ML11307A369: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Lingam, SivaSent:Monday, October 31, 2011 9:07 AMTo:jwshea@tva.govCc:Broaddus, Doug; Hoang, Dan; Hamm, Matthew; Howe, Andrew; Levine, Michael; Jones, Steve; Casto, Greg
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Lingam, Siva Sent: Monday, October 31, 2011 9:07 AM To: jwshea@tva.gov Cc: Broaddus, Doug; Hoang, Dan; Hamm, Matthew; Howe, Andrew; Levine, Michael; Jones, Steve; Casto, Greg


==Subject:==
==Subject:==
Sequoyah, Unit 1 - Acceptance Review of LAR Requesting to Add a One-Time License Condition to Conduct Heavy Load Lifts for Unit 2 SGRP (TAC No. ME7225)By letter dated September 29, 2011, Tennessee Valley Authority (TVA or the licensee) submitted a license amendment for Sequoyah Nuclear Plant (SQN), Unit 1. This license amendment proposes to add a one-time license condition to the SQN, Unit 1 operating license for the conduct of heavy load lifts for the SQN, Unit 2 steam generator replacement project (SGRP). The purpose of this e-mail is to provide the results of the U.S.
Sequoyah, Unit 1 - Acceptance Review of LAR Requesting to Add a One-Time License Condition to Conduct Heavy Load Lifts for Unit 2 SGRP (TAC No. ME7225)By letter dated September 29, 2011, Tennessee Valley Authority (TVA or the licensee) submitted a license amendment for Sequoyah Nuclear Plant (SQN), Unit 1. This license amendment proposes to add a one-time license condition to the SQN, Unit 1 operating license for the conduct of heavy load lifts for the SQN, Unit 2 steam generator replacement project (SGRP). The purpose of this e-mail is to provide the results of the U.S.  
Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
 
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Nuclear Regulatory Commission (NRC) staff's acceptanc e review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
If you have any questions, please contact me.
 
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that  
 
impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.  
 
If you have any questions, please contact me.  
 
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)
Sequoyah Nuclear Plant Crystal River Nuclear plant (EPU) Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov Hearing Identifier:  NRR_PMDA Email Number:  191  Mail Envelope Properties  (Siva.Lingam@nrc.gov20111031090700)  
Sequoyah Nuclear Plant Crystal River Nuclear plant (EPU) Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov
 
Hearing Identifier:  NRR_PMDA Email Number:  191  Mail Envelope Properties  (Siva.Lingam@nrc.gov20111031090700)


==Subject:==
==Subject:==
Sequoyah, Unit 1 - Acceptance Review of LAR Requesting to Add a One-Time License Condition to Conduct Heavy Load Lifts for Unit 2 SGRP (TAC No. ME7225)  Sent Date:  10/31/2011 9:07:27 AM  Received Date:  10/31/2011 9:07:00 AM From:    Lingam, Siva Created By:  Siva.Lingam@nrc.gov Recipients:    "Broaddus, Doug" <Doug.Broaddus@nrc.gov>  Tracking Status: None "Hoang, Dan" <Dan.Hoang@nrc.gov>  Tracking Status: None  "Hamm, Matthew" <Matthew.Hamm@nrc.gov>
Sequoyah, Unit 1 - Acceptance Review of LAR Requesting to Add a One-Time License Condition to Conduct Heavy Load Lifts for Unit 2 SGRP (TAC No. ME7225)  Sent Date:  10/31/2011 9:07:27 AM  Received Date:  10/31/2011 9:07:00 AM From:    Lingam, Siva Created By:  Siva.Lingam@nrc.gov Recipients:    "Broaddus, Doug" <Doug.Broaddus@nrc.gov>  Tracking Status: None "Hoang, Dan" <Dan.Hoang@nrc.gov>  Tracking Status: None  "Hamm, Matthew" <Matthew.Hamm@nrc.gov>
Tracking Status: None  "Howe, Andrew" <Andrew.Howe@nrc.gov>  Tracking Status: None "Levine, Michael" <Michael.Levine@nrc.gov>  Tracking Status: None  "Jones, Steve" <Steve.Jones@nrc.gov>
Tracking Status: None  "Howe, Andrew" <Andrew.Howe@nrc.gov>  Tracking Status: None "Levine, Michael" <Michael.Levine@nrc.gov>  Tracking Status: None  "Jones, Steve" <Steve.Jones@nrc.gov>
Tracking Status: None  "Casto, Greg" <Greg.Casto@nrc.gov>  Tracking Status: None "jwshea@tva.gov" <jwshea@tva.gov>  Tracking Status: None Post Office:      Files    Size      Date & Time MESSAGE    2061      10/31/2011 9:07:00 AM   Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:      
Tracking Status: None  "Casto, Greg" <Greg.Casto@nrc.gov>  Tracking Status: None "jwshea@tva.gov" <jwshea@tva.gov>  Tracking Status: None  
}}
 
