| number = ML18136A495 | | number = ML18136A495 | ||
| issue date = 05/15/2018 | | issue date = 05/15/2018 | ||
| title = | | title = Pressure Temperature Limits Report, Revision 6 | ||
| author name = Williams A L | | author name = Williams A L | ||
| author affiliation = Tennessee Valley Authority | | author affiliation = Tennessee Valley Authority |
Revision as of 05:51, 27 January 2019
ML18136A495 | |
Person / Time | |
---|---|
Site: | Sequoyah |
Issue date: | 05/15/2018 |
From: | Williams A L Tennessee Valley Authority |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML18136A495 (32) | |
Similar Documents at Sequoyah | |
---|---|
Category:Letter
MONTHYEARML24247A2212024-08-29029 August 2024
[Table view]Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),”2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),” IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 ML24100A0162024-04-11011 April 2024 Request for Regulatory Conference (Tennessee Valley Authority - Sequoyah Nuclear Plant) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements ML24088A0332024-03-28028 March 2024 Request for Regulatory Conference (Tennessee Valley Authority) CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report ML24040A2062024-03-26026 March 2024 Issuance of Amendment Nos. 367 and 361 Regarding Changes to the Hydrologic Analyses (EPID L-2020-LLA-0004) - Public IR 05000327/20240902024-03-19019 March 2024 NRC Inspection Report 05000327-2024090 and 05000328-2024090 and Preliminary Greater than Green Finding and Apparent Violation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 CNL-24-027, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000327/20244012024-03-12012 March 2024 – Security Baseline Inspection Report 05000327/2024401 and 05000328/2024401 IR 05000259/20230062024-02-28028 February 2024 Annual Assessment Letter for Sequoyah Nuclear Plant, Units 1, 2 - Report 05000259/2023006, 05000260/2023006 and 05000296/2023006 ML24053A3932024-02-22022 February 2024 Final Report of a Deviation or Failure to Comply - Crompton Instruments Type 077 Ammeter CNL-24-023, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 252024-02-20020 February 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 25 ML24046A2362024-02-15015 February 2024 Discharge Monitoring Report (Dmr), January 2024 ML24046A2072024-02-15015 February 2024 Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 59 and EPIP-7, Revision 38 ML24046A2372024-02-15015 February 2024 Annual Water Withdrawal Report 2023 ML24046A0252024-02-14014 February 2024 Final Report of a Deviation or Failure to Comply Lube Oil Scavenging and Fuel Oil Engine Driven Pump 2024-08-29 Category:Report MONTHYEARML24247A1732024-08-28028 August 2024
[Table view]Enclosure 5: Joint Frequency Distributions of Wind Speed and Direction 2004 to 2013 SQN Units 1 & 2 ML23284A4252023-10-11011 October 2023 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection Report ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information ML21246A2802021-09-29029 September 2021 Final Ea/Fonsi for Tva'S Initial and Updated Triennial Decommissioning Funding Plans for Sequoyah Nuclear Plant ISFSIs IR 05000327/20210052021-08-18018 August 2021 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 Report 05000327/2021005 and 05000328/2021005 CNL-21-072, TVA Nuclear Calculation Coversheet/ Ecm Metadata Update2021-08-13013 August 2021 TVA Nuclear Calculation Coversheet/ Ecm Metadata Update ML21140A0282021-05-14014 May 2021 Gravel Lot Restoration Project, Construction General Permit, Notice of Intent CNL-20-102, 10 CFR 71.95 Report for 3-60B Casks User2020-12-16016 December 2020 10 CFR 71.95 Report for 3-60B Casks User ML20350B7202020-12-15015 December 2020 Discharge Monitoring Report Quality Assurance Study 40 Final Report 2020 ML20308A4762020-11-0202 November 2020 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report and Commitment Summary Report ML20304A4032020-10-28028 October 2020 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements Manual ML19156A2612019-06-0505 June 2019 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report and Commitment Summary Report ML18352A2292018-12-17017 December 2018 Pressure Temperature Limits Report, Revision 7 ML18340A0302018-11-30030 November 2018 Tennessee Valley Authority - Sequoyah, Study to Confirm Calibration of Numerical Model ML18136A4952018-05-15015 May 2018 Pressure Temperature Limits Report, Revision 6 ML18061A0362018-03-0202 March 2018 IAEA Report of the Operational Safety Review Team (Osart) Mission to the Sequoyah Nuclear Power Plant ML17278A7592017-10-0505 October 2017 Soarca Sequoyah Updated Draft Executive Summary ML15336A9402015-11-26026 November 2015 Submittal of 10 CFR 50.46 Combined Annual and 30-Day Report ML15321A4542015-11-13013 November 2015 Submittal of 10 CFR 71.95 Report on the 8-120B Cask CNL-15-143, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report2015-07-31031 July 2015 the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report CNL-15-106, 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information2015-07-0808 July 2015 3, Sequoyah and Watts Bar, Units 1 & 2 - Provides Service List Update for Routine Information ML15156A3892015-04-28028 April 2015 LTR-SGMP-15-25 Np, Response to NRC Request for Additional Information on the Design Features of the Sequoyah, Unit 2, Replacement Steam Generators. ML14325A0692014-11-17017 November 2014 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report ML14283A5132014-11-17017 November 2014 NRC Staff Review Documentation Provided by TVA for the Sequoyah Nuclear Plant, Units 1 and 2 Concerning Resolution of GL2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurizer-Wate ML14259A3382014-09-12012 September 2014 Plant(Sqn) - NPDES Permit No. TN0026450 - Discharge Monitoring Report(Dmr) for August 2014 CNL-14-130, Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant2014-08-28028 August 2014 Third Six-Month Status Report in Response to the March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) for Sequoyah Nuclear Plant CNL-14-038, Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc2014-03-31031 March 2014 Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid CNL-14-033, Second Six-Month Status Report and Revised Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-03-0505 March 2014 Second Six-Month Status Report and Revised Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses Re Requirements for Mitigation Strategies for Beyond-Design-Basis External Events ML14063A5422014-03-0404 March 2014 TVA Response to Request for Clarification to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, LRA B.1.31, B.1.25.1 B, B.1.34-Sa, B.1.34-9a, LRA Annual ... ML14002A1132014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14041A1922014-02-16016 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Sequoyah Nuclear Plant, Units 1 and 2, TAC Nos.: MF0864 and MF0865 ML14016A0392014-02-0606 February 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident CNL-14-013, Highlights of Improvements to the Sequoyah Nuclear Plant IPEEE Seismic Analysis Results and Supplemental Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)Regarding...2014-01-31031 January 2014 Highlights of Improvements to the Sequoyah Nuclear Plant IPEEE Seismic Analysis Results and Supplemental Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)Regarding... CNL-13-117, 10 CFR 50.46 - Combined Annual and 30-Day Report2013-11-18018 November 2013 10 CFR 50.46 - Combined Annual and 30-Day Report ML13298A0312013-10-22022 October 2013 SQN Femp Energy and Ghg Reporting Tool: Results Summary Fy 2008 - Fy 2012 Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.a.i.9 (7 Pages) ML13294A4302013-09-26026 September 2013 Fukushima Near-Term Task Force Recommendation 2.3: Seismic Response Report, Revision 1 ML13282A2332013-09-26026 September 2013 Fukushima Near-Term Task Force Recommendation 2.3: Seismic Response Report ML13206A0042013-06-24024 June 2013 Methodology for Evaluating the Potential for Multiple Dam Failures Due to Seismic Events ML13144A5762013-05-22022 May 2013 Watt Bar, Units 1 & 2, Report of Drug Testing Error in Accordance with 10 CFR 26.719(c)(1) ML13142A1982013-05-16016 May 2013 Path Forward for Resolution of Generic Safety Issue (GSI)-191 ML13080A0732013-03-12012 March 2013 Extension Request Regarding the Flooding Hazard Reevaluation Report Required by NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation.. ML13072A5802013-03-0505 March 2013 Storm Water Pollution Prevention Plan ML13032A2532013-01-10010 January 2013 WCAP-17539-NP, Revision 0, Sequoyah, Units 1 and 2 Time-Limited Aging Analysis on Reactor Vessel Integrity ML12335A3402012-11-27027 November 2012 Tennessee Valley Authority - Fleet Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding the Flooding Walkdown Results of Recommendation 2.3 of the Near-Term Task Force Review of ML12240A1742012-09-18018 September 2012 Review of the 2011 Refueling Outage Steam Generator Tube Inservice Inspection Reports ML1218500102012-06-30030 June 2012 Enclosure 2, Tennessee Valley Authority Sequoyah Nuclear Plant Units 1 and 2 - ANP-3053(NP), Revision 4, Sequoyah Htp Fuel Transition - NRC RAIs and Responses, June 2012 (Non-Proprietary Version) ML12153A3782012-05-31031 May 2012 Enclosure 2, Sequoyah Nuclear Plant, Units 1 & 2 - ANP-3053 (Np), Revision 3, Sequoyah Htp Fuel Transition - NRC RAIs and Responses ML12137A2982012-05-15015 May 2012 ANP-2970Q2(NP), Rev 0, Sequoyah, Units 1 and 2 Htp Fuel Realistic Large Break LOCA Analysis ML12118A1662012-04-26026 April 2012 ANP-2970Q1(NP), Revision 000, Htp Fuel Realistic Large Break LOCA Analysis, April 2012 (Non-Proprietary Version), Enclosure 2 ML12114A0612012-04-0505 April 2012 Technical Report, SQN2-SGR-TRI, Revision 3, Sequoyah Unit 2 Steam Generator Replacement Rigging and Heavy Load Handling. 2024-08-28 Category:Technical MONTHYEARML24247A1732024-08-28028 August 2024
[Table view]Enclosure 5: Joint Frequency Distributions of Wind Speed and Direction 2004 to 2013 SQN Units 1 & 2 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-21-072, TVA Nuclear Calculation Coversheet/ Ecm Metadata Update2021-08-13013 August 2021 TVA Nuclear Calculation Coversheet/ Ecm Metadata Update ML21140A0282021-05-14014 May 2021 Gravel Lot Restoration Project, Construction General Permit, Notice of Intent CNL-20-102, 10 CFR 71.95 Report for 3-60B Casks User2020-12-16016 December 2020 10 CFR 71.95 Report for 3-60B Casks User ML20350B7202020-12-15015 December 2020 Discharge Monitoring Report Quality Assurance Study 40 Final Report 2020 ML20308A4762020-11-0202 November 2020 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report and Commitment Summary Report ML20304A4032020-10-28028 October 2020 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements Manual ML18352A2292018-12-17017 December 2018 Pressure Temperature Limits Report, Revision 7 ML18340A0302018-11-30030 November 2018 Tennessee Valley Authority - Sequoyah, Study to Confirm Calibration of Numerical Model ML18136A4952018-05-15015 May 2018 Pressure Temperature Limits Report, Revision 6 ML18061A0362018-03-0202 March 2018 IAEA Report of the Operational Safety Review Team (Osart) Mission to the Sequoyah Nuclear Power Plant CNL-15-143, the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report2015-07-31031 July 2015 the Tennessee Valley Authority (TVA) Nuclear Power Group Commercial Grade Dedication Recovery Project - Closure Report ML14283A5132014-11-17017 November 2014 NRC Staff Review Documentation Provided by TVA for the Sequoyah Nuclear Plant, Units 1 and 2 Concerning Resolution of GL2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurizer-Wate CNL-14-038, Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc2014-03-31031 March 2014 Tennessee Valley Authority'S Seismic Hazard & Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid ML14063A5422014-03-0404 March 2014 TVA Response to Request for Clarification to NRC Request for Additional Information Regarding the Review of the Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application, LRA B.1.31, B.1.25.1 B, B.1.34-Sa, B.1.34-9a, LRA Annual ... ML14002A1132014-02-19019 February 2014 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14041A1922014-02-16016 February 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Sequoyah Nuclear Plant, Units 1 and 2, TAC Nos.: MF0864 and MF0865 ML13282A2332013-09-26026 September 2013 Fukushima Near-Term Task Force Recommendation 2.3: Seismic Response Report ML13206A0042013-06-24024 June 2013 Methodology for Evaluating the Potential for Multiple Dam Failures Due to Seismic Events ML13142A1982013-05-16016 May 2013 Path Forward for Resolution of Generic Safety Issue (GSI)-191 ML13072A5802013-03-0505 March 2013 Storm Water Pollution Prevention Plan ML13032A2532013-01-10010 January 2013 WCAP-17539-NP, Revision 0, Sequoyah, Units 1 and 2 Time-Limited Aging Analysis on Reactor Vessel Integrity ML1218500102012-06-30030 June 2012 Enclosure 2, Tennessee Valley Authority Sequoyah Nuclear Plant Units 1 and 2 - ANP-3053(NP), Revision 4, Sequoyah Htp Fuel Transition - NRC RAIs and Responses, June 2012 (Non-Proprietary Version) ML12153A3782012-05-31031 May 2012 Enclosure 2, Sequoyah Nuclear Plant, Units 1 & 2 - ANP-3053 (Np), Revision 3, Sequoyah Htp Fuel Transition - NRC RAIs and Responses ML12137A2982012-05-15015 May 2012 ANP-2970Q2(NP), Rev 0, Sequoyah, Units 1 and 2 Htp Fuel Realistic Large Break LOCA Analysis ML12118A1662012-04-26026 April 2012 ANP-2970Q1(NP), Revision 000, Htp Fuel Realistic Large Break LOCA Analysis, April 2012 (Non-Proprietary Version), Enclosure 2 ML12114A0612012-04-0505 April 2012 Technical Report, SQN2-SGR-TRI, Revision 3, Sequoyah Unit 2 Steam Generator Replacement Rigging and Heavy Load Handling. ML12088A1712012-03-31031 March 2012 ANP-3053(NP), Revision 2, Sequoyah Htp Fuel Transition - NRC RAIs and Responses, March 2012 (Non-Proprietary Version), Enclosure 2 ML11266A1582011-09-16016 September 2011 C17 Voltage-Based ARC 90-Day Report ML11266A1592011-09-16016 September 2011 Areva Np, Inc., Sequoyah 2C17 W-Star 90-Day Report ML11210B5322011-07-31031 July 2011 ANP-2986(NP), Revision 3, Sequoyah Htp Fuel Transition. Attachment 2 ML11172A0702011-06-30030 June 2011 ANP-2986(NP), Revision 2, Sequoyah Htp Fuel Transition, Attachment 8 ML11172A0722011-05-31031 May 2011 ANP-2971(NP), Rev 1, Sequoyah Units 1 and 2 Htp Fuel S-RELAP5 Small Break LOCA Analysis, Attachment 9 ML11172A0642011-04-30030 April 2011 ANP-2970(NP), Rev 0, Sequoyah, Units 1 and 2 Htp Fuel Realistic Large Break LOCA Analysis, Attachment 10 ML11116A2112011-04-21021 April 2011 Technical Report No. SQN2-SGR-TR3, Revision 0 Sequoyah Unit 2 Steam Generator Replacement Alternate Rebar Splice - Bar-Lock Mechanical Splices Technical Report, Attachment 2 ML1005507732010-01-31031 January 2010 SG-SGMP-10-2, Condition Monitoring and Operational Assessment: GL-95-05 Alternate Repair Criterion End of Cycle 16 - 90 Day Report, Enclosure 1 ML1108310412009-05-31031 May 2009 Engineering Evaluation of Hesco Barriers Performance at Fargo, Nd 2009, Wenck File 2283-01, Enclosure 2 ML0904007952009-02-0404 February 2009 GSI-189 Action Plan, Feb. 09 Update, Publicly Available Version ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0824806912008-07-31031 July 2008 SG-CDME-08-24, Revision 0, Condition Monitoring and Operational Assessment: GL-95-05 Alternate Repair Criterion End of Cycle 15 90 Day Report, Sequoyah Unit 2. ML0810803382008-02-29029 February 2008 ANP-2695(NP), Rev 0, Enclosure 3, Sequoyah Nuclear Plant Unit 1, Realistic Large Break Loss of Coolant Accident Analysis ML0734000922007-11-30030 November 2007 Rev. 2 to SG-CDME-07-7, Condition Monitoring and Operational Assessment: GL-95-05 Alternate Repair Criterion End of Cycle 14, 90 Day Report for Sequoyah Unit 2. ML0732400482007-09-30030 September 2007 Rev. 0 to SG-CDME-07-21-NP, Examination of a Steam Generator Tube Removed from Sequoyah Unit 2. ML0711602272007-04-24024 April 2007 Staff Technical Evaluation Report, 06-03 ML0523405032005-08-15015 August 2005 Unit 2 Cycle 13 (U2C13) 90-Day Steam Generator (S/G) Report for Voltage-Based Alternate Repair Criteria and W* Alternate Repair Criteria ML1108310422005-04-30030 April 2005 Texas Transportation Institute, DOS K12 Crash Test and Evaluation of the Hesco C-3315 Flood Barrier, April 2005, Enclosure 3 ML11307A4202005-04-30030 April 2005 Enclosure 2 - Wenck Associates, Inc., Engineering Evaluation of Hesco Barriers Performance at Fargo, Nd 2009, May 2009 ML0410506212004-04-12012 April 2004 Diffuser Line Manhole Breach ML0409104172004-03-18018 March 2004 TRC Studies, EPA Information, Bmp Plan, Biodetergent 73551 2024-08-28 |
Text
ii iii iv 1
2
3 4
°° 5
° 6
7 8
9 10
11 12 13
14 15 16
17 18 19 20 21 22 23 WCAP-15224, Analysis of Capsule Y from the Tennessee Valley Authority Sequoyah Unit 1 Reactor Vessel Radiation Surveillance Program, T.J. Laubham, et. al., June 1999.
24
Retrieved from "https://kanterella.com/w/index.php?title=ML18136A495&oldid=1226139"