{{#Wiki_filter:S DUKE Steven D. CappsVice President
{{#Wiki_filter:S DUKE Steven D. Capps Vice President~''ENERG..Y McGuire Nuclear Station Duke Energy MG01VP I 12700 Hagers Ferry Road Huntersville, NC 28078 0: 980.875.4805 Seril No MNS16-02 1' 980.875.4809 Seril N. MN-16002Steven.Capps@duke-energy.com January 7, 2016 10 CFR 50.90 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION:
~''ENERG..Y McGuire Nuclear StationDuke EnergyMG01VP I 12700 Hagers Ferry RoadHuntersville, NC 280780: 980.875.4805 Seril No MNS16-02 1' 980.875.4809 Seril N. MN-16002Steven.Capps@duke-energy.com January 7, 2016 10 CFR 50.90U.S. Nuclear Regulatory Commission Washington, D.C. 20555ATTENTION:
Document Control Desk  
Document Control Desk


==Subject:==
==Subject:==
Duke Energy Carolinas, LLC (Duke Energy)": McGuire Nuclear Station (MNS), Units 1 and 2, Docket Numbers 50-369 and 50-370, Renewed Facility Operating Licenses NPF-9 and NPF-17 Catawba Nuclear Station (CNS), Units 1 and 2 Docket Numbers 50-413 and 50-41 4, Renewed Facility Operating Licenses NPF-35 and NPF-52 Proposed Technical Specifications (TS) Amendment TS 3.7.10, "Control Room Area Chilled Water System" (MNS), and TS 3.7.11, "Control Room Area Chilled Water System" (CNS)Pursuant to 10 CFR 50.90, Duke Energy is requesting amendments to the MNS and CNS Facility Operating Licenses and subject Technical Specifications (TS). This proposed license amendment request (LAR) modifies the TS by adding a new Action for both trains of Control Room Area Chilled Water Systems (CRACWS) inoperable.
The new Action allows a finite time to restore one train to Operable status and requires periodic verification that Control Room temperature is maintained at or below 90°F.The proposed LAR is modeled after TSTF-477; Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems." This TSTF is specific to the BWR NUREGs 1433 and 1434. Duke Energy has determined this TSTF is readily adaptable to a NUREG-1 431 Standard TS for a Westinghouse plant. This topic was discussed with the NRC Staff on April 9, 2014. The proposed amendment is not being submitted under the Consolidated Line Item Improvement Process (CLIIP) process.Attachment 1 provides Duke Energy's evaluation of the amendment, which contains a description of the proposed changes, the technical evaluation, the regulatory analysis, the determination that this LAR contains No Significant Hazards Considerations, the basis for the categorical exclusion from performing an Environmental Assessment/Impact Statement, and precedent for the LAR.Attachment 2A provides the existing MNS TS pages marked-up to show the proposed changes.The reprinted TS pages will be provided to the NRC upon issuance of the approved amendment.
www.duke-energy.com U.S. Nuclear Regulatory Commission-MNS-1 6-002 Page 2 Attachment 2B provides the existing CNS TS pages marked-up to show the proposed changes.The reprinted TS pages will be provided to the NRC upon issuance of the approved amendment.
Attachment 3A provides a portion of the existing MNS TS Bases pages marked-up to show the corresponding proposed Bases changes. The TS Bases change will be processed after LAR approval under the MNS Bases Control Program (TS 5.5.14).Attachment 3B provides a portion of the existing CNS TS Bases pages marked-up to show the corresponding proposed Bases changes. The TS Bases change will be processed after LAR approval under the CNS Bases Control Program (TS 5.5.14).This proposed LAR has been reviewed and approved by the MNS and CNS Plant Operations Review Committees in accordance with the requirements of the Duke Energy Quality Assurance Program.In accordance with 10 CFR 50.91, Duke Energy is notifying the applicable state officials of this application for license amendment by transmitting a copy of this letter and its attachments to the designated officials.
This submittal will not impact the MNS or CNS Updated Final Safety Analysis Reports (UFSARs).Duke Energy requests approval of this submittal within one calendar year of the submittal date and an implementation period of 60 days from the date of amendment issuance.There are no regulatory commitments contained in this amendment.
Please direct any questions you may have in this matter to Lee A. Hentz at (980) 875-41 87.I declare under penalty of perjury that the foregoing is true and correct. Executed on January 7, 2016.Sincerely, Steven D. Capps Attachments U.S. Nuclear Regulatory Commission MNS-1 6-002 Page 3 xc (with attachments):
Catherine Haney Regional Administrator U.S. Nuclear Regulatory Commission
-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 G.A. Hutto, Ill Senior Resident Inspector (Catawba)U.S. Nuclear Regulatory Commission Catawba Nuclear Station J. Zeiler Senior Resident Inspector (McGuire)U.S. Nuclear Regulatory Commission McGuire Nuclear Station G. E. Miller (addressee only)NRC Project Manager (Catawba and McGuire)U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8-G9A 11555 Rockville Pike Rockville, MD 20852-2738 S.E. Jenkins Manager Radioactive and Infectious Waste Management Division of Waste Management South Carolina Department of Health and Environmental Control 2600 Bull St.Columbia, SC 29201 W.L. Cox, Ill Section Chief Division of Environmental Health Radiation Protection Section North Carolina Department of Environment and Natural Resources 1645 Mail Service Center Raleigh, NC 27699 ATTACHMENT 1 EVALUATION OF PROPOSED AMENDMENT 1.0


Duke Energy Carolinas, LLC (Duke Energy)":
==SUMMARY==
McGuire Nuclear Station (MNS), Units 1 and 2,Docket Numbers 50-369 and 50-370, Renewed Facility Operating LicensesNPF-9 and NPF-17Catawba Nuclear Station (CNS), Units 1 and 2Docket Numbers 50-413 and 50-41 4, Renewed Facility Operating LicensesNPF-35 and NPF-52Proposed Technical Specifications (TS) Amendment TS 3.7.10, "Control RoomArea Chilled Water System" (MNS), and TS 3.7.11, "Control Room Area ChilledWater System" (CNS)Pursuant to 10 CFR 50.90, Duke Energy is requesting amendments to the MNS and CNSFacility Operating Licenses and subject Technical Specifications (TS). This proposed licenseamendment request (LAR) modifies the TS by adding a new Action for both trains of ControlRoom Area Chilled Water Systems (CRACWS) inoperable.
DESCRIPTION 2.0 DETAILED DESCRIPTION 3.0 TECHNICAL EVALUATION 3.1 TS System Descriptions 3.2 Adaptability of BWR TSTF-477 Rev.3 to a Westinghouse Plant 3.3 Operational Burden 3.4 System Reliability Improvements 3.5 Control Room Equipment Temperature Limit Validation 3.6 Application of Proposed Change 4.0 REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria
The new Action allows a finite timeto restore one train to Operable status and requires periodic verification that Control Roomtemperature is maintained at or below 90°F.The proposed LAR is modeled after TSTF-477; Rev. 3, "Add Action for Two Inoperable ControlRoom AC Subsystems."
This TSTF is specific to the BWR NUREGs 1433 and 1434. DukeEnergy has determined this TSTF is readily adaptable to a NUREG-1 431 Standard TS for aWestinghouse plant. This topic was discussed with the NRC Staff on April 9, 2014. Theproposed amendment is not being submitted under the Consolidated Line Item Improvement Process (CLIIP) process.Attachment 1 provides Duke Energy's evaluation of the amendment, which contains adescription of the proposed
: changes, the technical evaluation, the regulatory
: analysis, thedetermination that this LAR contains No Significant Hazards Considerations, the basis for thecategorical exclusion from performing an Environmental Assessment/Impact Statement, andprecedent for the LAR.Attachment 2A provides the existing MNS TS pages marked-up to show the proposed changes.The reprinted TS pages will be provided to the NRC upon issuance of the approvedamendment.
www.duke-energy.com U.S. Nuclear Regulatory Commission-MNS-1 6-002Page 2Attachment 2B provides the existing CNS TS pages marked-up to show the proposed changes.The reprinted TS pages will be provided to the NRC upon issuance of the approvedamendment.
Attachment 3A provides a portion of the existing MNS TS Bases pages marked-up to show thecorresponding proposed Bases changes.
The TS Bases change will be processed after LARapproval under the MNS Bases Control Program (TS 5.5.14).Attachment 3B provides a portion of the existing CNS TS Bases pages marked-up to show thecorresponding proposed Bases changes.
The TS Bases change will be processed after LARapproval under the CNS Bases Control Program (TS 5.5.14).This proposed LAR has been reviewed and approved by the MNS and CNS Plant Operations Review Committees in accordance with the requirements of the Duke Energy Quality Assurance Program.In accordance with 10 CFR 50.91, Duke Energy is notifying the applicable state officials of thisapplication for license amendment by transmitting a copy of this letter and its attachments to thedesignated officials.
This submittal will not impact the MNS or CNS Updated Final Safety Analysis Reports(UFSARs).
Duke Energy requests approval of this submittal within one calendar year of the submittal dateand an implementation period of 60 days from the date of amendment issuance.
There are no regulatory commitments contained in this amendment.
Please direct any questions you may have in this matter to Lee A. Hentz at (980) 875-41 87.I declare under penalty of perjury that the foregoing is true and correct.
Executed on January 7,2016.Sincerely, Steven D. CappsAttachments U.S. Nuclear Regulatory Commission MNS-1 6-002Page 3xc (with attachments):
Catherine HaneyRegional Administrator U.S. Nuclear Regulatory Commission
-Region IIMarquis One Tower245 Peachtree Center Ave., NE Suite 1200Atlanta, GA 30303-1257 G.A. Hutto, IllSenior Resident Inspector (Catawba)
U.S. Nuclear Regulatory Commission Catawba Nuclear StationJ. ZeilerSenior Resident Inspector (McGuire)
U.S. Nuclear Regulatory Commission McGuire Nuclear StationG. E. Miller (addressee only)NRC Project Manager (Catawba and McGuire)U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8-G9A11555 Rockville PikeRockville, MD 20852-2738 S.E. JenkinsManagerRadioactive and Infectious Waste Management Division of Waste Management South Carolina Department of Health and Environmental Control2600 Bull St.Columbia, SC 29201W.L. Cox, IllSection ChiefDivision of Environmental HealthRadiation Protection SectionNorth Carolina Department of Environment and Natural Resources 1645 Mail Service CenterRaleigh, NC 27699 ATTACHMENT 1EVALUATION OF PROPOSED AMENDMENT 1.0 SUMMARY DESCRIPTION 2.0 DETAILED DESCRIPTION 3.0 TECHNICAL EVALUATION 3.1 TS System Descriptions 3.2 Adaptability of BWR TSTF-477 Rev.3 to a Westinghouse Plant3.3 Operational Burden3.4 System Reliability Improvements 3.5 Control Room Equipment Temperature Limit Validation 3.6 Application of Proposed Change4.0 REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria


===4.2 Precedents===
===4.2 Precedents===
Line 50: Line 40:
==6.0 REFERENCES==
==6.0 REFERENCES==


I ATTACHMENT 11.0 SUMMARY DESCRIPTION Pursuant to 10 CFR 50.90, Duke Energy is requesting amendments to the McGuire NuclearStation (MNS) and Catawba Nuclear Station (CNS) Facility Operating Licenses and subjectTechnical Specifications (TS). This proposed license amendment request (LAR) modifies MNSTS 3.7.10, "Control Room Area Chilled Water Systems,"
I ATTACHMENT 1 1.0  
and corresponding CNS TS 3.7.11 byadding a new Action for both trains of Control Room Area Chilled Water Systems (CRACWS)inoperable.
 
The new Action allows a finite time, 24 hours, to restore one train to Operablestatus and requires periodic verification that Control Room temperature is maintained at orbelow 900°F.2.0 DETAILED DESCRIPTION As discussed in a meeting with the NRC staff on April 9, 2014, the proposed LAR is modeledafter TSTF-477, Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems."
==SUMMARY==
TSTF-477 is applicable only to BWR (General Electric)
DESCRIPTION Pursuant to 10 CFR 50.90, Duke Energy is requesting amendments to the McGuire Nuclear Station (MNS) and Catawba Nuclear Station (CNS) Facility Operating Licenses and subject Technical Specifications (TS). This proposed license amendment request (LAR) modifies MNS TS 3.7.10, "Control Room Area Chilled Water Systems," and corresponding CNS TS 3.7.11 by adding a new Action for both trains of Control Room Area Chilled Water Systems (CRACWS)inoperable.
NUREGs 1433 and 1434, and adoption of thisTSTF is available to BWRs via the Consolidated Line Item Improvement Process (CLIIP).
The new Action allows a finite time, 24 hours, to restore one train to Operable status and requires periodic verification that Control Room temperature is maintained at or below 900°F.2.0 DETAILED DESCRIPTION As discussed in a meeting with the NRC staff on April 9, 2014, the proposed LAR is modeled after TSTF-477, Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems." TSTF-477 is applicable only to BWR (General Electric)
Sincethe CNS and MNS TS are based on the Westinghouse NUREG-1431 Standard TSs, this DukeEnergy LAR is not proposed to be processed via the CLIIP process.
NUREGs 1433 and 1434, and adoption of this TSTF is available to BWRs via the Consolidated Line Item Improvement Process (CLIIP). Since the CNS and MNS TS are based on the Westinghouse NUREG-1431 Standard TSs, this Duke Energy LAR is not proposed to be processed via the CLIIP process. TSTF-477 adds a Condition to restore one Control Room AC subsystem within 72 hours in the event two Control Room AC subsystems become inoperable.
TSTF-477 adds aCondition to restore one Control Room AC subsystem within 72 hours in the event two ControlRoom AC subsystems become inoperable.
Since the Duke Energy meeting with the NRC staff, the Technical Specification Task Force has submitted a Traveler, TSTF-553, for NRC review. TSTF-553 is similar to TSTF-477 but is applicable to Westinghouse (NUREG-1 431) and Babcock & Wilcox (NUREG-1 430) plants and provides a Completion Time of 24 hours for both plant types in the event two Control Room AC subsystems become inoperable.
Since the Duke Energy meeting with the NRC staff, the Technical Specification Task Force hassubmitted a Traveler, TSTF-553, for NRC review. TSTF-553 is similar to TSTF-477 but isapplicable to Westinghouse (NUREG-1 431) and Babcock & Wilcox (NUREG-1 430) plants andprovides a Completion Time of 24 hours for both plant types in the event two Control Room ACsubsystems become inoperable.
TSTF-553 also includes a note that precludes use of the 24 hour allowance when the second train is intentionally made inoperable.
TSTF-553 also includes a note that precludes use of the 24hour allowance when the second train is intentionally made inoperable.
Although TSTF-553 has not yet been reviewed or approved by the NRC, the LAR proposed by Duke Energy adopts the more conservative 24 hour Completion Time and the additional restriction regarding intentional entry into the Condition.
Although TSTF-553 hasnot yet been reviewed or approved by the NRC, the LAR proposed by Duke Energy adopts themore conservative 24 hour Completion Time and the additional restriction regarding intentional entry into the Condition.
The proposed LAR revises MNS TS 3.7.10 and CNS TS 3.7.11 as follows: a. Add a new Action B. New Action B applies when two CRACWS trains are inoperable.
The proposed LAR revises MNS TS 3.7.10 and CNS TS 3.7.11 as follows:a. Add a new Action B. New Action B applies when two CRACWS trains are inoperable.
Required Action B.1 requires verification once per 4 hours that Control Room temperature is less than or equal to 90°F. Required Action B.2 requires restoration of one CRACWS train to operable status within 24 hours.b. New Condition B is modified by a Note which states, "Not applicable when second CRACWS train intentionally made inoperable." If the second CRACWS train is intentionally made inoperable, there is no applicable Condition~and immediate entry into LCO 3.0.3 is required.c. Existing Action B, now renamed Action C, which applies when the Required Action and associated Completion Time of Condition A (one CRACWS train inoperable) is not met in MODES 1, 2, 3,or 4, is revised to also be applicable when the Required Actions and associated Completion Times of new Condition B~are not met. Renumbered Condition C requires being in Mode 3 in 6 hours and Mode 5 in 36 hours.2 ATTACHMENT 1 d. Existing Action C, now renamed Action D, remains unchanged.
Required Action B.1 requires verification once per 4 hours that Control Roomtemperature is less than or equal to 90°F. Required Action B.2 requires restoration ofone CRACWS train to operable status within 24 hours.b. New Condition B is modified by a Note which states, "Not applicable when secondCRACWS train intentionally made inoperable."
: e. For MNS, existing Action 0, now renamed Action E, which applies when two CRACWS trains are inoperable during movement of irradiated fuel assemblies or during core alterations, is revised to be applicable when the Required Actions and associated Completion Times of new Condition B are not met.f. For CNS, existing Action D, now renamed Action E, which applies when two CRACWS trains are inoperable during movement of recently irradiated fuel assemblies, is revised to be applicable when the Required Actions and associated Completion Times of new Condition B are not met.g. Existing Action E, which applied when two CRACWS trains are inoperable in MODE 1, 2, 3, or 4, and requires entry into LCO 3.0.3, is no longer needed and deleted (redundant to revised Condition C.).The marked-up TS pages showing the proposed changes above are provided in Attachments 2A and 2B.The corresponding TS Bases pages showing the proposed changes are provided in Attachments 3A and 3B. The TS Bases change will be processed after LAR approval under the MNS and CNS Bases Control Program (TS 5.5.14). They are provided in this LAR for information only.3.0 TECHNICAL EVALUATION 3.1 TS System Descriptions The CRACWS provides air temperature control for the Control Room, Control Room Area, and Switchgear Rooms. The Control Room Area (CRA) consists predominately of the Vital Battery and Equipment Rooms, Motor Control Center (MCC) rooms, and Cable Rooms. The Switchgear Rooms contain the essential switchgear.
If the second CRACWS train isintentionally made inoperable, there is no applicable Condition~and immediate entry intoLCO 3.0.3 is required.
The CRA and Switchgear Rooms are not part of the Control Room Envelope and not governed by the CRACWS Technical Specifications.
: c. Existing Action B, now renamed Action C, which applies when the Required Action andassociated Completion Time of Condition A (one CRACWS train inoperable) is not metin MODES 1, 2, 3,or 4, is revised to also be applicable when the Required Actions andassociated Completion Times of new Condition B~are not met. Renumbered Condition Crequires being in Mode 3 in 6 hours and Mode 5 in 36 hours.2 ATTACHMENT 1d. Existing Action C, now renamed Action D, remains unchanged.
The CRACWS consists of two independent and redundant trains. Each train consists of a chiller package, chilled water pump, air handling units with cooling coils, instrumentation, and controls.The CRACWS is an emergency system, which also operates during normal unit operations.
: e. For MNS, existing Action 0, now renamed Action E, which applies when two CRACWStrains are inoperable during movement of irradiated fuel assemblies or during corealterations, is revised to be applicable when the Required Actions and associated Completion Times of new Condition B are not met.f. For CNS, existing Action D, now renamed Action E, which applies when two CRACWStrains are inoperable during movement of recently irradiated fuel assemblies, is revisedto be applicable when the Required Actions and associated Completion Times of newCondition B are not met.g. Existing Action E, which applied when two CRACWS trains are inoperable in MODE 1,2, 3, or 4, and requires entry into LCO 3.0.3, is no longer needed and deleted (redundant to revised Condition C.).The marked-up TS pages showing the proposed changes above are provided in Attachments 2A and 2B.The corresponding TS Bases pages showing the proposed changes are provided inAttachments 3A and 3B. The TS Bases change will be processed after LAR approval under theMNS and CNS Bases Control Program (TS 5.5.14).
A single train will provide the required temperature control to maintain the Control Room at approximately 75°F for MNS and 74°F for CNS, respectively.
They are provided in this LAR forinformation only.3.0 TECHNICAL EVALUATION 3.1 TS System Descriptions The CRACWS provides air temperature control for the Control Room, Control Room Area, andSwitchgear Rooms. The Control Room Area (CRA) consists predominately of the Vital Batteryand Equipment Rooms, Motor Control Center (MCC) rooms, and Cable Rooms. TheSwitchgear Rooms contain the essential switchgear.
The design basis of the CRACWS is to maintain the Control Room temperature for 30 days of continuous occupancy.
The CRA and Switchgear Rooms are notpart of the Control Room Envelope and not governed by the CRACWS Technical Specifications.
The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the Control Room temperature between 75°F and 90°F for MNS and between 72°F and 85°F for CNS, respectively.
The CRACWS consists of two independent and redundant trains. Each train consists of achiller package, chilled water pump, air handling units with cooling coils, instrumentation, andcontrols.
A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to perform its design function.
The CRACWS is an emergency system, which also operates during normal unit operations.
Redundant detectors and controls are provided for Control Room temperature control. The CRACWS is designed in accordance with Seismic Category I 3 ATTACHMENT 1 requirements.
Asingle train will provide the required temperature control to maintain the Control Room atapproximately 75°F for MNS and 74°F for CNS, respectively.
The CRACWS is capable of removing sensible and latent heat loads from the Control Room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment operability.
The design basis of the CRACWSis to maintain the Control Room temperature for 30 days of continuous occupancy.
Two independent and redundant trains of the CRACWS are required to be operable to ensure that at least one is available, assuming a single failure disabling the other train. The CRACWS is shared between the two units. The system must be operable for each unit when that unit is in the Mode of Applicability.
The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the Control Room temperature between 75°F and 90°F forMNS and between 72°F and 85°F for CNS, respectively.
The MNS and CNS Control Room Area Ventilation Systems (CRAVS) are governed by separate Technical Specifications; MNS TS 3.7.9 and CNS TS 3.7.10. The CRAVS is an emergency redundant system that provides a protected habitable environment for the Control Room Envelope from which occupants can control the Units following an uncontrolled release of radioactivity, hazardous chemicals, or smoke. The CRAVS does not provide a protected habitable environment for the Control Room Area or Switchgear Rooms. The inoperability of CRACWS does not impact the operability of CRAVS.The MNS CRACWS and CRAVS are described in MNS UFSAR Section 6.4. The CNS CRACWS and CRAVS are described in CNS UFSAR Section 9.4.3.2 Adaptability of BWR TSTF-477 Rev.3 to a Westinghouse Plant TSTF-477 Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems," was NRC approved for adoption in 2007. This BWR (GE) specific TSTF allows for two trains of Control Room cooling to be inoperable for up to 72 hours as long as the Control Room area temperature can be maintained (and monitored) within a pre-determined limit, commonly 90°F.The 72 hour Completion Time was deemed reasonable considering that Control Room temperature is being maintained within limits and the low probability of an event occurring that would require Control Room area isolation.
A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to performits design function.
Alternate methods of maintaining control room temperature, such as non-safety grade air conditioning systems or fans, can also be used to maintain control room temperature.
Redundant detectors and controls are provided for Control Roomtemperature control.
As previously stated in Section 2.0, Duke Energy will adopt the more conservative Completion Time of 24 hours proposed by TSTF-553.TSTF-477 Rev. 3 is deterministically justified and relies on safety related cabinet equipment qualification (EQ) temperature limits and Control Room heat-up assumptions.
The CRACWS is designed in accordance with Seismic Category I3 ATTACHMENT 1requirements.
For the GE plants, a GE Topical Report supports the EQ justification.
The CRACWS is capable of removing sensible and latent heat loads from theControl Room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment operability.
Duke Energy has performed site specific confirmations that equipment qualification for Control Room safety related instrumentation and devices remains valid up to 90°F. Note MNS TS 3.7.10 and CNS TS 3.7.11 already contain a Surveillance Requirement (SR) that confirms the Control Room is 90°F or less every 12 hours.AS precedent; TSTF-477 Rev. 3 references other GE Technical Specifications that currently provide an Action with a finite time to restore one train to operable status when both trains are inoperable.
Two independent and redundant trains of the CRACWS are required to be operable to ensurethat at least one is available, assuming a single failure disabling the other train. The CRACWSis shared between the two units. The system must be operable for each unit when that unit is inthe Mode of Applicability.
The MNS and CNS Control Room Area Ventilation Systems (CRAVS) are governed by separateTechnical Specifications; MNS TS 3.7.9 and CNS TS 3.7.10. The CRAVS is an emergency redundant system that provides a protected habitable environment for the Control RoomEnvelope from which occupants can control the Units following an uncontrolled release ofradioactivity, hazardous chemicals, or smoke. The CRAVS does not provide a protected habitable environment for the Control Room Area or Switchgear Rooms. The inoperability ofCRACWS does not impact the operability of CRAVS.The MNS CRACWS and CRAVS are described in MNS UFSAR Section 6.4. The CNSCRACWS and CRAVS are described in CNS UFSAR Section 9.4.3.2 Adaptability of BWR TSTF-477 Rev.3 to a Westinghouse PlantTSTF-477 Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems,"
was NRCapproved for adoption in 2007. This BWR (GE) specific TSTF allows for two trains of ControlRoom cooling to be inoperable for up to 72 hours as long as the Control Room areatemperature can be maintained (and monitored) within a pre-determined limit, commonly 90°F.The 72 hour Completion Time was deemed reasonable considering that Control Roomtemperature is being maintained within limits and the low probability of an event occurring thatwould require Control Room area isolation.
Alternate methods of maintaining control roomtemperature, such as non-safety grade air conditioning systems or fans, can also be used tomaintain control room temperature.
As previously stated in Section 2.0, Duke Energy will adoptthe more conservative Completion Time of 24 hours proposed by TSTF-553.
TSTF-477 Rev. 3 is deterministically justified and relies on safety related cabinet equipment qualification (EQ) temperature limits and Control Room heat-up assumptions.
For the GEplants, a GE Topical Report supports the EQ justification.
Duke Energy has performed sitespecific confirmations that equipment qualification for Control Room safety relatedinstrumentation and devices remains valid up to 90°F. Note MNS TS 3.7.10 and CNS TS 3.7.11already contain a Surveillance Requirement (SR) that confirms the Control Room is 90°F or lessevery 12 hours.AS precedent; TSTF-477 Rev. 3 references other GE Technical Specifications that currently provide an Action with a finite time to restore one train to operable status when both trains areinoperable.
MNS and CNS have similar Technical Specifications:
MNS and CNS have similar Technical Specifications:
: 1. MNS and CNS TSs 3.3.3, "Post Accident Monitoring" (7 days).2. MNS TS 3.7.11 and CNS TS 3.7.12, "Auxiliary Building Filtered Ventilation ExhaustSystem" (24 hours).4 ATTACHMENT 1Duke Energy has also reviewed the Hope Creek and Edwin Hatch LARs, Request for Additional Information (RAIs), and the NRC Safety Evaluations (SE) that adopted TSTF-477 Rev. 3.Based on that review, Duke Energy did not identify an issue that could not be addressed at ourplants and did not identify any GE/BWR specific requirements or conditions.
: 1. MNS and CNS TSs 3.3.3, "Post Accident Monitoring" (7 days).2. MNS TS 3.7.11 and CNS TS 3.7.12, "Auxiliary Building Filtered Ventilation Exhaust System" (24 hours).4 ATTACHMENT 1 Duke Energy has also reviewed the Hope Creek and Edwin Hatch LARs, Request for Additional Information (RAIs), and the NRC Safety Evaluations (SE) that adopted TSTF-477 Rev. 3.Based on that review, Duke Energy did not identify an issue that could not be addressed at our plants and did not identify any GE/BWR specific requirements or conditions.
3.3 Operational BurdenBoth MNS and CNS have experienced the inoperability of both trains of Control Room cooling.These occurred in 2005 and 2010 at MNS and in 2011 at CNS. With Control Room coolingbeing a shared system, these three events led to the initiation of a two unit shutdown.
3.3 Operational Burden Both MNS and CNS have experienced the inoperability of both trains of Control Room cooling.These occurred in 2005 and 2010 at MNS and in 2011 at CNS. With Control Room cooling being a shared system, these three events led to the initiation of a two unit shutdown.For the MNS events, one Control Room cooling train was functional but not operable.
For the MNS events, one Control Room cooling train was functional but not operable.
Notice of Enforcement Discretion (NOEDs) were submitted and granted for MNS on both occasions to remain at power operation until one cooling train was restored to Operable status.For the CNS event, the "A" cooling train was in planned maintenance when the "B" cooling train tripped due to a chiller controls system micro-processor failure. Both units initiated a shutdown and proceeded to Mode 3 while a NOED was processed to not proceed to Mode 4. The "A" cooling train was restored shortly thereafter.
Notice ofEnforcement Discretion (NOEDs) were submitted and granted for MNS on both occasions toremain at power operation until one cooling train was restored to Operable status.For the CNS event, the "A" cooling train was in planned maintenance when the "B" cooling traintripped due to a chiller controls system micro-processor failure.
As part of the 2010 NRC approved NOED, MNS committed to submit an LAR to address operability requirements of the Control Room cooling Technical Specification.
Both units initiated a shutdownand proceeded to Mode 3 while a NOED was processed to not proceed to Mode 4. The "A"cooling train was restored shortly thereafter.
3.4 System Reliability Improvements The 2005 MNS event was caused by a degraded oil pressure switch, which prohibited the "A" cooling train chiller compressor from starting.
As part of the 2010 NRC approved NOED, MNS committed to submit an LAR to addressoperability requirements of the Control Room cooling Technical Specification.
At the time, the redundant cooling train was functional but administratively inoperable due to support system alignments for refueling outage Engineered Safety Features (ESF) testing. The degraded oil pressure switch was replaced, and then in 2007, the original chiller controls were replaced with digital controls, which improved the reliability of the oil pressure switch function.For the 2010 MNS event, the loss of the operating train of Control Room cooling was caused by high vibration of the hot gas bypass line (HGBP), which led to a breach of the coolant line. At the time, the redundant cooling train was in a planned maintenance evolution and temporarily unavailable.
3.4 System Reliability Improvements The 2005 MNS event was caused by a degraded oil pressure switch, which prohibited the "A"cooling train chiller compressor from starting.
Since 2010, both MNS Control Room cooling trains have been upgraded with new HGBP piping to reduce vibration interactions, vibration isolators have been installed, corroded and eroded service water piping has been replaced, small bore piping and tubing has been replaced, and piping analysis models were developed to identify potential thermal stresses.
At the time, the redundant cooling train wasfunctional but administratively inoperable due to support system alignments for refueling outageEngineered Safety Features (ESF) testing.
In addition, the condenser normal operating head pressure was reduced, which further reduced HGBP piping vibration.
The degraded oil pressure switch was replaced, andthen in 2007, the original chiller controls were replaced with digital controls, which improved thereliability of the oil pressure switch function.
After the 2011 CNS chiller micro-processor failure, significant efforts were made to determine the cause of the failure and to enable the chiller to be rapidly restarted.
For the 2010 MNS event, the loss of the operating train of Control Room cooling was caused byhigh vibration of the hot gas bypass line (HGBP), which led to a breach of the coolant line. Atthe time, the redundant cooling train was in a planned maintenance evolution and temporarily unavailable.
The failed micro-processor was sent to the original qualifier of the controls who, in concert with the original manufacturer of the controls, investigated the cause of the failure. The manufacturer has many years of in-service experience with this type of micro-processor and has experienced very few 5 ATTACHMENT 1 failures.
Since 2010, both MNS Control Room cooling trains have been upgraded with new HGBP pipingto reduce vibration interactions, vibration isolators have been installed, corroded and erodedservice water piping has been replaced, small bore piping and tubing has been replaced, andpiping analysis models were developed to identify potential thermal stresses.
The failed micro-processor was subject to multiple tests, but the problem did not re-occur.Both companies recommended that failures of this type be addressed by removing and reapplying power to the micro-processor, similar to how many computer related problems are addressed.
In addition, thecondenser normal operating head pressure was reduced, which further reduced HGBP pipingvibration.
This allows rapid re-start of the chiller. CNS has incorporated such actions into the current operating procedures.
After the 2011 CNS chiller micro-processor  
In addition, CNS maintenance procedures have been enhanced to provide direction on how to replace a micro-processor which can now be done very quickly.Since MNS utilizes the same chiller controls, similar operating and maintenance procedure enhancements were incorporated.
: failure, significant efforts were made to determine the cause of the failure and to enable the chiller to be rapidly restarted.
3.5 Control Room Equipment Temperature Limit Validation MNS TS 3.7.10 and CNS TS 3.7.11 currently contain an SR that confirms the Control Room is 90°F or less every 12 hours. As such, the current licensed design temperature of the Control Room equipment remains unchanged by the proposed TS changes.Duke Energy has also concluded that the 90°F limit in the new proposed TS Action B remains unchanged based on a review of design specifications for the respective Control Room safety related instruments and devices. Design specifications for protective equipment in the Control Room specify no loss of protective function over the temperature range of 40°F to 90°F and a humidity range of 15 to 95% relative humidity.Therefore, monitoring of bulk Control Room temperature every 4 hours to ensure that ambient temperature is less than or equal to 90°F would verify that the Control Room temperature is at or below the design limit.3.6 Application of Proposed Change The most likely application of proposed Condition B and the associated Required Actions is when both CRACWS trains are inoperable but one train is functional with the ability to cool the Control Room. In this case, the Control Room temperature would remain constant at a normal value, and the 90°F limit is not challenged.
The failed micro-processor was sent to the original qualifier of the controls who, in concert with the originalmanufacturer of the controls, investigated the cause of the failure.
One CRACWS would need to be restored to Operable status within 24 hours.In the event both CRACWS trains are inoperable and non-functional, MNS and CNS have developed
The manufacturer has manyyears of in-service experience with this type of micro-processor and has experienced very few5 ATTACHMENT 1failures.
'"Abnormal Procedures" (AP) to mitigate rising temperatures in the Control Room and take actions to shutdown the affected Units if temperature rises above 90°F, or there are indications of instrumentation malfunctions that have safety significance.
The failed micro-processor was subject to multiple tests, but the problem did not re-occur.Both companies recommended that failures of this type be addressed by removing andreapplying power to the micro-processor, similar to how many computer related problems areaddressed.
4.0. REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria General Design Criterion (GDC) 19, "Control Room" states in part: A Control Room shall be provided from which actions can be taken to operate the nuclear power unit safely under normal conditions and to maintain it in a safe condition 6 ATTACHMENT 1 under accident conditions, including loss-of-coolant accidents.
This allows rapid re-start of the chiller.
Adequate radiation protection shall be provided to permit access and occupancy of the control room under accident conditions without personnel receiving radiation exposures in excess of 5 rem whole body, or its equivalent to any part of the body, for the duration of the accident.The MNS and CNS Control Room Area Ventilation Systems (CRAVS) provide compliance with GDC 19. The CRAVS is an emergency redundant system that provides a protected habitable environment for the Control Room Envelope from which occupants can control the Units following an uncontrolled release of radioactivity, hazardous chemicals, or smoke. The proposed changes to the CRACWS TS do not impact the operability of CRAVS.In addition, the operability requirements of the CRACWS have not changed. The regulatory requirements do not specifically address Completion Times with inoperable systems. As a result, the regulatory requirements and criteria are not affected by the proposed change.4.2 Precedents Duke Energy has also reviewed the Hope Creek and Edwin Hatch LARs, PAls, and NRC SEs that recently adopted TSTF-477 Rev. 3. Based on that review, Duke Energy did not identify an issue that could not be addressed at our plants and did not identify any GE/BWR specific requirements or conditions.
CNS has incorporated such actions into thecurrent operating procedures.
*PSEG Hope Creek Generating Station, LAR dated February 28, 2011 (ADAMS Accession No. ML1 10590636);
In addition, CNS maintenance procedures have been enhancedto provide direction on how to replace a micro-processor which can now be done very quickly.Since MNS utilizes the same chiller controls, similar operating and maintenance procedure enhancements were incorporated.
as supplemented by letters dated August 29, 2011 (ML1 12420124), December 16, 2011 (ML1 13530205), and January 26, 2012 (ML12026A458);
3.5 Control Room Equipment Temperature Limit Validation MNS TS 3.7.10 and CNS TS 3.7.11 currently contain an SR that confirms the Control Room is90°F or less every 12 hours. As such, the current licensed design temperature of the ControlRoom equipment remains unchanged by the proposed TS changes.Duke Energy has also concluded that the 90°F limit in the new proposed TS Action B remainsunchanged based on a review of design specifications for the respective Control Room safetyrelated instruments and devices.
Design specifications for protective equipment in the ControlRoom specify no loss of protective function over the temperature range of 40°F to 90°F and ahumidity range of 15 to 95% relative humidity.
Therefore, monitoring of bulk Control Room temperature every 4 hours to ensure that ambienttemperature is less than or equal to 90°F would verify that the Control Room temperature is ator below the design limit.3.6 Application of Proposed ChangeThe most likely application of proposed Condition B and the associated Required Actions iswhen both CRACWS trains are inoperable but one train is functional with the ability to cool theControl Room. In this case, the Control Room temperature would remain constant at a normalvalue, and the 90°F limit is not challenged.
One CRACWS would need to be restored toOperable status within 24 hours.In the event both CRACWS trains are inoperable and non-functional, MNS and CNS havedeveloped
'"Abnormal Procedures" (AP) to mitigate rising temperatures in the Control Room andtake actions to shutdown the affected Units if temperature rises above 90°F, or there areindications of instrumentation malfunctions that have safety significance.
4.0. REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria General Design Criterion (GDC) 19, "Control Room" states in part:A Control Room shall be provided from which actions can be taken to operate thenuclear power unit safely under normal conditions and to maintain it in a safe condition 6
ATTACHMENT 1under accident conditions, including loss-of-coolant accidents.
Adequate radiation protection shall be provided to permit access and occupancy of the control room underaccident conditions without personnel receiving radiation exposures in excess of 5 remwhole body, or its equivalent to any part of the body, for the duration of the accident.
The MNS and CNS Control Room Area Ventilation Systems (CRAVS) provide compliance withGDC 19. The CRAVS is an emergency redundant system that provides a protected habitable environment for the Control Room Envelope from which occupants can control the Unitsfollowing an uncontrolled release of radioactivity, hazardous chemicals, or smoke. Theproposed changes to the CRACWS TS do not impact the operability of CRAVS.In addition, the operability requirements of the CRACWS have not changed.
The regulatory requirements do not specifically address Completion Times with inoperable systems.
As aresult, the regulatory requirements and criteria are not affected by the proposed change.4.2 Precedents Duke Energy has also reviewed the Hope Creek and Edwin Hatch LARs, PAls, and NRC SEsthat recently adopted TSTF-477 Rev. 3. Based on that review, Duke Energy did not identify anissue that could not be addressed at our plants and did not identify any GE/BWR specificrequirements or conditions.
*PSEG Hope Creek Generating  
: Station, LAR dated February 28, 2011 (ADAMSAccession No. ML1 10590636);
as supplemented by letters dated August 29, 2011(ML1 12420124),
December 16, 2011 (ML1 13530205),
and January 26, 2012(ML12026A458);
NRC SE dated February 8, 2012 (ML120180078).
NRC SE dated February 8, 2012 (ML120180078).
* SNC Edwin I. Hatch Nuclear Plant, LAR dated January 16, 2014, (ADAMS Accession No. ML14016A202);
* SNC Edwin I. Hatch Nuclear Plant, LAR dated January 16, 2014, (ADAMS Accession No. ML14016A202);
as supplemented by letter dated May 2, 2014 (ML14122A339);
as supplemented by letter dated May 2, 2014 (ML14122A339);
andNRC SE dated December 10, 2014 (ML14279A261).
and NRC SE dated December 10, 2014 (ML14279A261).
4.3 No Significant Hazards Consideration Pursuant to 10 CFR 50.90, Duke Energy Carolinas, LLC (Duke Energy) proposes a licenseamendment request (LAR) for the Renewed Facility Operating License (FOL) and Technical Specifications (TS) for McGuire (MNS) and Catawba (CNS) Nuclear Stations, Units I and 2.This proposed LAR modifies MNS TS 3.7.10, "Control Room Area Chilled Water Systems,"
4.3 No Significant Hazards Consideration Pursuant to 10 CFR 50.90, Duke Energy Carolinas, LLC (Duke Energy) proposes a license amendment request (LAR) for the Renewed Facility Operating License (FOL) and Technical Specifications (TS) for McGuire (MNS) and Catawba (CNS) Nuclear Stations, Units I and 2.This proposed LAR modifies MNS TS 3.7.10, "Control Room Area Chilled Water Systems," and corresponding CNS TS 3.7.11 by adding a new Action for both trains of Control Room Area Chilled Water Systems (CRACWS) inoperable.
andcorresponding CNS TS 3.7.11 by adding a new Action for both trains of Control Room AreaChilled Water Systems (CRACWS) inoperable.
The new Action allows a finite time, 24 hours, to restore one train to Operable status and requires periodic verification that Control Room temperature is maintained at-or below 90°F degrees.-
The new Action allows a finite time, 24 hours, torestore one train to Operable status and requires periodic verification that Control Roomtemperature is maintained at-or below 90°F degrees.-
The-proposed LAR is modeled after TSTF-477, Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems." Duke Energy has concluded that operation of the McGuire and Catawba Nuclear Stations in accordance with the proposed generic changes to the Technical Specifications does not involve a significant hazards consideration.
The-proposed LAR is modeled afterTSTF-477, Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems."
Duke Energy's conclusion is based on its evaluation, in accordance with 10 CFR 50.91 (a)(1), of the three standards set forth in 10 CFR 50.92(c) as discussed below: 7 ATTACHMENT 1 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Duke Energy has concluded that operation of the McGuire and Catawba Nuclear Stations inaccordance with the proposed generic changes to the Technical Specifications does not involvea significant hazards consideration.
Duke Energy's conclusion is based on its evaluation, inaccordance with 10 CFR 50.91 (a)(1), of the three standards set forth in 10 CFR 50.92(c) asdiscussed below:7 ATTACHMENT  
: 11. Does the proposed change involve a significant increase in the probability orconsequences of an accident previously evaluated?
Response:
Response:
No.The proposed change allows 24 hours to restore an inoperable CRACWS train when both trainsare inoperable provided Control Room temperature is verified to be within the design limitsevery 4 hours. The equipment qualification temperature of Control Room equipment is notaffected.
No.The proposed change allows 24 hours to restore an inoperable CRACWS train when both trains are inoperable provided Control Room temperature is verified to be within the design limits every 4 hours. The equipment qualification temperature of Control Room equipment is not affected.
The CRACWS is not an initiator of any accident previously evaluated.
The CRACWS is not an initiator of any accident previously evaluated.
As a result, theprobability of any accident previously evaluated is not increased.
As a result, the probability of any accident previously evaluated is not increased.
The consequences of an accident during the proposed 24 hour Completion Time are nodifferent than the consequences of an accident during the existing 1 hour Completion Timeprovided in LCO 3.0.3 to prepare for a shutdown.
The consequences of an accident during the proposed 24 hour Completion Time are no different than the consequences of an accident during the existing 1 hour Completion Time provided in LCO 3.0.3 to prepare for a shutdown.
The proposed TS changes do not increase orchange the current Control Room temperature limit. As a result, the consequences of anyaccident previously evaluated are not significantly increased.
The proposed TS changes do not increase or change the current Control Room temperature limit. As a result, the consequences of any accident previously evaluated are not significantly increased.
Therefore, the proposed change does not involve a significant increase in the probability orconsequences of an accident previously evaluated.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
: 2. Does the proposed change create the possibility of a new or different kind of accidentfrom any accident previously evaluated?
: 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response:
Response:
No.No new or different accidents result from utilizing the proposed change. The TS changes do notinvolve a physical alteration of the plant or a change in the methods governing normal plantoperation.
No.No new or different accidents result from utilizing the proposed change. The TS changes do not involve a physical alteration of the plant or a change in the methods governing normal plant operation.
In addition, the changes do not impose any new or different requirements.
In addition, the changes do not impose any new or different requirements.
Should thenew Actions not be met, the existing and proposed Actions require a plant shutdown.
Should the new Actions not be met, the existing and proposed Actions require a plant shutdown.
Thechanges do not alter assumptions made in the safety analysis.
The changes do not alter assumptions made in the safety analysis.
The proposed changes areconsistent with the safety analysis assumptions.
The proposed changes are consistent with the safety analysis assumptions.
Therefore, the proposed change does not create the possibility of a new or different kind ofaccident from any accident previously evaluated.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
: 3. Does the proposed change involve a significant reduction in a margin of safety?Response:
: 3. Does the proposed change involve a significant reduction in a margin of safety?Response:
No.The proposed change provides a limited period of time to restore an inoperable CRACWS traininstead of requiring an immediate plant shutdown.
No.The proposed change provides a limited period of time to restore an inoperable CRACWS train instead of requiring an immediate plant shutdown.
A plant shutdown is a transient, which maybe avoided by providing a limited time to make repairs.
A plant shutdown is a transient, which may be avoided by providing a limited time to make repairs. In addition, the Control Room temPerature must be maintained less than a limit set to_ ensure habitability of the Control Room and the operability of-the equipment cooled by the CRACWS. The potential to avoid a plant transient, in conjunction with maintaining the Control Room temperature and the low probability of an event occurring during this time period, offset any risk associated with the limited Completion Time.Therefore, the proposed change does not involve a significant reduction in a margin of safety.8 ATTACHMENT 1 Based on the above, Duke Energy concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CER 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
In addition, the Control RoomtemPerature must be maintained less than a limit set to_ ensure habitability of the Control Roomand the operability of-the equipment cooled by the CRACWS. The potential to avoid a planttransient, in conjunction with maintaining the Control Room temperature and the low probability of an event occurring during this time period, offset any risk associated with the limitedCompletion Time.Therefore, the proposed change does not involve a significant reduction in a margin of safety.8 ATTACHMENT 1Based on the above, Duke Energy concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CER 50.92(c),
and, accordingly, afinding of "no significant hazards consideration" is justified.


===4.4 Conclusion===
===4.4 Conclusion===
In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposedmanner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the approval of the proposed change will not be inimical to the common defense andsecurity or to the health and safety of the public.5.0 ENVIRONMENTAL CONSIDERATIONS A review has determined that the proposed change would change a requirement with respect toinstallation or use of a facility component located within the restricted area, as defined in 10CER 20, or would change an inspection or surveillance requirement.  
In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the approval of the proposed change will not be inimical to the common defense and security or to the health and safety of the public.5.0 ENVIRONMENTAL CONSIDERATIONS A review has determined that the proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CER 20, or would change an inspection or surveillance requirement.
: However, the proposedchange does not involve (i) a significant hazards consideration, (ii) a significant change in thetypes or significant increase in the amounts of any effluents that may be released  
However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii)a significant increase in individual or cumulative occupational radiation exposure.
: offsite, or (iii)a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51 .22(c)(g).
Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR51 .22(c)(g).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.9 ATTACHMENT 1
Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.9 ATTACHMENT  


==16.0 REFERENCES==
==6.0 REFERENCES==
: 1) TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems, datedMarch 26, 2007.2) NRC Letter, Summary of April 9, 2014, Public Teleconference Regarding Potential Submission of a License Amendment Request to Implement TSTF-477 for Control Room AirConditioning subsystems, dated April 21, 2014, ADAMS Accession No.ML14101A243.
: 1) TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems, dated March 26, 2007.2) NRC Letter, Summary of April 9, 2014, Public Teleconference Regarding Potential Submission of a License Amendment Request to Implement TSTF-477 for Control Room Air Conditioning subsystems, dated April 21, 2014, ADAMS Accession No.ML14101A243.
: 3) TSTF-553, Revision 0, Add Action for Two Inoperable CREA TCS Trains, transmitted forNRC review on October 31, 2015.4) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station, Units 1and 2, Docket Number 50-369 and 50-370 Notice of Enforcement Discretion RequestTechnical Specification (TS) 3. 7.10, Control Room Area Chilled water System, datedJanuary 14, 2010.5) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station, Unit 250-370 Notice of Enforcement Discretion Request Technical Specification  
: 3) TSTF-553, Revision 0, Add Action for Two Inoperable CREA TCS Trains, transmitted for NRC review on October 31, 2015.4) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station, Units 1 and 2, Docket Number 50-369 and 50-370 Notice of Enforcement Discretion Request Technical Specification (TS) 3. 7.10, Control Room Area Chilled water System, dated January 14, 2010.5) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station, Unit 2 50-370 Notice of Enforcement Discretion Request Technical Specification  
: 3. 7.10, ControlRoom Area Chilled water System (CRACWS),
: 3. 7.10, Control Room Area Chilled water System (CRACWS), dated October 12, 2005.6) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke Energy) Catawba Nuclear Station, Units I and 2, Docket Number 50-4 13 and 50-4 14 Notice of Enforcement Discretion (NOED)Request Technical Specification (TS) 3. 7.11, "Control Room Area Chilled water System (CRACWS)" TS Limiting condition for Operation (LCO) 3.0.3 dated December 19, 2011.7) PSEG Letter, Hope Creek Generating Station, Facility Operating License No. NPF-57 NRC Docket No. 50-354 Application for Technical Specification Change TSF-4 77, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process, dated February 28, 2011.8) Southern Nuclear Letter, Edwin I. Hatch Nuclear Plant Application for Technical Specification Change to Revise Action Statements for Inoperable Control Room Air conditioning Subsystems, dated January 16, 2014.10 ATTACHMENT 2A MNS MARKED UP TECH SPEC PAGES CRACWS 3.7.10 3.7 PLANT SYSTEMS 3.7.10 Control Room Area Chilled Water System (CRACWS)LCO 3.7.10 APPLICABILITY:
dated October 12, 2005.6) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke Energy) Catawba Nuclear Station,Units I and 2, Docket Number 50-4 13 and 50-4 14 Notice of Enforcement Discretion (NOED)Request Technical Specification (TS) 3. 7.11, "Control Room Area Chilled water System(CRACWS)"
Two CRACWS trains shall be OPERABLE.MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
TS Limiting condition for Operation (LCO) 3.0.3 dated December 19, 2011.7) PSEG Letter, Hope Creek Generating  
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRACWS train A.1 Restore CRACWS train to 30 days inoperable.
: Station, Facility Operating License No. NPF-57 NRCDocket No. 50-354 Application for Technical Specification Change TSF-4 77, Revision 3,Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement  
OPERABLE status.C AB_,. Required Action and ,B.1 Be in MODE 3. 6 hours associated Completion Time of Condition A not AND met in MODE1, 2, C or.ior 1.2 Be in MODE 5. 36 hours DRequired Action and ¢.1 Place OPERABLE Immediately associated Completion CRACWS train in Time of Condition A not operation.
: Process, dated February 28,2011.8) Southern Nuclear Letter, Edwin I. Hatch Nuclear Plant Application for Technical Specification Change to Revise Action Statements for Inoperable Control Room Airconditioning Subsystems, dated January 16, 2014.10 ATTACHMENT 2AMNS MARKED UP TECH SPEC PAGES CRACWS3.7.103.7 PLANT SYSTEMS3.7.10 Control Room Area Chilled Water System (CRACWS)LCO 3.7.10APPLICABILITY:
met in MODE 5 or 6, or during movement of OR irradiated fuel D assemblies, or during p.2.1 Suspend CORE Immediately CORE ALTERATIONS.
Two CRACWS trains shall be OPERABLE.
MODES 1, 2, 3, 4, 5, and 6,During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
ACTIONSCONDITION REQUIRED ACTION COMPLETION TIMEA. One CRACWS train A.1 Restore CRACWS train to 30 daysinoperable.
OPERABLE status.CAB_,. Required Action and ,B.1 Be in MODE 3. 6 hoursassociated Completion Time of Condition A not ANDmet in MODE1, 2, Cor.ior 1.2 Be in MODE 5. 36 hoursDRequired Action and ¢.1 Place OPERABLE Immediately associated Completion CRACWS train inTime of Condition A not operation.
met in MODE 5 or 6, orduring movement of ORirradiated fuel Dassemblies, or during p.2.1 Suspend CORE Immediately CORE ALTERATIONS.
ALTERATIONS.
ALTERATIONS.
ANDDZ;.2.2 Suspend movement of Immediately irradiated fuel assemblies.
AND D Z;.2.2 Suspend movement of Immediately irradiated fuel assemblies.
INSERT 1 New Condition B(continued)
INSERT 1 New Condition B (continued)
McGuire Units 1 and 23.7.10-1Mc~ure nitsI ad 2 .7.0-1Amendment No. 1-84/1t6e CRACWS3.7.10ACTIONS (continued)
McGuire Units 1 and 2 3.7.10-1 Mc~ure nitsI ad 2 .7.0-1Amendment No. 1-84/1t6e CRACWS 3.7.10 ACTIONS (continued)
CONDITION  
CONDITION  
[REQUIRED ACTION COMPLETION TIMEin MODE 5or 6, or duringmovement of irradiated fuel assemblies, orduring COREALTERATIONS.
[REQUIRED ACTION COMPLETION TIME in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
Efr.1ANDE012Suspend COREALTERATIONS.
E fr.1 AND E 012 Suspend CORE ALTERATIONS.
Suspend movement ofirradiated fuel assemblies.
Suspend movement of irradiated fuel assemblies.
Immediately Immediately E. C"RA.\AI trains E.1 E nter !C 3.0.3 ~ vt41efihtey SURVEILLANCE REQUIREMENTS
Immediately Immediately E. C"RA.\AI trains E.1 E nter !C 3.0.3 ~ vt41efihtey SURVEILLANCE REQUIREMENTS
_______SURVEILLANCE FREQUENCY SR 3.7.10.1 Verify the control room temperature is < 900F. In accordance withthe Surveillance Frequency ControlProgramINSERTRequired Action and associated Completion Timeof Condition B not metIIMcGuire Units 1 and 23.7.10-2Mc~ure nits1 ad 2 .7.0-2Amendment No.
_______SURVEILLANCE FREQUENCY SR 3.7.10.1 Verify the control room temperature is < 90 0 F. In accordance with the Surveillance Frequency Control Program INSERT Required Action and associated Completion Time of Condition B not met II McGuire Units 1 and 2 3.7.10-2 Mc~ure nits1 ad 2 .7.0-2Amendment No.
INSERT 1 TS 3.7.10 New Condition BCONDITION f REQUIRED ACTION jCOMPLETION TIMENot applicable whensecond CRACWSintentionally madeinoperable.
INSERT 1 TS 3.7.10 New Condition B CONDI T ION f REQUIRED ACTION jCOMPLETION TIME Not applicable when second CRACWS intentionally made inoperable.
Two CRACWS trainsinoperable.
Two CRACWS trains inoperable.
B. 1 Verify Control roomtemperature
B. 1 Verify Control room temperature
_< 90&deg;F.ANDB.2 Restore one CRACWStrain to OPERABLEstatus.Once per 4 hours24 hoursU U ATTACHMENT 2BCNS MARKED UP TECH SPEC PAGES CRACWS3.7.113.7 PLANT SYSTEMS3.7.11 Control Room Area Chilled Water System (CRACWS)LCO 3.7.11APPLICABILITY:
_< 90&deg;F.AND B.2 Restore one CRACWS train to OPERABLE status.Once per 4 hours 24 hours U U ATTACHMENT 2B CNS MARKED UP TECH SPEC PAGES CRACWS 3.7.11 3.7 PLANT SYSTEMS 3.7.11 Control Room Area Chilled Water System (CRACWS)LCO 3.7.11 APPLICABILITY:
Two CRACWS trains shall be OPERABLE.
Two CRACWS trains shall be OPERABLE.MODES 1, 2, 3, 4, 5, and 6, During movement of recently irradiated fuel assemblies.
MODES 1, 2, 3, 4, 5, and 6,During movement of recently irradiated fuel assemblies.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRACWS train A.1 Restore CRACWS train to 30 days inoperable.
ACTIONSCONDITION REQUIRED ACTION COMPLETION TIMEA. One CRACWS train A.1 Restore CRACWS train to 30 daysinoperable.
OPERABLE status.C.-BC. Required Action and B.1 Be in MODE 3. 6 hours associated Completion Time of Condition A bnot AND met in MODE 1, 2, 3,\ C 36 hours or 4. )--- .2 Be in MODE 5.-e;D. Required Action and Place OPERABLE Immediately associated Completion CRACWS train in operation.
OPERABLE status.C.-BC. Required Action and B.1 Be in MODE 3. 6 hoursassociated Completion Time of Condition A bnot ANDmet in MODE 1, 2, 3,\ C 36 hoursor 4. )--- .2 Be in MODE 5.-e;D. Required Action and Place OPERABLE Immediately associated Completion CRACWS train in operation.
Time of Condition A not met in MODE 5or 6,or OR during movement of recently irradiated fuel Suspend movement of assemblies, recently irradiated fuel Immediately assemblies.(continued)
Time of Condition A notmet in MODE 5or 6,or ORduring movement ofrecently irradiated fuel Suspend movement ofassemblies, recently irradiated fuel Immediately assemblies.
INSERT 1 New Condition B Catawba Units 1 and 2 3.7.11-1 Cataba nits1 ad 2 .7.1-1Amendment Nos. 1-98/1-9 CRACWS 3.7.11 CONDITION REQUIRED ACTION COMPLETION TIME-DE. Two CRA.CWS train-s T... in TnMODE 5 or 6, or during movement of recently irradiated fuel assemblies.
(continued)
DE.1 Suspend movement of recently irradiated fuel assemblies.
INSERT 1 New Condition BCatawba Units 1 and 23.7.11-1Cataba nits1 ad 2 .7.1-1Amendment Nos. 1-98/1-9 CRACWS3.7.11CONDITION REQUIRED ACTION COMPLETION TIME-DE. Two CRA.CWS train-sT... in TnMODE 5or 6, or duringmovement of recentlyirradiated fuelassemblies.
ImmediatelySURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.11.1 Verify the control room temperature is < 90&deg;F. In accordance with the Surveillance Frequency Control Program NSERT1/4t NSERT Required Action and associated Completion Time of Condition B met notl II Catawba Units 1 and 2 3.7.11-2 Cataba nits1 ad 2 .7.1-2Amendment Nos. 263, 2-59 INSERT 1 TS 3.7.11 New Condition B CONDITION REQUIRED ACTION [COMPLETION TIME B. --- NOTE Not applicable when second CRACWS intentionally made inoperable.
DE.1 Suspend movement ofrecently irradiated fuelassemblies.
Two CRACWS trains inoperable.
Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.11.1 Verify the control room temperature is < 90&deg;F. In accordance withthe Surveillance Frequency ControlProgramNSERT1/4tNSERTRequired Action and associated Completion Time of Condition Bmetnotl IICatawba Units 1 and 23.7.11-2Cataba nits1 ad 2 .7.1-2Amendment Nos. 263, 2-59 INSERT 1 TS 3.7.11 New Condition BCONDITION REQUIRED ACTION [COMPLETION TIMEB. --- NOTENot applicable whensecond CRACWSintentionally madeinoperable.
B. 1 Verify Control room temperature
Two CRACWS trainsinoperable.
< 90&deg;F.AND B.2 Restore one CRACWS train to OPERABLE status.Once per 4 hours 24 hours a a ATTACHMENT 3A MNS MARKED UP TECH SPEC BASES PAGES B 3.7 PLANT SYSTEMS B 3.7.10 Control Room Area Chilled Water System (CRACWS)BASES BACKGROUND The CRACWS provides temperature control for the control room following isolation of the control room.The CRACWS consists of two independent and redundant trains that provide cooling of recirculated control room air. Each train consists of cooling coils, instrumentation, and controls to provide for control room temperature control. The CRACWS is a subsystem providing air temperature control for the control room.The CRACWS is an emergency system, parts of which may also operate during normal unit operations.
B. 1 Verify Control roomtemperature
A single train will provide the required temperature control to maintain the control room at approximately 75&deg;F.The CRACWS operation in maintaining the control room temperature is discussed in the UFSAR, Section 6.4 (Ref. 1).There are components that are part of the CRACWS but do not affect the CRAVS. These components are associated with the Control Room Area Air Handling units, the Switchgear Air Handling units. LCO 3.7.10 does not apply if a CRAVS component does not directly impact the CRACWS.APPLICABLE The design basis of the CRACWS is to maintain the control room SAFETY ANALYSES temperature for 30 days of continuous occupancy.
< 90&deg;F.ANDB.2 Restore one CRACWStrain to OPERABLEstatus.Once per 4 hours24 hoursa a ATTACHMENT 3AMNS MARKED UP TECH SPEC BASES PAGES B 3.7 PLANT SYSTEMSB 3.7.10 Control Room Area Chilled Water System (CRACWS)BASESBACKGROUND The CRACWS provides temperature control for the control room following isolation of the control room.The CRACWS consists of two independent and redundant trains thatprovide cooling of recirculated control room air. Each train consists ofcooling coils, instrumentation, and controls to provide for control roomtemperature control.
The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the temperature between 75&deg;F and 90&deg;F. A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to perform its design function.
The CRACWS is a subsystem providing airtemperature control for the control room.The CRACWS is an emergency system, parts of which may also operateduring normal unit operations.
Redundant detectors and controls are provided for control room temperature control.The CRACWS is designed in accordance with Seismic Category I requirements.
A single train will provide the requiredtemperature control to maintain the control room at approximately 75&deg;F.The CRACWS operation in maintaining the control room temperature isdiscussed in the UFSAR, Section 6.4 (Ref. 1).There are components that are part of the CRACWS but do not affect theCRAVS. These components are associated with the Control Room AreaAir Handling units, the Switchgear Air Handling units. LCO 3.7.10 doesnot apply if a CRAVS component does not directly impact the CRACWS.APPLICABLE The design basis of the CRACWS is to maintain the control roomSAFETY ANALYSES temperature for 30 days of continuous occupancy.
The CRACWS is capable of removing sensible and latent heat loads from the control room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment OPERABILITY.
The CRACWS components are arranged in redundant, safety relatedtrains. During emergency operation, the CRACWS maintains thetemperature between 75&deg;F and 90&deg;F. A single active failure of acomponent of the CRACWS, with a loss of offsite power, does not impairthe ability of the system to perform its design function.
The CRACWS satisfies Criterion 3 of 10 CFR 50.36 (Ref. 2).McGuire Units 1 and 2 B371- eiinN.1-B 3.7.10-1 Revision No. "I"1-5 CRACWS B 3.7.10 BASES LCO Two independent and redundant trains of the CRACWS are required to be OPERABLE to ensure that at least one is available, assuming a single failure disabling the other train. Total system failure could result in the equipment operating temperature exceeding limits in the event of an accident.The CRACWS is considered to be OPERABLE when the individual components necessary to maintain the control room temperature are OPERABLE in both trains. These components include the cooling coils and associated temperature control instrumentation.
Redundant detectors and controls are provided for control room temperature control.The CRACWS is designed in accordance with Seismic Category Irequirements.
In addition, the CRACWS must be operable to the extent that air circulation can be maintained.
The CRACWS is capable of removing sensible and latentheat loads from the control room, which include consideration ofequipment heat loads and personnel occupancy requirements, to ensureequipment OPERABILITY.
The CRACWS is shared between the two units. The system must be OPERABLE for each unit when that unit is in the MODE of Applicability.
The CRACWS satisfies Criterion 3 of 10 CFR 50.36 (Ref. 2).McGuire Units 1 and 2 B371- eiinN.1-B 3.7.10-1Revision No. "I"1-5 CRACWSB 3.7.10BASESLCO Two independent and redundant trains of the CRACWS arerequired to be OPERABLE to ensure that at least one is available, assuming a single failure disabling the other train. Total systemfailure could result in the equipment operating temperature exceeding limits in the event of an accident.
Additionally, both normal and emergency power must also be OPERABLE because the system is shared. If a CRACWS component becomes inoperable, or normal or emergency power to a CRACWS component becomes inoperable, then the Required Actions of this LCO must be entered independently for each unit that is in the MODE of applicability of the LCO.APPLICABILITY In MODES 1, 2, 3, 4, 5, and 6, and during movement of irradiated fuel assemblies and during CORE ALTERATIONS, the CRACWS must be OPERABLE to ensure that the control room temperature will not exceed equipment operational requirements following isolation of the control room.ACTIONS A.1 With one CRACWS train inoperable, action must be taken to restore OPERABLE status within 30 days. In this Condition, the remaining OPERABLE CRACWS train is adequate to maintain the control room temperature within limits. However, the overall reliability is reduced because a single failure in the OPERABLE CRACWS train could result in loss of CRACWS function.
The CRACWS is considered to be OPERABLE when theindividual components necessary to maintain the control roomtemperature are OPERABLE in both trains. These components include the cooling coils and associated temperature controlinstrumentation.
The 30 day Completion Time is based on the low probability of an event requiring control room isolation, the consideration that the remaining train can provide the required protection, and that alternate safety or nonsafety related cooling means are available.(ew paragraph) anB2 I m m McGuire Units 1 and 2 B371- eiinN.1-B 3.7.10-2 Revision No. "I-I-5 INSERT 2 Bases B.1 and B.2 (new paragraph)
In addition, the CRACWS must be operable tothe extent that air circulation can be maintained.
B.1 and B.2 If both CRACWS trains are inoperable, the CRACWS may not be capable of performing its intended function.
The CRACWS is shared between the two units. The system mustbe OPERABLE for each unit when that unit is in the MODE ofApplicability.
Therefore, the control room temperature is required to be monitored to ensure that temperature is being maintained low enough that equipment in the control room is not adversely affected and remains habitable.
Additionally, both normal and emergency powermust also be OPERABLE because the system is shared. If aCRACWS component becomes inoperable, or normal oremergency power to a CRACWS component becomes inoperable, then the Required Actions of this LCO must be enteredindependently for each unit that is in the MODE of applicability ofthe LCO.APPLICABILITY In MODES 1, 2, 3, 4, 5, and 6, and during movement of irradiated fuel assemblies and during CORE ALTERATIONS, the CRACWSmust be OPERABLE to ensure that the control room temperature will not exceed equipment operational requirements following isolation of the control room.ACTIONS A.1With one CRACWS train inoperable, action must be taken torestore OPERABLE status within 30 days. In this Condition, theremaining OPERABLE CRACWS train is adequate to maintain thecontrol room temperature within limits. However, the overallreliability is reduced because a single failure in the OPERABLECRACWS train could result in loss of CRACWS function.
Mitigating actions, such as opening cabinet doors, use of fans, or opening control room doors or ventilation paths, may be used to maintain control room temperature.
The30 day Completion Time is based on the low probability of anevent requiring control room isolation, the consideration that theremaining train can provide the required protection, and thatalternate safety or nonsafety related cooling means are available.
With the control room temperature being maintained within the temperature limit, 24 hours is allowed to restore a CRACWS train to OPERABLE status. This Completion Time is reasonable considering that the control room temperature is being maintained within limits and the low probability of an event occurring requiring control room isolation.
(ew paragraph) anB2Im mMcGuire Units 1 and 2 B371- eiinN.1-B 3.7.10-2Revision No. "I-I-5 INSERT 2 Bases B.1 and B.2 (new paragraph)
The condition is modified by a Note stating it is not applicable when the second CRACWS train is intentionally made inoperable.
B.1 and B.2If both CRACWS trains are inoperable, the CRACWS may not be capable of performing itsintended function.
This Required Action is not intended for voluntary removal of redundant systems or components from service. The Required Action is only applicable if one CRACWS train is inoperable for any reason and a second CRACWS train is found to be inoperable, or if two CRACWS trains are found to be inoperable at the same time.
Therefore, the control room temperature is required to be monitored toensure that temperature is being maintained low enough that equipment in the control room isnot adversely affected and remains habitable.
CRACWS B 3.7.10 BASES ACTIONS (continued) assocated t ra~n In MODE 1, 2, 3, or 4, if the inoperable-R:ACWS trafti cannot be restored to OPERABLE status within the Time, the unit must be placed in a MODE that minimizes the risk.To achieve this status, the unit must be placed in at least MODE 3 within 6 hours, and in MODE 5 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.D D 0[A. 1,X32.1. and [.2.2 In MODE 5 or 6, or during movement of irradiated fuel, or during CORE ALTERATIONS, if the inoperable CRACWS train cannot be restored to OPERABLE status within the required Completion Time, the OPERABLE CRACWS train must be placed in operation immediately.
Mitigating  
This action ensures that the remaining train is OPERABLE, that no failures preventing automatic actuation will occur, and that active failures will be readily detected.An alternative to Required Action is to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control room. This places the unit in a condition that the movement of fuel if Required Actions B.1 or B.2 cannotE be met within the required Completion 1 and.2 /Times In MODE 5 or 6, or during movement f. irradiated fuel assemblies, or during CORE ALTERATIONS, hiprbe, action must be taken immediately to suspend activities I that could result in a release of radioactivity that might require isolation of the control room. This places the unit in a condition that minimizes risk. This does not preclude the movement of fuel to a safe position.If b.,cth ;r,,, ,noop,.rabohl in MODEN: "1. 2. 3. or I the" cotinrrl roomir a y n,,o.. t .,bo. c,, ap...blc ofI pz-^ r- In^g^.......  
: actions, such as opening cabinetdoors, use of fans, or opening control room doors or ventilation paths, may be used to maintaincontrol room temperature.
.. .... .. .t".. ,i.,,,,, itS IrIIIdtjlltd lUIiL~, i. I. I 3I.0.3.. III..u l.iat ,b 1 lc.,tcz, McGuire Units 1 and 2B37103RvsoN.1-5 B 3.7.10-3 Revision No. ffff5 CRACWS B 3.7.10 BASES SURVEILLANCE SR 3.7.10.1 REQUIREMENTS This SR verifies that the heat removal capability of the system is sufficient to maintain the temperature in the control room at or below 90&deg;F. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.REFERENCES
With the control room temperature being maintained within thetemperature limit, 24 hours is allowed to restore a CRACWS train to OPERABLE status. ThisCompletion Time is reasonable considering that the control room temperature is beingmaintained within limits and the low probability of an event occurring requiring control roomisolation.
The condition is modified by a Note stating it is not applicable when the second CRACWS trainis intentionally made inoperable.
This Required Action is not intended for voluntary removal ofredundant systems or components from service.
The Required Action is only applicable if oneCRACWS train is inoperable for any reason and a second CRACWS train is found to beinoperable, or if two CRACWS trains are found to be inoperable at the same time.
CRACWSB 3.7.10BASESACTIONS (continued) assocated t ra~nIn MODE 1, 2, 3, or 4, if the inoperable-R:ACWS trafti cannot berestored to OPERABLE status within the Time, the unit must be placed in a MODE that minimizes the risk.To achieve this status, the unit must be placed in at least MODE 3within 6 hours, and in MODE 5 within 36 hours. The allowedCompletion Times are reasonable, based on operating experience, to reach the required unit conditions from full powerconditions in an orderly manner and without challenging unitsystems.D D 0[A. 1,X32.1.
and [.2.2In MODE 5 or 6, or during movement of irradiated fuel, or duringCORE ALTERATIONS, if the inoperable CRACWS train cannot berestored to OPERABLE status within the required Completion Time, the OPERABLE CRACWS train must be placed in operation immediately.
This action ensures that the remaining train isOPERABLE, that no failures preventing automatic actuation willoccur, and that active failures will be readily detected.
An alternative to Required Action is to immediately suspendactivities that present a potential for releasing radioactivity thatmight require isolation of the control room. This places the unit ina condition that the movement of fuel if Required Actions B.1 or B.2 cannotE be met within the required Completion 1 and.2 /TimesIn MODE 5 or 6, or during movement  
: f. irradiated fuel assemblies, or during CORE ALTERATIONS, hiprbe, action must be taken immediately to suspend activities Ithat could result in a release of radioactivity that might requireisolation of the control room. This places the unit in a condition that minimizes risk. This does not preclude the movement of fuelto a safe position.
If b.,cth ;r,,, ,noop,.rabohl in MODEN: "1. 2. 3. or I the"cotinrrl roomir a y n,,o.. t .,bo. c,, ap...blc ofI pz-^ r- In^g^.......  
.. .... .. .t".. ,i.,,,,,
itSIrIIIdtjlltd lUIiL~, i. I. I 3I.0.3..
III..u l.iat ,b 1 lc.,tcz,McGuire Units 1 and 2B37103RvsoN.1-5 B 3.7.10-3Revision No. ffff5 CRACWSB 3.7.10BASESSURVEILLANCE SR 3.7.10.1REQUIREMENTS This SR verifies that the heat removal capability of the system issufficient to maintain the temperature in the control room at orbelow 90&deg;F. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.REFERENCES
: 1. UFSAR, Section 6.4.2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
: 1. UFSAR, Section 6.4.2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
McGuire Units 1 and 2B37104RvsoN.1--
McGuire Units 1 and 2B37104RvsoN.1--
B 3.7.10-4Revision No. 4-'1-5 ATTACHMENT 3BONS MARKED UP TECH SPEC BASES PAGES CRACWSB 3.7.11B 3.7 PLANT SYSTEMSB 3.7.11 Control Room Area Chilled Water System (CRACWS)BASESBACKGROUND The CRACWS provides temperature control for the control room and thecontrol room area.The CRACWS consists of two independent and redundant trains thatprovide cooling to the control room and control room area. Each trainconsists of a chiller package, chilled water pump, and air handling unitswith cooling coils. Chilled water is passed through the cooling coils of theair handling unit to cool the air. Electric duct heaters are then used tocontrol the supply air temperature.
B 3.7.10-4 Revision No. 4-'1-5 ATTACHMENT 3B ONS MARKED UP TECH SPEC BASES PAGES CRACWS B 3.7.11 B 3.7 PLANT SYSTEMS B 3.7.11 Control Room Area Chilled Water System (CRACWS)BASES BACKGROUND The CRACWS provides temperature control for the control room and the control room area.The CRACWS consists of two independent and redundant trains that provide cooling to the control room and control room area. Each train consists of a chiller package, chilled water pump, and air handling units with cooling coils. Chilled water is passed through the cooling coils of the air handling unit to cool the air. Electric duct heaters are then used to control the supply air temperature.
The CRACWS provides both normal and emergency cooling to thecontrol room and control room area. A single train will provide therequired temperature control to maintain the control room approximately 74&deg;F. The CRACWS operation in maintaining the control roomtemperature is discussed in the UFSAR, Section 9.4 (Ref. 1).APPLICABLE The design basis of the CRACWS is to maintain the control roomSAFETY ANALYSES temperature for 30 days of continuous occupancy.
The CRACWS provides both normal and emergency cooling to the control room and control room area. A single train will provide the required temperature control to maintain the control room approximately 74&deg;F. The CRACWS operation in maintaining the control room temperature is discussed in the UFSAR, Section 9.4 (Ref. 1).APPLICABLE The design basis of the CRACWS is to maintain the control room SAFETY ANALYSES temperature for 30 days of continuous occupancy.
The CRACWS components are arranged in redundant, safety relatedtrains. During emergency operation, the CRACWS maintains thetemperature between 72&deg;F and 85&deg;F. A single active failure of acomponent of the CRACWS, with a loss of offsite power, does not impairthe ability of the system to perform its design function.
The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the temperature between 72&deg;F and 85&deg;F. A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to perform its design function.
Redundant detectors and controls are provided for control room temperature control.The CRACWS is designed in accordance with Seismic Category Irequirements.
Redundant detectors and controls are provided for control room temperature control.The CRACWS is designed in accordance with Seismic Category I requirements.
The CRACWS is capable of removing sensible and latentheat loads from the control room, which include consideration ofequipment heat loads and personnel occupancy requirements, to ensureequipment OPERABILITY.
The CRACWS is capable of removing sensible and latent heat loads from the control room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment OPERABILITY.
Th'e CRACWS satisfies Criterion 3 of 10 CFR 50.36 (Ref. 2).Catawba Units 1 and 2 B 3.7.11-1 Revision No.
Th'e CRACWS satisfies Criterion 3 of 10 CFR 50.36 (Ref. 2).Catawba Units 1 and 2 B 3.7.11-1 Revision No.
CRACWSB 3.7.11BASESLCOTwo independent and redundant trains of the CRACWS are required tobe OPERABLE to ensure that at least one is available, assuming a singlefailure disabling the other train. Total system failure could result in theequipment operating temperature exceeding limits in the event of anaccident.
CRACWS B 3.7.11 BASES LCO Two independent and redundant trains of the CRACWS are required to be OPERABLE to ensure that at least one is available, assuming a single failure disabling the other train. Total system failure could result in the equipment operating temperature exceeding limits in the event of an accident.The CRACWS is considered to be OPERABLE when the individual components necessary to maintain the control room temperature are OPERABLE in both trains. These components include a chiller package, chilled water pump, and air handling unit. In addition, the CRACWS must be OPERABLE to the extent that air circulation can be maintained.
The CRACWS is considered to be OPERABLE when the individual components necessary to maintain the control room temperature areOPERABLE in both trains. These components include a chiller package,chilled water pump, and air handling unit. In addition, the CRACWS mustbe OPERABLE to the extent that air circulation can be maintained.
The CRACWS is shared between the two units. The system must be OPERABLE for each unit when that unit is in the MODE of Applicability.
The CRACWS is shared between the two units. The system must beOPERABLE for each unit when that unit is in the MODE of Applicability.
Additionally, both normal and emergency power must also be OPERABLE because the system is shared. A shutdown unit supplying its associated emergency power source (1 EMXG/2EMXH) cannot be credited for OPERABILITY of components supporting the operating unit.If a CRACWS component becomes inoperable, or normal or emergency power to a CRACWS component becomes inoperable, then the Required Actions of this LCO must be entered independently for each unit that is in the MODE of applicability of the LCO.APPLICABILITY In MODES 1, 2, 3, 4, 5, and 6, and during movement of recently irradiated fuel assemblies, the CRACWS must be OPERABLE to ensure that the control room temperature will not exceed equipment operational requirements following a design basis accident.
Additionally, both normal and emergency power must also beOPERABLE because the system is shared. A shutdown unit supplying itsassociated emergency power source (1 EMXG/2EMXH) cannot becredited for OPERABILITY of components supporting the operating unit.If a CRACWS component becomes inoperable, or normal or emergency power to a CRACWS component becomes inoperable, then the RequiredActions of this LCO must be entered independently for each unit that is inthe MODE of applicability of the LCO.APPLICABILITY In MODES 1, 2, 3, 4, 5, and 6, and during movement of recentlyirradiated fuel assemblies, the CRACWS must be OPERABLE to ensurethat the control room temperature will not exceed equipment operational requirements following a design basis accident.
The CRACWS is only required to be OPERABLE during fuel handling involving handling recently irradiated fuel (i.e., fuel that has occupied part of a critical reactor core within the previous 72 hours) due to radioactive decay.ACTIONS A.__1 With one CRACWS train inoperable, action must be taken to restore OPERABLE status within 30 days. In this Condition, the remaining OPERABLE CRACWS train is adequate to maintain the control room temperature within limits. However, the overall reliability is reduced because a single failure in the OPERABLE CRACWS train could result in loss of CRACWS function.
The CRACWS is onlyrequired to be OPERABLE during fuel handling involving handlingrecently irradiated fuel (i.e., fuel that has occupied part of a critical reactorcore within the previous 72 hours) due to radioactive decay.ACTIONSA.__1With one CRACWS train inoperable, action must be taken to restoreOPERABLE status within 30 days. In this Condition, the remaining OPERABLE CRACWS train is adequate to maintain the control roomtemperature within limits. However, the overall reliability is reducedbecause a single failure in the OPERABLE CRACWS train could result inloss of CRACWS function.
The 30 day Completion Time is based on the low probability of an event, the consideration that the remaining train can provide the required protection, and that alternate safety or nonsafety related cooling means are available.
The 30 day Completion Time is based on thelow probability of an event, the consideration that the remaining train canprovide the required protection, and that alternate safety or nonsafety related cooling means are available.
INSERT 2 B.1 and B.2 (new paragraph)
INSERT 2 B.1 and B.2(new paragraph)
I Catawba Units 1 and 2B371-2RvsoNO B 3.7.11-2 Revision INSERT 2 Bases B.1 and B.2 (new paragraph)
ICatawba Units 1 and 2B371-2RvsoNO B 3.7.11-2Revision INSERT 2 Bases B.1 and B.2 (new paragraph)
B.1 and B.2 If both CRACWS trains are inoperable, the CRACWS may not be capable of performing its intended function.
B.1 and B.2If both CRACWS trains are inoperable, the CRACWS may not be capable of performing itsintended function.
Therefore, the control room temperature is required to be monitored to ensure that temperature is being maintained low enough that equipment in the control room is not adversely affected and remains habitable.
Therefore, the control room temperature is required to be monitored to ensurethat temperature is being maintained low enough that equipment in the control room is notadversely affected and remains habitable.
Mitigating actions, such as opening cabinet doors, use of fans, or opening control room doors or ventilation paths, may be used to maintain control room temperature.
Mitigating  
With the control room temperature being maintained within the temperature limit, 24 hours is allowed to restore a CRACWS train to OPERABLE status. This Completion Time is reasonable considering that the control room temperature is being maintained within limits and the low probability of an event occurring requiring control room isolation.
: actions, such as opening cabinet doors,use of fans, or opening control room doors or ventilation paths, may be used to maintain controlroom temperature.
The condition is modified by a Note stating it is not applicable when the second CRACWS train is intentionally made inoperable.
With the control room temperature being maintained within the temperature limit, 24 hours is allowed to restore a CRACWS train to OPERABLE status. This Completion Time is reasonable considering that the control room temperature is being maintained withinlimits and the low probability of an event occurring requiring control room isolation.
This Required Action is not intended for voluntary removal of redundant systems or components from service. The Required Action is only applicable if one CRACWS train is inoperable for any reason and a second CRACWS train is found to be inoperable, or if two CRACWS trains are found to be inoperable at the same time.
The condition is modified by a Note stating it is not applicable when the second CRACWS train isintentionally made inoperable.
CRACWS B 3.7.11 BASES ACTIONS (continue II i an C 1asscae Itrain s)/In MODE 1, 2, 3, or 4, if the inoperab .,<RACWS tr cannot be restored to OPERABLE status within the Completion Time, the unit must be placed in a MODE that minimizes the risk. To achieve this status, the unit must be placed in at least MODE 3 within 6 hours, and in MODE 5 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems..l and D.In MODE 5 or 6, or during movement of recently irradiated fuel, if the inoperable CRACWS train cannot be restored to OPERABLE status within the required Completion Time, the OPERABLE CRACWS train must be placed in operation immediately.
This Required Action is not intended for voluntary removal ofredundant systems or components from service.
This action ensures that the remaining train is OPERABLE, and that active failures will be readily detected.An alternative to Required Action is to immediately suspend activities that present a potential for releasing radioactivity.
The Required Action is only applicable if oneCRACWS train is inoperable for any reason and a second CRACWS train is found to beinoperable, or if two CRACWS trains are found to be inoperable at the same time.
This places the unit in a condition that minimizes accident risk. This does not preclude th-' ma~,,-m-,rt i'f f, ,--I ta =- nn~itiAn I if Required Actions B.1 or B.2 cannot be met within the required Completion Times I* I In MODE 5or 6,or urn moeeto eetyirradiated fuel assemblies, wihtf RCSt'lq ,o~sle, action must be taken immediately to suspend activities that could result in a release of radioactivity.
CRACWSB 3.7.11BASESACTIONS (continue IIi an C 1asscae Itrain s)/In MODE 1, 2, 3, or 4, if the inoperab  
This places the unit in a condition that minimizes risk. This does not preclude the movement of fuel to a safe position.It hnth CRAPW~ trnir.~ ~IIIUperabIlU MODIIEJ~l 1,2, 3, Ul 4', tllr:: rwII Ig r..om........ma..not c ....bl cf p6-o-~F tg ,n ftllded ['urLiuunI.
.,<RACWS tr cannot berestored to OPERABLE status within the Completion Time, theunit must be placed in a MODE that minimizes the risk. To achieve thisstatus, the unit must be placed in at least MODE 3 within 6 hours, and inMODE 5 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions fromfull power conditions in an orderly manner and without challenging unitsystems..l and D.In MODE 5 or 6, or during movement of recently irradiated fuel, if theinoperable CRACWS train cannot be restored to OPERABLE statuswithin the required Completion Time, the OPERABLE CRACWS trainmust be placed in operation immediately.
This action ensures that theremaining train is OPERABLE, and that active failures will be readilydetected.
An alternative to Required Action is to immediately suspendactivities that present a potential for releasing radioactivity.
This placesthe unit in a condition that minimizes accident risk. This does notpreclude th-' ma~,,-m-,rt i'f f, ,--I ta =- nn~itiAnI if Required Actions B.1 or B.2 cannot bemet within the required Completion TimesI* IIn MODE 5or 6,or urn moeeto eetyirradiated fuelassemblies, wihtf RCSt'lq ,o~sle, action must be takenimmediately to suspend activities that could result in a release ofradioactivity.
This places the unit in a condition that minimizes risk. Thisdoes not preclude the movement of fuel to a safe position.
It hnth CRAPW~ trnir.~ ~IIIUperabIlU MODIIEJ~l 1,2, 3, Ul 4', tllr:: rwII Igr..om........ma..not c ....bl cf p6-o-~F tg ,n ftllded ['urLiuunI.
Therefore, LCOJ 3.U.3 must be entered Immediately.
Therefore, LCOJ 3.U.3 must be entered Immediately.
Catawba Units I and 2B3.113evsoNo B 3.7.11-3Revision CRACWSB 3.7.11BASESSURVEILLANCE SR 3.7.11.1REQUI REMENTSThis SR verifies that the heat removal capability of the system is sufficient to maintain the temperature in the control room at or below 90&deg;F. TheSurveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.REFERENCES
Catawba Units I and 2B3.113evsoNo B 3.7.11-3 Revision CRACWS B 3.7.11 BASES SURVEILLANCE SR 3.7.11.1 REQUI REMENTS This SR verifies that the heat removal capability of the system is sufficient to maintain the temperature in the control room at or below 90&deg;F. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.REFERENCES
: 1. UFSAR, Section 9.4.2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
: 1. UFSAR, Section 9.4.2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
: 3. 10 CFR 50.67, Accident source term.4. Regulatory Guide 1.183, Revision 0.Catawba Units 1 and 2 B371- eiinNAB 3.7.11-4Revision No./,3/
: 3. 10 CFR 50.67, Accident source term.4. Regulatory Guide 1.183, Revision 0.Catawba Units 1 and 2 B371- eiinNA B 3.7.11-4 Revision No./,3/
S DUKE Steven D. CappsVice President
S DUKE Steven D. Capps Vice President~''ENERG..Y McGuire Nuclear Station Duke Energy MG01VP I 12700 Hagers Ferry Road Huntersville, NC 28078 0: 980.875.4805 Seril No MNS16-02 1' 980.875.4809 Seril N. MN-16002Steven.Capps@duke-energy.com January 7, 2016 10 CFR 50.90 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION:
~''ENERG..Y McGuire Nuclear StationDuke EnergyMG01VP I 12700 Hagers Ferry RoadHuntersville, NC 280780: 980.875.4805 Seril No MNS16-02 1' 980.875.4809 Seril N. MN-16002Steven.Capps@duke-energy.com January 7, 2016 10 CFR 50.90U.S. Nuclear Regulatory Commission Washington, D.C. 20555ATTENTION:
Document Control Desk  
Document Control Desk


==Subject:==
==Subject:==
Duke Energy Carolinas, LLC (Duke Energy)": McGuire Nuclear Station (MNS), Units 1 and 2, Docket Numbers 50-369 and 50-370, Renewed Facility Operating Licenses NPF-9 and NPF-17 Catawba Nuclear Station (CNS), Units 1 and 2 Docket Numbers 50-413 and 50-41 4, Renewed Facility Operating Licenses NPF-35 and NPF-52 Proposed Technical Specifications (TS) Amendment TS 3.7.10, "Control Room Area Chilled Water System" (MNS), and TS 3.7.11, "Control Room Area Chilled Water System" (CNS)Pursuant to 10 CFR 50.90, Duke Energy is requesting amendments to the MNS and CNS Facility Operating Licenses and subject Technical Specifications (TS). This proposed license amendment request (LAR) modifies the TS by adding a new Action for both trains of Control Room Area Chilled Water Systems (CRACWS) inoperable.
The new Action allows a finite time to restore one train to Operable status and requires periodic verification that Control Room temperature is maintained at or below 90&deg;F.The proposed LAR is modeled after TSTF-477; Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems." This TSTF is specific to the BWR NUREGs 1433 and 1434. Duke Energy has determined this TSTF is readily adaptable to a NUREG-1 431 Standard TS for a Westinghouse plant. This topic was discussed with the NRC Staff on April 9, 2014. The proposed amendment is not being submitted under the Consolidated Line Item Improvement Process (CLIIP) process.Attachment 1 provides Duke Energy's evaluation of the amendment, which contains a description of the proposed changes, the technical evaluation, the regulatory analysis, the determination that this LAR contains No Significant Hazards Considerations, the basis for the categorical exclusion from performing an Environmental Assessment/Impact Statement, and precedent for the LAR.Attachment 2A provides the existing MNS TS pages marked-up to show the proposed changes.The reprinted TS pages will be provided to the NRC upon issuance of the approved amendment.
www.duke-energy.com U.S. Nuclear Regulatory Commission-MNS-1 6-002 Page 2 Attachment 2B provides the existing CNS TS pages marked-up to show the proposed changes.The reprinted TS pages will be provided to the NRC upon issuance of the approved amendment.
Attachment 3A provides a portion of the existing MNS TS Bases pages marked-up to show the corresponding proposed Bases changes. The TS Bases change will be processed after LAR approval under the MNS Bases Control Program (TS 5.5.14).Attachment 3B provides a portion of the existing CNS TS Bases pages marked-up to show the corresponding proposed Bases changes. The TS Bases change will be processed after LAR approval under the CNS Bases Control Program (TS 5.5.14).This proposed LAR has been reviewed and approved by the MNS and CNS Plant Operations Review Committees in accordance with the requirements of the Duke Energy Quality Assurance Program.In accordance with 10 CFR 50.91, Duke Energy is notifying the applicable state officials of this application for license amendment by transmitting a copy of this letter and its attachments to the designated officials.
This submittal will not impact the MNS or CNS Updated Final Safety Analysis Reports (UFSARs).Duke Energy requests approval of this submittal within one calendar year of the submittal date and an implementation period of 60 days from the date of amendment issuance.There are no regulatory commitments contained in this amendment.
Please direct any questions you may have in this matter to Lee A. Hentz at (980) 875-41 87.I declare under penalty of perjury that the foregoing is true and correct. Executed on January 7, 2016.Sincerely, Steven D. Capps Attachments U.S. Nuclear Regulatory Commission MNS-1 6-002 Page 3 xc (with attachments):
Catherine Haney Regional Administrator U.S. Nuclear Regulatory Commission
-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 G.A. Hutto, Ill Senior Resident Inspector (Catawba)U.S. Nuclear Regulatory Commission Catawba Nuclear Station J. Zeiler Senior Resident Inspector (McGuire)U.S. Nuclear Regulatory Commission McGuire Nuclear Station G. E. Miller (addressee only)NRC Project Manager (Catawba and McGuire)U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8-G9A 11555 Rockville Pike Rockville, MD 20852-2738 S.E. Jenkins Manager Radioactive and Infectious Waste Management Division of Waste Management South Carolina Department of Health and Environmental Control 2600 Bull St.Columbia, SC 29201 W.L. Cox, Ill Section Chief Division of Environmental Health Radiation Protection Section North Carolina Department of Environment and Natural Resources 1645 Mail Service Center Raleigh, NC 27699 ATTACHMENT 1 EVALUATION OF PROPOSED AMENDMENT 1.0


Duke Energy Carolinas, LLC (Duke Energy)":
==SUMMARY==
McGuire Nuclear Station (MNS), Units 1 and 2,Docket Numbers 50-369 and 50-370, Renewed Facility Operating LicensesNPF-9 and NPF-17Catawba Nuclear Station (CNS), Units 1 and 2Docket Numbers 50-413 and 50-41 4, Renewed Facility Operating LicensesNPF-35 and NPF-52Proposed Technical Specifications (TS) Amendment TS 3.7.10, "Control RoomArea Chilled Water System" (MNS), and TS 3.7.11, "Control Room Area ChilledWater System" (CNS)Pursuant to 10 CFR 50.90, Duke Energy is requesting amendments to the MNS and CNSFacility Operating Licenses and subject Technical Specifications (TS). This proposed licenseamendment request (LAR) modifies the TS by adding a new Action for both trains of ControlRoom Area Chilled Water Systems (CRACWS) inoperable.
DESCRIPTION 2.0 DETAILED DESCRIPTION 3.0 TECHNICAL EVALUATION 3.1 TS System Descriptions 3.2 Adaptability of BWR TSTF-477 Rev.3 to a Westinghouse Plant 3.3 Operational Burden 3.4 System Reliability Improvements 3.5 Control Room Equipment Temperature Limit Validation 3.6 Application of Proposed Change 4.0 REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria
The new Action allows a finite timeto restore one train to Operable status and requires periodic verification that Control Roomtemperature is maintained at or below 90&deg;F.The proposed LAR is modeled after TSTF-477; Rev. 3, "Add Action for Two Inoperable ControlRoom AC Subsystems."
This TSTF is specific to the BWR NUREGs 1433 and 1434. DukeEnergy has determined this TSTF is readily adaptable to a NUREG-1 431 Standard TS for aWestinghouse plant. This topic was discussed with the NRC Staff on April 9, 2014. Theproposed amendment is not being submitted under the Consolidated Line Item Improvement Process (CLIIP) process.Attachment 1 provides Duke Energy's evaluation of the amendment, which contains adescription of the proposed
: changes, the technical evaluation, the regulatory
: analysis, thedetermination that this LAR contains No Significant Hazards Considerations, the basis for thecategorical exclusion from performing an Environmental Assessment/Impact Statement, andprecedent for the LAR.Attachment 2A provides the existing MNS TS pages marked-up to show the proposed changes.The reprinted TS pages will be provided to the NRC upon issuance of the approvedamendment.
www.duke-energy.com U.S. Nuclear Regulatory Commission-MNS-1 6-002Page 2Attachment 2B provides the existing CNS TS pages marked-up to show the proposed changes.The reprinted TS pages will be provided to the NRC upon issuance of the approvedamendment.
Attachment 3A provides a portion of the existing MNS TS Bases pages marked-up to show thecorresponding proposed Bases changes.
The TS Bases change will be processed after LARapproval under the MNS Bases Control Program (TS 5.5.14).Attachment 3B provides a portion of the existing CNS TS Bases pages marked-up to show thecorresponding proposed Bases changes.
The TS Bases change will be processed after LARapproval under the CNS Bases Control Program (TS 5.5.14).This proposed LAR has been reviewed and approved by the MNS and CNS Plant Operations Review Committees in accordance with the requirements of the Duke Energy Quality Assurance Program.In accordance with 10 CFR 50.91, Duke Energy is notifying the applicable state officials of thisapplication for license amendment by transmitting a copy of this letter and its attachments to thedesignated officials.
This submittal will not impact the MNS or CNS Updated Final Safety Analysis Reports(UFSARs).
Duke Energy requests approval of this submittal within one calendar year of the submittal dateand an implementation period of 60 days from the date of amendment issuance.
There are no regulatory commitments contained in this amendment.
Please direct any questions you may have in this matter to Lee A. Hentz at (980) 875-41 87.I declare under penalty of perjury that the foregoing is true and correct.
Executed on January 7,2016.Sincerely, Steven D. CappsAttachments U.S. Nuclear Regulatory Commission MNS-1 6-002Page 3xc (with attachments):
Catherine HaneyRegional Administrator U.S. Nuclear Regulatory Commission
-Region IIMarquis One Tower245 Peachtree Center Ave., NE Suite 1200Atlanta, GA 30303-1257 G.A. Hutto, IllSenior Resident Inspector (Catawba)
U.S. Nuclear Regulatory Commission Catawba Nuclear StationJ. ZeilerSenior Resident Inspector (McGuire)
U.S. Nuclear Regulatory Commission McGuire Nuclear StationG. E. Miller (addressee only)NRC Project Manager (Catawba and McGuire)U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8-G9A11555 Rockville PikeRockville, MD 20852-2738 S.E. JenkinsManagerRadioactive and Infectious Waste Management Division of Waste Management South Carolina Department of Health and Environmental Control2600 Bull St.Columbia, SC 29201W.L. Cox, IllSection ChiefDivision of Environmental HealthRadiation Protection SectionNorth Carolina Department of Environment and Natural Resources 1645 Mail Service CenterRaleigh, NC 27699 ATTACHMENT 1EVALUATION OF PROPOSED AMENDMENT 1.0 SUMMARY DESCRIPTION 2.0 DETAILED DESCRIPTION 3.0 TECHNICAL EVALUATION 3.1 TS System Descriptions 3.2 Adaptability of BWR TSTF-477 Rev.3 to a Westinghouse Plant3.3 Operational Burden3.4 System Reliability Improvements 3.5 Control Room Equipment Temperature Limit Validation 3.6 Application of Proposed Change4.0 REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria


===4.2 Precedents===
===4.2 Precedents===
Line 298: Line 223:
==6.0 REFERENCES==
==6.0 REFERENCES==


I ATTACHMENT 11.0 SUMMARY DESCRIPTION Pursuant to 10 CFR 50.90, Duke Energy is requesting amendments to the McGuire NuclearStation (MNS) and Catawba Nuclear Station (CNS) Facility Operating Licenses and subjectTechnical Specifications (TS). This proposed license amendment request (LAR) modifies MNSTS 3.7.10, "Control Room Area Chilled Water Systems,"
I ATTACHMENT 1 1.0  
and corresponding CNS TS 3.7.11 byadding a new Action for both trains of Control Room Area Chilled Water Systems (CRACWS)inoperable.
 
The new Action allows a finite time, 24 hours, to restore one train to Operablestatus and requires periodic verification that Control Room temperature is maintained at orbelow 900&deg;F.2.0 DETAILED DESCRIPTION As discussed in a meeting with the NRC staff on April 9, 2014, the proposed LAR is modeledafter TSTF-477, Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems."
==SUMMARY==
TSTF-477 is applicable only to BWR (General Electric)
DESCRIPTION Pursuant to 10 CFR 50.90, Duke Energy is requesting amendments to the McGuire Nuclear Station (MNS) and Catawba Nuclear Station (CNS) Facility Operating Licenses and subject Technical Specifications (TS). This proposed license amendment request (LAR) modifies MNS TS 3.7.10, "Control Room Area Chilled Water Systems," and corresponding CNS TS 3.7.11 by adding a new Action for both trains of Control Room Area Chilled Water Systems (CRACWS)inoperable.
NUREGs 1433 and 1434, and adoption of thisTSTF is available to BWRs via the Consolidated Line Item Improvement Process (CLIIP).
The new Action allows a finite time, 24 hours, to restore one train to Operable status and requires periodic verification that Control Room temperature is maintained at or below 900&deg;F.2.0 DETAILED DESCRIPTION As discussed in a meeting with the NRC staff on April 9, 2014, the proposed LAR is modeled after TSTF-477, Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems." TSTF-477 is applicable only to BWR (General Electric)
Sincethe CNS and MNS TS are based on the Westinghouse NUREG-1431 Standard TSs, this DukeEnergy LAR is not proposed to be processed via the CLIIP process.
NUREGs 1433 and 1434, and adoption of this TSTF is available to BWRs via the Consolidated Line Item Improvement Process (CLIIP). Since the CNS and MNS TS are based on the Westinghouse NUREG-1431 Standard TSs, this Duke Energy LAR is not proposed to be processed via the CLIIP process. TSTF-477 adds a Condition to restore one Control Room AC subsystem within 72 hours in the event two Control Room AC subsystems become inoperable.
TSTF-477 adds aCondition to restore one Control Room AC subsystem within 72 hours in the event two ControlRoom AC subsystems become inoperable.
Since the Duke Energy meeting with the NRC staff, the Technical Specification Task Force has submitted a Traveler, TSTF-553, for NRC review. TSTF-553 is similar to TSTF-477 but is applicable to Westinghouse (NUREG-1 431) and Babcock & Wilcox (NUREG-1 430) plants and provides a Completion Time of 24 hours for both plant types in the event two Control Room AC subsystems become inoperable.
Since the Duke Energy meeting with the NRC staff, the Technical Specification Task Force hassubmitted a Traveler, TSTF-553, for NRC review. TSTF-553 is similar to TSTF-477 but isapplicable to Westinghouse (NUREG-1 431) and Babcock & Wilcox (NUREG-1 430) plants andprovides a Completion Time of 24 hours for both plant types in the event two Control Room ACsubsystems become inoperable.
TSTF-553 also includes a note that precludes use of the 24 hour allowance when the second train is intentionally made inoperable.
TSTF-553 also includes a note that precludes use of the 24hour allowance when the second train is intentionally made inoperable.
Although TSTF-553 has not yet been reviewed or approved by the NRC, the LAR proposed by Duke Energy adopts the more conservative 24 hour Completion Time and the additional restriction regarding intentional entry into the Condition.
Although TSTF-553 hasnot yet been reviewed or approved by the NRC, the LAR proposed by Duke Energy adopts themore conservative 24 hour Completion Time and the additional restriction regarding intentional entry into the Condition.
The proposed LAR revises MNS TS 3.7.10 and CNS TS 3.7.11 as follows: a. Add a new Action B. New Action B applies when two CRACWS trains are inoperable.
The proposed LAR revises MNS TS 3.7.10 and CNS TS 3.7.11 as follows:a. Add a new Action B. New Action B applies when two CRACWS trains are inoperable.
Required Action B.1 requires verification once per 4 hours that Control Room temperature is less than or equal to 90&deg;F. Required Action B.2 requires restoration of one CRACWS train to operable status within 24 hours.b. New Condition B is modified by a Note which states, "Not applicable when second CRACWS train intentionally made inoperable." If the second CRACWS train is intentionally made inoperable, there is no applicable Condition~and immediate entry into LCO 3.0.3 is required.c. Existing Action B, now renamed Action C, which applies when the Required Action and associated Completion Time of Condition A (one CRACWS train inoperable) is not met in MODES 1, 2, 3,or 4, is revised to also be applicable when the Required Actions and associated Completion Times of new Condition B~are not met. Renumbered Condition C requires being in Mode 3 in 6 hours and Mode 5 in 36 hours.2 ATTACHMENT 1 d. Existing Action C, now renamed Action D, remains unchanged.
Required Action B.1 requires verification once per 4 hours that Control Roomtemperature is less than or equal to 90&deg;F. Required Action B.2 requires restoration ofone CRACWS train to operable status within 24 hours.b. New Condition B is modified by a Note which states, "Not applicable when secondCRACWS train intentionally made inoperable."
: e. For MNS, existing Action 0, now renamed Action E, which applies when two CRACWS trains are inoperable during movement of irradiated fuel assemblies or during core alterations, is revised to be applicable when the Required Actions and associated Completion Times of new Condition B are not met.f. For CNS, existing Action D, now renamed Action E, which applies when two CRACWS trains are inoperable during movement of recently irradiated fuel assemblies, is revised to be applicable when the Required Actions and associated Completion Times of new Condition B are not met.g. Existing Action E, which applied when two CRACWS trains are inoperable in MODE 1, 2, 3, or 4, and requires entry into LCO 3.0.3, is no longer needed and deleted (redundant to revised Condition C.).The marked-up TS pages showing the proposed changes above are provided in Attachments 2A and 2B.The corresponding TS Bases pages showing the proposed changes are provided in Attachments 3A and 3B. The TS Bases change will be processed after LAR approval under the MNS and CNS Bases Control Program (TS 5.5.14). They are provided in this LAR for information only.3.0 TECHNICAL EVALUATION 3.1 TS System Descriptions The CRACWS provides air temperature control for the Control Room, Control Room Area, and Switchgear Rooms. The Control Room Area (CRA) consists predominately of the Vital Battery and Equipment Rooms, Motor Control Center (MCC) rooms, and Cable Rooms. The Switchgear Rooms contain the essential switchgear.
If the second CRACWS train isintentionally made inoperable, there is no applicable Condition~and immediate entry intoLCO 3.0.3 is required.
The CRA and Switchgear Rooms are not part of the Control Room Envelope and not governed by the CRACWS Technical Specifications.
: c. Existing Action B, now renamed Action C, which applies when the Required Action andassociated Completion Time of Condition A (one CRACWS train inoperable) is not metin MODES 1, 2, 3,or 4, is revised to also be applicable when the Required Actions andassociated Completion Times of new Condition B~are not met. Renumbered Condition Crequires being in Mode 3 in 6 hours and Mode 5 in 36 hours.2 ATTACHMENT 1d. Existing Action C, now renamed Action D, remains unchanged.
The CRACWS consists of two independent and redundant trains. Each train consists of a chiller package, chilled water pump, air handling units with cooling coils, instrumentation, and controls.The CRACWS is an emergency system, which also operates during normal unit operations.
: e. For MNS, existing Action 0, now renamed Action E, which applies when two CRACWStrains are inoperable during movement of irradiated fuel assemblies or during corealterations, is revised to be applicable when the Required Actions and associated Completion Times of new Condition B are not met.f. For CNS, existing Action D, now renamed Action E, which applies when two CRACWStrains are inoperable during movement of recently irradiated fuel assemblies, is revisedto be applicable when the Required Actions and associated Completion Times of newCondition B are not met.g. Existing Action E, which applied when two CRACWS trains are inoperable in MODE 1,2, 3, or 4, and requires entry into LCO 3.0.3, is no longer needed and deleted (redundant to revised Condition C.).The marked-up TS pages showing the proposed changes above are provided in Attachments 2A and 2B.The corresponding TS Bases pages showing the proposed changes are provided inAttachments 3A and 3B. The TS Bases change will be processed after LAR approval under theMNS and CNS Bases Control Program (TS 5.5.14).
A single train will provide the required temperature control to maintain the Control Room at approximately 75&deg;F for MNS and 74&deg;F for CNS, respectively.
They are provided in this LAR forinformation only.3.0 TECHNICAL EVALUATION 3.1 TS System Descriptions The CRACWS provides air temperature control for the Control Room, Control Room Area, andSwitchgear Rooms. The Control Room Area (CRA) consists predominately of the Vital Batteryand Equipment Rooms, Motor Control Center (MCC) rooms, and Cable Rooms. TheSwitchgear Rooms contain the essential switchgear.
The design basis of the CRACWS is to maintain the Control Room temperature for 30 days of continuous occupancy.
The CRA and Switchgear Rooms are notpart of the Control Room Envelope and not governed by the CRACWS Technical Specifications.
The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the Control Room temperature between 75&deg;F and 90&deg;F for MNS and between 72&deg;F and 85&deg;F for CNS, respectively.
The CRACWS consists of two independent and redundant trains. Each train consists of achiller package, chilled water pump, air handling units with cooling coils, instrumentation, andcontrols.
A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to perform its design function.
The CRACWS is an emergency system, which also operates during normal unit operations.
Redundant detectors and controls are provided for Control Room temperature control. The CRACWS is designed in accordance with Seismic Category I 3 ATTACHMENT 1 requirements.
Asingle train will provide the required temperature control to maintain the Control Room atapproximately 75&deg;F for MNS and 74&deg;F for CNS, respectively.
The CRACWS is capable of removing sensible and latent heat loads from the Control Room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment operability.
The design basis of the CRACWSis to maintain the Control Room temperature for 30 days of continuous occupancy.
Two independent and redundant trains of the CRACWS are required to be operable to ensure that at least one is available, assuming a single failure disabling the other train. The CRACWS is shared between the two units. The system must be operable for each unit when that unit is in the Mode of Applicability.
The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the Control Room temperature between 75&deg;F and 90&deg;F forMNS and between 72&deg;F and 85&deg;F for CNS, respectively.
The MNS and CNS Control Room Area Ventilation Systems (CRAVS) are governed by separate Technical Specifications; MNS TS 3.7.9 and CNS TS 3.7.10. The CRAVS is an emergency redundant system that provides a protected habitable environment for the Control Room Envelope from which occupants can control the Units following an uncontrolled release of radioactivity, hazardous chemicals, or smoke. The CRAVS does not provide a protected habitable environment for the Control Room Area or Switchgear Rooms. The inoperability of CRACWS does not impact the operability of CRAVS.The MNS CRACWS and CRAVS are described in MNS UFSAR Section 6.4. The CNS CRACWS and CRAVS are described in CNS UFSAR Section 9.4.3.2 Adaptability of BWR TSTF-477 Rev.3 to a Westinghouse Plant TSTF-477 Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems," was NRC approved for adoption in 2007. This BWR (GE) specific TSTF allows for two trains of Control Room cooling to be inoperable for up to 72 hours as long as the Control Room area temperature can be maintained (and monitored) within a pre-determined limit, commonly 90&deg;F.The 72 hour Completion Time was deemed reasonable considering that Control Room temperature is being maintained within limits and the low probability of an event occurring that would require Control Room area isolation.
A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to performits design function.
Alternate methods of maintaining control room temperature, such as non-safety grade air conditioning systems or fans, can also be used to maintain control room temperature.
Redundant detectors and controls are provided for Control Roomtemperature control.
As previously stated in Section 2.0, Duke Energy will adopt the more conservative Completion Time of 24 hours proposed by TSTF-553.TSTF-477 Rev. 3 is deterministically justified and relies on safety related cabinet equipment qualification (EQ) temperature limits and Control Room heat-up assumptions.
The CRACWS is designed in accordance with Seismic Category I3 ATTACHMENT 1requirements.
For the GE plants, a GE Topical Report supports the EQ justification.
The CRACWS is capable of removing sensible and latent heat loads from theControl Room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment operability.
Duke Energy has performed site specific confirmations that equipment qualification for Control Room safety related instrumentation and devices remains valid up to 90&deg;F. Note MNS TS 3.7.10 and CNS TS 3.7.11 already contain a Surveillance Requirement (SR) that confirms the Control Room is 90&deg;F or less every 12 hours.AS precedent; TSTF-477 Rev. 3 references other GE Technical Specifications that currently provide an Action with a finite time to restore one train to operable status when both trains are inoperable.
Two independent and redundant trains of the CRACWS are required to be operable to ensurethat at least one is available, assuming a single failure disabling the other train. The CRACWSis shared between the two units. The system must be operable for each unit when that unit is inthe Mode of Applicability.
The MNS and CNS Control Room Area Ventilation Systems (CRAVS) are governed by separateTechnical Specifications; MNS TS 3.7.9 and CNS TS 3.7.10. The CRAVS is an emergency redundant system that provides a protected habitable environment for the Control RoomEnvelope from which occupants can control the Units following an uncontrolled release ofradioactivity, hazardous chemicals, or smoke. The CRAVS does not provide a protected habitable environment for the Control Room Area or Switchgear Rooms. The inoperability ofCRACWS does not impact the operability of CRAVS.The MNS CRACWS and CRAVS are described in MNS UFSAR Section 6.4. The CNSCRACWS and CRAVS are described in CNS UFSAR Section 9.4.3.2 Adaptability of BWR TSTF-477 Rev.3 to a Westinghouse PlantTSTF-477 Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems,"
was NRCapproved for adoption in 2007. This BWR (GE) specific TSTF allows for two trains of ControlRoom cooling to be inoperable for up to 72 hours as long as the Control Room areatemperature can be maintained (and monitored) within a pre-determined limit, commonly 90&deg;F.The 72 hour Completion Time was deemed reasonable considering that Control Roomtemperature is being maintained within limits and the low probability of an event occurring thatwould require Control Room area isolation.
Alternate methods of maintaining control roomtemperature, such as non-safety grade air conditioning systems or fans, can also be used tomaintain control room temperature.
As previously stated in Section 2.0, Duke Energy will adoptthe more conservative Completion Time of 24 hours proposed by TSTF-553.
TSTF-477 Rev. 3 is deterministically justified and relies on safety related cabinet equipment qualification (EQ) temperature limits and Control Room heat-up assumptions.
For the GEplants, a GE Topical Report supports the EQ justification.
Duke Energy has performed sitespecific confirmations that equipment qualification for Control Room safety relatedinstrumentation and devices remains valid up to 90&deg;F. Note MNS TS 3.7.10 and CNS TS 3.7.11already contain a Surveillance Requirement (SR) that confirms the Control Room is 90&deg;F or lessevery 12 hours.AS precedent; TSTF-477 Rev. 3 references other GE Technical Specifications that currently provide an Action with a finite time to restore one train to operable status when both trains areinoperable.
MNS and CNS have similar Technical Specifications:
MNS and CNS have similar Technical Specifications:
: 1. MNS and CNS TSs 3.3.3, "Post Accident Monitoring" (7 days).2. MNS TS 3.7.11 and CNS TS 3.7.12, "Auxiliary Building Filtered Ventilation ExhaustSystem" (24 hours).4 ATTACHMENT 1Duke Energy has also reviewed the Hope Creek and Edwin Hatch LARs, Request for Additional Information (RAIs), and the NRC Safety Evaluations (SE) that adopted TSTF-477 Rev. 3.Based on that review, Duke Energy did not identify an issue that could not be addressed at ourplants and did not identify any GE/BWR specific requirements or conditions.
: 1. MNS and CNS TSs 3.3.3, "Post Accident Monitoring" (7 days).2. MNS TS 3.7.11 and CNS TS 3.7.12, "Auxiliary Building Filtered Ventilation Exhaust System" (24 hours).4 ATTACHMENT 1 Duke Energy has also reviewed the Hope Creek and Edwin Hatch LARs, Request for Additional Information (RAIs), and the NRC Safety Evaluations (SE) that adopted TSTF-477 Rev. 3.Based on that review, Duke Energy did not identify an issue that could not be addressed at our plants and did not identify any GE/BWR specific requirements or conditions.
3.3 Operational BurdenBoth MNS and CNS have experienced the inoperability of both trains of Control Room cooling.These occurred in 2005 and 2010 at MNS and in 2011 at CNS. With Control Room coolingbeing a shared system, these three events led to the initiation of a two unit shutdown.
3.3 Operational Burden Both MNS and CNS have experienced the inoperability of both trains of Control Room cooling.These occurred in 2005 and 2010 at MNS and in 2011 at CNS. With Control Room cooling being a shared system, these three events led to the initiation of a two unit shutdown.For the MNS events, one Control Room cooling train was functional but not operable.
For the MNS events, one Control Room cooling train was functional but not operable.
Notice of Enforcement Discretion (NOEDs) were submitted and granted for MNS on both occasions to remain at power operation until one cooling train was restored to Operable status.For the CNS event, the "A" cooling train was in planned maintenance when the "B" cooling train tripped due to a chiller controls system micro-processor failure. Both units initiated a shutdown and proceeded to Mode 3 while a NOED was processed to not proceed to Mode 4. The "A" cooling train was restored shortly thereafter.
Notice ofEnforcement Discretion (NOEDs) were submitted and granted for MNS on both occasions toremain at power operation until one cooling train was restored to Operable status.For the CNS event, the "A" cooling train was in planned maintenance when the "B" cooling traintripped due to a chiller controls system micro-processor failure.
As part of the 2010 NRC approved NOED, MNS committed to submit an LAR to address operability requirements of the Control Room cooling Technical Specification.
Both units initiated a shutdownand proceeded to Mode 3 while a NOED was processed to not proceed to Mode 4. The "A"cooling train was restored shortly thereafter.
3.4 System Reliability Improvements The 2005 MNS event was caused by a degraded oil pressure switch, which prohibited the "A" cooling train chiller compressor from starting.
As part of the 2010 NRC approved NOED, MNS committed to submit an LAR to addressoperability requirements of the Control Room cooling Technical Specification.
At the time, the redundant cooling train was functional but administratively inoperable due to support system alignments for refueling outage Engineered Safety Features (ESF) testing. The degraded oil pressure switch was replaced, and then in 2007, the original chiller controls were replaced with digital controls, which improved the reliability of the oil pressure switch function.For the 2010 MNS event, the loss of the operating train of Control Room cooling was caused by high vibration of the hot gas bypass line (HGBP), which led to a breach of the coolant line. At the time, the redundant cooling train was in a planned maintenance evolution and temporarily unavailable.
3.4 System Reliability Improvements The 2005 MNS event was caused by a degraded oil pressure switch, which prohibited the "A"cooling train chiller compressor from starting.
Since 2010, both MNS Control Room cooling trains have been upgraded with new HGBP piping to reduce vibration interactions, vibration isolators have been installed, corroded and eroded service water piping has been replaced, small bore piping and tubing has been replaced, and piping analysis models were developed to identify potential thermal stresses.
At the time, the redundant cooling train wasfunctional but administratively inoperable due to support system alignments for refueling outageEngineered Safety Features (ESF) testing.
In addition, the condenser normal operating head pressure was reduced, which further reduced HGBP piping vibration.
The degraded oil pressure switch was replaced, andthen in 2007, the original chiller controls were replaced with digital controls, which improved thereliability of the oil pressure switch function.
After the 2011 CNS chiller micro-processor failure, significant efforts were made to determine the cause of the failure and to enable the chiller to be rapidly restarted.
For the 2010 MNS event, the loss of the operating train of Control Room cooling was caused byhigh vibration of the hot gas bypass line (HGBP), which led to a breach of the coolant line. Atthe time, the redundant cooling train was in a planned maintenance evolution and temporarily unavailable.
The failed micro-processor was sent to the original qualifier of the controls who, in concert with the original manufacturer of the controls, investigated the cause of the failure. The manufacturer has many years of in-service experience with this type of micro-processor and has experienced very few 5 ATTACHMENT 1 failures.
Since 2010, both MNS Control Room cooling trains have been upgraded with new HGBP pipingto reduce vibration interactions, vibration isolators have been installed, corroded and erodedservice water piping has been replaced, small bore piping and tubing has been replaced, andpiping analysis models were developed to identify potential thermal stresses.
The failed micro-processor was subject to multiple tests, but the problem did not re-occur.Both companies recommended that failures of this type be addressed by removing and reapplying power to the micro-processor, similar to how many computer related problems are addressed.
In addition, thecondenser normal operating head pressure was reduced, which further reduced HGBP pipingvibration.
This allows rapid re-start of the chiller. CNS has incorporated such actions into the current operating procedures.
After the 2011 CNS chiller micro-processor  
In addition, CNS maintenance procedures have been enhanced to provide direction on how to replace a micro-processor which can now be done very quickly.Since MNS utilizes the same chiller controls, similar operating and maintenance procedure enhancements were incorporated.
: failure, significant efforts were made to determine the cause of the failure and to enable the chiller to be rapidly restarted.
3.5 Control Room Equipment Temperature Limit Validation MNS TS 3.7.10 and CNS TS 3.7.11 currently contain an SR that confirms the Control Room is 90&deg;F or less every 12 hours. As such, the current licensed design temperature of the Control Room equipment remains unchanged by the proposed TS changes.Duke Energy has also concluded that the 90&deg;F limit in the new proposed TS Action B remains unchanged based on a review of design specifications for the respective Control Room safety related instruments and devices. Design specifications for protective equipment in the Control Room specify no loss of protective function over the temperature range of 40&deg;F to 90&deg;F and a humidity range of 15 to 95% relative humidity.Therefore, monitoring of bulk Control Room temperature every 4 hours to ensure that ambient temperature is less than or equal to 90&deg;F would verify that the Control Room temperature is at or below the design limit.3.6 Application of Proposed Change The most likely application of proposed Condition B and the associated Required Actions is when both CRACWS trains are inoperable but one train is functional with the ability to cool the Control Room. In this case, the Control Room temperature would remain constant at a normal value, and the 90&deg;F limit is not challenged.
The failed micro-processor was sent to the original qualifier of the controls who, in concert with the originalmanufacturer of the controls, investigated the cause of the failure.
One CRACWS would need to be restored to Operable status within 24 hours.In the event both CRACWS trains are inoperable and non-functional, MNS and CNS have developed
The manufacturer has manyyears of in-service experience with this type of micro-processor and has experienced very few5 ATTACHMENT 1failures.
'"Abnormal Procedures" (AP) to mitigate rising temperatures in the Control Room and take actions to shutdown the affected Units if temperature rises above 90&deg;F, or there are indications of instrumentation malfunctions that have safety significance.
The failed micro-processor was subject to multiple tests, but the problem did not re-occur.Both companies recommended that failures of this type be addressed by removing andreapplying power to the micro-processor, similar to how many computer related problems areaddressed.
4.0. REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria General Design Criterion (GDC) 19, "Control Room" states in part: A Control Room shall be provided from which actions can be taken to operate the nuclear power unit safely under normal conditions and to maintain it in a safe condition 6 ATTACHMENT 1 under accident conditions, including loss-of-coolant accidents.
This allows rapid re-start of the chiller.
Adequate radiation protection shall be provided to permit access and occupancy of the control room under accident conditions without personnel receiving radiation exposures in excess of 5 rem whole body, or its equivalent to any part of the body, for the duration of the accident.The MNS and CNS Control Room Area Ventilation Systems (CRAVS) provide compliance with GDC 19. The CRAVS is an emergency redundant system that provides a protected habitable environment for the Control Room Envelope from which occupants can control the Units following an uncontrolled release of radioactivity, hazardous chemicals, or smoke. The proposed changes to the CRACWS TS do not impact the operability of CRAVS.In addition, the operability requirements of the CRACWS have not changed. The regulatory requirements do not specifically address Completion Times with inoperable systems. As a result, the regulatory requirements and criteria are not affected by the proposed change.4.2 Precedents Duke Energy has also reviewed the Hope Creek and Edwin Hatch LARs, PAls, and NRC SEs that recently adopted TSTF-477 Rev. 3. Based on that review, Duke Energy did not identify an issue that could not be addressed at our plants and did not identify any GE/BWR specific requirements or conditions.
CNS has incorporated such actions into thecurrent operating procedures.
*PSEG Hope Creek Generating Station, LAR dated February 28, 2011 (ADAMS Accession No. ML1 10590636);
In addition, CNS maintenance procedures have been enhancedto provide direction on how to replace a micro-processor which can now be done very quickly.Since MNS utilizes the same chiller controls, similar operating and maintenance procedure enhancements were incorporated.
as supplemented by letters dated August 29, 2011 (ML1 12420124), December 16, 2011 (ML1 13530205), and January 26, 2012 (ML12026A458);
3.5 Control Room Equipment Temperature Limit Validation MNS TS 3.7.10 and CNS TS 3.7.11 currently contain an SR that confirms the Control Room is90&deg;F or less every 12 hours. As such, the current licensed design temperature of the ControlRoom equipment remains unchanged by the proposed TS changes.Duke Energy has also concluded that the 90&deg;F limit in the new proposed TS Action B remainsunchanged based on a review of design specifications for the respective Control Room safetyrelated instruments and devices.
Design specifications for protective equipment in the ControlRoom specify no loss of protective function over the temperature range of 40&deg;F to 90&deg;F and ahumidity range of 15 to 95% relative humidity.
Therefore, monitoring of bulk Control Room temperature every 4 hours to ensure that ambienttemperature is less than or equal to 90&deg;F would verify that the Control Room temperature is ator below the design limit.3.6 Application of Proposed ChangeThe most likely application of proposed Condition B and the associated Required Actions iswhen both CRACWS trains are inoperable but one train is functional with the ability to cool theControl Room. In this case, the Control Room temperature would remain constant at a normalvalue, and the 90&deg;F limit is not challenged.
One CRACWS would need to be restored toOperable status within 24 hours.In the event both CRACWS trains are inoperable and non-functional, MNS and CNS havedeveloped
'"Abnormal Procedures" (AP) to mitigate rising temperatures in the Control Room andtake actions to shutdown the affected Units if temperature rises above 90&deg;F, or there areindications of instrumentation malfunctions that have safety significance.
4.0. REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria General Design Criterion (GDC) 19, "Control Room" states in part:A Control Room shall be provided from which actions can be taken to operate thenuclear power unit safely under normal conditions and to maintain it in a safe condition 6
ATTACHMENT 1under accident conditions, including loss-of-coolant accidents.
Adequate radiation protection shall be provided to permit access and occupancy of the control room underaccident conditions without personnel receiving radiation exposures in excess of 5 remwhole body, or its equivalent to any part of the body, for the duration of the accident.
The MNS and CNS Control Room Area Ventilation Systems (CRAVS) provide compliance withGDC 19. The CRAVS is an emergency redundant system that provides a protected habitable environment for the Control Room Envelope from which occupants can control the Unitsfollowing an uncontrolled release of radioactivity, hazardous chemicals, or smoke. Theproposed changes to the CRACWS TS do not impact the operability of CRAVS.In addition, the operability requirements of the CRACWS have not changed.
The regulatory requirements do not specifically address Completion Times with inoperable systems.
As aresult, the regulatory requirements and criteria are not affected by the proposed change.4.2 Precedents Duke Energy has also reviewed the Hope Creek and Edwin Hatch LARs, PAls, and NRC SEsthat recently adopted TSTF-477 Rev. 3. Based on that review, Duke Energy did not identify anissue that could not be addressed at our plants and did not identify any GE/BWR specificrequirements or conditions.
*PSEG Hope Creek Generating  
: Station, LAR dated February 28, 2011 (ADAMSAccession No. ML1 10590636);
as supplemented by letters dated August 29, 2011(ML1 12420124),
December 16, 2011 (ML1 13530205),
and January 26, 2012(ML12026A458);
NRC SE dated February 8, 2012 (ML120180078).
NRC SE dated February 8, 2012 (ML120180078).
* SNC Edwin I. Hatch Nuclear Plant, LAR dated January 16, 2014, (ADAMS Accession No. ML14016A202);
* SNC Edwin I. Hatch Nuclear Plant, LAR dated January 16, 2014, (ADAMS Accession No. ML14016A202);
as supplemented by letter dated May 2, 2014 (ML14122A339);
as supplemented by letter dated May 2, 2014 (ML14122A339);
andNRC SE dated December 10, 2014 (ML14279A261).
and NRC SE dated December 10, 2014 (ML14279A261).
4.3 No Significant Hazards Consideration Pursuant to 10 CFR 50.90, Duke Energy Carolinas, LLC (Duke Energy) proposes a licenseamendment request (LAR) for the Renewed Facility Operating License (FOL) and Technical Specifications (TS) for McGuire (MNS) and Catawba (CNS) Nuclear Stations, Units I and 2.This proposed LAR modifies MNS TS 3.7.10, "Control Room Area Chilled Water Systems,"
4.3 No Significant Hazards Consideration Pursuant to 10 CFR 50.90, Duke Energy Carolinas, LLC (Duke Energy) proposes a license amendment request (LAR) for the Renewed Facility Operating License (FOL) and Technical Specifications (TS) for McGuire (MNS) and Catawba (CNS) Nuclear Stations, Units I and 2.This proposed LAR modifies MNS TS 3.7.10, "Control Room Area Chilled Water Systems," and corresponding CNS TS 3.7.11 by adding a new Action for both trains of Control Room Area Chilled Water Systems (CRACWS) inoperable.
andcorresponding CNS TS 3.7.11 by adding a new Action for both trains of Control Room AreaChilled Water Systems (CRACWS) inoperable.
The new Action allows a finite time, 24 hours, to restore one train to Operable status and requires periodic verification that Control Room temperature is maintained at-or below 90&deg;F degrees.-
The new Action allows a finite time, 24 hours, torestore one train to Operable status and requires periodic verification that Control Roomtemperature is maintained at-or below 90&deg;F degrees.-
The-proposed LAR is modeled after TSTF-477, Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems." Duke Energy has concluded that operation of the McGuire and Catawba Nuclear Stations in accordance with the proposed generic changes to the Technical Specifications does not involve a significant hazards consideration.
The-proposed LAR is modeled afterTSTF-477, Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems."
Duke Energy's conclusion is based on its evaluation, in accordance with 10 CFR 50.91 (a)(1), of the three standards set forth in 10 CFR 50.92(c) as discussed below: 7 ATTACHMENT 1 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Duke Energy has concluded that operation of the McGuire and Catawba Nuclear Stations inaccordance with the proposed generic changes to the Technical Specifications does not involvea significant hazards consideration.
Duke Energy's conclusion is based on its evaluation, inaccordance with 10 CFR 50.91 (a)(1), of the three standards set forth in 10 CFR 50.92(c) asdiscussed below:7 ATTACHMENT  
: 11. Does the proposed change involve a significant increase in the probability orconsequences of an accident previously evaluated?
Response:
Response:
No.The proposed change allows 24 hours to restore an inoperable CRACWS train when both trainsare inoperable provided Control Room temperature is verified to be within the design limitsevery 4 hours. The equipment qualification temperature of Control Room equipment is notaffected.
No.The proposed change allows 24 hours to restore an inoperable CRACWS train when both trains are inoperable provided Control Room temperature is verified to be within the design limits every 4 hours. The equipment qualification temperature of Control Room equipment is not affected.
The CRACWS is not an initiator of any accident previously evaluated.
The CRACWS is not an initiator of any accident previously evaluated.
As a result, theprobability of any accident previously evaluated is not increased.
As a result, the probability of any accident previously evaluated is not increased.
The consequences of an accident during the proposed 24 hour Completion Time are nodifferent than the consequences of an accident during the existing 1 hour Completion Timeprovided in LCO 3.0.3 to prepare for a shutdown.
The consequences of an accident during the proposed 24 hour Completion Time are no different than the consequences of an accident during the existing 1 hour Completion Time provided in LCO 3.0.3 to prepare for a shutdown.
The proposed TS changes do not increase orchange the current Control Room temperature limit. As a result, the consequences of anyaccident previously evaluated are not significantly increased.
The proposed TS changes do not increase or change the current Control Room temperature limit. As a result, the consequences of any accident previously evaluated are not significantly increased.
Therefore, the proposed change does not involve a significant increase in the probability orconsequences of an accident previously evaluated.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
: 2. Does the proposed change create the possibility of a new or different kind of accidentfrom any accident previously evaluated?
: 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response:
Response:
No.No new or different accidents result from utilizing the proposed change. The TS changes do notinvolve a physical alteration of the plant or a change in the methods governing normal plantoperation.
No.No new or different accidents result from utilizing the proposed change. The TS changes do not involve a physical alteration of the plant or a change in the methods governing normal plant operation.
In addition, the changes do not impose any new or different requirements.
In addition, the changes do not impose any new or different requirements.
Should thenew Actions not be met, the existing and proposed Actions require a plant shutdown.
Should the new Actions not be met, the existing and proposed Actions require a plant shutdown.
Thechanges do not alter assumptions made in the safety analysis.
The changes do not alter assumptions made in the safety analysis.
The proposed changes areconsistent with the safety analysis assumptions.
The proposed changes are consistent with the safety analysis assumptions.
Therefore, the proposed change does not create the possibility of a new or different kind ofaccident from any accident previously evaluated.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
: 3. Does the proposed change involve a significant reduction in a margin of safety?Response:
: 3. Does the proposed change involve a significant reduction in a margin of safety?Response:
No.The proposed change provides a limited period of time to restore an inoperable CRACWS traininstead of requiring an immediate plant shutdown.
No.The proposed change provides a limited period of time to restore an inoperable CRACWS train instead of requiring an immediate plant shutdown.
A plant shutdown is a transient, which maybe avoided by providing a limited time to make repairs.
A plant shutdown is a transient, which may be avoided by providing a limited time to make repairs. In addition, the Control Room temPerature must be maintained less than a limit set to_ ensure habitability of the Control Room and the operability of-the equipment cooled by the CRACWS. The potential to avoid a plant transient, in conjunction with maintaining the Control Room temperature and the low probability of an event occurring during this time period, offset any risk associated with the limited Completion Time.Therefore, the proposed change does not involve a significant reduction in a margin of safety.8 ATTACHMENT 1 Based on the above, Duke Energy concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CER 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
In addition, the Control RoomtemPerature must be maintained less than a limit set to_ ensure habitability of the Control Roomand the operability of-the equipment cooled by the CRACWS. The potential to avoid a planttransient, in conjunction with maintaining the Control Room temperature and the low probability of an event occurring during this time period, offset any risk associated with the limitedCompletion Time.Therefore, the proposed change does not involve a significant reduction in a margin of safety.8 ATTACHMENT 1Based on the above, Duke Energy concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CER 50.92(c),
and, accordingly, afinding of "no significant hazards consideration" is justified.