Post Office:      Files    Size      Date & Time MESSAGE    2061      10/31/2011 9:07:00 AM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}

Revision as of 14:12, 2 August 2018

2011/10/31 NRR E-mail Capture - Sequoyah, Unit 1 - Acceptance Review of LAR Requesting to Add a One-Time License Condition to Conduct Heavy Load Lifts for Unit 2 SGRP (TAC No. ME7225)
ML11307A369
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/31/2011
From: Lingam S P
Plant Licensing Branch II
To: Shea J W
Tennessee Valley Authority
References
TAC ME7225
Download: ML11307A369 (2)


Text

1 NRR-PMDAPEm Resource From: Lingam, Siva Sent: Monday, October 31, 2011 9:07 AM To: jwshea@tva.gov Cc: Broaddus, Doug; Hoang, Dan; Hamm, Matthew; Howe, Andrew; Levine, Michael; Jones, Steve; Casto, Greg

Subject:

Sequoyah, Unit 1 - Acceptance Review of LAR Requesting to Add a One-Time License Condition to Conduct Heavy Load Lifts for Unit 2 SGRP (TAC No. ME7225)By letter dated September 29, 2011, Tennessee Valley Authority (TVA or the licensee) submitted a license amendment for Sequoyah Nuclear Plant (SQN), Unit 1. This license amendment proposes to add a one-time license condition to the SQN, Unit 1 operating license for the conduct of heavy load lifts for the SQN, Unit 2 steam generator replacement project (SGRP). The purpose of this e-mail is to provide the results of the U.S.

Nuclear Regulatory Commission (NRC) staff's acceptanc e review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that

impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)

Sequoyah Nuclear Plant Crystal River Nuclear plant (EPU) Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov

Hearing Identifier: NRR_PMDA Email Number: 191 Mail Envelope Properties (Siva.Lingam@nrc.gov20111031090700)

Subject:

Sequoyah, Unit 1 - Acceptance Review of LAR Requesting to Add a One-Time License Condition to Conduct Heavy Load Lifts for Unit 2 SGRP (TAC No. ME7225) Sent Date: 10/31/2011 9:07:27 AM Received Date: 10/31/2011 9:07:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients: "Broaddus, Doug" <Doug.Broaddus@nrc.gov> Tracking Status: None "Hoang, Dan" <Dan.Hoang@nrc.gov> Tracking Status: None "Hamm, Matthew" <Matthew.Hamm@nrc.gov>

Tracking Status: None "Howe, Andrew" <Andrew.Howe@nrc.gov> Tracking Status: None "Levine, Michael" <Michael.Levine@nrc.gov> Tracking Status: None "Jones, Steve" <Steve.Jones@nrc.gov>

Tracking Status: None "Casto, Greg" <Greg.Casto@nrc.gov> Tracking Status: None "jwshea@tva.gov" <jwshea@tva.gov> Tracking Status: None

Post Office: Files Size Date & Time MESSAGE 2061 10/31/2011 9:07:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: