost.

if that division With one spray pond drained and the siphon plugged with inflatable plugs, it is possible to restore the division associated with the drained pond in a very short time. The water level in the full pond is above the highest point of the siphon, so flow will proceed automatically through the siphon if the inflatable plugs are deflated. Since the siphon plugs can be deflated from the edge of the pond, that flow can be established quickly. Within one hour the previously inoperable division could be brought on line.

UHS Water Inventor Mith one pond drained, the water inventory is approximately half of that normally available. However, the severe heat loads associated with the aesign basis accident can not occur in>the refueling mode and considerably less water is required. An evaluation was done to determine the length of time the water in one pond would last makeup and without2offsite power.

if cooling were requi red without Heat loads associated with previously analyzed accidents were used including diesel generators, decay heat from the core, decay heat from the fuel pool, and from auxiliaries (room coolers, etc.). Design basis drift loss and leakage were assumed. The results of our evaluation indicate that the water inventory of one pond would last over 22 days.

ATTACHMENT I Contd.

While the normal 30 day inventory requirement is not met in this mode of operation, the probability of significant radioactive release is extremely small with the plant shut down in the refueling mode. We would have free movement about the site and have documented experience that with freedom of movement, makeup water can be provided. For example, temporary pipe lines from the river have, in the past, been installed in about 3 days. In addition, one tower makeup pump (12,500 gpm each) can be powered by emergency diesels if piping remains intact.

The 22 day inventory provides adequate time to provide makeup via temporary or installed systems. Long term cooling water supply can be assured.

UHS Coolin Water Tem erature 2

The safety analyses reported in the FSAR were performed under the worst case meteorological conditions and using severe heat loads associated with a design basis accident. In providing the cross-connection during refueling and draining one pond, we have not diminished the heat dissipation capability of the system. Heat dissipation in the sprays is a function of flow rate and meteorological conditions, and the worst case analysis for cooling water temperatures reported in the FSAR used one SW division operable. The effect of the reduction in inventory is a more rapid response to heat load changes. Since the plant is not under-going a rapid transient accident in the case we are evaluating here, the importance of the response time is minimal. The heat loads are relatively stable during the cross connection operation which will be several days after shutdown.

Long term p)ant heat loads during refueling are bounded by those reported in the FSAR for the accident case, and temperature of cooling water would therefore be the same or lower.

Our conclusion is that the maximum temperature reported in the FSAR is bounding for the intended use of the SW cross connection.

Severe Natural Phenomena The major natural phenomena affecting the UHS spray ponds are earthquakes and tornados. If an SSE were to occur during cross-connection use, the operable SW division would continue to serve the plant and the emergency diesel generators. Makeup from the river would potentially be lost due to loss of the Seismic Category II pipe line, but the previous evaluations indicate cooling would continue. Temporary lines could be installed in the 22 days cooling that the inventory would provide. If a tornado were to damage the spray headers or remove some water, the emergency diesel power connection to the tower makeup pumps on the river would assure sufficient cool river water to pryvide essentially once through cooling, the same as described in the FSAR .

ATTACHMENT I Contd.

Conclusion It is our conclusion from the evaluation performed that the cross connection meets safety requirements and that it can be installed when the plant is in refueling mode "star" as described in the Technical Specifications.

Supply System Calculation ME-02-85 "Evaluation of SSl< Cross Connection" FSAR Section 9.2.5

ATTACHMENT II Standby Service Water Flow Paths Cross Connection Locatio Pond B 30" Si Pond A B Pumphouse Division B Return Pump See Detail A A Pumphouse Pump DETAIL A Division B Return O O Grade El. ~

O p ~

O p

C/l Cil Cil U)

I

~

)

I f

CD CD Div. A Return CD Flanged removable Spool Piece and Valve. All piping is 18"P.

NOTE: Nor~ally spool piece cross connection and valve are removed and connections to return line are blind flanged. During outage when draining a pond (plant in mode "*") the spool piece may be installed to allow aligning valves so B return can go to B pond and vice versa for A.

  • Division A Return runs underground between ponds.