===4.4 Conclusion===
===4.4 Conclusion===
In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposedmanner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the approval of the proposed change will not be inimical to the common defense andsecurity or to the health and safety of the public.5.0 ENVIRONMENTAL CONSIDERATIONS A review has determined that the proposed change would change a requirement with respect toinstallation or use of a facility component located within the restricted area, as defined in 10CER 20, or would change an inspection or surveillance requirement.  
In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the approval of the proposed change will not be inimical to the common defense and security or to the health and safety of the public.5.0 ENVIRONMENTAL CONSIDERATIONS A review has determined that the proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CER 20, or would change an inspection or surveillance requirement.
: However, the proposedchange does not involve (i) a significant hazards consideration, (ii) a significant change in thetypes or significant increase in the amounts of any effluents that may be released  
However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii)a significant increase in individual or cumulative occupational radiation exposure.
: offsite, or (iii)a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51 .22(c)(g).
Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR51 .22(c)(g).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.9 ATTACHMENT 1
Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.9 ATTACHMENT  


==16.0 REFERENCES==
==6.0 REFERENCES==
: 1) TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems, datedMarch 26, 2007.2) NRC Letter, Summary of April 9, 2014, Public Teleconference Regarding Potential Submission of a License Amendment Request to Implement TSTF-477 for Control Room AirConditioning subsystems, dated April 21, 2014, ADAMS Accession No.ML14101A243.
: 1) TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems, dated March 26, 2007.2) NRC Letter, Summary of April 9, 2014, Public Teleconference Regarding Potential Submission of a License Amendment Request to Implement TSTF-477 for Control Room Air Conditioning subsystems, dated April 21, 2014, ADAMS Accession No.ML14101A243.
: 3) TSTF-553, Revision 0, Add Action for Two Inoperable CREA TCS Trains, transmitted forNRC review on October 31, 2015.4) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station, Units 1and 2, Docket Number 50-369 and 50-370 Notice of Enforcement Discretion RequestTechnical Specification (TS) 3. 7.10, Control Room Area Chilled water System, datedJanuary 14, 2010.5) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station, Unit 250-370 Notice of Enforcement Discretion Request Technical Specification  
: 3) TSTF-553, Revision 0, Add Action for Two Inoperable CREA TCS Trains, transmitted for NRC review on October 31, 2015.4) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station, Units 1 and 2, Docket Number 50-369 and 50-370 Notice of Enforcement Discretion Request Technical Specification (TS) 3. 7.10, Control Room Area Chilled water System, dated January 14, 2010.5) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station, Unit 2 50-370 Notice of Enforcement Discretion Request Technical Specification  
: 3. 7.10, ControlRoom Area Chilled water System (CRACWS),
: 3. 7.10, Control Room Area Chilled water System (CRACWS), dated October 12, 2005.6) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke Energy) Catawba Nuclear Station, Units I and 2, Docket Number 50-4 13 and 50-4 14 Notice of Enforcement Discretion (NOED)Request Technical Specification (TS) 3. 7.11, "Control Room Area Chilled water System (CRACWS)" TS Limiting condition for Operation (LCO) 3.0.3 dated December 19, 2011.7) PSEG Letter, Hope Creek Generating Station, Facility Operating License No. NPF-57 NRC Docket No. 50-354 Application for Technical Specification Change TSF-4 77, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process, dated February 28, 2011.8) Southern Nuclear Letter, Edwin I. Hatch Nuclear Plant Application for Technical Specification Change to Revise Action Statements for Inoperable Control Room Air conditioning Subsystems, dated January 16, 2014.10 ATTACHMENT 2A MNS MARKED UP TECH SPEC PAGES CRACWS 3.7.10 3.7 PLANT SYSTEMS 3.7.10 Control Room Area Chilled Water System (CRACWS)LCO 3.7.10 APPLICABILITY:
dated October 12, 2005.6) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke Energy) Catawba Nuclear Station,Units I and 2, Docket Number 50-4 13 and 50-4 14 Notice of Enforcement Discretion (NOED)Request Technical Specification (TS) 3. 7.11, "Control Room Area Chilled water System(CRACWS)"
Two CRACWS trains shall be OPERABLE.MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
TS Limiting condition for Operation (LCO) 3.0.3 dated December 19, 2011.7) PSEG Letter, Hope Creek Generating  
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRACWS train A.1 Restore CRACWS train to 30 days inoperable.
: Station, Facility Operating License No. NPF-57 NRCDocket No. 50-354 Application for Technical Specification Change TSF-4 77, Revision 3,Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement  
OPERABLE status.C AB_,. Required Action and ,B.1 Be in MODE 3. 6 hours associated Completion Time of Condition A not AND met in MODE1, 2, C or.ior 1.2 Be in MODE 5. 36 hours DRequired Action and &#xa2;.1 Place OPERABLE Immediately associated Completion CRACWS train in Time of Condition A not operation.
: Process, dated February 28,2011.8) Southern Nuclear Letter, Edwin I. Hatch Nuclear Plant Application for Technical Specification Change to Revise Action Statements for Inoperable Control Room Airconditioning Subsystems, dated January 16, 2014.10 ATTACHMENT 2AMNS MARKED UP TECH SPEC PAGES CRACWS3.7.103.7 PLANT SYSTEMS3.7.10 Control Room Area Chilled Water System (CRACWS)LCO 3.7.10APPLICABILITY:
met in MODE 5 or 6, or during movement of OR irradiated fuel D assemblies, or during p.2.1 Suspend CORE Immediately CORE ALTERATIONS.
Two CRACWS trains shall be OPERABLE.
MODES 1, 2, 3, 4, 5, and 6,During movement of irradiated fuel assemblies, During CORE ALTERATIONS.
ACTIONSCONDITION REQUIRED ACTION COMPLETION TIMEA. One CRACWS train A.1 Restore CRACWS train to 30 daysinoperable.
OPERABLE status.CAB_,. Required Action and ,B.1 Be in MODE 3. 6 hoursassociated Completion Time of Condition A not ANDmet in MODE1, 2, Cor.ior 1.2 Be in MODE 5. 36 hoursDRequired Action and &#xa2;.1 Place OPERABLE Immediately associated Completion CRACWS train inTime of Condition A not operation.
met in MODE 5 or 6, orduring movement of ORirradiated fuel Dassemblies, or during p.2.1 Suspend CORE Immediately CORE ALTERATIONS.
ALTERATIONS.
ALTERATIONS.
ANDDZ;.2.2 Suspend movement of Immediately irradiated fuel assemblies.
AND D Z;.2.2 Suspend movement of Immediately irradiated fuel assemblies.
INSERT 1 New Condition B(continued)
INSERT 1 New Condition B (continued)
McGuire Units 1 and 23.7.10-1Mc~ure nitsI ad 2 .7.0-1Amendment No. 1-84/1t6e CRACWS3.7.10ACTIONS (continued)
McGuire Units 1 and 2 3.7.10-1 Mc~ure nitsI ad 2 .7.0-1Amendment No. 1-84/1t6e CRACWS 3.7.10 ACTIONS (continued)
CONDITION  
CONDITION  
[REQUIRED ACTION COMPLETION TIMEin MODE 5or 6, or duringmovement of irradiated fuel assemblies, orduring COREALTERATIONS.
[REQUIRED ACTION COMPLETION TIME in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.
Efr.1ANDE012Suspend COREALTERATIONS.
E fr.1 AND E 012 Suspend CORE ALTERATIONS.
Suspend movement ofirradiated fuel assemblies.
Suspend movement of irradiated fuel assemblies.
Immediately Immediately E. C"RA.\AI trains E.1 E nter !C 3.0.3 ~ vt41efihtey SURVEILLANCE REQUIREMENTS
Immediately Immediately E. C"RA.\AI trains E.1 E nter !C 3.0.3 ~ vt41efihtey SURVEILLANCE REQUIREMENTS
_______SURVEILLANCE FREQUENCY SR 3.7.10.1 Verify the control room temperature is < 900F. In accordance withthe Surveillance Frequency ControlProgramINSERTRequired Action and associated Completion Timeof Condition B not metIIMcGuire Units 1 and 23.7.10-2Mc~ure nits1 ad 2 .7.0-2Amendment No.
_______SURVEILLANCE FREQUENCY SR 3.7.10.1 Verify the control room temperature is < 90 0 F. In accordance with the Surveillance Frequency Control Program INSERT Required Action and associated Completion Time of Condition B not met II McGuire Units 1 and 2 3.7.10-2 Mc~ure nits1 ad 2 .7.0-2Amendment No.
INSERT 1 TS 3.7.10 New Condition BCONDITION f REQUIRED ACTION jCOMPLETION TIMENot applicable whensecond CRACWSintentionally madeinoperable.
INSERT 1 TS 3.7.10 New Condition B CONDI T ION f REQUIRED ACTION jCOMPLETION TIME Not applicable when second CRACWS intentionally made inoperable.
Two CRACWS trainsinoperable.
Two CRACWS trains inoperable.
B. 1 Verify Control roomtemperature
B. 1 Verify Control room temperature
_< 90&deg;F.ANDB.2 Restore one CRACWStrain to OPERABLEstatus.Once per 4 hours24 hoursU U ATTACHMENT 2BCNS MARKED UP TECH SPEC PAGES CRACWS3.7.113.7 PLANT SYSTEMS3.7.11 Control Room Area Chilled Water System (CRACWS)LCO 3.7.11APPLICABILITY:
_< 90&deg;F.AND B.2 Restore one CRACWS train to OPERABLE status.Once per 4 hours 24 hours U U ATTACHMENT 2B CNS MARKED UP TECH SPEC PAGES CRACWS 3.7.11 3.7 PLANT SYSTEMS 3.7.11 Control Room Area Chilled Water System (CRACWS)LCO 3.7.11 APPLICABILITY:
Two CRACWS trains shall be OPERABLE.
Two CRACWS trains shall be OPERABLE.MODES 1, 2, 3, 4, 5, and 6, During movement of recently irradiated fuel assemblies.
MODES 1, 2, 3, 4, 5, and 6,During movement of recently irradiated fuel assemblies.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRACWS train A.1 Restore CRACWS train to 30 days inoperable.
ACTIONSCONDITION REQUIRED ACTION COMPLETION TIMEA. One CRACWS train A.1 Restore CRACWS train to 30 daysinoperable.
OPERABLE status.C.-BC. Required Action and B.1 Be in MODE 3. 6 hours associated Completion Time of Condition A bnot AND met in MODE 1, 2, 3,\ C 36 hours or 4. )--- .2 Be in MODE 5.-e;D. Required Action and Place OPERABLE Immediately associated Completion CRACWS train in operation.
OPERABLE status.C.-BC. Required Action and B.1 Be in MODE 3. 6 hoursassociated Completion Time of Condition A bnot ANDmet in MODE 1, 2, 3,\ C 36 hoursor 4. )--- .2 Be in MODE 5.-e;D. Required Action and Place OPERABLE Immediately associated Completion CRACWS train in operation.
Time of Condition A not met in MODE 5or 6,or OR during movement of recently irradiated fuel Suspend movement of assemblies, recently irradiated fuel Immediately assemblies.(continued)
Time of Condition A notmet in MODE 5or 6,or ORduring movement ofrecently irradiated fuel Suspend movement ofassemblies, recently irradiated fuel Immediately assemblies.
INSERT 1 New Condition B Catawba Units 1 and 2 3.7.11-1 Cataba nits1 ad 2 .7.1-1Amendment Nos. 1-98/1-9 CRACWS 3.7.11 CONDITION REQUIRED ACTION COMPLETION TIME-DE. Two CRA.CWS train-s T... in TnMODE 5 or 6, or during movement of recently irradiated fuel assemblies.
(continued)
DE.1 Suspend movement of recently irradiated fuel assemblies.
INSERT 1 New Condition BCatawba Units 1 and 23.7.11-1Cataba nits1 ad 2 .7.1-1Amendment Nos. 1-98/1-9 CRACWS3.7.11CONDITION REQUIRED ACTION COMPLETION TIME-DE. Two CRA.CWS train-sT... in TnMODE 5or 6, or duringmovement of recentlyirradiated fuelassemblies.
ImmediatelySURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.11.1 Verify the control room temperature is < 90&deg;F. In accordance with the Surveillance Frequency Control Program NSERT1/4t NSERT Required Action and associated Completion Time of Condition B met notl II Catawba Units 1 and 2 3.7.11-2 Cataba nits1 ad 2 .7.1-2Amendment Nos. 263, 2-59 INSERT 1 TS 3.7.11 New Condition B CONDITION REQUIRED ACTION [COMPLETION TIME B. --- NOTE Not applicable when second CRACWS intentionally made inoperable.
DE.1 Suspend movement ofrecently irradiated fuelassemblies.
Two CRACWS trains inoperable.
Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.11.1 Verify the control room temperature is < 90&deg;F. In accordance withthe Surveillance Frequency ControlProgramNSERT1/4tNSERTRequired Action and associated Completion Time of Condition Bmetnotl IICatawba Units 1 and 23.7.11-2Cataba nits1 ad 2 .7.1-2Amendment Nos. 263, 2-59 INSERT 1 TS 3.7.11 New Condition BCONDITION REQUIRED ACTION [COMPLETION TIMEB. --- NOTENot applicable whensecond CRACWSintentionally madeinoperable.
B. 1 Verify Control room temperature
Two CRACWS trainsinoperable.
< 90&deg;F.AND B.2 Restore one CRACWS train to OPERABLE status.Once per 4 hours 24 hours a a ATTACHMENT 3A MNS MARKED UP TECH SPEC BASES PAGES B 3.7 PLANT SYSTEMS B 3.7.10 Control Room Area Chilled Water System (CRACWS)BASES BACKGROUND The CRACWS provides temperature control for the control room following isolation of the control room.The CRACWS consists of two independent and redundant trains that provide cooling of recirculated control room air. Each train consists of cooling coils, instrumentation, and controls to provide for control room temperature control. The CRACWS is a subsystem providing air temperature control for the control room.The CRACWS is an emergency system, parts of which may also operate during normal unit operations.
B. 1 Verify Control roomtemperature
A single train will provide the required temperature control to maintain the control room at approximately 75&deg;F.The CRACWS operation in maintaining the control room temperature is discussed in the UFSAR, Section 6.4 (Ref. 1).There are components that are part of the CRACWS but do not affect the CRAVS. These components are associated with the Control Room Area Air Handling units, the Switchgear Air Handling units. LCO 3.7.10 does not apply if a CRAVS component does not directly impact the CRACWS.APPLICABLE The design basis of the CRACWS is to maintain the control room SAFETY ANALYSES temperature for 30 days of continuous occupancy.
< 90&deg;F.ANDB.2 Restore one CRACWStrain to OPERABLEstatus.Once per 4 hours24 hoursa a ATTACHMENT 3AMNS MARKED UP TECH SPEC BASES PAGES B 3.7 PLANT SYSTEMSB 3.7.10 Control Room Area Chilled Water System (CRACWS)BASESBACKGROUND The CRACWS provides temperature control for the control room following isolation of the control room.The CRACWS consists of two independent and redundant trains thatprovide cooling of recirculated control room air. Each train consists ofcooling coils, instrumentation, and controls to provide for control roomtemperature control.
The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the temperature between 75&deg;F and 90&deg;F. A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to perform its design function.
The CRACWS is a subsystem providing airtemperature control for the control room.The CRACWS is an emergency system, parts of which may also operateduring normal unit operations.
Redundant detectors and controls are provided for control room temperature control.The CRACWS is designed in accordance with Seismic Category I requirements.
A single train will provide the requiredtemperature control to maintain the control room at approximately 75&deg;F.The CRACWS operation in maintaining the control room temperature isdiscussed in the UFSAR, Section 6.4 (Ref. 1).There are components that are part of the CRACWS but do not affect theCRAVS. These components are associated with the Control Room AreaAir Handling units, the Switchgear Air Handling units. LCO 3.7.10 doesnot apply if a CRAVS component does not directly impact the CRACWS.APPLICABLE The design basis of the CRACWS is to maintain the control roomSAFETY ANALYSES temperature for 30 days of continuous occupancy.
The CRACWS is capable of removing sensible and latent heat loads from the control room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment OPERABILITY.
The CRACWS components are arranged in redundant, safety relatedtrains. During emergency operation, the CRACWS maintains thetemperature between 75&deg;F and 90&deg;F. A single active failure of acomponent of the CRACWS, with a loss of offsite power, does not impairthe ability of the system to perform its design function.
The CRACWS satisfies Criterion 3 of 10 CFR 50.36 (Ref. 2).McGuire Units 1 and 2 B371- eiinN.1-B 3.7.10-1 Revision No. "I"1-5 CRACWS B 3.7.10 BASES LCO Two independent and redundant trains of the CRACWS are required to be OPERABLE to ensure that at least one is available, assuming a single failure disabling the other train. Total system failure could result in the equipment operating temperature exceeding limits in the event of an accident.The CRACWS is considered to be OPERABLE when the individual components necessary to maintain the control room temperature are OPERABLE in both trains. These components include the cooling coils and associated temperature control instrumentation.
Redundant detectors and controls are provided for control room temperature control.The CRACWS is designed in accordance with Seismic Category Irequirements.
In addition, the CRACWS must be operable to the extent that air circulation can be maintained.
The CRACWS is capable of removing sensible and latentheat loads from the control room, which include consideration ofequipment heat loads and personnel occupancy requirements, to ensureequipment OPERABILITY.
The CRACWS is shared between the two units. The system must be OPERABLE for each unit when that unit is in the MODE of Applicability.
The CRACWS satisfies Criterion 3 of 10 CFR 50.36 (Ref. 2).McGuire Units 1 and 2 B371- eiinN.1-B 3.7.10-1Revision No. "I"1-5 CRACWSB 3.7.10BASESLCO Two independent and redundant trains of the CRACWS arerequired to be OPERABLE to ensure that at least one is available, assuming a single failure disabling the other train. Total systemfailure could result in the equipment operating temperature exceeding limits in the event of an accident.
Additionally, both normal and emergency power must also be OPERABLE because the system is shared. If a CRACWS component becomes inoperable, or normal or emergency power to a CRACWS component becomes inoperable, then the Required Actions of this LCO must be entered independently for each unit that is in the MODE of applicability of the LCO.APPLICABILITY In MODES 1, 2, 3, 4, 5, and 6, and during movement of irradiated fuel assemblies and during CORE ALTERATIONS, the CRACWS must be OPERABLE to ensure that the control room temperature will not exceed equipment operational requirements following isolation of the control room.ACTIONS A.1 With one CRACWS train inoperable, action must be taken to restore OPERABLE status within 30 days. In this Condition, the remaining OPERABLE CRACWS train is adequate to maintain the control room temperature within limits. However, the overall reliability is reduced because a single failure in the OPERABLE CRACWS train could result in loss of CRACWS function.
The CRACWS is considered to be OPERABLE when theindividual components necessary to maintain the control roomtemperature are OPERABLE in both trains. These components include the cooling coils and associated temperature controlinstrumentation.
The 30 day Completion Time is based on the low probability of an event requiring control room isolation, the consideration that the remaining train can provide the required protection, and that alternate safety or nonsafety related cooling means are available.(ew paragraph) anB2 I m m McGuire Units 1 and 2 B371- eiinN.1-B 3.7.10-2 Revision No. "I-I-5 INSERT 2 Bases B.1 and B.2 (new paragraph)
In addition, the CRACWS must be operable tothe extent that air circulation can be maintained.
B.1 and B.2 If both CRACWS trains are inoperable, the CRACWS may not be capable of performing its intended function.
The CRACWS is shared between the two units. The system mustbe OPERABLE for each unit when that unit is in the MODE ofApplicability.
Therefore, the control room temperature is required to be monitored to ensure that temperature is being maintained low enough that equipment in the control room is not adversely affected and remains habitable.
Additionally, both normal and emergency powermust also be OPERABLE because the system is shared. If aCRACWS component becomes inoperable, or normal oremergency power to a CRACWS component becomes inoperable, then the Required Actions of this LCO must be enteredindependently for each unit that is in the MODE of applicability ofthe LCO.APPLICABILITY In MODES 1, 2, 3, 4, 5, and 6, and during movement of irradiated fuel assemblies and during CORE ALTERATIONS, the CRACWSmust be OPERABLE to ensure that the control room temperature will not exceed equipment operational requirements following isolation of the control room.ACTIONS A.1With one CRACWS train inoperable, action must be taken torestore OPERABLE status within 30 days. In this Condition, theremaining OPERABLE CRACWS train is adequate to maintain thecontrol room temperature within limits. However, the overallreliability is reduced because a single failure in the OPERABLECRACWS train could result in loss of CRACWS function.
Mitigating actions, such as opening cabinet doors, use of fans, or opening control room doors or ventilation paths, may be used to maintain control room temperature.
The30 day Completion Time is based on the low probability of anevent requiring control room isolation, the consideration that theremaining train can provide the required protection, and thatalternate safety or nonsafety related cooling means are available.
With the control room temperature being maintained within the temperature limit, 24 hours is allowed to restore a CRACWS train to OPERABLE status. This Completion Time is reasonable considering that the control room temperature is being maintained within limits and the low probability of an event occurring requiring control room isolation.
(ew paragraph) anB2Im mMcGuire Units 1 and 2 B371- eiinN.1-B 3.7.10-2Revision No. "I-I-5 INSERT 2 Bases B.1 and B.2 (new paragraph)
The condition is modified by a Note stating it is not applicable when the second CRACWS train is intentionally made inoperable.
B.1 and B.2If both CRACWS trains are inoperable, the CRACWS may not be capable of performing itsintended function.
This Required Action is not intended for voluntary removal of redundant systems or components from service. The Required Action is only applicable if one CRACWS train is inoperable for any reason and a second CRACWS train is found to be inoperable, or if two CRACWS trains are found to be inoperable at the same time.
Therefore, the control room temperature is required to be monitored toensure that temperature is being maintained low enough that equipment in the control room isnot adversely affected and remains habitable.
CRACWS B 3.7.10 BASES ACTIONS (continued) assocated t ra~n In MODE 1, 2, 3, or 4, if the inoperable-R:ACWS trafti cannot be restored to OPERABLE status within the Time, the unit must be placed in a MODE that minimizes the risk.To achieve this status, the unit must be placed in at least MODE 3 within 6 hours, and in MODE 5 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.D D 0[A. 1,X32.1. and [.2.2 In MODE 5 or 6, or during movement of irradiated fuel, or during CORE ALTERATIONS, if the inoperable CRACWS train cannot be restored to OPERABLE status within the required Completion Time, the OPERABLE CRACWS train must be placed in operation immediately.
Mitigating  
This action ensures that the remaining train is OPERABLE, that no failures preventing automatic actuation will occur, and that active failures will be readily detected.An alternative to Required Action is to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control room. This places the unit in a condition that the movement of fuel if Required Actions B.1 or B.2 cannotE be met within the required Completion 1 and.2 /Times In MODE 5 or 6, or during movement f. irradiated fuel assemblies, or during CORE ALTERATIONS, hiprbe, action must be taken immediately to suspend activities I that could result in a release of radioactivity that might require isolation of the control room. This places the unit in a condition that minimizes risk. This does not preclude the movement of fuel to a safe position.If b.,cth ;r,,, ,noop,.rabohl in MODEN: "1. 2. 3. or I the" cotinrrl roomir a y n,,o.. t .,bo. c,, ap...blc ofI pz-^ r- In^g^.......  
: actions, such as opening cabinetdoors, use of fans, or opening control room doors or ventilation paths, may be used to maintaincontrol room temperature.
.. .... .. .t".. ,i.,,,,, itS IrIIIdtjlltd lUIiL~, i. I. I 3I.0.3.. III..u l.iat ,b 1 lc.,tcz, McGuire Units 1 and 2B37103RvsoN.1-5 B 3.7.10-3 Revision No. ffff5 CRACWS B 3.7.10 BASES SURVEILLANCE SR 3.7.10.1 REQUIREMENTS This SR verifies that the heat removal capability of the system is sufficient to maintain the temperature in the control room at or below 90&deg;F. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.REFERENCES
With the control room temperature being maintained within thetemperature limit, 24 hours is allowed to restore a CRACWS train to OPERABLE status. ThisCompletion Time is reasonable considering that the control room temperature is beingmaintained within limits and the low probability of an event occurring requiring control roomisolation.
The condition is modified by a Note stating it is not applicable when the second CRACWS trainis intentionally made inoperable.
This Required Action is not intended for voluntary removal ofredundant systems or components from service.
The Required Action is only applicable if oneCRACWS train is inoperable for any reason and a second CRACWS train is found to beinoperable, or if two CRACWS trains are found to be inoperable at the same time.
CRACWSB 3.7.10BASESACTIONS (continued) assocated t ra~nIn MODE 1, 2, 3, or 4, if the inoperable-R:ACWS trafti cannot berestored to OPERABLE status within the Time, the unit must be placed in a MODE that minimizes the risk.To achieve this status, the unit must be placed in at least MODE 3within 6 hours, and in MODE 5 within 36 hours. The allowedCompletion Times are reasonable, based on operating experience, to reach the required unit conditions from full powerconditions in an orderly manner and without challenging unitsystems.D D 0[A. 1,X32.1.
and [.2.2In MODE 5 or 6, or during movement of irradiated fuel, or duringCORE ALTERATIONS, if the inoperable CRACWS train cannot berestored to OPERABLE status within the required Completion Time, the OPERABLE CRACWS train must be placed in operation immediately.
This action ensures that the remaining train isOPERABLE, that no failures preventing automatic actuation willoccur, and that active failures will be readily detected.
An alternative to Required Action is to immediately suspendactivities that present a potential for releasing radioactivity thatmight require isolation of the control room. This places the unit ina condition that the movement of fuel if Required Actions B.1 or B.2 cannotE be met within the required Completion 1 and.2 /TimesIn MODE 5 or 6, or during movement  
: f. irradiated fuel assemblies, or during CORE ALTERATIONS, hiprbe, action must be taken immediately to suspend activities Ithat could result in a release of radioactivity that might requireisolation of the control room. This places the unit in a condition that minimizes risk. This does not preclude the movement of fuelto a safe position.
If b.,cth ;r,,, ,noop,.rabohl in MODEN: "1. 2. 3. or I the"cotinrrl roomir a y n,,o.. t .,bo. c,, ap...blc ofI pz-^ r- In^g^.......  
.. .... .. .t".. ,i.,,,,,
itSIrIIIdtjlltd lUIiL~, i. I. I 3I.0.3..
III..u l.iat ,b 1 lc.,tcz,McGuire Units 1 and 2B37103RvsoN.1-5 B 3.7.10-3Revision No. ffff5 CRACWSB 3.7.10BASESSURVEILLANCE SR 3.7.10.1REQUIREMENTS This SR verifies that the heat removal capability of the system issufficient to maintain the temperature in the control room at orbelow 90&deg;F. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.REFERENCES
: 1. UFSAR, Section 6.4.2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
: 1. UFSAR, Section 6.4.2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
McGuire Units 1 and 2B37104RvsoN.1--
McGuire Units 1 and 2B37104RvsoN.1--
B 3.7.10-4Revision No. 4-'1-5 ATTACHMENT 3BONS MARKED UP TECH SPEC BASES PAGES CRACWSB 3.7.11B 3.7 PLANT SYSTEMSB 3.7.11 Control Room Area Chilled Water System (CRACWS)BASESBACKGROUND The CRACWS provides temperature control for the control room and thecontrol room area.The CRACWS consists of two independent and redundant trains thatprovide cooling to the control room and control room area. Each trainconsists of a chiller package, chilled water pump, and air handling unitswith cooling coils. Chilled water is passed through the cooling coils of theair handling unit to cool the air. Electric duct heaters are then used tocontrol the supply air temperature.
B 3.7.10-4 Revision No. 4-'1-5 ATTACHMENT 3B ONS MARKED UP TECH SPEC BASES PAGES CRACWS B 3.7.11 B 3.7 PLANT SYSTEMS B 3.7.11 Control Room Area Chilled Water System (CRACWS)BASES BACKGROUND The CRACWS provides temperature control for the control room and the control room area.The CRACWS consists of two independent and redundant trains that provide cooling to the control room and control room area. Each train consists of a chiller package, chilled water pump, and air handling units with cooling coils. Chilled water is passed through the cooling coils of the air handling unit to cool the air. Electric duct heaters are then used to control the supply air temperature.
The CRACWS provides both normal and emergency cooling to thecontrol room and control room area. A single train will provide therequired temperature control to maintain the control room approximately 74&deg;F. The CRACWS operation in maintaining the control roomtemperature is discussed in the UFSAR, Section 9.4 (Ref. 1).APPLICABLE The design basis of the CRACWS is to maintain the control roomSAFETY ANALYSES temperature for 30 days of continuous occupancy.
The CRACWS provides both normal and emergency cooling to the control room and control room area. A single train will provide the required temperature control to maintain the control room approximately 74&deg;F. The CRACWS operation in maintaining the control room temperature is discussed in the UFSAR, Section 9.4 (Ref. 1).APPLICABLE The design basis of the CRACWS is to maintain the control room SAFETY ANALYSES temperature for 30 days of continuous occupancy.
The CRACWS components are arranged in redundant, safety relatedtrains. During emergency operation, the CRACWS maintains thetemperature between 72&deg;F and 85&deg;F. A single active failure of acomponent of the CRACWS, with a loss of offsite power, does not impairthe ability of the system to perform its design function.
The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the temperature between 72&deg;F and 85&deg;F. A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to perform its design function.
Redundant detectors and controls are provided for control room temperature control.The CRACWS is designed in accordance with Seismic Category Irequirements.
Redundant detectors and controls are provided for control room temperature control.The CRACWS is designed in accordance with Seismic Category I requirements.
The CRACWS is capable of removing sensible and latentheat loads from the control room, which include consideration ofequipment heat loads and personnel occupancy requirements, to ensureequipment OPERABILITY.
The CRACWS is capable of removing sensible and latent heat loads from the control room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment OPERABILITY.
Th'e CRACWS satisfies Criterion 3 of 10 CFR 50.36 (Ref. 2).Catawba Units 1 and 2 B 3.7.11-1 Revision No.
Th'e CRACWS satisfies Criterion 3 of 10 CFR 50.36 (Ref. 2).Catawba Units 1 and 2 B 3.7.11-1 Revision No.
CRACWSB 3.7.11BASESLCOTwo independent and redundant trains of the CRACWS are required tobe OPERABLE to ensure that at least one is available, assuming a singlefailure disabling the other train. Total system failure could result in theequipment operating temperature exceeding limits in the event of anaccident.
CRACWS B 3.7.11 BASES LCO Two independent and redundant trains of the CRACWS are required to be OPERABLE to ensure that at least one is available, assuming a single failure disabling the other train. Total system failure could result in the equipment operating temperature exceeding limits in the event of an accident.The CRACWS is considered to be OPERABLE when the individual components necessary to maintain the control room temperature are OPERABLE in both trains. These components include a chiller package, chilled water pump, and air handling unit. In addition, the CRACWS must be OPERABLE to the extent that air circulation can be maintained.
The CRACWS is considered to be OPERABLE when the individual components necessary to maintain the control room temperature areOPERABLE in both trains. These components include a chiller package,chilled water pump, and air handling unit. In addition, the CRACWS mustbe OPERABLE to the extent that air circulation can be maintained.
The CRACWS is shared between the two units. The system must be OPERABLE for each unit when that unit is in the MODE of Applicability.
The CRACWS is shared between the two units. The system must beOPERABLE for each unit when that unit is in the MODE of Applicability.
Additionally, both normal and emergency power must also be OPERABLE because the system is shared. A shutdown unit supplying its associated emergency power source (1 EMXG/2EMXH) cannot be credited for OPERABILITY of components supporting the operating unit.If a CRACWS component becomes inoperable, or normal or emergency power to a CRACWS component becomes inoperable, then the Required Actions of this LCO must be entered independently for each unit that is in the MODE of applicability of the LCO.APPLICABILITY In MODES 1, 2, 3, 4, 5, and 6, and during movement of recently irradiated fuel assemblies, the CRACWS must be OPERABLE to ensure that the control room temperature will not exceed equipment operational requirements following a design basis accident.
Additionally, both normal and emergency power must also beOPERABLE because the system is shared. A shutdown unit supplying itsassociated emergency power source (1 EMXG/2EMXH) cannot becredited for OPERABILITY of components supporting the operating unit.If a CRACWS component becomes inoperable, or normal or emergency power to a CRACWS component becomes inoperable, then the RequiredActions of this LCO must be entered independently for each unit that is inthe MODE of applicability of the LCO.APPLICABILITY In MODES 1, 2, 3, 4, 5, and 6, and during movement of recentlyirradiated fuel assemblies, the CRACWS must be OPERABLE to ensurethat the control room temperature will not exceed equipment operational requirements following a design basis accident.
The CRACWS is only required to be OPERABLE during fuel handling involving handling recently irradiated fuel (i.e., fuel that has occupied part of a critical reactor core within the previous 72 hours) due to radioactive decay.ACTIONS A.__1 With one CRACWS train inoperable, action must be taken to restore OPERABLE status within 30 days. In this Condition, the remaining OPERABLE CRACWS train is adequate to maintain the control room temperature within limits. However, the overall reliability is reduced because a single failure in the OPERABLE CRACWS train could result in loss of CRACWS function.
The CRACWS is onlyrequired to be OPERABLE during fuel handling involving handlingrecently irradiated fuel (i.e., fuel that has occupied part of a critical reactorcore within the previous 72 hours) due to radioactive decay.ACTIONSA.__1With one CRACWS train inoperable, action must be taken to restoreOPERABLE status within 30 days. In this Condition, the remaining OPERABLE CRACWS train is adequate to maintain the control roomtemperature within limits. However, the overall reliability is reducedbecause a single failure in the OPERABLE CRACWS train could result inloss of CRACWS function.
The 30 day Completion Time is based on the low probability of an event, the consideration that the remaining train can provide the required protection, and that alternate safety or nonsafety related cooling means are available.
The 30 day Completion Time is based on thelow probability of an event, the consideration that the remaining train canprovide the required protection, and that alternate safety or nonsafety related cooling means are available.
INSERT 2 B.1 and B.2 (new paragraph)
INSERT 2 B.1 and B.2(new paragraph)
I Catawba Units 1 and 2B371-2RvsoNO B 3.7.11-2 Revision INSERT 2 Bases B.1 and B.2 (new paragraph)
ICatawba Units 1 and 2B371-2RvsoNO B 3.7.11-2Revision INSERT 2 Bases B.1 and B.2 (new paragraph)
B.1 and B.2 If both CRACWS trains are inoperable, the CRACWS may not be capable of performing its intended function.
B.1 and B.2If both CRACWS trains are inoperable, the CRACWS may not be capable of performing itsintended function.
Therefore, the control room temperature is required to be monitored to ensure that temperature is being maintained low enough that equipment in the control room is not adversely affected and remains habitable.
Therefore, the control room temperature is required to be monitored to ensurethat temperature is being maintained low enough that equipment in the control room is notadversely affected and remains habitable.
Mitigating actions, such as opening cabinet doors, use of fans, or opening control room doors or ventilation paths, may be used to maintain control room temperature.
Mitigating  
With the control room temperature being maintained within the temperature limit, 24 hours is allowed to restore a CRACWS train to OPERABLE status. This Completion Time is reasonable considering that the control room temperature is being maintained within limits and the low probability of an event occurring requiring control room isolation.
: actions, such as opening cabinet doors,use of fans, or opening control room doors or ventilation paths, may be used to maintain controlroom temperature.
The condition is modified by a Note stating it is not applicable when the second CRACWS train is intentionally made inoperable.
With the control room temperature being maintained within the temperature limit, 24 hours is allowed to restore a CRACWS train to OPERABLE status. This Completion Time is reasonable considering that the control room temperature is being maintained withinlimits and the low probability of an event occurring requiring control room isolation.
This Required Action is not intended for voluntary removal of redundant systems or components from service. The Required Action is only applicable if one CRACWS train is inoperable for any reason and a second CRACWS train is found to be inoperable, or if two CRACWS trains are found to be inoperable at the same time.
The condition is modified by a Note stating it is not applicable when the second CRACWS train isintentionally made inoperable.
CRACWS B 3.7.11 BASES ACTIONS (continue II i an C 1asscae Itrain s)/In MODE 1, 2, 3, or 4, if the inoperab .,<RACWS tr cannot be restored to OPERABLE status within the Completion Time, the unit must be placed in a MODE that minimizes the risk. To achieve this status, the unit must be placed in at least MODE 3 within 6 hours, and in MODE 5 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems..l and D.In MODE 5 or 6, or during movement of recently irradiated fuel, if the inoperable CRACWS train cannot be restored to OPERABLE status within the required Completion Time, the OPERABLE CRACWS train must be placed in operation immediately.
This Required Action is not intended for voluntary removal ofredundant systems or components from service.
This action ensures that the remaining train is OPERABLE, and that active failures will be readily detected.An alternative to Required Action is to immediately suspend activities that present a potential for releasing radioactivity.
The Required Action is only applicable if oneCRACWS train is inoperable for any reason and a second CRACWS train is found to beinoperable, or if two CRACWS trains are found to be inoperable at the same time.
This places the unit in a condition that minimizes accident risk. This does not preclude th-' ma~,,-m-,rt i'f f, ,--I ta =- nn~itiAn I if Required Actions B.1 or B.2 cannot be met within the required Completion Times I* I In MODE 5or 6,or urn moeeto eetyirradiated fuel assemblies, wihtf RCSt'lq ,o~sle, action must be taken immediately to suspend activities that could result in a release of radioactivity.
CRACWSB 3.7.11BASESACTIONS (continue IIi an C 1asscae Itrain s)/In MODE 1, 2, 3, or 4, if the inoperab  
This places the unit in a condition that minimizes risk. This does not preclude the movement of fuel to a safe position.It hnth CRAPW~ trnir.~ ~IIIUperabIlU MODIIEJ~l 1,2, 3, Ul 4', tllr:: rwII Ig r..om........ma..not c ....bl cf p6-o-~F tg ,n ftllded ['urLiuunI.
.,<RACWS tr cannot berestored to OPERABLE status within the Completion Time, theunit must be placed in a MODE that minimizes the risk. To achieve thisstatus, the unit must be placed in at least MODE 3 within 6 hours, and inMODE 5 within 36 hours. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions fromfull power conditions in an orderly manner and without challenging unitsystems..l and D.In MODE 5 or 6, or during movement of recently irradiated fuel, if theinoperable CRACWS train cannot be restored to OPERABLE statuswithin the required Completion Time, the OPERABLE CRACWS trainmust be placed in operation immediately.
This action ensures that theremaining train is OPERABLE, and that active failures will be readilydetected.
An alternative to Required Action is to immediately suspendactivities that present a potential for releasing radioactivity.
This placesthe unit in a condition that minimizes accident risk. This does notpreclude th-' ma~,,-m-,rt i'f f, ,--I ta =- nn~itiAnI if Required Actions B.1 or B.2 cannot bemet within the required Completion TimesI* IIn MODE 5or 6,or urn moeeto eetyirradiated fuelassemblies, wihtf RCSt'lq ,o~sle, action must be takenimmediately to suspend activities that could result in a release ofradioactivity.
This places the unit in a condition that minimizes risk. Thisdoes not preclude the movement of fuel to a safe position.
It hnth CRAPW~ trnir.~ ~IIIUperabIlU MODIIEJ~l 1,2, 3, Ul 4', tllr:: rwII Igr..om........ma..not c ....bl cf p6-o-~F tg ,n ftllded ['urLiuunI.
Therefore, LCOJ 3.U.3 must be entered Immediately.
Therefore, LCOJ 3.U.3 must be entered Immediately.
Catawba Units I and 2B3.113evsoNo B 3.7.11-3Revision CRACWSB 3.7.11BASESSURVEILLANCE SR 3.7.11.1REQUI REMENTSThis SR verifies that the heat removal capability of the system is sufficient to maintain the temperature in the control room at or below 90&deg;F. TheSurveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.REFERENCES
Catawba Units I and 2B3.113evsoNo B 3.7.11-3 Revision CRACWS B 3.7.11 BASES SURVEILLANCE SR 3.7.11.1 REQUI REMENTS This SR verifies that the heat removal capability of the system is sufficient to maintain the temperature in the control room at or below 90&deg;F. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.REFERENCES
: 1. UFSAR, Section 9.4.2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
: 1. UFSAR, Section 9.4.2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
: 3. 10 CFR 50.67, Accident source term.4. Regulatory Guide 1.183, Revision 0.Catawba Units 1 and 2 B371- eiinNAB 3.7.11-4Revision No./,3/}}
: 3. 10 CFR 50.67, Accident source term.4. Regulatory Guide 1.183, Revision 0.Catawba Units 1 and 2 B371- eiinNA B 3.7.11-4 Revision No./,3/}}

