ML12219A271: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Thompson, JonSent:Monday, August 06, 2012 11:08 AMTo:Ashe, Ken; Bryant, Julius WCc:Thorp, John; Mazumdar, Subinoy
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Thompson, Jon Sent: Monday, August 06, 2012 11:08 AM To: Ashe, Ken; Bryant, Julius W Cc: Thorp, John; Mazumdar, Subinoy


==Subject:==
==Subject:==
Request for Additional Information for License Amendment Request dated March 5, 2012 (TAC Nos. ME8213 and ME8214), RAI Questions 43 and 44
Request for Additional Information for Li cense Amendment Request dated March 5, 2012 (TAC Nos. ME8213 and ME8214), RAI Questions 43 and 44


==SUBJECT:==
==SUBJECT:==
MCGUIRE NUCLEAR STATION, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT RELATED TO MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NOS. ME8213 AND ME8214)
MCGUIRE NUCLEAR STATION, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT RELATED TO MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NOS. ME8213 AND ME8214)  
By letter dated March 5, 2012, Duke Energy Carolinas, LLC (the licensee), submitted a proposed license amendment to change the McGuire Nuclear Station, Units 1 and 2 (McGuire 1 and 2), Technical Specifications (TSs). The proposed change revises the TSs to implement a measurement uncertainty recapture power uprate for McGuire 1 and 2. The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal and determined that additional information is needed in order to complete our review. The enclosed document describes this request for additional information (RAI). Please note that the numbering of the questions in this RAI does not begin at the number one. Three prior RAIs regarding this proposed license amendment were issued to you by letters dated April 27, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12117A175), May 22, 2012 (ADAMS Accession No. ML12138A267), June 6, 2012, (ADAMS Accession No. ML12158A481), June 15, 2012 (ADAMS Accession No. ML12168A002), and August 1, 2012 (ADAMS Accession No. ML12215A330), with RAI questions numbered 1-4, 5-19, 20-31, 32-40, and 41-42, respectively.


A telephone conference will be set up to discuss these RAI questions, as needed. If you have any questions, please call me at 301-415-1119. Sincerely, Jon Thompson, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing  Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370  
By letter dated March 5, 2012, Duke Energy Carolinas, LLC (the licensee), submitted a proposed license amendment to change the McGuire Nuclear Station, Units 1 and 2 (McGuire 1 and 2), Technical Specifications (TSs). The proposed change revises the TSs to implement a measurement uncertainty recapture power uprate for McGuire 1 and 2.
The U.S. Nuclear Regulatory Commission (NRC) sta ff has reviewed the licensee's submittal and determined that additional information is needed in order to complete our review. The enclosed document describes this request for additional information (RAI). Please note that the numbering of the questions in this RAI does not begin at the number one. Three prior RAIs regarding this proposed license amendment were issued to you by letters dated April 27, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12117A175), May 22, 2012 (ADAMS Accession No. ML12138A267), June 6, 2012, (ADAMS Accession No. ML12158A481), June 15, 2012 (ADAMS Accession No. ML12168A002), and August 1, 2012 (ADAMS Accession No. ML12215A330), with RAI questions numbered 1-4, 5-19, 20-31, 32-40, and 41-42, respectively.
 
A telephone conference will be set up to discuss these RAI questions, as needed. If you have any questions, please call me at 301-415-1119.
Sincerely,
 
Jon Thompson, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing  Office of Nuclear Reactor Regulation  
 
Docket Nos. 50-369 and 50-370  


==Enclosure:==
==Enclosure:==
RAI   REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REGARDING LICENSE AMENDMENT REQUEST RELATED TO THE   IMPLEMENTATION OF A MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE 2MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 By letter dated March 5, 2012 (Agencywide Documents Access and Management System (ADAMS), Accession No. ML12082A210), Duke Energy Carolinas, LLC (Duke Energy, the licensee), submitted a license amendment request (LAR) to change the McGuire Nuclear Station, Units 1 and 2 (McGuire 1 and 2), Technical Specifications (TSs). The proposed change revises the TSs to implement a measurement uncertainty recapture (MUR) power uprate for McGuire 1 and 2.
RAI REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REGARDING LICENSE AMENDMEN T REQUEST RELATED TO THE IMPLEMENTATION OF A MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE
 
2MCGUIRE NUCLEAR STATION, UNITS 1 AND 2
 
By letter dated March 5, 2012 (Agencywide Docu ments Access and Management System (ADAMS), Accession No. ML12082A210), Duke Energy Carolinas, LLC (Duke Energy, the licensee), submitted a license amendment request (LAR) to change the McGuire Nuclear Station, Units 1 and 2 (McGuire 1 and 2), Technical Specifications (TSs). The proposed change revises the TSs to implement a measurement uncertainty recapture (MUR) power uprate for McGuire 1 and 2.  
 
By letter July 6, 2012, (ADAMS Package No. ML121990025) the licensee responded to the NRC's request for additional information (RAI) question 20.c, dated June 6, 2012 (ADAMS Accession No. ML12158A481). RAI question 20.c requested the following: (1) engineering evaluation on how the bounding uncertainty of 0.045%
By letter July 6, 2012, (ADAMS Package No. ML121990025) the licensee responded to the NRC's request for additional information (RAI) question 20.c, dated June 6, 2012 (ADAMS Accession No. ML12158A481). RAI question 20.c requested the following: (1) engineering evaluation on how the bounding uncertainty of 0.045%
rated thermal power (RTP) was established in calculating secondary calorimetric uncertainty (SCU) and (2) justifications for selection of a 7-day period upon loss of the leading edge flow meter (LEFM). In its response, the licensee stated that these numbers were established using a drift analysis of the operator aid computer calorimetric data, which is then compared to the turbine first stage pressure for one year of full operation. Based on this drift analysis, a bounding value of 0.0451%, RTP was estimated. This analysis was performed by Cameron and inspected and run independently by the licensee.
rated thermal power (RTP) was established in calculating secondary calorimetric uncertainty (SCU) and (2) justifications for selection of a 7-day period upon loss of the leading edge flow meter (LEFM). In its response, the licensee stated that these numbers were established using a drift analysis of the operator aid computer calorimetric data, which is then compared to the turbine first stage pressure for one year of full operation. Based on this drift analysis, a bounding value of 0.0451%, RTP was estimated. This analysis was performed by Cameron and inspected and run independently by the licensee.  
The NRC staff has reviewed the licensee's response and determined that following additional information are needed to complete the safety evaluation:
 
43. The licensee indicated that bounding value of 0.045% RTP SCU was established by one year study of the SCU data. Provide information how this bounding SCU data will be updated based on future plant performance data. 44. The MUR LAR is asking for 7 days plant operation with the above bounding SCU when the LEFM is inoperative. For previous measurement uncertainty recapture (MUR) power uprate applications, the NRC approved similar allowed outage time (AOT) with LEFM inoperable for maximum of 3 days, which is consistent with Cameron's analysis and recommendations to operate with a failed LEFM. AOT of 3 days for repair or replacement of inoperable instrumentation and controls systems is an established practice in the nuclear power industry. Please explain why 7-days AOT at the higher power level is needed for McGuire, when the LEFM equipment that justifies operation at the higher power level is inoperable.
The NRC staff has reviewed the licensee's response and de termined that following additional information are needed to complete the safety evaluation:  
Hearing Identifier:  NRR_PMDA Email Number:  436  Mail Envelope Properties  (Jon.Thompson@nrc.gov20120806110700)  
: 43. The licensee indicated that bounding value of 0.045% RTP SCU was established by one year study of the SCU data. Provide information how this bounding SCU data will be updated based on future plant  
 
performance data.  
: 44. The MUR LAR is asking for 7 days plant operation with the above bounding SCU when the LEFM is inoperative. For previous measurement uncertainty recapture (MUR) power uprate applications, the NRC approved similar allowed outage time (AOT) with LEFM inoperable for maximum of 3 days, which is consistent with Cameron's analysis and recommendations to operate with a failed LEFM. AOT of 3 days for repair or replacement of inoperable instrumentation and controls systems is an established practice in the nuclear power industry. Please explain why 7-days AOT at the higher power level is needed for McGuire, when the LEFM equipment that justifies operation at the higher power level is inoperable.
Hearing Identifier:  NRR_PMDA Email Number:  436  Mail Envelope Properties  (Jon.Thompson@nrc.gov20120806110700)


