{{#Wiki_filter:CATEGORY1REGUDRTOO~INFORMATION'DISTRIBUTION
{{#Wiki_filter:CATEGORY 1 REGUDRTOO~INFORMATION'DISTRIBUTION
%STEM(RIDE)ACCESSION NBR:9601020057 DOC.DATE:
%STEM (RIDE)ACCESSION NBR:9601020057 DOC.DATE: 95/12/21 NOTARIZED:
95/12/21NOTARIZED:
NO'OCKET I FACIL:50-244 Robert"Emmet,Ginna kQclear.Plant', Unit j., Rochester G 05000244 AUTH.NAMEAUTHOR AFFILIATION MECREDY,R.C.
NO'OCKETIFACIL:50-244 Robert"Emmet,Ginna kQclear.Plant',Unitj.,Rochester G05000244AUTH.NAMEAUTHORAFFILIATION MECREDY,R.C.
Rochester Gas'&Electric Corp.RECIP.NAME RECIPIENT=AFFILIATION.JOHNSON,A.R.
Rochester Gas'&ElectricCorp.RECIP.NAME RECIPIENT=AFFILIATION
.JOHNSON,A.R.


==SUBJECT:==
==SUBJECT:==
ForwardsRev22to"QAProgram'forStationOperation,"
Forwards Rev 22 to"QA Program'for Station Operation," incorporating organization related changes associated w/C>>'restructuring of corporation.'
incorporating organization relatedchangesassociated w/C>>'restructuring ofcorporation.'
DISTRIBUTION CODE: Q004D COPIES RECEIVED:LTR ENCL U SIZE: TITLE: QA Topical Report, Change, Amendment, or Correspondence (ocket Utili NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
DISTRIBUTION CODE:Q004DCOPIESRECEIVED:LTR ENCLUSIZE:TITLE:QATopicalReport,Change,Amendment, orCorrespondence (ocketUtiliNOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
05000244 E EXT RNA NRR DRCH/HQMB OC/LFDCB DMB/OSS NRC PDR RECIPIENT ID CODE/NAME JOHNSON,A INTERNAL: DRS/RGNl 3 ILE CE COPIES.LTTR ENCL 1"1 1 1 1 1 2 2 1 1 1 1 1 1'1 RECIPIENT ID CODE/NAME DRS/RGN2 DRS/RGN4 NRR/DISP/IMS NUDOCS-ABSTRACT RGN1 FILE IHS COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1.1 D 0 C U E NOTE TO ALL"RZDS" RECZPZENTS:
05000244EEXTRNANRRDRCH/HQMB OC/LFDCBDMB/OSSNRCPDRRECIPIENT IDCODE/NAME JOHNSON,A INTERNAL:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR,'.15 ENCL."15 I li A!;0>1 C f 4~~l~"p' 4ND I ROCHESTER GAS AND EIECIIIIC CORPORATION
DRS/RGNl3ILECECOPIES.LTTRENCL1"1111122111111'1RECIPIENT IDCODE/NAME DRS/RGN2DRS/RGN4NRR/DISP/IMS NUDOCS-ABSTRACT RGN1FILEIHSCOPIESLTTRENCL11111111111.1D0CUENOTETOALL"RZDS"RECZPZENTS:
~89 EASTAY&IUf, ROCHESlER, N.Y IrIiQ9-0001 AREA CODE716 546-27M ROBERT C.MECREDY Vice President Nuclear Operations December 21, 1995 U.S.Nuclear Regulatory Commission Document Control Desk Attn: 'llen R.Johnson Project Directorate I-1 Washington, D.C.20555  
PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFNSD-5(EXT.
415-2083)
TOELZMZNATE YOURNAMEFROMDZSTRZBUTZON LZSTSFORDOCUMENTS YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:
LTTR,'.15ENCL."15I liA!;0>1Cf4~~l~"p' 4NDIROCHESTER GASANDEIECIIIIC CORPORATION
~89EASTAY&IUf, ROCHESlER, N.YIrIiQ9-0001 AREACODE716546-27MROBERTC.MECREDYVicePresident NuclearOperations December21,1995U.S.NuclearRegulatory Commission DocumentControlDeskAttn:'llenR.JohnsonProjectDirectorate I-1Washington, D.C.20555


==Subject:==
==Subject:==
RevisedSubmittal ofQualityAssurance ProgramforStationOperation Rochester Gas6ElectricCorporation R.E.GinnaNuclearPowerPlantDocketNo.50-244
Revised Submittal of Quality Assurance Program for Station Operation Rochester Gas 6 Electric Corporation R.E.Ginna Nuclear Power Plant Docket No.50-244  


==DearMr.Johnson,==
==Dear Mr.Johnson,==
Inaccordance with10CFR50.54(a)(3),
In accordance with 10CFR50.54(a)(3), enclosed is revision 22 to the Quality Assurance Program for Station Operation (QAPSO).Revision 22 incorporates organization related changes associated with the restructuring of the corporation.
enclosedisrevision22totheQualityAssurance ProgramforStationOperation (QAPSO).Revision22incorporates organization relatedchangesassociated withtherestructuring ofthecorporation.
Our effectiveness review concluded that these changes do not impact commitments in the quality assurance program description previously approved by the Nuclear Regulatory Commission (NRC)and therefore do not require prior NRC approval.The changes are described in the attached Synopsis of Changes (Attachment 1)and in the enclosed program revision.Attachment 1 also provides the basis for concluding that the revised program continues to satisfy the 10CFR50, Appendix B criteria and does not reduce the scope of the quality assurance program.Changes made to revision 21 of the Quality Assurance Program for Station Operation are denoted by a single revision bar in the left margin.Attachment 2 is a copy of the QAPSO with changes denoted by highlighting or strike-out.
Oureffectiveness reviewconcluded thatthesechangesdonotimpactcommitments inthequalityassurance programdescription previously approvedbytheNuclearRegulatory Commission (NRC)andtherefore donotrequirepriorNRCapproval.
These QA Program changes are considered effective immediately.
Thechangesaredescribed intheattachedSynopsisofChanges(Attachment 1)andintheenclosedprogramrevision.
Ver truly yours, Robert C.ecr dy GAH'It413 Attachments 1 and 2 Enclosure 1: QA Program for Station Operation Revision 22'st601020057 951221 PDR ADOCK 05000244 P PDR 02003I OO(
Attachment 1alsoprovidesthebasisforconcluding thattherevisedprogramcontinues tosatisfythe10CFR50,AppendixBcriteriaanddoesnotreducethescopeofthequalityassurance program.Changesmadetorevision21oftheQualityAssurance ProgramforStationOperation aredenotedbyasinglerevisionbarintheleftmargin.Attachment 2isacopyoftheQAPSOwithchangesdenotedbyhighlighting orstrike-out.
xc: Mr.Allen R.Johnson (Mail Stop 14B2)PWR Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector ATTACHMENT 1 S no sis of Chan es Or anization and Position Title Chan es The following organization titles and position titles have been changed: "Senior Vice President, Customer Operations" to"Senior Vice President, Energy Operations""Vice President, Nuclear Operations" to"Vice President, Nuclear Operations Group""Division Manager, Support Services" to"Group Manager, Support Services""Division Manager,'nergy Delivery" to"Group Manager, Energy Delivery""Division Manager, Information Services" to"Group Manager, Information Services""Nuclear Division Training" to"Nuclear Training" These changes are reflected throughout the revised document and are not identified at each occurrence in the following summary.17.1 MANAGEMENT 17.1.1 Methodolo Paragraph 3-Last sentence was revised to be consistent with the phrase used on the"RGRE Corporate Statement of QA Policy"-Table 17.1.1-1.Paragraph 4-Reference to ANSI N18.2-1973 is removed as it has been superseded by ANSI/ANS 51.1-1983.
TheseQAProgramchangesareconsidered effective immediately.
Paragraph 5-This paragraph has been rewritten to clarify ,RGEE's method of applying a graded QA Program to items which are not classified as"Safety Related".
Vertrulyyours,RobertC.ecrdyGAH'It413 Attachments 1and2Enclosure 1:QAProgramforStationOperation Revision22'st601020057 951221PDRADOCK05000244PPDR02003IOO(
ATTACHMENT 1 S no sis of Chan es 17.1 MANAGEMENT (Cont.)17.1.2 Or anization The following organization changes were made and are reflected throughout the text of the document and on the Figure 17.1.2-1 Organization Chart: The Senior Vice President, Energy Operations reports directly to the Chairman of the Board, President, and Chief Executive Officer.The Executive Vice President position no longer exists.~Information Services now reports to the Energy Services vice Energy Operations.
xc:Mr.AllenR.Johnson(MailStop14B2)PWRProjectDirectorate I-1Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector ATTACHMENT 1SnosisofChanesOranization andPositionTitleChanesThefollowing organization titlesandpositiontitleshavebeenchanged:"SeniorVicePresident, CustomerOperations" to"SeniorVicePresident, EnergyOperations" "VicePresident, NuclearOperations" to"VicePresident, NuclearOperations Group""Division Manager,SupportServices" to"GroupManager,SupportServices" "Division Manager,'nergy Delivery" to"GroupManager,EnergyDelivery" "Division Manager,Information Services" to"GroupManager,Information Services" "NuclearDivisionTraining" to"NuclearTraining" Thesechangesarereflected throughout thereviseddocumentandarenotidentified ateachoccurrence inthefollowing summary.17.1MANAGEMENT 17.1.1Methodolo Paragraph 3-Lastsentencewasrevisedtobeconsistent withthephraseusedonthe"RGRECorporate Statement ofQAPolicy"-Table17.1.1-1.
However, their functions in supporting the QA Program have remained the same.A new position, the Director, Operating Experience, has been assigned the responsibility of supporting root cause investigations and corrective action for significant conditions adverse to quality, and for evaluating and disseminating industry experience information.
Paragraph 4-Reference toANSIN18.2-1973 isremovedasithasbeensuperseded byANSI/ANS51.1-1983.
These responsibilities were previously assigned to the Manager, Nuclear Assurance.
Paragraph 5-Thisparagraph hasbeenrewritten toclarify,RGEE'smethodofapplyingagradedQAProgramtoitemswhicharenotclassified as"SafetyRelated".
Plant Manager, Ginna Station"Procurement" was added to list of responsibilities for clarification.
ATTACHMENT 1SnosisofChanes17.1MANAGEMENT (Cont.)17.1.2Oranization Thefollowing organization changesweremadeandarereflected throughout thetextofthedocumentandontheFigure17.1.2-1Organization Chart:TheSeniorVicePresident, EnergyOperations reportsdirectlytotheChairmanoftheBoard,President, andChiefExecutive Officer.TheExecutive VicePresident positionnolongerexists.~Information ServicesnowreportstotheEnergyServicesviceEnergyOperations.
Department Manager, Nuclear Engineering Services"Technical Support" for Ginna Operations was revised for clarification.
However,theirfunctions insupporting theQAProgramhaveremainedthesame.Anewposition, theDirector, Operating Experience, hasbeenassignedtheresponsibility ofsupporting rootcauseinvestigations andcorrective actionforsignificant conditions adversetoquality,andforevaluating anddisseminating industryexperience information.
Manager, Quality Assurance Revised to eliminate redundancy in text.Manager, Nuclear Assurance Revised to remove responsibilities now assigned to the Director, Operating Experience and to add responsibility for trending and analysis of corrective action program data.Group Manager, Support Services Revised to clarify responsibility for calibration of M6TE reference standards.
Theseresponsibilities werepreviously assignedtotheManager,NuclearAssurance.
Group Manager, Information Services Revised to clarify responsibility for calibration of installed electric meters.Group Manager, Energy Delivery Revised to eliminate redundancy in text.
PlantManager,GinnaStation"Procurement" wasaddedtolistofresponsibilities forclarification.
ATTACHMENT 1 S no sis of Chan es 17.1 MANAGEMENT 17.1.2 Or anization Cont.Review and Audit Organizations
Department Manager,NuclearEngineering Services"Technical Support"forGinnaOperations wasrevisedforclarification.
~Nuclear Safety Audit and.Review Board Removed reference to the QA/QC Subcommittee of the NSARB.Plant Operations Review Committee Paragraph 2 Paragraph 7 Removed last sentence.This sentence does not discuss the primary responsibilities of the PORC and is unnecessary.
Manager,QualityAssurance Revisedtoeliminate redundancy intext.Manager,NuclearAssurance Revisedtoremoveresponsibilities nowassignedtotheDirector, Operating Experience andtoaddresponsibility fortrendingandanalysisofcorrective actionprogramdata.GroupManager,SupportServicesRevisedtoclarifyresponsibility forcalibration ofM6TEreference standards.
'I Removed requirement for PORC to provide written meeting minutes to the Vice President, Nuclear Operations Group and the Chairman, NSARB.These meeting minutes are retained as a record by Records Management.
GroupManager,Information ServicesRevisedtoclarifyresponsibility forcalibration ofinstalled electricmeters.GroupManager,EnergyDeliveryRevisedtoeliminate redundancy intext.
Dele ation of Work Paragraph was revised to provide clarification of QA Program requirements for external organizations.
ATTACHMENT 1SnosisofChanes17.1MANAGEMENT 17.1.2Oranization Cont.ReviewandAuditOrganizations
17.1.5 Personnel Trainin and uglification Paragraph was revised to provide clarification of requirements for training of personnel in QA policies and instructions.
~NuclearSafetyAuditand.ReviewBoardRemovedreference totheQA/QCSubcommittee oftheNSARB.PlantOperations ReviewCommittee Paragraph 2Paragraph 7Removedlastsentence.
17.1.6 Corrective Action Paragraph was revised to provide clarification of requirements for identifying adverse trends in performance.
Thissentencedoesnotdiscusstheprimaryresponsibilities ofthePORCandisunnecessary.
ATTACHMENT 1 S no sis of Chan es 17.1 MANAGEMENT (Cont.)Table 17.1.1-2 Su lementar Glossar Commitment Heavy Load Revised to be consistent with definition used in the Nuclear Policy Manual.Revised to include specific plant information.
'IRemovedrequirement forPORCtoprovidewrittenmeetingminutestotheVicePresident, NuclearOperations GroupandtheChairman, NSARB.ThesemeetingminutesareretainedasarecordbyRecordsManagement.
Off the Shelf Safety Related SSCs Deleted.Old term is no longer used.Revised for clarification Safety Significant SSCs Revised for clarification Table 17.1.7-1 Conformance of Ginna Station Pro ram to ualit Assurance Standards Re uirements and Guides Regulatory Guide 1.26 Reference to ANSI N18.2-1973 is removed as it has been superseded by ANSI/ANS 51.1-1983.
DeleationofWorkParagraph wasrevisedtoprovideclarification ofQAProgramrequirements forexternalorganizations.
ANSI/ANS 3.1-1987, Section 4.7.Revised to clarify that qualification requirements apply to NSARB members only as addressed by this standard.17.2 PERFORMANCE/VERIFICATION 17.2.1 Methodolo Paragraph 1-Revised for clarification and consistency with 10CFR50 Appendix B.17.2.2 Desi n Control Paragraph 7-Revised for clarification.
17.1.5Personnel Traininanduglification Paragraph wasrevisedtoprovideclarification ofrequirements fortrainingofpersonnel inQApoliciesandinstructions.
ATTACHMENT 1 S no sis of Chan es 17.2 PERFORMANCE/VERIFICATION (Cont.)17.2.4 Procurement Control Acceptance of Items and Services Revised for clarification and to allow for the use of methods such as sampling.17.2.5 Procurement Verification Paragraph 5-Revised for clarification and to allow for the use of post installation testing as a means of item acceptance.
17.1.6Corrective ActionParagraph wasrevisedtoprovideclarification ofrequirements foridentifying adversetrendsinperformance.
17.2.8 Test Control Paragraph 6-Revised for clarification.
ATTACHMENT 1SnosisofChanes17.1MANAGEMENT (Cont.)Table17.1.1-2SulementarGlossarCommitment HeavyLoadRevisedtobeconsistent withdefinition usedintheNuclearPolicyManual.Revisedtoincludespecificplantinformation.
17.2.11 S ecial Process Control Paragraph 4-Revised for clarification of responsibility changed in previous submittal (Rev.21).17.2.14 Document Control Paragraph 1-Revised for clarification.
OfftheShelfSafetyRelatedSSCsDeleted.Oldtermisnolongerused.Revisedforclarification SafetySignificant SSCsRevisedforclarification Table17.1.7-1Conformance ofGinnaStationProramtoualitAssurance Standards Reuirements andGuidesRegulatory Guide1.26Reference toANSIN18.2-1973 isremovedasithasbeensuperseded byANSI/ANS51.1-1983.
Paragraph 3 Revised for clarification of method used to approve temporary procedure changes at Ginna Station.Temporary procedure changes receive the same level of review as permanent changes, and in addition receive approval by the Shift Supervisor.
ANSI/ANS3.1-1987, Section4.7.Revisedtoclarifythatqualification requirements applytoNSARBmembersonlyasaddressed bythisstandard.
Temporary procedure changes are approved by the Plant Manager or designee prior to implementation.
17.2PERFORMANCE/VERIFICATION 17.2.1Methodolo Paragraph 1-Revisedforclarification andconsistency with10CFR50AppendixB.17.2.2DesinControlParagraph 7-Revisedforclarification.
17.2.15 Records Paragraph 1-Revised for clarification.
ATTACHMENT 1SnosisofChanes17.2PERFORMANCE/VERIFICATION (Cont.)17.2.4Procurement ControlAcceptance ofItemsandServicesRevisedforclarification andtoallowfortheuseofmethodssuchassampling.
ATTACHMENT 1 S no sis of Chan es 17.3 ASSESSMENT 17.3.1 Methodolo Paragraph 3 Revised to remove reference to the QA/QC Subcommittee.
17.2.5Procurement Verification Paragraph 5-Revisedforclarification andtoallowfortheuseofpostinstallation testingasameansofitemacceptance.
Provides clarification of"Operational Assessment" as an assessment type and"Operating Experience" as an organization which performs this assessment.
17.2.8TestControlParagraph 6-Revisedforclarification.
17.3.2 Assessment Operational Assessment The responsibility for reviewing NRC Information Notices has been reassigned to Nuclear Safety and Licensing.
17.2.11SecialProcessControlParagraph 4-Revisedforclarification ofresponsibility changedinprevioussubmittal (Rev.21).17.2.14DocumentControlParagraph 1-Revisedforclarification.
The revised program, as described above, continues to satisfy the 10CFR50 criteria and does not reduce the scope of the quality assurance program.These changes do not require NRC approval prior to implementation.}}
Paragraph 3Revisedforclarification ofmethodusedtoapprovetemporary procedure changesatGinnaStation.Temporary procedure changesreceivethesamelevelofreviewaspermanent changes,andinadditionreceiveapprovalbytheShiftSupervisor.
Temporary procedure changesareapprovedbythePlantManagerordesigneepriortoimplementation.
17.2.15RecordsParagraph 1-Revisedforclarification.
ATTACHMENT 1SnosisofChanes17.3ASSESSMENT 17.3.1Methodolo Paragraph 3Revisedtoremovereference totheQA/QCSubcommittee.
Providesclarification of"Operational Assessment" asanassessment typeand"Operating Experience" asanorganization whichperformsthisassessment.
17.3.2Assessment Operational Assessment Theresponsibility forreviewing NRCInformation Noticeshasbeenreassigned toNuclearSafetyandLicensing.
Therevisedprogram,asdescribed above,continues tosatisfythe10CFR50criteriaanddoesnotreducethescopeofthequalityassurance program.ThesechangesdonotrequireNRCapprovalpriortoimplementation.}}

Revision as of 13:53, 7 July 2018

Forwards Rev 22 to QA Program for Station Operation, Incorporating Organization Related Changes Associated W/ Restructuring of Corporation
ML17264A307
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/21/1995
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: JOHNSON A R
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17264A308 List:
References
NUDOCS 9601020057
Download: ML17264A307 (10)


Text

CATEGORY 1 REGUDRTOO~INFORMATION'DISTRIBUTION

%STEM (RIDE)ACCESSION NBR:9601020057 DOC.DATE: 95/12/21 NOTARIZED:

NO'OCKET I FACIL:50-244 Robert"Emmet,Ginna kQclear.Plant', Unit j., Rochester G 05000244 AUTH.NAMEAUTHOR AFFILIATION MECREDY,R.C.

Rochester Gas'&Electric Corp.RECIP.NAME RECIPIENT=AFFILIATION.JOHNSON,A.R.

SUBJECT:

Forwards Rev 22 to"QA Program'for Station Operation," incorporating organization related changes associated w/C>>'restructuring of corporation.'

DISTRIBUTION CODE: Q004D COPIES RECEIVED:LTR ENCL U SIZE: TITLE: QA Topical Report, Change, Amendment, or Correspondence (ocket Utili NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 E EXT RNA NRR DRCH/HQMB OC/LFDCB DMB/OSS NRC PDR RECIPIENT ID CODE/NAME JOHNSON,A INTERNAL: DRS/RGNl 3 ILE CE COPIES.LTTR ENCL 1"1 1 1 1 1 2 2 1 1 1 1 1 1'1 RECIPIENT ID CODE/NAME DRS/RGN2 DRS/RGN4 NRR/DISP/IMS NUDOCS-ABSTRACT RGN1 FILE IHS COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1.1 D 0 C U E NOTE TO ALL"RZDS" RECZPZENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELZMZNATE YOUR NAME FROM DZSTRZBUTZON LZSTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR,'.15 ENCL."15 I li A!;0>1 C f 4~~l~"p' 4ND I ROCHESTER GAS AND EIECIIIIC CORPORATION

~89 EASTAY&IUf, ROCHESlER, N.Y IrIiQ9-0001 AREA CODE716 546-27M ROBERT C.MECREDY Vice President Nuclear Operations December 21, 1995 U.S.Nuclear Regulatory Commission Document Control Desk Attn: 'llen R.Johnson Project Directorate I-1 Washington, D.C.20555

Subject:

Revised Submittal of Quality Assurance Program for Station Operation Rochester Gas 6 Electric Corporation R.E.Ginna Nuclear Power Plant Docket No.50-244

Dear Mr.Johnson,

In accordance with 10CFR50.54(a)(3), enclosed is revision 22 to the Quality Assurance Program for Station Operation (QAPSO).Revision 22 incorporates organization related changes associated with the restructuring of the corporation.

Our effectiveness review concluded that these changes do not impact commitments in the quality assurance program description previously approved by the Nuclear Regulatory Commission (NRC)and therefore do not require prior NRC approval.The changes are described in the attached Synopsis of Changes (Attachment 1)and in the enclosed program revision.Attachment 1 also provides the basis for concluding that the revised program continues to satisfy the 10CFR50, Appendix B criteria and does not reduce the scope of the quality assurance program.Changes made to revision 21 of the Quality Assurance Program for Station Operation are denoted by a single revision bar in the left margin.Attachment 2 is a copy of the QAPSO with changes denoted by highlighting or strike-out.

These QA Program changes are considered effective immediately.

Ver truly yours, Robert C.ecr dy GAH'It413 Attachments 1 and 2 Enclosure 1: QA Program for Station Operation Revision 22'st601020057 951221 PDR ADOCK 05000244 P PDR 02003I OO(

xc: Mr.Allen R.Johnson (Mail Stop 14B2)PWR Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector ATTACHMENT 1 S no sis of Chan es Or anization and Position Title Chan es The following organization titles and position titles have been changed: "Senior Vice President, Customer Operations" to"Senior Vice President, Energy Operations""Vice President, Nuclear Operations" to"Vice President, Nuclear Operations Group""Division Manager, Support Services" to"Group Manager, Support Services""Division Manager,'nergy Delivery" to"Group Manager, Energy Delivery""Division Manager, Information Services" to"Group Manager, Information Services""Nuclear Division Training" to"Nuclear Training" These changes are reflected throughout the revised document and are not identified at each occurrence in the following summary.17.1 MANAGEMENT 17.1.1 Methodolo Paragraph 3-Last sentence was revised to be consistent with the phrase used on the"RGRE Corporate Statement of QA Policy"-Table 17.1.1-1.Paragraph 4-Reference to ANSI N18.2-1973 is removed as it has been superseded by ANSI/ANS 51.1-1983.

Paragraph 5-This paragraph has been rewritten to clarify ,RGEE's method of applying a graded QA Program to items which are not classified as"Safety Related".

ATTACHMENT 1 S no sis of Chan es 17.1 MANAGEMENT (Cont.)17.1.2 Or anization The following organization changes were made and are reflected throughout the text of the document and on the Figure 17.1.2-1 Organization Chart: The Senior Vice President, Energy Operations reports directly to the Chairman of the Board, President, and Chief Executive Officer.The Executive Vice President position no longer exists.~Information Services now reports to the Energy Services vice Energy Operations.

However, their functions in supporting the QA Program have remained the same.A new position, the Director, Operating Experience, has been assigned the responsibility of supporting root cause investigations and corrective action for significant conditions adverse to quality, and for evaluating and disseminating industry experience information.

These responsibilities were previously assigned to the Manager, Nuclear Assurance.

Plant Manager, Ginna Station"Procurement" was added to list of responsibilities for clarification.

Department Manager, Nuclear Engineering Services"Technical Support" for Ginna Operations was revised for clarification.

Manager, Quality Assurance Revised to eliminate redundancy in text.Manager, Nuclear Assurance Revised to remove responsibilities now assigned to the Director, Operating Experience and to add responsibility for trending and analysis of corrective action program data.Group Manager, Support Services Revised to clarify responsibility for calibration of M6TE reference standards.

Group Manager, Information Services Revised to clarify responsibility for calibration of installed electric meters.Group Manager, Energy Delivery Revised to eliminate redundancy in text.

ATTACHMENT 1 S no sis of Chan es 17.1 MANAGEMENT 17.1.2 Or anization Cont.Review and Audit Organizations

~Nuclear Safety Audit and.Review Board Removed reference to the QA/QC Subcommittee of the NSARB.Plant Operations Review Committee Paragraph 2 Paragraph 7 Removed last sentence.This sentence does not discuss the primary responsibilities of the PORC and is unnecessary.

'I Removed requirement for PORC to provide written meeting minutes to the Vice President, Nuclear Operations Group and the Chairman, NSARB.These meeting minutes are retained as a record by Records Management.

Dele ation of Work Paragraph was revised to provide clarification of QA Program requirements for external organizations.

17.1.5 Personnel Trainin and uglification Paragraph was revised to provide clarification of requirements for training of personnel in QA policies and instructions.

17.1.6 Corrective Action Paragraph was revised to provide clarification of requirements for identifying adverse trends in performance.

ATTACHMENT 1 S no sis of Chan es 17.1 MANAGEMENT (Cont.)Table 17.1.1-2 Su lementar Glossar Commitment Heavy Load Revised to be consistent with definition used in the Nuclear Policy Manual.Revised to include specific plant information.

Off the Shelf Safety Related SSCs Deleted.Old term is no longer used.Revised for clarification Safety Significant SSCs Revised for clarification Table 17.1.7-1 Conformance of Ginna Station Pro ram to ualit Assurance Standards Re uirements and Guides Regulatory Guide 1.26 Reference to ANSI N18.2-1973 is removed as it has been superseded by ANSI/ANS 51.1-1983.

ANSI/ANS 3.1-1987, Section 4.7.Revised to clarify that qualification requirements apply to NSARB members only as addressed by this standard.17.2 PERFORMANCE/VERIFICATION 17.2.1 Methodolo Paragraph 1-Revised for clarification and consistency with 10CFR50 Appendix B.17.2.2 Desi n Control Paragraph 7-Revised for clarification.

ATTACHMENT 1 S no sis of Chan es 17.2 PERFORMANCE/VERIFICATION (Cont.)17.2.4 Procurement Control Acceptance of Items and Services Revised for clarification and to allow for the use of methods such as sampling.17.2.5 Procurement Verification Paragraph 5-Revised for clarification and to allow for the use of post installation testing as a means of item acceptance.

17.2.8 Test Control Paragraph 6-Revised for clarification.

17.2.11 S ecial Process Control Paragraph 4-Revised for clarification of responsibility changed in previous submittal (Rev.21).17.2.14 Document Control Paragraph 1-Revised for clarification.

Paragraph 3 Revised for clarification of method used to approve temporary procedure changes at Ginna Station.Temporary procedure changes receive the same level of review as permanent changes, and in addition receive approval by the Shift Supervisor.

Temporary procedure changes are approved by the Plant Manager or designee prior to implementation.

17.2.15 Records Paragraph 1-Revised for clarification.

ATTACHMENT 1 S no sis of Chan es 17.3 ASSESSMENT 17.3.1 Methodolo Paragraph 3 Revised to remove reference to the QA/QC Subcommittee.

Provides clarification of"Operational Assessment" as an assessment type and"Operating Experience" as an organization which performs this assessment.

17.3.2 Assessment Operational Assessment The responsibility for reviewing NRC Information Notices has been reassigned to Nuclear Safety and Licensing.

The revised program, as described above, continues to satisfy the 10CFR50 criteria and does not reduce the scope of the quality assurance program.These changes do not require NRC approval prior to implementation.