Revision as of 16:44, 8 July 2018

McGuire, Units 1 and 2, Catawba, Units 1 and 2 - Proposed Technical Specifications (TS) Amendment TS 3.7.10, Control Room Area Chilled Water System (Mns), and TS 3.7.11, Control Room Area Chilled Water System (CNS)
ML16029A077
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 01/07/2016
From: Capps S D
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
MNS-16-002
Download: ML16029A077 (33)


Text

S DUKE Steven D. Capps Vice President~ENERG..Y McGuire Nuclear Station Duke Energy MG01VP I 12700 Hagers Ferry Road Huntersville, NC 28078 0: 980.875.4805 Seril No MNS16-02 1' 980.875.4809 Seril N. MN-16002Steven.Capps@duke-energy.com January 7, 2016 10 CFR 50.90 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION:

Document Control Desk

Subject:

Duke Energy Carolinas, LLC (Duke Energy)": McGuire Nuclear Station (MNS), Units 1 and 2, Docket Numbers 50-369 and 50-370, Renewed Facility Operating Licenses NPF-9 and NPF-17 Catawba Nuclear Station (CNS), Units 1 and 2 Docket Numbers 50-413 and 50-41 4, Renewed Facility Operating Licenses NPF-35 and NPF-52 Proposed Technical Specifications (TS) Amendment TS 3.7.10, "Control Room Area Chilled Water System" (MNS), and TS 3.7.11, "Control Room Area Chilled Water System" (CNS)Pursuant to 10 CFR 50.90, Duke Energy is requesting amendments to the MNS and CNS Facility Operating Licenses and subject Technical Specifications (TS). This proposed license amendment request (LAR) modifies the TS by adding a new Action for both trains of Control Room Area Chilled Water Systems (CRACWS) inoperable.

The new Action allows a finite time to restore one train to Operable status and requires periodic verification that Control Room temperature is maintained at or below 90°F.The proposed LAR is modeled after TSTF-477; Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems." This TSTF is specific to the BWR NUREGs 1433 and 1434. Duke Energy has determined this TSTF is readily adaptable to a NUREG-1 431 Standard TS for a Westinghouse plant. This topic was discussed with the NRC Staff on April 9, 2014. The proposed amendment is not being submitted under the Consolidated Line Item Improvement Process (CLIIP) process.Attachment 1 provides Duke Energy's evaluation of the amendment, which contains a description of the proposed changes, the technical evaluation, the regulatory analysis, the determination that this LAR contains No Significant Hazards Considerations, the basis for the categorical exclusion from performing an Environmental Assessment/Impact Statement, and precedent for the LAR.Attachment 2A provides the existing MNS TS pages marked-up to show the proposed changes.The reprinted TS pages will be provided to the NRC upon issuance of the approved amendment.

www.duke-energy.com U.S. Nuclear Regulatory Commission-MNS-1 6-002 Page 2 Attachment 2B provides the existing CNS TS pages marked-up to show the proposed changes.The reprinted TS pages will be provided to the NRC upon issuance of the approved amendment.

Attachment 3A provides a portion of the existing MNS TS Bases pages marked-up to show the corresponding proposed Bases changes. The TS Bases change will be processed after LAR approval under the MNS Bases Control Program (TS 5.5.14).Attachment 3B provides a portion of the existing CNS TS Bases pages marked-up to show the corresponding proposed Bases changes. The TS Bases change will be processed after LAR approval under the CNS Bases Control Program (TS 5.5.14).This proposed LAR has been reviewed and approved by the MNS and CNS Plant Operations Review Committees in accordance with the requirements of the Duke Energy Quality Assurance Program.In accordance with 10 CFR 50.91, Duke Energy is notifying the applicable state officials of this application for license amendment by transmitting a copy of this letter and its attachments to the designated officials.

This submittal will not impact the MNS or CNS Updated Final Safety Analysis Reports (UFSARs).Duke Energy requests approval of this submittal within one calendar year of the submittal date and an implementation period of 60 days from the date of amendment issuance.There are no regulatory commitments contained in this amendment.

Please direct any questions you may have in this matter to Lee A. Hentz at (980) 875-41 87.I declare under penalty of perjury that the foregoing is true and correct. Executed on January 7, 2016.Sincerely, Steven D. Capps Attachments U.S. Nuclear Regulatory Commission MNS-1 6-002 Page 3 xc (with attachments):

Catherine Haney Regional Administrator U.S. Nuclear Regulatory Commission

-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 G.A. Hutto, Ill Senior Resident Inspector (Catawba)U.S. Nuclear Regulatory Commission Catawba Nuclear Station J. Zeiler Senior Resident Inspector (McGuire)U.S. Nuclear Regulatory Commission McGuire Nuclear Station G. E. Miller (addressee only)NRC Project Manager (Catawba and McGuire)U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8-G9A 11555 Rockville Pike Rockville, MD 20852-2738 S.E. Jenkins Manager Radioactive and Infectious Waste Management Division of Waste Management South Carolina Department of Health and Environmental Control 2600 Bull St.Columbia, SC 29201 W.L. Cox, Ill Section Chief Division of Environmental Health Radiation Protection Section North Carolina Department of Environment and Natural Resources 1645 Mail Service Center Raleigh, NC 27699 ATTACHMENT 1 EVALUATION OF PROPOSED AMENDMENT 1.0

SUMMARY

DESCRIPTION 2.0 DETAILED DESCRIPTION 3.0 TECHNICAL EVALUATION 3.1 TS System Descriptions 3.2 Adaptability of BWR TSTF-477 Rev.3 to a Westinghouse Plant 3.3 Operational Burden 3.4 System Reliability Improvements 3.5 Control Room Equipment Temperature Limit Validation 3.6 Application of Proposed Change 4.0 REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria

4.2 Precedents

4.3 No Significant Hazards Consideration

4.4 Conclusion

5.0 ENVIRONMENTAL CONSIDERATIONS

6.0 REFERENCES

I ATTACHMENT 1 1.0

SUMMARY

DESCRIPTION Pursuant to 10 CFR 50.90, Duke Energy is requesting amendments to the McGuire Nuclear Station (MNS) and Catawba Nuclear Station (CNS) Facility Operating Licenses and subject Technical Specifications (TS). This proposed license amendment request (LAR) modifies MNS TS 3.7.10, "Control Room Area Chilled Water Systems," and corresponding CNS TS 3.7.11 by adding a new Action for both trains of Control Room Area Chilled Water Systems (CRACWS)inoperable.

The new Action allows a finite time, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, to restore one train to Operable status and requires periodic verification that Control Room temperature is maintained at or below 900°F.2.0 DETAILED DESCRIPTION As discussed in a meeting with the NRC staff on April 9, 2014, the proposed LAR is modeled after TSTF-477, Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems." TSTF-477 is applicable only to BWR (General Electric)

NUREGs 1433 and 1434, and adoption of this TSTF is available to BWRs via the Consolidated Line Item Improvement Process (CLIIP). Since the CNS and MNS TS are based on the Westinghouse NUREG-1431 Standard TSs, this Duke Energy LAR is not proposed to be processed via the CLIIP process. TSTF-477 adds a Condition to restore one Control Room AC subsystem within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in the event two Control Room AC subsystems become inoperable.

Since the Duke Energy meeting with the NRC staff, the Technical Specification Task Force has submitted a Traveler, TSTF-553, for NRC review. TSTF-553 is similar to TSTF-477 but is applicable to Westinghouse (NUREG-1 431) and Babcock & Wilcox (NUREG-1 430) plants and provides a Completion Time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for both plant types in the event two Control Room AC subsystems become inoperable.

TSTF-553 also includes a note that precludes use of the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> allowance when the second train is intentionally made inoperable.

Although TSTF-553 has not yet been reviewed or approved by the NRC, the LAR proposed by Duke Energy adopts the more conservative 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time and the additional restriction regarding intentional entry into the Condition.

The proposed LAR revises MNS TS 3.7.10 and CNS TS 3.7.11 as follows: a. Add a new Action B. New Action B applies when two CRACWS trains are inoperable.

Required Action B.1 requires verification once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> that Control Room temperature is less than or equal to 90°F. Required Action B.2 requires restoration of one CRACWS train to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.b. New Condition B is modified by a Note which states, "Not applicable when second CRACWS train intentionally made inoperable." If the second CRACWS train is intentionally made inoperable, there is no applicable Condition~and immediate entry into LCO 3.0.3 is required.c. Existing Action B, now renamed Action C, which applies when the Required Action and associated Completion Time of Condition A (one CRACWS train inoperable) is not met in MODES 1, 2, 3,or 4, is revised to also be applicable when the Required Actions and associated Completion Times of new Condition B~are not met. Renumbered Condition C requires being in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.2 ATTACHMENT 1 d. Existing Action C, now renamed Action D, remains unchanged.

e. For MNS, existing Action 0, now renamed Action E, which applies when two CRACWS trains are inoperable during movement of irradiated fuel assemblies or during core alterations, is revised to be applicable when the Required Actions and associated Completion Times of new Condition B are not met.f. For CNS, existing Action D, now renamed Action E, which applies when two CRACWS trains are inoperable during movement of recently irradiated fuel assemblies, is revised to be applicable when the Required Actions and associated Completion Times of new Condition B are not met.g. Existing Action E, which applied when two CRACWS trains are inoperable in MODE 1, 2, 3, or 4, and requires entry into LCO 3.0.3, is no longer needed and deleted (redundant to revised Condition C.).The marked-up TS pages showing the proposed changes above are provided in Attachments 2A and 2B.The corresponding TS Bases pages showing the proposed changes are provided in Attachments 3A and 3B. The TS Bases change will be processed after LAR approval under the MNS and CNS Bases Control Program (TS 5.5.14). They are provided in this LAR for information only.3.0 TECHNICAL EVALUATION 3.1 TS System Descriptions The CRACWS provides air temperature control for the Control Room, Control Room Area, and Switchgear Rooms. The Control Room Area (CRA) consists predominately of the Vital Battery and Equipment Rooms, Motor Control Center (MCC) rooms, and Cable Rooms. The Switchgear Rooms contain the essential switchgear.

The CRA and Switchgear Rooms are not part of the Control Room Envelope and not governed by the CRACWS Technical Specifications.

The CRACWS consists of two independent and redundant trains. Each train consists of a chiller package, chilled water pump, air handling units with cooling coils, instrumentation, and controls.The CRACWS is an emergency system, which also operates during normal unit operations.

A single train will provide the required temperature control to maintain the Control Room at approximately 75°F for MNS and 74°F for CNS, respectively.

The design basis of the CRACWS is to maintain the Control Room temperature for 30 days of continuous occupancy.

The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the Control Room temperature between 75°F and 90°F for MNS and between 72°F and 85°F for CNS, respectively.

A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to perform its design function.

Redundant detectors and controls are provided for Control Room temperature control. The CRACWS is designed in accordance with Seismic Category I 3 ATTACHMENT 1 requirements.

The CRACWS is capable of removing sensible and latent heat loads from the Control Room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment operability.

Two independent and redundant trains of the CRACWS are required to be operable to ensure that at least one is available, assuming a single failure disabling the other train. The CRACWS is shared between the two units. The system must be operable for each unit when that unit is in the Mode of Applicability.

The MNS and CNS Control Room Area Ventilation Systems (CRAVS) are governed by separate Technical Specifications; MNS TS 3.7.9 and CNS TS 3.7.10. The CRAVS is an emergency redundant system that provides a protected habitable environment for the Control Room Envelope from which occupants can control the Units following an uncontrolled release of radioactivity, hazardous chemicals, or smoke. The CRAVS does not provide a protected habitable environment for the Control Room Area or Switchgear Rooms. The inoperability of CRACWS does not impact the operability of CRAVS.The MNS CRACWS and CRAVS are described in MNS UFSAR Section 6.4. The CNS CRACWS and CRAVS are described in CNS UFSAR Section 9.4.3.2 Adaptability of BWR TSTF-477 Rev.3 to a Westinghouse Plant TSTF-477 Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems," was NRC approved for adoption in 2007. This BWR (GE) specific TSTF allows for two trains of Control Room cooling to be inoperable for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> as long as the Control Room area temperature can be maintained (and monitored) within a pre-determined limit, commonly 90°F.The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time was deemed reasonable considering that Control Room temperature is being maintained within limits and the low probability of an event occurring that would require Control Room area isolation.

Alternate methods of maintaining control room temperature, such as non-safety grade air conditioning systems or fans, can also be used to maintain control room temperature.

As previously stated in Section 2.0, Duke Energy will adopt the more conservative Completion Time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> proposed by TSTF-553.TSTF-477 Rev. 3 is deterministically justified and relies on safety related cabinet equipment qualification (EQ) temperature limits and Control Room heat-up assumptions.

For the GE plants, a GE Topical Report supports the EQ justification.

Duke Energy has performed site specific confirmations that equipment qualification for Control Room safety related instrumentation and devices remains valid up to 90°F. Note MNS TS 3.7.10 and CNS TS 3.7.11 already contain a Surveillance Requirement (SR) that confirms the Control Room is 90°F or less every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.AS precedent; TSTF-477 Rev. 3 references other GE Technical Specifications that currently provide an Action with a finite time to restore one train to operable status when both trains are inoperable.

MNS and CNS have similar Technical Specifications:

1. MNS and CNS TSs 3.3.3, "Post Accident Monitoring" (7 days).2. MNS TS 3.7.11 and CNS TS 3.7.12, "Auxiliary Building Filtered Ventilation Exhaust System" (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />).4 ATTACHMENT 1 Duke Energy has also reviewed the Hope Creek and Edwin Hatch LARs, Request for Additional Information (RAIs), and the NRC Safety Evaluations (SE) that adopted TSTF-477 Rev. 3.Based on that review, Duke Energy did not identify an issue that could not be addressed at our plants and did not identify any GE/BWR specific requirements or conditions.

3.3 Operational Burden Both MNS and CNS have experienced the inoperability of both trains of Control Room cooling.These occurred in 2005 and 2010 at MNS and in 2011 at CNS. With Control Room cooling being a shared system, these three events led to the initiation of a two unit shutdown.For the MNS events, one Control Room cooling train was functional but not operable.

Notice of Enforcement Discretion (NOEDs) were submitted and granted for MNS on both occasions to remain at power operation until one cooling train was restored to Operable status.For the CNS event, the "A" cooling train was in planned maintenance when the "B" cooling train tripped due to a chiller controls system micro-processor failure. Both units initiated a shutdown and proceeded to Mode 3 while a NOED was processed to not proceed to Mode 4. The "A" cooling train was restored shortly thereafter.

As part of the 2010 NRC approved NOED, MNS committed to submit an LAR to address operability requirements of the Control Room cooling Technical Specification.

3.4 System Reliability Improvements The 2005 MNS event was caused by a degraded oil pressure switch, which prohibited the "A" cooling train chiller compressor from starting.

At the time, the redundant cooling train was functional but administratively inoperable due to support system alignments for refueling outage Engineered Safety Features (ESF) testing. The degraded oil pressure switch was replaced, and then in 2007, the original chiller controls were replaced with digital controls, which improved the reliability of the oil pressure switch function.For the 2010 MNS event, the loss of the operating train of Control Room cooling was caused by high vibration of the hot gas bypass line (HGBP), which led to a breach of the coolant line. At the time, the redundant cooling train was in a planned maintenance evolution and temporarily unavailable.

Since 2010, both MNS Control Room cooling trains have been upgraded with new HGBP piping to reduce vibration interactions, vibration isolators have been installed, corroded and eroded service water piping has been replaced, small bore piping and tubing has been replaced, and piping analysis models were developed to identify potential thermal stresses.

In addition, the condenser normal operating head pressure was reduced, which further reduced HGBP piping vibration.

After the 2011 CNS chiller micro-processor failure, significant efforts were made to determine the cause of the failure and to enable the chiller to be rapidly restarted.

The failed micro-processor was sent to the original qualifier of the controls who, in concert with the original manufacturer of the controls, investigated the cause of the failure. The manufacturer has many years of in-service experience with this type of micro-processor and has experienced very few 5 ATTACHMENT 1 failures.

The failed micro-processor was subject to multiple tests, but the problem did not re-occur.Both companies recommended that failures of this type be addressed by removing and reapplying power to the micro-processor, similar to how many computer related problems are addressed.

This allows rapid re-start of the chiller. CNS has incorporated such actions into the current operating procedures.

In addition, CNS maintenance procedures have been enhanced to provide direction on how to replace a micro-processor which can now be done very quickly.Since MNS utilizes the same chiller controls, similar operating and maintenance procedure enhancements were incorporated.

3.5 Control Room Equipment Temperature Limit Validation MNS TS 3.7.10 and CNS TS 3.7.11 currently contain an SR that confirms the Control Room is 90°F or less every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. As such, the current licensed design temperature of the Control Room equipment remains unchanged by the proposed TS changes.Duke Energy has also concluded that the 90°F limit in the new proposed TS Action B remains unchanged based on a review of design specifications for the respective Control Room safety related instruments and devices. Design specifications for protective equipment in the Control Room specify no loss of protective function over the temperature range of 40°F to 90°F and a humidity range of 15 to 95% relative humidity.Therefore, monitoring of bulk Control Room temperature every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to ensure that ambient temperature is less than or equal to 90°F would verify that the Control Room temperature is at or below the design limit.3.6 Application of Proposed Change The most likely application of proposed Condition B and the associated Required Actions is when both CRACWS trains are inoperable but one train is functional with the ability to cool the Control Room. In this case, the Control Room temperature would remain constant at a normal value, and the 90°F limit is not challenged.

One CRACWS would need to be restored to Operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.In the event both CRACWS trains are inoperable and non-functional, MNS and CNS have developed

'"Abnormal Procedures" (AP) to mitigate rising temperatures in the Control Room and take actions to shutdown the affected Units if temperature rises above 90°F, or there are indications of instrumentation malfunctions that have safety significance.

4.0. REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria General Design Criterion (GDC) 19, "Control Room" states in part: A Control Room shall be provided from which actions can be taken to operate the nuclear power unit safely under normal conditions and to maintain it in a safe condition 6 ATTACHMENT 1 under accident conditions, including loss-of-coolant accidents.

Adequate radiation protection shall be provided to permit access and occupancy of the control room under accident conditions without personnel receiving radiation exposures in excess of 5 rem whole body, or its equivalent to any part of the body, for the duration of the accident.The MNS and CNS Control Room Area Ventilation Systems (CRAVS) provide compliance with GDC 19. The CRAVS is an emergency redundant system that provides a protected habitable environment for the Control Room Envelope from which occupants can control the Units following an uncontrolled release of radioactivity, hazardous chemicals, or smoke. The proposed changes to the CRACWS TS do not impact the operability of CRAVS.In addition, the operability requirements of the CRACWS have not changed. The regulatory requirements do not specifically address Completion Times with inoperable systems. As a result, the regulatory requirements and criteria are not affected by the proposed change.4.2 Precedents Duke Energy has also reviewed the Hope Creek and Edwin Hatch LARs, PAls, and NRC SEs that recently adopted TSTF-477 Rev. 3. Based on that review, Duke Energy did not identify an issue that could not be addressed at our plants and did not identify any GE/BWR specific requirements or conditions.

  • PSEG Hope Creek Generating Station, LAR dated February 28, 2011 (ADAMS Accession No. ML1 10590636);

as supplemented by letters dated August 29, 2011 (ML1 12420124), December 16, 2011 (ML1 13530205), and January 26, 2012 (ML12026A458);

NRC SE dated February 8, 2012 (ML120180078).

as supplemented by letter dated May 2, 2014 (ML14122A339);

and NRC SE dated December 10, 2014 (ML14279A261).

4.3 No Significant Hazards Consideration Pursuant to 10 CFR 50.90, Duke Energy Carolinas, LLC (Duke Energy) proposes a license amendment request (LAR) for the Renewed Facility Operating License (FOL) and Technical Specifications (TS) for McGuire (MNS) and Catawba (CNS) Nuclear Stations, Units I and 2.This proposed LAR modifies MNS TS 3.7.10, "Control Room Area Chilled Water Systems," and corresponding CNS TS 3.7.11 by adding a new Action for both trains of Control Room Area Chilled Water Systems (CRACWS) inoperable.

The new Action allows a finite time, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, to restore one train to Operable status and requires periodic verification that Control Room temperature is maintained at-or below 90°F degrees.-

The-proposed LAR is modeled after TSTF-477, Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems." Duke Energy has concluded that operation of the McGuire and Catawba Nuclear Stations in accordance with the proposed generic changes to the Technical Specifications does not involve a significant hazards consideration.

Duke Energy's conclusion is based on its evaluation, in accordance with 10 CFR 50.91 (a)(1), of the three standards set forth in 10 CFR 50.92(c) as discussed below: 7 ATTACHMENT 1 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response:

No.The proposed change allows 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to restore an inoperable CRACWS train when both trains are inoperable provided Control Room temperature is verified to be within the design limits every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The equipment qualification temperature of Control Room equipment is not affected.

The CRACWS is not an initiator of any accident previously evaluated.

As a result, the probability of any accident previously evaluated is not increased.

The consequences of an accident during the proposed 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time are no different than the consequences of an accident during the existing 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time provided in LCO 3.0.3 to prepare for a shutdown.

The proposed TS changes do not increase or change the current Control Room temperature limit. As a result, the consequences of any accident previously evaluated are not significantly increased.

Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response:

No.No new or different accidents result from utilizing the proposed change. The TS changes do not involve a physical alteration of the plant or a change in the methods governing normal plant operation.

In addition, the changes do not impose any new or different requirements.

Should the new Actions not be met, the existing and proposed Actions require a plant shutdown.

The changes do not alter assumptions made in the safety analysis.

The proposed changes are consistent with the safety analysis assumptions.

Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?Response:

No.The proposed change provides a limited period of time to restore an inoperable CRACWS train instead of requiring an immediate plant shutdown.

A plant shutdown is a transient, which may be avoided by providing a limited time to make repairs. In addition, the Control Room temPerature must be maintained less than a limit set to_ ensure habitability of the Control Room and the operability of-the equipment cooled by the CRACWS. The potential to avoid a plant transient, in conjunction with maintaining the Control Room temperature and the low probability of an event occurring during this time period, offset any risk associated with the limited Completion Time.Therefore, the proposed change does not involve a significant reduction in a margin of safety.8 ATTACHMENT 1 Based on the above, Duke Energy concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CER 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.

4.4 Conclusion

In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the approval of the proposed change will not be inimical to the common defense and security or to the health and safety of the public.5.0 ENVIRONMENTAL CONSIDERATIONS A review has determined that the proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CER 20, or would change an inspection or surveillance requirement.

However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii)a significant increase in individual or cumulative occupational radiation exposure.

Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51 .22(c)(g).

Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.9 ATTACHMENT 1

6.0 REFERENCES

1) TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems, dated March 26, 2007.2) NRC Letter, Summary of April 9, 2014, Public Teleconference Regarding Potential Submission of a License Amendment Request to Implement TSTF-477 for Control Room Air Conditioning subsystems, dated April 21, 2014, ADAMS Accession No.ML14101A243.
3) TSTF-553, Revision 0, Add Action for Two Inoperable CREA TCS Trains, transmitted for NRC review on October 31, 2015.4) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station, Units 1 and 2, Docket Number 50-369 and 50-370 Notice of Enforcement Discretion Request Technical Specification (TS) 3. 7.10, Control Room Area Chilled water System, dated January 14, 2010.5) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station, Unit 2 50-370 Notice of Enforcement Discretion Request Technical Specification
3. 7.10, Control Room Area Chilled water System (CRACWS), dated October 12, 2005.6) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke Energy) Catawba Nuclear Station, Units I and 2, Docket Number 50-4 13 and 50-4 14 Notice of Enforcement Discretion (NOED)Request Technical Specification (TS) 3. 7.11, "Control Room Area Chilled water System (CRACWS)" TS Limiting condition for Operation (LCO) 3.0.3 dated December 19, 2011.7) PSEG Letter, Hope Creek Generating Station, Facility Operating License No. NPF-57 NRC Docket No. 50-354 Application for Technical Specification Change TSF-4 77, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process, dated February 28, 2011.8) Southern Nuclear Letter, Edwin I. Hatch Nuclear Plant Application for Technical Specification Change to Revise Action Statements for Inoperable Control Room Air conditioning Subsystems, dated January 16, 2014.10 ATTACHMENT 2A MNS MARKED UP TECH SPEC PAGES CRACWS 3.7.10 3.7 PLANT SYSTEMS 3.7.10 Control Room Area Chilled Water System (CRACWS)LCO 3.7.10 APPLICABILITY:

Two CRACWS trains shall be OPERABLE.MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRACWS train A.1 Restore CRACWS train to 30 days inoperable.

OPERABLE status.C AB_,. Required Action and ,B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met in MODE1, 2, C or.ior 1.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> DRequired Action and ¢.1 Place OPERABLE Immediately associated Completion CRACWS train in Time of Condition A not operation.

met in MODE 5 or 6, or during movement of OR irradiated fuel D assemblies, or during p.2.1 Suspend CORE Immediately CORE ALTERATIONS.

ALTERATIONS.

AND D Z;.2.2 Suspend movement of Immediately irradiated fuel assemblies.

INSERT 1 New Condition B (continued)

McGuire Units 1 and 2 3.7.10-1 Mc~ure nitsI ad 2 .7.0-1Amendment No. 1-84/1t6e CRACWS 3.7.10 ACTIONS (continued)

CONDITION

[REQUIRED ACTION COMPLETION TIME in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

E fr.1 AND E 012 Suspend CORE ALTERATIONS.

Suspend movement of irradiated fuel assemblies.

Immediately Immediately E. C"RA.\AI trains E.1 E nter !C 3.0.3 ~ vt41efihtey SURVEILLANCE REQUIREMENTS

_______SURVEILLANCE FREQUENCY SR 3.7.10.1 Verify the control room temperature is < 90 0 F. In accordance with the Surveillance Frequency Control Program INSERT Required Action and associated Completion Time of Condition B not met II McGuire Units 1 and 2 3.7.10-2 Mc~ure nits1 ad 2 .7.0-2Amendment No.

INSERT 1 TS 3.7.10 New Condition B CONDI T ION f REQUIRED ACTION jCOMPLETION TIME Not applicable when second CRACWS intentionally made inoperable.

Two CRACWS trains inoperable.

B. 1 Verify Control room temperature

_< 90°F.AND B.2 Restore one CRACWS train to OPERABLE status.Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 24 hours U U ATTACHMENT 2B CNS MARKED UP TECH SPEC PAGES CRACWS 3.7.11 3.7 PLANT SYSTEMS 3.7.11 Control Room Area Chilled Water System (CRACWS)LCO 3.7.11 APPLICABILITY:

Two CRACWS trains shall be OPERABLE.MODES 1, 2, 3, 4, 5, and 6, During movement of recently irradiated fuel assemblies.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRACWS train A.1 Restore CRACWS train to 30 days inoperable.

OPERABLE status.C.-BC. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A bnot AND met in MODE 1, 2, 3,\ C 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> or 4. )--- .2 Be in MODE 5.-e;D. Required Action and Place OPERABLE Immediately associated Completion CRACWS train in operation.

Time of Condition A not met in MODE 5or 6,or OR during movement of recently irradiated fuel Suspend movement of assemblies, recently irradiated fuel Immediately assemblies.(continued)

INSERT 1 New Condition B Catawba Units 1 and 2 3.7.11-1 Cataba nits1 ad 2 .7.1-1Amendment Nos. 1-98/1-9 CRACWS 3.7.11 CONDITION REQUIRED ACTION COMPLETION TIME-DE. Two CRA.CWS train-s T... in TnMODE 5 or 6, or during movement of recently irradiated fuel assemblies.

DE.1 Suspend movement of recently irradiated fuel assemblies.

ImmediatelySURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.11.1 Verify the control room temperature is < 90°F. In accordance with the Surveillance Frequency Control Program NSERT1/4t NSERT Required Action and associated Completion Time of Condition B met notl II Catawba Units 1 and 2 3.7.11-2 Cataba nits1 ad 2 .7.1-2Amendment Nos. 263, 2-59 INSERT 1 TS 3.7.11 New Condition B CONDITION REQUIRED ACTION [COMPLETION TIME B. --- NOTE Not applicable when second CRACWS intentionally made inoperable.

Two CRACWS trains inoperable.

B. 1 Verify Control room temperature

< 90°F.AND B.2 Restore one CRACWS train to OPERABLE status.Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 24 hours a a ATTACHMENT 3A MNS MARKED UP TECH SPEC BASES PAGES B 3.7 PLANT SYSTEMS B 3.7.10 Control Room Area Chilled Water System (CRACWS)BASES BACKGROUND The CRACWS provides temperature control for the control room following isolation of the control room.The CRACWS consists of two independent and redundant trains that provide cooling of recirculated control room air. Each train consists of cooling coils, instrumentation, and controls to provide for control room temperature control. The CRACWS is a subsystem providing air temperature control for the control room.The CRACWS is an emergency system, parts of which may also operate during normal unit operations.

A single train will provide the required temperature control to maintain the control room at approximately 75°F.The CRACWS operation in maintaining the control room temperature is discussed in the UFSAR, Section 6.4 (Ref. 1).There are components that are part of the CRACWS but do not affect the CRAVS. These components are associated with the Control Room Area Air Handling units, the Switchgear Air Handling units. LCO 3.7.10 does not apply if a CRAVS component does not directly impact the CRACWS.APPLICABLE The design basis of the CRACWS is to maintain the control room SAFETY ANALYSES temperature for 30 days of continuous occupancy.

The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the temperature between 75°F and 90°F. A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to perform its design function.

Redundant detectors and controls are provided for control room temperature control.The CRACWS is designed in accordance with Seismic Category I requirements.

The CRACWS is capable of removing sensible and latent heat loads from the control room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment OPERABILITY.

The CRACWS satisfies Criterion 3 of 10 CFR 50.36 (Ref. 2).McGuire Units 1 and 2 B371- eiinN.1-B 3.7.10-1 Revision No. "I"1-5 CRACWS B 3.7.10 BASES LCO Two independent and redundant trains of the CRACWS are required to be OPERABLE to ensure that at least one is available, assuming a single failure disabling the other train. Total system failure could result in the equipment operating temperature exceeding limits in the event of an accident.The CRACWS is considered to be OPERABLE when the individual components necessary to maintain the control room temperature are OPERABLE in both trains. These components include the cooling coils and associated temperature control instrumentation.

In addition, the CRACWS must be operable to the extent that air circulation can be maintained.

The CRACWS is shared between the two units. The system must be OPERABLE for each unit when that unit is in the MODE of Applicability.

Additionally, both normal and emergency power must also be OPERABLE because the system is shared. If a CRACWS component becomes inoperable, or normal or emergency power to a CRACWS component becomes inoperable, then the Required Actions of this LCO must be entered independently for each unit that is in the MODE of applicability of the LCO.APPLICABILITY In MODES 1, 2, 3, 4, 5, and 6, and during movement of irradiated fuel assemblies and during CORE ALTERATIONS, the CRACWS must be OPERABLE to ensure that the control room temperature will not exceed equipment operational requirements following isolation of the control room.ACTIONS A.1 With one CRACWS train inoperable, action must be taken to restore OPERABLE status within 30 days. In this Condition, the remaining OPERABLE CRACWS train is adequate to maintain the control room temperature within limits. However, the overall reliability is reduced because a single failure in the OPERABLE CRACWS train could result in loss of CRACWS function.

The 30 day Completion Time is based on the low probability of an event requiring control room isolation, the consideration that the remaining train can provide the required protection, and that alternate safety or nonsafety related cooling means are available.(ew paragraph) anB2 I m m McGuire Units 1 and 2 B371- eiinN.1-B 3.7.10-2 Revision No. "I-I-5 INSERT 2 Bases B.1 and B.2 (new paragraph)

B.1 and B.2 If both CRACWS trains are inoperable, the CRACWS may not be capable of performing its intended function.

Therefore, the control room temperature is required to be monitored to ensure that temperature is being maintained low enough that equipment in the control room is not adversely affected and remains habitable.

Mitigating actions, such as opening cabinet doors, use of fans, or opening control room doors or ventilation paths, may be used to maintain control room temperature.

With the control room temperature being maintained within the temperature limit, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is allowed to restore a CRACWS train to OPERABLE status. This Completion Time is reasonable considering that the control room temperature is being maintained within limits and the low probability of an event occurring requiring control room isolation.

The condition is modified by a Note stating it is not applicable when the second CRACWS train is intentionally made inoperable.

This Required Action is not intended for voluntary removal of redundant systems or components from service. The Required Action is only applicable if one CRACWS train is inoperable for any reason and a second CRACWS train is found to be inoperable, or if two CRACWS trains are found to be inoperable at the same time.

CRACWS B 3.7.10 BASES ACTIONS (continued) assocated t ra~n In MODE 1, 2, 3, or 4, if the inoperable-R:ACWS trafti cannot be restored to OPERABLE status within the Time, the unit must be placed in a MODE that minimizes the risk.To achieve this status, the unit must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.D D 0[A. 1,X32.1. and [.2.2 In MODE 5 or 6, or during movement of irradiated fuel, or during CORE ALTERATIONS, if the inoperable CRACWS train cannot be restored to OPERABLE status within the required Completion Time, the OPERABLE CRACWS train must be placed in operation immediately.

This action ensures that the remaining train is OPERABLE, that no failures preventing automatic actuation will occur, and that active failures will be readily detected.An alternative to Required Action is to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control room. This places the unit in a condition that the movement of fuel if Required Actions B.1 or B.2 cannotE be met within the required Completion 1 and.2 /Times In MODE 5 or 6, or during movement f. irradiated fuel assemblies, or during CORE ALTERATIONS, hiprbe, action must be taken immediately to suspend activities I that could result in a release of radioactivity that might require isolation of the control room. This places the unit in a condition that minimizes risk. This does not preclude the movement of fuel to a safe position.If b.,cth ;r,,, ,noop,.rabohl in MODEN: "1. 2. 3. or I the" cotinrrl roomir a y n,,o.. t .,bo. c,, ap...blc ofI pz-^ r- In^g^.......

.. .... .. .t".. ,i.,,,,, itS IrIIIdtjlltd lUIiL~, i. I. I 3I.0.3.. III..u l.iat ,b 1 lc.,tcz, McGuire Units 1 and 2B37103RvsoN.1-5 B 3.7.10-3 Revision No. ffff5 CRACWS B 3.7.10 BASES SURVEILLANCE SR 3.7.10.1 REQUIREMENTS This SR verifies that the heat removal capability of the system is sufficient to maintain the temperature in the control room at or below 90°F. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.REFERENCES

1. UFSAR, Section 6.4.2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).

McGuire Units 1 and 2B37104RvsoN.1--

B 3.7.10-4 Revision No. 4-'1-5 ATTACHMENT 3B ONS MARKED UP TECH SPEC BASES PAGES CRACWS B 3.7.11 B 3.7 PLANT SYSTEMS B 3.7.11 Control Room Area Chilled Water System (CRACWS)BASES BACKGROUND The CRACWS provides temperature control for the control room and the control room area.The CRACWS consists of two independent and redundant trains that provide cooling to the control room and control room area. Each train consists of a chiller package, chilled water pump, and air handling units with cooling coils. Chilled water is passed through the cooling coils of the air handling unit to cool the air. Electric duct heaters are then used to control the supply air temperature.

The CRACWS provides both normal and emergency cooling to the control room and control room area. A single train will provide the required temperature control to maintain the control room approximately 74°F. The CRACWS operation in maintaining the control room temperature is discussed in the UFSAR, Section 9.4 (Ref. 1).APPLICABLE The design basis of the CRACWS is to maintain the control room SAFETY ANALYSES temperature for 30 days of continuous occupancy.

The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the temperature between 72°F and 85°F. A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to perform its design function.

Redundant detectors and controls are provided for control room temperature control.The CRACWS is designed in accordance with Seismic Category I requirements.

The CRACWS is capable of removing sensible and latent heat loads from the control room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment OPERABILITY.

Th'e CRACWS satisfies Criterion 3 of 10 CFR 50.36 (Ref. 2).Catawba Units 1 and 2 B 3.7.11-1 Revision No.

CRACWS B 3.7.11 BASES LCO Two independent and redundant trains of the CRACWS are required to be OPERABLE to ensure that at least one is available, assuming a single failure disabling the other train. Total system failure could result in the equipment operating temperature exceeding limits in the event of an accident.The CRACWS is considered to be OPERABLE when the individual components necessary to maintain the control room temperature are OPERABLE in both trains. These components include a chiller package, chilled water pump, and air handling unit. In addition, the CRACWS must be OPERABLE to the extent that air circulation can be maintained.

The CRACWS is shared between the two units. The system must be OPERABLE for each unit when that unit is in the MODE of Applicability.

Additionally, both normal and emergency power must also be OPERABLE because the system is shared. A shutdown unit supplying its associated emergency power source (1 EMXG/2EMXH) cannot be credited for OPERABILITY of components supporting the operating unit.If a CRACWS component becomes inoperable, or normal or emergency power to a CRACWS component becomes inoperable, then the Required Actions of this LCO must be entered independently for each unit that is in the MODE of applicability of the LCO.APPLICABILITY In MODES 1, 2, 3, 4, 5, and 6, and during movement of recently irradiated fuel assemblies, the CRACWS must be OPERABLE to ensure that the control room temperature will not exceed equipment operational requirements following a design basis accident.

The CRACWS is only required to be OPERABLE during fuel handling involving handling recently irradiated fuel (i.e., fuel that has occupied part of a critical reactor core within the previous 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />) due to radioactive decay.ACTIONS A.__1 With one CRACWS train inoperable, action must be taken to restore OPERABLE status within 30 days. In this Condition, the remaining OPERABLE CRACWS train is adequate to maintain the control room temperature within limits. However, the overall reliability is reduced because a single failure in the OPERABLE CRACWS train could result in loss of CRACWS function.

The 30 day Completion Time is based on the low probability of an event, the consideration that the remaining train can provide the required protection, and that alternate safety or nonsafety related cooling means are available.

INSERT 2 B.1 and B.2 (new paragraph)

I Catawba Units 1 and 2B371-2RvsoNO B 3.7.11-2 Revision INSERT 2 Bases B.1 and B.2 (new paragraph)

B.1 and B.2 If both CRACWS trains are inoperable, the CRACWS may not be capable of performing its intended function.

Therefore, the control room temperature is required to be monitored to ensure that temperature is being maintained low enough that equipment in the control room is not adversely affected and remains habitable.

Mitigating actions, such as opening cabinet doors, use of fans, or opening control room doors or ventilation paths, may be used to maintain control room temperature.

With the control room temperature being maintained within the temperature limit, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is allowed to restore a CRACWS train to OPERABLE status. This Completion Time is reasonable considering that the control room temperature is being maintained within limits and the low probability of an event occurring requiring control room isolation.

The condition is modified by a Note stating it is not applicable when the second CRACWS train is intentionally made inoperable.

This Required Action is not intended for voluntary removal of redundant systems or components from service. The Required Action is only applicable if one CRACWS train is inoperable for any reason and a second CRACWS train is found to be inoperable, or if two CRACWS trains are found to be inoperable at the same time.

CRACWS B 3.7.11 BASES ACTIONS (continue II i an C 1asscae Itrain s)/In MODE 1, 2, 3, or 4, if the inoperab .,<RACWS tr cannot be restored to OPERABLE status within the Completion Time, the unit must be placed in a MODE that minimizes the risk. To achieve this status, the unit must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems..l and D.In MODE 5 or 6, or during movement of recently irradiated fuel, if the inoperable CRACWS train cannot be restored to OPERABLE status within the required Completion Time, the OPERABLE CRACWS train must be placed in operation immediately.

This action ensures that the remaining train is OPERABLE, and that active failures will be readily detected.An alternative to Required Action is to immediately suspend activities that present a potential for releasing radioactivity.

This places the unit in a condition that minimizes accident risk. This does not preclude th-' ma~,,-m-,rt i'f f, ,--I ta =- nn~itiAn I if Required Actions B.1 or B.2 cannot be met within the required Completion Times I* I In MODE 5or 6,or urn moeeto eetyirradiated fuel assemblies, wihtf RCSt'lq ,o~sle, action must be taken immediately to suspend activities that could result in a release of radioactivity.

This places the unit in a condition that minimizes risk. This does not preclude the movement of fuel to a safe position.It hnth CRAPW~ trnir.~ ~IIIUperabIlU MODIIEJ~l 1,2, 3, Ul 4', tllr:: rwII Ig r..om........ma..not c ....bl cf p6-o-~F tg ,n ftllded ['urLiuunI.

Therefore, LCOJ 3.U.3 must be entered Immediately.

Catawba Units I and 2B3.113evsoNo B 3.7.11-3 Revision CRACWS B 3.7.11 BASES SURVEILLANCE SR 3.7.11.1 REQUI REMENTS This SR verifies that the heat removal capability of the system is sufficient to maintain the temperature in the control room at or below 90°F. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.REFERENCES

1. UFSAR, Section 9.4.2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
3. 10 CFR 50.67, Accident source term.4. Regulatory Guide 1.183, Revision 0.Catawba Units 1 and 2 B371- eiinNA B 3.7.11-4 Revision No./,3/

S DUKE Steven D. Capps Vice President~ENERG..Y McGuire Nuclear Station Duke Energy MG01VP I 12700 Hagers Ferry Road Huntersville, NC 28078 0: 980.875.4805 Seril No MNS16-02 1' 980.875.4809 Seril N. MN-16002Steven.Capps@duke-energy.com January 7, 2016 10 CFR 50.90 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION:

Document Control Desk

Subject:

Duke Energy Carolinas, LLC (Duke Energy)": McGuire Nuclear Station (MNS), Units 1 and 2, Docket Numbers 50-369 and 50-370, Renewed Facility Operating Licenses NPF-9 and NPF-17 Catawba Nuclear Station (CNS), Units 1 and 2 Docket Numbers 50-413 and 50-41 4, Renewed Facility Operating Licenses NPF-35 and NPF-52 Proposed Technical Specifications (TS) Amendment TS 3.7.10, "Control Room Area Chilled Water System" (MNS), and TS 3.7.11, "Control Room Area Chilled Water System" (CNS)Pursuant to 10 CFR 50.90, Duke Energy is requesting amendments to the MNS and CNS Facility Operating Licenses and subject Technical Specifications (TS). This proposed license amendment request (LAR) modifies the TS by adding a new Action for both trains of Control Room Area Chilled Water Systems (CRACWS) inoperable.

The new Action allows a finite time to restore one train to Operable status and requires periodic verification that Control Room temperature is maintained at or below 90°F.The proposed LAR is modeled after TSTF-477; Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems." This TSTF is specific to the BWR NUREGs 1433 and 1434. Duke Energy has determined this TSTF is readily adaptable to a NUREG-1 431 Standard TS for a Westinghouse plant. This topic was discussed with the NRC Staff on April 9, 2014. The proposed amendment is not being submitted under the Consolidated Line Item Improvement Process (CLIIP) process.Attachment 1 provides Duke Energy's evaluation of the amendment, which contains a description of the proposed changes, the technical evaluation, the regulatory analysis, the determination that this LAR contains No Significant Hazards Considerations, the basis for the categorical exclusion from performing an Environmental Assessment/Impact Statement, and precedent for the LAR.Attachment 2A provides the existing MNS TS pages marked-up to show the proposed changes.The reprinted TS pages will be provided to the NRC upon issuance of the approved amendment.

www.duke-energy.com U.S. Nuclear Regulatory Commission-MNS-1 6-002 Page 2 Attachment 2B provides the existing CNS TS pages marked-up to show the proposed changes.The reprinted TS pages will be provided to the NRC upon issuance of the approved amendment.

Attachment 3A provides a portion of the existing MNS TS Bases pages marked-up to show the corresponding proposed Bases changes. The TS Bases change will be processed after LAR approval under the MNS Bases Control Program (TS 5.5.14).Attachment 3B provides a portion of the existing CNS TS Bases pages marked-up to show the corresponding proposed Bases changes. The TS Bases change will be processed after LAR approval under the CNS Bases Control Program (TS 5.5.14).This proposed LAR has been reviewed and approved by the MNS and CNS Plant Operations Review Committees in accordance with the requirements of the Duke Energy Quality Assurance Program.In accordance with 10 CFR 50.91, Duke Energy is notifying the applicable state officials of this application for license amendment by transmitting a copy of this letter and its attachments to the designated officials.

This submittal will not impact the MNS or CNS Updated Final Safety Analysis Reports (UFSARs).Duke Energy requests approval of this submittal within one calendar year of the submittal date and an implementation period of 60 days from the date of amendment issuance.There are no regulatory commitments contained in this amendment.

Please direct any questions you may have in this matter to Lee A. Hentz at (980) 875-41 87.I declare under penalty of perjury that the foregoing is true and correct. Executed on January 7, 2016.Sincerely, Steven D. Capps Attachments U.S. Nuclear Regulatory Commission MNS-1 6-002 Page 3 xc (with attachments):

Catherine Haney Regional Administrator U.S. Nuclear Regulatory Commission

-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, GA 30303-1257 G.A. Hutto, Ill Senior Resident Inspector (Catawba)U.S. Nuclear Regulatory Commission Catawba Nuclear Station J. Zeiler Senior Resident Inspector (McGuire)U.S. Nuclear Regulatory Commission McGuire Nuclear Station G. E. Miller (addressee only)NRC Project Manager (Catawba and McGuire)U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8-G9A 11555 Rockville Pike Rockville, MD 20852-2738 S.E. Jenkins Manager Radioactive and Infectious Waste Management Division of Waste Management South Carolina Department of Health and Environmental Control 2600 Bull St.Columbia, SC 29201 W.L. Cox, Ill Section Chief Division of Environmental Health Radiation Protection Section North Carolina Department of Environment and Natural Resources 1645 Mail Service Center Raleigh, NC 27699 ATTACHMENT 1 EVALUATION OF PROPOSED AMENDMENT 1.0

SUMMARY

DESCRIPTION 2.0 DETAILED DESCRIPTION 3.0 TECHNICAL EVALUATION 3.1 TS System Descriptions 3.2 Adaptability of BWR TSTF-477 Rev.3 to a Westinghouse Plant 3.3 Operational Burden 3.4 System Reliability Improvements 3.5 Control Room Equipment Temperature Limit Validation 3.6 Application of Proposed Change 4.0 REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria

4.2 Precedents

4.3 No Significant Hazards Consideration

4.4 Conclusion

5.0 ENVIRONMENTAL CONSIDERATIONS

6.0 REFERENCES

I ATTACHMENT 1 1.0

SUMMARY

DESCRIPTION Pursuant to 10 CFR 50.90, Duke Energy is requesting amendments to the McGuire Nuclear Station (MNS) and Catawba Nuclear Station (CNS) Facility Operating Licenses and subject Technical Specifications (TS). This proposed license amendment request (LAR) modifies MNS TS 3.7.10, "Control Room Area Chilled Water Systems," and corresponding CNS TS 3.7.11 by adding a new Action for both trains of Control Room Area Chilled Water Systems (CRACWS)inoperable.

The new Action allows a finite time, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, to restore one train to Operable status and requires periodic verification that Control Room temperature is maintained at or below 900°F.2.0 DETAILED DESCRIPTION As discussed in a meeting with the NRC staff on April 9, 2014, the proposed LAR is modeled after TSTF-477, Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems." TSTF-477 is applicable only to BWR (General Electric)

NUREGs 1433 and 1434, and adoption of this TSTF is available to BWRs via the Consolidated Line Item Improvement Process (CLIIP). Since the CNS and MNS TS are based on the Westinghouse NUREG-1431 Standard TSs, this Duke Energy LAR is not proposed to be processed via the CLIIP process. TSTF-477 adds a Condition to restore one Control Room AC subsystem within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in the event two Control Room AC subsystems become inoperable.

Since the Duke Energy meeting with the NRC staff, the Technical Specification Task Force has submitted a Traveler, TSTF-553, for NRC review. TSTF-553 is similar to TSTF-477 but is applicable to Westinghouse (NUREG-1 431) and Babcock & Wilcox (NUREG-1 430) plants and provides a Completion Time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for both plant types in the event two Control Room AC subsystems become inoperable.

TSTF-553 also includes a note that precludes use of the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> allowance when the second train is intentionally made inoperable.

Although TSTF-553 has not yet been reviewed or approved by the NRC, the LAR proposed by Duke Energy adopts the more conservative 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time and the additional restriction regarding intentional entry into the Condition.

The proposed LAR revises MNS TS 3.7.10 and CNS TS 3.7.11 as follows: a. Add a new Action B. New Action B applies when two CRACWS trains are inoperable.

Required Action B.1 requires verification once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> that Control Room temperature is less than or equal to 90°F. Required Action B.2 requires restoration of one CRACWS train to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.b. New Condition B is modified by a Note which states, "Not applicable when second CRACWS train intentionally made inoperable." If the second CRACWS train is intentionally made inoperable, there is no applicable Condition~and immediate entry into LCO 3.0.3 is required.c. Existing Action B, now renamed Action C, which applies when the Required Action and associated Completion Time of Condition A (one CRACWS train inoperable) is not met in MODES 1, 2, 3,or 4, is revised to also be applicable when the Required Actions and associated Completion Times of new Condition B~are not met. Renumbered Condition C requires being in Mode 3 in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 5 in 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.2 ATTACHMENT 1 d. Existing Action C, now renamed Action D, remains unchanged.

e. For MNS, existing Action 0, now renamed Action E, which applies when two CRACWS trains are inoperable during movement of irradiated fuel assemblies or during core alterations, is revised to be applicable when the Required Actions and associated Completion Times of new Condition B are not met.f. For CNS, existing Action D, now renamed Action E, which applies when two CRACWS trains are inoperable during movement of recently irradiated fuel assemblies, is revised to be applicable when the Required Actions and associated Completion Times of new Condition B are not met.g. Existing Action E, which applied when two CRACWS trains are inoperable in MODE 1, 2, 3, or 4, and requires entry into LCO 3.0.3, is no longer needed and deleted (redundant to revised Condition C.).The marked-up TS pages showing the proposed changes above are provided in Attachments 2A and 2B.The corresponding TS Bases pages showing the proposed changes are provided in Attachments 3A and 3B. The TS Bases change will be processed after LAR approval under the MNS and CNS Bases Control Program (TS 5.5.14). They are provided in this LAR for information only.3.0 TECHNICAL EVALUATION 3.1 TS System Descriptions The CRACWS provides air temperature control for the Control Room, Control Room Area, and Switchgear Rooms. The Control Room Area (CRA) consists predominately of the Vital Battery and Equipment Rooms, Motor Control Center (MCC) rooms, and Cable Rooms. The Switchgear Rooms contain the essential switchgear.

The CRA and Switchgear Rooms are not part of the Control Room Envelope and not governed by the CRACWS Technical Specifications.

The CRACWS consists of two independent and redundant trains. Each train consists of a chiller package, chilled water pump, air handling units with cooling coils, instrumentation, and controls.The CRACWS is an emergency system, which also operates during normal unit operations.

A single train will provide the required temperature control to maintain the Control Room at approximately 75°F for MNS and 74°F for CNS, respectively.

The design basis of the CRACWS is to maintain the Control Room temperature for 30 days of continuous occupancy.

The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the Control Room temperature between 75°F and 90°F for MNS and between 72°F and 85°F for CNS, respectively.

A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to perform its design function.

Redundant detectors and controls are provided for Control Room temperature control. The CRACWS is designed in accordance with Seismic Category I 3 ATTACHMENT 1 requirements.

The CRACWS is capable of removing sensible and latent heat loads from the Control Room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment operability.

Two independent and redundant trains of the CRACWS are required to be operable to ensure that at least one is available, assuming a single failure disabling the other train. The CRACWS is shared between the two units. The system must be operable for each unit when that unit is in the Mode of Applicability.

The MNS and CNS Control Room Area Ventilation Systems (CRAVS) are governed by separate Technical Specifications; MNS TS 3.7.9 and CNS TS 3.7.10. The CRAVS is an emergency redundant system that provides a protected habitable environment for the Control Room Envelope from which occupants can control the Units following an uncontrolled release of radioactivity, hazardous chemicals, or smoke. The CRAVS does not provide a protected habitable environment for the Control Room Area or Switchgear Rooms. The inoperability of CRACWS does not impact the operability of CRAVS.The MNS CRACWS and CRAVS are described in MNS UFSAR Section 6.4. The CNS CRACWS and CRAVS are described in CNS UFSAR Section 9.4.3.2 Adaptability of BWR TSTF-477 Rev.3 to a Westinghouse Plant TSTF-477 Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems," was NRC approved for adoption in 2007. This BWR (GE) specific TSTF allows for two trains of Control Room cooling to be inoperable for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> as long as the Control Room area temperature can be maintained (and monitored) within a pre-determined limit, commonly 90°F.The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time was deemed reasonable considering that Control Room temperature is being maintained within limits and the low probability of an event occurring that would require Control Room area isolation.

Alternate methods of maintaining control room temperature, such as non-safety grade air conditioning systems or fans, can also be used to maintain control room temperature.

As previously stated in Section 2.0, Duke Energy will adopt the more conservative Completion Time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> proposed by TSTF-553.TSTF-477 Rev. 3 is deterministically justified and relies on safety related cabinet equipment qualification (EQ) temperature limits and Control Room heat-up assumptions.

For the GE plants, a GE Topical Report supports the EQ justification.

Duke Energy has performed site specific confirmations that equipment qualification for Control Room safety related instrumentation and devices remains valid up to 90°F. Note MNS TS 3.7.10 and CNS TS 3.7.11 already contain a Surveillance Requirement (SR) that confirms the Control Room is 90°F or less every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.AS precedent; TSTF-477 Rev. 3 references other GE Technical Specifications that currently provide an Action with a finite time to restore one train to operable status when both trains are inoperable.

MNS and CNS have similar Technical Specifications:

1. MNS and CNS TSs 3.3.3, "Post Accident Monitoring" (7 days).2. MNS TS 3.7.11 and CNS TS 3.7.12, "Auxiliary Building Filtered Ventilation Exhaust System" (24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />).4 ATTACHMENT 1 Duke Energy has also reviewed the Hope Creek and Edwin Hatch LARs, Request for Additional Information (RAIs), and the NRC Safety Evaluations (SE) that adopted TSTF-477 Rev. 3.Based on that review, Duke Energy did not identify an issue that could not be addressed at our plants and did not identify any GE/BWR specific requirements or conditions.

3.3 Operational Burden Both MNS and CNS have experienced the inoperability of both trains of Control Room cooling.These occurred in 2005 and 2010 at MNS and in 2011 at CNS. With Control Room cooling being a shared system, these three events led to the initiation of a two unit shutdown.For the MNS events, one Control Room cooling train was functional but not operable.

Notice of Enforcement Discretion (NOEDs) were submitted and granted for MNS on both occasions to remain at power operation until one cooling train was restored to Operable status.For the CNS event, the "A" cooling train was in planned maintenance when the "B" cooling train tripped due to a chiller controls system micro-processor failure. Both units initiated a shutdown and proceeded to Mode 3 while a NOED was processed to not proceed to Mode 4. The "A" cooling train was restored shortly thereafter.

As part of the 2010 NRC approved NOED, MNS committed to submit an LAR to address operability requirements of the Control Room cooling Technical Specification.

3.4 System Reliability Improvements The 2005 MNS event was caused by a degraded oil pressure switch, which prohibited the "A" cooling train chiller compressor from starting.

At the time, the redundant cooling train was functional but administratively inoperable due to support system alignments for refueling outage Engineered Safety Features (ESF) testing. The degraded oil pressure switch was replaced, and then in 2007, the original chiller controls were replaced with digital controls, which improved the reliability of the oil pressure switch function.For the 2010 MNS event, the loss of the operating train of Control Room cooling was caused by high vibration of the hot gas bypass line (HGBP), which led to a breach of the coolant line. At the time, the redundant cooling train was in a planned maintenance evolution and temporarily unavailable.

Since 2010, both MNS Control Room cooling trains have been upgraded with new HGBP piping to reduce vibration interactions, vibration isolators have been installed, corroded and eroded service water piping has been replaced, small bore piping and tubing has been replaced, and piping analysis models were developed to identify potential thermal stresses.

In addition, the condenser normal operating head pressure was reduced, which further reduced HGBP piping vibration.

After the 2011 CNS chiller micro-processor failure, significant efforts were made to determine the cause of the failure and to enable the chiller to be rapidly restarted.

The failed micro-processor was sent to the original qualifier of the controls who, in concert with the original manufacturer of the controls, investigated the cause of the failure. The manufacturer has many years of in-service experience with this type of micro-processor and has experienced very few 5 ATTACHMENT 1 failures.

The failed micro-processor was subject to multiple tests, but the problem did not re-occur.Both companies recommended that failures of this type be addressed by removing and reapplying power to the micro-processor, similar to how many computer related problems are addressed.

This allows rapid re-start of the chiller. CNS has incorporated such actions into the current operating procedures.

In addition, CNS maintenance procedures have been enhanced to provide direction on how to replace a micro-processor which can now be done very quickly.Since MNS utilizes the same chiller controls, similar operating and maintenance procedure enhancements were incorporated.

3.5 Control Room Equipment Temperature Limit Validation MNS TS 3.7.10 and CNS TS 3.7.11 currently contain an SR that confirms the Control Room is 90°F or less every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. As such, the current licensed design temperature of the Control Room equipment remains unchanged by the proposed TS changes.Duke Energy has also concluded that the 90°F limit in the new proposed TS Action B remains unchanged based on a review of design specifications for the respective Control Room safety related instruments and devices. Design specifications for protective equipment in the Control Room specify no loss of protective function over the temperature range of 40°F to 90°F and a humidity range of 15 to 95% relative humidity.Therefore, monitoring of bulk Control Room temperature every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to ensure that ambient temperature is less than or equal to 90°F would verify that the Control Room temperature is at or below the design limit.3.6 Application of Proposed Change The most likely application of proposed Condition B and the associated Required Actions is when both CRACWS trains are inoperable but one train is functional with the ability to cool the Control Room. In this case, the Control Room temperature would remain constant at a normal value, and the 90°F limit is not challenged.

One CRACWS would need to be restored to Operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.In the event both CRACWS trains are inoperable and non-functional, MNS and CNS have developed

'"Abnormal Procedures" (AP) to mitigate rising temperatures in the Control Room and take actions to shutdown the affected Units if temperature rises above 90°F, or there are indications of instrumentation malfunctions that have safety significance.

4.0. REGULATORY EVALUATION 4.1 Applicable Regulatory Requirements/Criteria General Design Criterion (GDC) 19, "Control Room" states in part: A Control Room shall be provided from which actions can be taken to operate the nuclear power unit safely under normal conditions and to maintain it in a safe condition 6 ATTACHMENT 1 under accident conditions, including loss-of-coolant accidents.

Adequate radiation protection shall be provided to permit access and occupancy of the control room under accident conditions without personnel receiving radiation exposures in excess of 5 rem whole body, or its equivalent to any part of the body, for the duration of the accident.The MNS and CNS Control Room Area Ventilation Systems (CRAVS) provide compliance with GDC 19. The CRAVS is an emergency redundant system that provides a protected habitable environment for the Control Room Envelope from which occupants can control the Units following an uncontrolled release of radioactivity, hazardous chemicals, or smoke. The proposed changes to the CRACWS TS do not impact the operability of CRAVS.In addition, the operability requirements of the CRACWS have not changed. The regulatory requirements do not specifically address Completion Times with inoperable systems. As a result, the regulatory requirements and criteria are not affected by the proposed change.4.2 Precedents Duke Energy has also reviewed the Hope Creek and Edwin Hatch LARs, PAls, and NRC SEs that recently adopted TSTF-477 Rev. 3. Based on that review, Duke Energy did not identify an issue that could not be addressed at our plants and did not identify any GE/BWR specific requirements or conditions.

  • PSEG Hope Creek Generating Station, LAR dated February 28, 2011 (ADAMS Accession No. ML1 10590636);

as supplemented by letters dated August 29, 2011 (ML1 12420124), December 16, 2011 (ML1 13530205), and January 26, 2012 (ML12026A458);

NRC SE dated February 8, 2012 (ML120180078).

as supplemented by letter dated May 2, 2014 (ML14122A339);

and NRC SE dated December 10, 2014 (ML14279A261).

4.3 No Significant Hazards Consideration Pursuant to 10 CFR 50.90, Duke Energy Carolinas, LLC (Duke Energy) proposes a license amendment request (LAR) for the Renewed Facility Operating License (FOL) and Technical Specifications (TS) for McGuire (MNS) and Catawba (CNS) Nuclear Stations, Units I and 2.This proposed LAR modifies MNS TS 3.7.10, "Control Room Area Chilled Water Systems," and corresponding CNS TS 3.7.11 by adding a new Action for both trains of Control Room Area Chilled Water Systems (CRACWS) inoperable.

The new Action allows a finite time, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, to restore one train to Operable status and requires periodic verification that Control Room temperature is maintained at-or below 90°F degrees.-

The-proposed LAR is modeled after TSTF-477, Rev. 3, "Add Action for Two Inoperable Control Room AC Subsystems." Duke Energy has concluded that operation of the McGuire and Catawba Nuclear Stations in accordance with the proposed generic changes to the Technical Specifications does not involve a significant hazards consideration.

Duke Energy's conclusion is based on its evaluation, in accordance with 10 CFR 50.91 (a)(1), of the three standards set forth in 10 CFR 50.92(c) as discussed below: 7 ATTACHMENT 1 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response:

No.The proposed change allows 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to restore an inoperable CRACWS train when both trains are inoperable provided Control Room temperature is verified to be within the design limits every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The equipment qualification temperature of Control Room equipment is not affected.

The CRACWS is not an initiator of any accident previously evaluated.

As a result, the probability of any accident previously evaluated is not increased.

The consequences of an accident during the proposed 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time are no different than the consequences of an accident during the existing 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time provided in LCO 3.0.3 to prepare for a shutdown.

The proposed TS changes do not increase or change the current Control Room temperature limit. As a result, the consequences of any accident previously evaluated are not significantly increased.

Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response:

No.No new or different accidents result from utilizing the proposed change. The TS changes do not involve a physical alteration of the plant or a change in the methods governing normal plant operation.

In addition, the changes do not impose any new or different requirements.

Should the new Actions not be met, the existing and proposed Actions require a plant shutdown.

The changes do not alter assumptions made in the safety analysis.

The proposed changes are consistent with the safety analysis assumptions.

Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?Response:

No.The proposed change provides a limited period of time to restore an inoperable CRACWS train instead of requiring an immediate plant shutdown.

A plant shutdown is a transient, which may be avoided by providing a limited time to make repairs. In addition, the Control Room temPerature must be maintained less than a limit set to_ ensure habitability of the Control Room and the operability of-the equipment cooled by the CRACWS. The potential to avoid a plant transient, in conjunction with maintaining the Control Room temperature and the low probability of an event occurring during this time period, offset any risk associated with the limited Completion Time.Therefore, the proposed change does not involve a significant reduction in a margin of safety.8 ATTACHMENT 1 Based on the above, Duke Energy concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CER 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.

4.4 Conclusion

In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the approval of the proposed change will not be inimical to the common defense and security or to the health and safety of the public.5.0 ENVIRONMENTAL CONSIDERATIONS A review has determined that the proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CER 20, or would change an inspection or surveillance requirement.

However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii)a significant increase in individual or cumulative occupational radiation exposure.

Accordingly, the proposed change meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51 .22(c)(g).

Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.9 ATTACHMENT 1

6.0 REFERENCES

1) TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems, dated March 26, 2007.2) NRC Letter, Summary of April 9, 2014, Public Teleconference Regarding Potential Submission of a License Amendment Request to Implement TSTF-477 for Control Room Air Conditioning subsystems, dated April 21, 2014, ADAMS Accession No.ML14101A243.
3) TSTF-553, Revision 0, Add Action for Two Inoperable CREA TCS Trains, transmitted for NRC review on October 31, 2015.4) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station, Units 1 and 2, Docket Number 50-369 and 50-370 Notice of Enforcement Discretion Request Technical Specification (TS) 3. 7.10, Control Room Area Chilled water System, dated January 14, 2010.5) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke) McGuire Nuclear Station, Unit 2 50-370 Notice of Enforcement Discretion Request Technical Specification
3. 7.10, Control Room Area Chilled water System (CRACWS), dated October 12, 2005.6) Duke Energy Letter, Duke Energy Carolinas, LLC (Duke Energy) Catawba Nuclear Station, Units I and 2, Docket Number 50-4 13 and 50-4 14 Notice of Enforcement Discretion (NOED)Request Technical Specification (TS) 3. 7.11, "Control Room Area Chilled water System (CRACWS)" TS Limiting condition for Operation (LCO) 3.0.3 dated December 19, 2011.7) PSEG Letter, Hope Creek Generating Station, Facility Operating License No. NPF-57 NRC Docket No. 50-354 Application for Technical Specification Change TSF-4 77, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems to the Technical Specifications Using Consolidated Line Item Improvement Process, dated February 28, 2011.8) Southern Nuclear Letter, Edwin I. Hatch Nuclear Plant Application for Technical Specification Change to Revise Action Statements for Inoperable Control Room Air conditioning Subsystems, dated January 16, 2014.10 ATTACHMENT 2A MNS MARKED UP TECH SPEC PAGES CRACWS 3.7.10 3.7 PLANT SYSTEMS 3.7.10 Control Room Area Chilled Water System (CRACWS)LCO 3.7.10 APPLICABILITY:

Two CRACWS trains shall be OPERABLE.MODES 1, 2, 3, 4, 5, and 6, During movement of irradiated fuel assemblies, During CORE ALTERATIONS.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRACWS train A.1 Restore CRACWS train to 30 days inoperable.

OPERABLE status.C AB_,. Required Action and ,B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A not AND met in MODE1, 2, C or.ior 1.2 Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> DRequired Action and ¢.1 Place OPERABLE Immediately associated Completion CRACWS train in Time of Condition A not operation.

met in MODE 5 or 6, or during movement of OR irradiated fuel D assemblies, or during p.2.1 Suspend CORE Immediately CORE ALTERATIONS.

ALTERATIONS.

AND D Z;.2.2 Suspend movement of Immediately irradiated fuel assemblies.

INSERT 1 New Condition B (continued)

McGuire Units 1 and 2 3.7.10-1 Mc~ure nitsI ad 2 .7.0-1Amendment No. 1-84/1t6e CRACWS 3.7.10 ACTIONS (continued)

CONDITION

[REQUIRED ACTION COMPLETION TIME in MODE 5 or 6, or during movement of irradiated fuel assemblies, or during CORE ALTERATIONS.

E fr.1 AND E 012 Suspend CORE ALTERATIONS.

Suspend movement of irradiated fuel assemblies.

Immediately Immediately E. C"RA.\AI trains E.1 E nter !C 3.0.3 ~ vt41efihtey SURVEILLANCE REQUIREMENTS

_______SURVEILLANCE FREQUENCY SR 3.7.10.1 Verify the control room temperature is < 90 0 F. In accordance with the Surveillance Frequency Control Program INSERT Required Action and associated Completion Time of Condition B not met II McGuire Units 1 and 2 3.7.10-2 Mc~ure nits1 ad 2 .7.0-2Amendment No.

INSERT 1 TS 3.7.10 New Condition B CONDI T ION f REQUIRED ACTION jCOMPLETION TIME Not applicable when second CRACWS intentionally made inoperable.

Two CRACWS trains inoperable.

B. 1 Verify Control room temperature

_< 90°F.AND B.2 Restore one CRACWS train to OPERABLE status.Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 24 hours U U ATTACHMENT 2B CNS MARKED UP TECH SPEC PAGES CRACWS 3.7.11 3.7 PLANT SYSTEMS 3.7.11 Control Room Area Chilled Water System (CRACWS)LCO 3.7.11 APPLICABILITY:

Two CRACWS trains shall be OPERABLE.MODES 1, 2, 3, 4, 5, and 6, During movement of recently irradiated fuel assemblies.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One CRACWS train A.1 Restore CRACWS train to 30 days inoperable.

OPERABLE status.C.-BC. Required Action and B.1 Be in MODE 3. 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition A bnot AND met in MODE 1, 2, 3,\ C 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> or 4. )--- .2 Be in MODE 5.-e;D. Required Action and Place OPERABLE Immediately associated Completion CRACWS train in operation.

Time of Condition A not met in MODE 5or 6,or OR during movement of recently irradiated fuel Suspend movement of assemblies, recently irradiated fuel Immediately assemblies.(continued)

INSERT 1 New Condition B Catawba Units 1 and 2 3.7.11-1 Cataba nits1 ad 2 .7.1-1Amendment Nos. 1-98/1-9 CRACWS 3.7.11 CONDITION REQUIRED ACTION COMPLETION TIME-DE. Two CRA.CWS train-s T... in TnMODE 5 or 6, or during movement of recently irradiated fuel assemblies.

DE.1 Suspend movement of recently irradiated fuel assemblies.

ImmediatelySURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.11.1 Verify the control room temperature is < 90°F. In accordance with the Surveillance Frequency Control Program NSERT1/4t NSERT Required Action and associated Completion Time of Condition B met notl II Catawba Units 1 and 2 3.7.11-2 Cataba nits1 ad 2 .7.1-2Amendment Nos. 263, 2-59 INSERT 1 TS 3.7.11 New Condition B CONDITION REQUIRED ACTION [COMPLETION TIME B. --- NOTE Not applicable when second CRACWS intentionally made inoperable.

Two CRACWS trains inoperable.

B. 1 Verify Control room temperature

< 90°F.AND B.2 Restore one CRACWS train to OPERABLE status.Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 24 hours a a ATTACHMENT 3A MNS MARKED UP TECH SPEC BASES PAGES B 3.7 PLANT SYSTEMS B 3.7.10 Control Room Area Chilled Water System (CRACWS)BASES BACKGROUND The CRACWS provides temperature control for the control room following isolation of the control room.The CRACWS consists of two independent and redundant trains that provide cooling of recirculated control room air. Each train consists of cooling coils, instrumentation, and controls to provide for control room temperature control. The CRACWS is a subsystem providing air temperature control for the control room.The CRACWS is an emergency system, parts of which may also operate during normal unit operations.

A single train will provide the required temperature control to maintain the control room at approximately 75°F.The CRACWS operation in maintaining the control room temperature is discussed in the UFSAR, Section 6.4 (Ref. 1).There are components that are part of the CRACWS but do not affect the CRAVS. These components are associated with the Control Room Area Air Handling units, the Switchgear Air Handling units. LCO 3.7.10 does not apply if a CRAVS component does not directly impact the CRACWS.APPLICABLE The design basis of the CRACWS is to maintain the control room SAFETY ANALYSES temperature for 30 days of continuous occupancy.

The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the temperature between 75°F and 90°F. A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to perform its design function.

Redundant detectors and controls are provided for control room temperature control.The CRACWS is designed in accordance with Seismic Category I requirements.

The CRACWS is capable of removing sensible and latent heat loads from the control room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment OPERABILITY.

The CRACWS satisfies Criterion 3 of 10 CFR 50.36 (Ref. 2).McGuire Units 1 and 2 B371- eiinN.1-B 3.7.10-1 Revision No. "I"1-5 CRACWS B 3.7.10 BASES LCO Two independent and redundant trains of the CRACWS are required to be OPERABLE to ensure that at least one is available, assuming a single failure disabling the other train. Total system failure could result in the equipment operating temperature exceeding limits in the event of an accident.The CRACWS is considered to be OPERABLE when the individual components necessary to maintain the control room temperature are OPERABLE in both trains. These components include the cooling coils and associated temperature control instrumentation.

In addition, the CRACWS must be operable to the extent that air circulation can be maintained.

The CRACWS is shared between the two units. The system must be OPERABLE for each unit when that unit is in the MODE of Applicability.

Additionally, both normal and emergency power must also be OPERABLE because the system is shared. If a CRACWS component becomes inoperable, or normal or emergency power to a CRACWS component becomes inoperable, then the Required Actions of this LCO must be entered independently for each unit that is in the MODE of applicability of the LCO.APPLICABILITY In MODES 1, 2, 3, 4, 5, and 6, and during movement of irradiated fuel assemblies and during CORE ALTERATIONS, the CRACWS must be OPERABLE to ensure that the control room temperature will not exceed equipment operational requirements following isolation of the control room.ACTIONS A.1 With one CRACWS train inoperable, action must be taken to restore OPERABLE status within 30 days. In this Condition, the remaining OPERABLE CRACWS train is adequate to maintain the control room temperature within limits. However, the overall reliability is reduced because a single failure in the OPERABLE CRACWS train could result in loss of CRACWS function.

The 30 day Completion Time is based on the low probability of an event requiring control room isolation, the consideration that the remaining train can provide the required protection, and that alternate safety or nonsafety related cooling means are available.(ew paragraph) anB2 I m m McGuire Units 1 and 2 B371- eiinN.1-B 3.7.10-2 Revision No. "I-I-5 INSERT 2 Bases B.1 and B.2 (new paragraph)

B.1 and B.2 If both CRACWS trains are inoperable, the CRACWS may not be capable of performing its intended function.

Therefore, the control room temperature is required to be monitored to ensure that temperature is being maintained low enough that equipment in the control room is not adversely affected and remains habitable.

Mitigating actions, such as opening cabinet doors, use of fans, or opening control room doors or ventilation paths, may be used to maintain control room temperature.

With the control room temperature being maintained within the temperature limit, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is allowed to restore a CRACWS train to OPERABLE status. This Completion Time is reasonable considering that the control room temperature is being maintained within limits and the low probability of an event occurring requiring control room isolation.

The condition is modified by a Note stating it is not applicable when the second CRACWS train is intentionally made inoperable.

This Required Action is not intended for voluntary removal of redundant systems or components from service. The Required Action is only applicable if one CRACWS train is inoperable for any reason and a second CRACWS train is found to be inoperable, or if two CRACWS trains are found to be inoperable at the same time.

CRACWS B 3.7.10 BASES ACTIONS (continued) assocated t ra~n In MODE 1, 2, 3, or 4, if the inoperable-R:ACWS trafti cannot be restored to OPERABLE status within the Time, the unit must be placed in a MODE that minimizes the risk.To achieve this status, the unit must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems.D D 0[A. 1,X32.1. and [.2.2 In MODE 5 or 6, or during movement of irradiated fuel, or during CORE ALTERATIONS, if the inoperable CRACWS train cannot be restored to OPERABLE status within the required Completion Time, the OPERABLE CRACWS train must be placed in operation immediately.

This action ensures that the remaining train is OPERABLE, that no failures preventing automatic actuation will occur, and that active failures will be readily detected.An alternative to Required Action is to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control room. This places the unit in a condition that the movement of fuel if Required Actions B.1 or B.2 cannotE be met within the required Completion 1 and.2 /Times In MODE 5 or 6, or during movement f. irradiated fuel assemblies, or during CORE ALTERATIONS, hiprbe, action must be taken immediately to suspend activities I that could result in a release of radioactivity that might require isolation of the control room. This places the unit in a condition that minimizes risk. This does not preclude the movement of fuel to a safe position.If b.,cth ;r,,, ,noop,.rabohl in MODEN: "1. 2. 3. or I the" cotinrrl roomir a y n,,o.. t .,bo. c,, ap...blc ofI pz-^ r- In^g^.......

.. .... .. .t".. ,i.,,,,, itS IrIIIdtjlltd lUIiL~, i. I. I 3I.0.3.. III..u l.iat ,b 1 lc.,tcz, McGuire Units 1 and 2B37103RvsoN.1-5 B 3.7.10-3 Revision No. ffff5 CRACWS B 3.7.10 BASES SURVEILLANCE SR 3.7.10.1 REQUIREMENTS This SR verifies that the heat removal capability of the system is sufficient to maintain the temperature in the control room at or below 90°F. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.REFERENCES

1. UFSAR, Section 6.4.2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).

McGuire Units 1 and 2B37104RvsoN.1--

B 3.7.10-4 Revision No. 4-'1-5 ATTACHMENT 3B ONS MARKED UP TECH SPEC BASES PAGES CRACWS B 3.7.11 B 3.7 PLANT SYSTEMS B 3.7.11 Control Room Area Chilled Water System (CRACWS)BASES BACKGROUND The CRACWS provides temperature control for the control room and the control room area.The CRACWS consists of two independent and redundant trains that provide cooling to the control room and control room area. Each train consists of a chiller package, chilled water pump, and air handling units with cooling coils. Chilled water is passed through the cooling coils of the air handling unit to cool the air. Electric duct heaters are then used to control the supply air temperature.

The CRACWS provides both normal and emergency cooling to the control room and control room area. A single train will provide the required temperature control to maintain the control room approximately 74°F. The CRACWS operation in maintaining the control room temperature is discussed in the UFSAR, Section 9.4 (Ref. 1).APPLICABLE The design basis of the CRACWS is to maintain the control room SAFETY ANALYSES temperature for 30 days of continuous occupancy.

The CRACWS components are arranged in redundant, safety related trains. During emergency operation, the CRACWS maintains the temperature between 72°F and 85°F. A single active failure of a component of the CRACWS, with a loss of offsite power, does not impair the ability of the system to perform its design function.

Redundant detectors and controls are provided for control room temperature control.The CRACWS is designed in accordance with Seismic Category I requirements.

The CRACWS is capable of removing sensible and latent heat loads from the control room, which include consideration of equipment heat loads and personnel occupancy requirements, to ensure equipment OPERABILITY.

Th'e CRACWS satisfies Criterion 3 of 10 CFR 50.36 (Ref. 2).Catawba Units 1 and 2 B 3.7.11-1 Revision No.

CRACWS B 3.7.11 BASES LCO Two independent and redundant trains of the CRACWS are required to be OPERABLE to ensure that at least one is available, assuming a single failure disabling the other train. Total system failure could result in the equipment operating temperature exceeding limits in the event of an accident.The CRACWS is considered to be OPERABLE when the individual components necessary to maintain the control room temperature are OPERABLE in both trains. These components include a chiller package, chilled water pump, and air handling unit. In addition, the CRACWS must be OPERABLE to the extent that air circulation can be maintained.

The CRACWS is shared between the two units. The system must be OPERABLE for each unit when that unit is in the MODE of Applicability.

Additionally, both normal and emergency power must also be OPERABLE because the system is shared. A shutdown unit supplying its associated emergency power source (1 EMXG/2EMXH) cannot be credited for OPERABILITY of components supporting the operating unit.If a CRACWS component becomes inoperable, or normal or emergency power to a CRACWS component becomes inoperable, then the Required Actions of this LCO must be entered independently for each unit that is in the MODE of applicability of the LCO.APPLICABILITY In MODES 1, 2, 3, 4, 5, and 6, and during movement of recently irradiated fuel assemblies, the CRACWS must be OPERABLE to ensure that the control room temperature will not exceed equipment operational requirements following a design basis accident.

The CRACWS is only required to be OPERABLE during fuel handling involving handling recently irradiated fuel (i.e., fuel that has occupied part of a critical reactor core within the previous 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />) due to radioactive decay.ACTIONS A.__1 With one CRACWS train inoperable, action must be taken to restore OPERABLE status within 30 days. In this Condition, the remaining OPERABLE CRACWS train is adequate to maintain the control room temperature within limits. However, the overall reliability is reduced because a single failure in the OPERABLE CRACWS train could result in loss of CRACWS function.

The 30 day Completion Time is based on the low probability of an event, the consideration that the remaining train can provide the required protection, and that alternate safety or nonsafety related cooling means are available.

INSERT 2 B.1 and B.2 (new paragraph)

I Catawba Units 1 and 2B371-2RvsoNO B 3.7.11-2 Revision INSERT 2 Bases B.1 and B.2 (new paragraph)

B.1 and B.2 If both CRACWS trains are inoperable, the CRACWS may not be capable of performing its intended function.

Therefore, the control room temperature is required to be monitored to ensure that temperature is being maintained low enough that equipment in the control room is not adversely affected and remains habitable.

Mitigating actions, such as opening cabinet doors, use of fans, or opening control room doors or ventilation paths, may be used to maintain control room temperature.

With the control room temperature being maintained within the temperature limit, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is allowed to restore a CRACWS train to OPERABLE status. This Completion Time is reasonable considering that the control room temperature is being maintained within limits and the low probability of an event occurring requiring control room isolation.

The condition is modified by a Note stating it is not applicable when the second CRACWS train is intentionally made inoperable.

This Required Action is not intended for voluntary removal of redundant systems or components from service. The Required Action is only applicable if one CRACWS train is inoperable for any reason and a second CRACWS train is found to be inoperable, or if two CRACWS trains are found to be inoperable at the same time.

CRACWS B 3.7.11 BASES ACTIONS (continue II i an C 1asscae Itrain s)/In MODE 1, 2, 3, or 4, if the inoperab .,<RACWS tr cannot be restored to OPERABLE status within the Completion Time, the unit must be placed in a MODE that minimizes the risk. To achieve this status, the unit must be placed in at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in MODE 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required unit conditions from full power conditions in an orderly manner and without challenging unit systems..l and D.In MODE 5 or 6, or during movement of recently irradiated fuel, if the inoperable CRACWS train cannot be restored to OPERABLE status within the required Completion Time, the OPERABLE CRACWS train must be placed in operation immediately.

This action ensures that the remaining train is OPERABLE, and that active failures will be readily detected.An alternative to Required Action is to immediately suspend activities that present a potential for releasing radioactivity.

This places the unit in a condition that minimizes accident risk. This does not preclude th-' ma~,,-m-,rt i'f f, ,--I ta =- nn~itiAn I if Required Actions B.1 or B.2 cannot be met within the required Completion Times I* I In MODE 5or 6,or urn moeeto eetyirradiated fuel assemblies, wihtf RCSt'lq ,o~sle, action must be taken immediately to suspend activities that could result in a release of radioactivity.

This places the unit in a condition that minimizes risk. This does not preclude the movement of fuel to a safe position.It hnth CRAPW~ trnir.~ ~IIIUperabIlU MODIIEJ~l 1,2, 3, Ul 4', tllr:: rwII Ig r..om........ma..not c ....bl cf p6-o-~F tg ,n ftllded ['urLiuunI.

Therefore, LCOJ 3.U.3 must be entered Immediately.

Catawba Units I and 2B3.113evsoNo B 3.7.11-3 Revision CRACWS B 3.7.11 BASES SURVEILLANCE SR 3.7.11.1 REQUI REMENTS This SR verifies that the heat removal capability of the system is sufficient to maintain the temperature in the control room at or below 90°F. The Surveillance Frequency is based on operating experience, equipment reliability, and plant risk and is controlled under the Surveillance Frequency Control Program.REFERENCES

1. UFSAR, Section 9.4.2. 10 CFR 50.36, Technical Specifications, (c)(2)(ii).
3. 10 CFR 50.67, Accident source term.4. Regulatory Guide 1.183, Revision 0.Catawba Units 1 and 2 B371- eiinNA B 3.7.11-4 Revision No./,3/