ML24046A025

From kanterella
Jump to navigation Jump to search
Final Report of a Deviation or Failure to Comply Lube Oil Scavenging and Fuel Oil Engine Driven Pump
ML24046A025
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/14/2024
From: Marshall T
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
Download: ML24046A025 (1)


Text

Sequoyah Nuclear Plant, Post Office Box 2000, Soddy Daisy, Tennessee 37384 February 14, 2024 10 CFR 21.21(a)(2) 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Sequoyah Nuclear Plant, Unit 2 Renewed Facility Operating License No. DPR-79 NRC Docket No. 50-328

Subject:

Final Report of a Deviation or Failure to Comply +/- Lube Oil Scavenging and Fuel Oil Engine Driven Pump

Reference:

TVA letter to NRC, ³Interim Report of a Deviation or Failure to Comply +/- Lube Oil Scavenging and Fuel Oil Engine Driven Pump,' dated December 28, 2023 In accordance with the requirements of 10 CFR 21.21(a)(2), the Tennessee Valley Authority is submitting a final update to the Referenced report for Sequoyah Nuclear Plant (SQN), Unit 2.

The Interim Report informed NRC that an evaluation was ongoing as a result of the failure of a Lube Oil Scavenging and Fuel Oil Engine Driven Pump. The specific pump is a Viking Model GV-731-B, wherein the pump shaft sheared in two. The evaluation has determined that the failure would not have resulted in a substantial safety hazard or violate a license technical specifications safety limit. In addition to the engine driven pump, each diesel engine also operates with a redundant direct current motor driven fuel oil pump. Accordingly, this investigation is now considered closed.

There are no new regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please contact Mr. Rick Medina, Site Licensing Manager, at (423) 843-8129 or rmedina4@tva.gov.

Respectfully, Thomas B. Marshall Site Vice President Sequoyah Nuclear Plant

U.S. Nuclear Regulatory Commission Page 2 February 14, 2024 cc:

NRC Regional Administrator +/- Region II NRC Senior Resident Inspector +/- Sequoyah Nuclear Plant