==Subject:==
==Subject:==
Request for Additional Information for License Amendment Request dated March 5, 2012 (TAC Nos. ME8213 and ME8214), RAI Questions 43 and 44  Sent Date:  8/6/2012 11:07:57 AM  Received Date:  8/6/2012 11:07:00 AM From:    Thompson, Jon Created By:  Jon.Thompson@nrc.gov Recipients:    "Thorp, John" <John.Thorp@nrc.gov>  Tracking Status: None "Mazumdar, Subinoy" <Subinoy.Mazumdar@nrc.gov>  Tracking Status: None  "Ashe, Ken" <Ken.Ashe@duke-energy.com>  Tracking Status: None  "Bryant, Julius W" <Julius.Bryant@duke-energy.com>  Tracking Status: None  
Request for Additional Information for License Amendment Request dated March 5, 2012 (TAC Nos. ME8213 and ME8214), RAI Questions 43 and 44  Sent Date:  8/6/2012 11:07:57 AM  Received Date:  8/6/2012 11:07:00 AM From:    Thompson, Jon Created By:  Jon.Thompson@nrc.gov Recipients:    "Thorp, John" <John.Thorp@nrc.gov>  Tracking Status: None "Mazumdar, Subinoy" <Subinoy.Mazumdar@nrc.gov>  Tracking Status: None  "Ashe, Ken" <Ken.Ashe@duke-energy.com>  Tracking Status: None  "Bryant, Julius W" <Julius.Bryant@duke-energy.com>  Tracking Status: None  


Post Office:      Files    Size      Date & Time MESSAGE    4640      8/6/2012 11:07:00 AM   Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:      
Post Office:      Files    Size      Date & Time MESSAGE    4640      8/6/2012 11:07:00 AM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}
}}

Revision as of 12:32, 26 July 2018

2012/08/06 NRR E-mail Capture - Request for Additional Information for License Amendment Request Dated March 5, 2012 (TAC Nos. ME8213 and ME8214), RAI Questions 43 and 44
ML12219A271
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 08/06/2012
From: Thompson J H
Plant Licensing Branch II
To: Ashe K L
Duke Energy Corp
References
TAC ME8213, TAC ME8214
Download: ML12219A271 (3)


Text

1 NRR-PMDAPEm Resource From: Thompson, Jon Sent: Monday, August 06, 2012 11:08 AM To: Ashe, Ken; Bryant, Julius W Cc: Thorp, John; Mazumdar, Subinoy

Subject:

Request for Additional Information for Li cense Amendment Request dated March 5, 2012 (TAC Nos. ME8213 and ME8214), RAI Questions 43 and 44

SUBJECT:

MCGUIRE NUCLEAR STATION, UNITS 1 AND 2, REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT RELATED TO MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NOS. ME8213 AND ME8214)

By letter dated March 5, 2012, Duke Energy Carolinas, LLC (the licensee), submitted a proposed license amendment to change the McGuire Nuclear Station, Units 1 and 2 (McGuire 1 and 2), Technical Specifications (TSs). The proposed change revises the TSs to implement a measurement uncertainty recapture power uprate for McGuire 1 and 2.

The U.S. Nuclear Regulatory Commission (NRC) sta ff has reviewed the licensee's submittal and determined that additional information is needed in order to complete our review. The enclosed document describes this request for additional information (RAI). Please note that the numbering of the questions in this RAI does not begin at the number one. Three prior RAIs regarding this proposed license amendment were issued to you by letters dated April 27, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12117A175), May 22, 2012 (ADAMS Accession No. ML12138A267), June 6, 2012, (ADAMS Accession No. ML12158A481), June 15, 2012 (ADAMS Accession No. ML12168A002), and August 1, 2012 (ADAMS Accession No. ML12215A330), with RAI questions numbered 1-4, 5-19, 20-31, 32-40, and 41-42, respectively.

A telephone conference will be set up to discuss these RAI questions, as needed. If you have any questions, please call me at 301-415-1119.

Sincerely,

Jon Thompson, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket Nos. 50-369 and 50-370

Enclosure:

RAI REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REGARDING LICENSE AMENDMEN T REQUEST RELATED TO THE IMPLEMENTATION OF A MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE

2MCGUIRE NUCLEAR STATION, UNITS 1 AND 2

By letter dated March 5, 2012 (Agencywide Docu ments Access and Management System (ADAMS), Accession No. ML12082A210), Duke Energy Carolinas, LLC (Duke Energy, the licensee), submitted a license amendment request (LAR) to change the McGuire Nuclear Station, Units 1 and 2 (McGuire 1 and 2), Technical Specifications (TSs). The proposed change revises the TSs to implement a measurement uncertainty recapture (MUR) power uprate for McGuire 1 and 2.

By letter July 6, 2012, (ADAMS Package No. ML121990025) the licensee responded to the NRC's request for additional information (RAI) question 20.c, dated June 6, 2012 (ADAMS Accession No. ML12158A481). RAI question 20.c requested the following: (1) engineering evaluation on how the bounding uncertainty of 0.045%

rated thermal power (RTP) was established in calculating secondary calorimetric uncertainty (SCU) and (2) justifications for selection of a 7-day period upon loss of the leading edge flow meter (LEFM). In its response, the licensee stated that these numbers were established using a drift analysis of the operator aid computer calorimetric data, which is then compared to the turbine first stage pressure for one year of full operation. Based on this drift analysis, a bounding value of 0.0451%, RTP was estimated. This analysis was performed by Cameron and inspected and run independently by the licensee.

The NRC staff has reviewed the licensee's response and de termined that following additional information are needed to complete the safety evaluation:

43. The licensee indicated that bounding value of 0.045% RTP SCU was established by one year study of the SCU data. Provide information how this bounding SCU data will be updated based on future plant

performance data.

44. The MUR LAR is asking for 7 days plant operation with the above bounding SCU when the LEFM is inoperative. For previous measurement uncertainty recapture (MUR) power uprate applications, the NRC approved similar allowed outage time (AOT) with LEFM inoperable for maximum of 3 days, which is consistent with Cameron's analysis and recommendations to operate with a failed LEFM. AOT of 3 days for repair or replacement of inoperable instrumentation and controls systems is an established practice in the nuclear power industry. Please explain why 7-days AOT at the higher power level is needed for McGuire, when the LEFM equipment that justifies operation at the higher power level is inoperable.

Hearing Identifier: NRR_PMDA Email Number: 436 Mail Envelope Properties (Jon.Thompson@nrc.gov20120806110700)

Subject:

Request for Additional Information for License Amendment Request dated March 5, 2012 (TAC Nos. ME8213 and ME8214), RAI Questions 43 and 44 Sent Date: 8/6/2012 11:07:57 AM Received Date: 8/6/2012 11:07:00 AM From: Thompson, Jon Created By: Jon.Thompson@nrc.gov Recipients: "Thorp, John" <John.Thorp@nrc.gov> Tracking Status: None "Mazumdar, Subinoy" <Subinoy.Mazumdar@nrc.gov> Tracking Status: None "Ashe, Ken" <Ken.Ashe@duke-energy.com> Tracking Status: None "Bryant, Julius W" <Julius.Bryant@duke-energy.com> Tracking Status: None

Post Office: Files Size Date & Time MESSAGE 4640 8/6/2012 11:07:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: