Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARHNP-11-065, Supplement Information in Regard to Measurement Uncertainty Recapture Power Uprate License Amendment Request2011-06-23023 June 2011 Supplement Information in Regard to Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Supplement ML12082A2102012-03-0505 March 2012 License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Request ML12117A1752012-04-27027 April 2012 Request for Additional Information Regarding License Amendment Related to Measure Uncertainty Recapture Power Uprate Project stage: RAI ML12138A2672012-05-22022 May 2012 Request for Additional Information Regarding License Amendment Related to Measurement Uncertainty Recapture Power Uprate (TAC Nos. ME8213 and ME8214) Project stage: RAI ML12160A0852012-05-29029 May 2012 Response to Request for Additional Information Regarding License Amendment Related to Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML12158A4812012-06-0606 June 2012 Request for Additional Information Regarding License Amendment Related to Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML12168A0022012-06-15015 June 2012 NRR E-mail Capture - Request for Additional Information for License Amendment Request Dated March 5, 2012 Project stage: RAI ML12187A1742012-06-21021 June 2012 Response to Request for Additional Information Regarding License Amendment Related to Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML1218006502012-07-0303 July 2012 Mcguire Nuclear Station, Units 1 and 2 - Fire Protection Fire Protection Safety Evaluation Input Regarding License Amendment Request Measurement Uncertainty Recapture Power Uprate Project stage: Approval ML12199A0232012-07-0606 July 2012 Response to Request for Additional Information Regarding License Amendment Related to Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML12209A1752012-07-16016 July 2012 Response to Request for Additional Information Regarding License Amendment Related to Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML12215A3302012-08-0101 August 2012 NRR E-mail Capture - Request for Additional Information for License Amendment Request Dated March 5, 2012 Project stage: RAI ML12219A2712012-08-0606 August 2012 NRR E-mail Capture - Request for Additional Information for License Amendment Request Dated March 5, 2012 (TAC Nos. ME8213 and ME8214), RAI Questions 43 and 44 Project stage: RAI ML12250A6222012-08-15015 August 2012 Response to Request for Additional Information Regarding License Amendment Request Related to Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML12254A0182012-08-23023 August 2012 NRR E-mail Capture - Request for Additional Information for License Amendment Request Dated March 5, 2012 (TAC Nos. ME8213 and ME8214), RAI Questions 45 and 46 Project stage: RAI ML12251A0282012-09-13013 September 2012 Request for Withholding Information from Public Disclosure (TAC Nos. ME8213 and ME8214) Project stage: Withholding Request Acceptance ML12251A0242012-09-13013 September 2012 Request for Withholding Information from Public Disclosure (TAC Nos. ME8213 and ME8214 Project stage: Withholding Request Acceptance ML12284A1302012-09-27027 September 2012 Response to Request for Additional Information Regarding License Amendment Request Related to Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML12310A3842012-11-0101 November 2012 Response to Request for Additional Information Regarding License Amendment Request Related to Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML13024A4062013-01-0202 January 2013 Revision to a Response to a Request for Additional Information Regarding License Amendment Request Related to Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML13079A3302013-03-0707 March 2013 Restatement of License Condition Proposed in August 15, 2012 Response to Request for Additional Information Related to License Amendment Request for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML13073A0412013-05-16016 May 2013 Issuance of Amendments Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Approval ML13151A2002013-06-0404 June 2013 Correction Letter to Issuance of Amendment Nos. 269 and 249, Measurement Uncertainty Recapture Power Uprate Project stage: Approval 2012-07-03
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML24085A2402024-03-21021 March 2024 Requalification Program Inspection - McGuire Nuclear Station IR 05000369/20230062024-02-28028 February 2024 Annual Assessment Letter for McGuire Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000369/2023006 and 05000370/2023006 ML24024A2182024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000369/20230042024-01-31031 January 2024 Integrated Inspection Report 05000369/2023004 and 05000370/2023004 ML24019A1392024-01-25025 January 2024 TSTF 505 and 50.69 Audit Summary ML24019A2002024-01-24024 January 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000369/20234022023-12-14014 December 2023 – Material Control and Accounting Program Inspection Report 05000369/2023402 and 05000370/2023402 05000369/LER-1923-001, Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error2023-12-13013 December 2023 Automatic Actuation of the 1A Motor Driven Auxiliary Feedwater Pump Due to Human Error ML23317A2272023-11-17017 November 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Transmittal of Dam Inspection Report - Non-Proprietary ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230032023-10-24024 October 2023 Integrated Inspection Report 05000369/2023003 and 05000370/2023003; and Inspection Report 07200038/2023001 IR 05000369/20240102023-10-13013 October 2023 Notification of McGuire Nuclear Station Comprehensive Engineering Team Inspection – U.S. Nuclear Regulatory Commission Inspection Report 05000369, 370/2024010 IR 05000369/20230102023-10-13013 October 2023 Age Related Degradation Inspection Report 05000369/2023010 and 05000370/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds IR 05000369/20233012023-09-20020 September 2023 William B. McGuire Nuclear Station - NRC Examination Report 05000369/2023301 and 05000370/2023301 ML23230A0652023-08-31031 August 2023 William B. McGuire Nuclear Station, Units 1 and 2 - Relief Request Use of Later Edition of ASME Code ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000369/20230052023-08-25025 August 2023 Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 (Report 05000369/2023005 and 05000370/2023005) IR 05000369/20234012023-08-0404 August 2023 – Security Baseline Inspection Report 05000369/2023401 and 05000370/2023401 (OUO-SRI) Cover IR 05000369/20230022023-07-28028 July 2023 Integrated Inspection Report 05000369/2023002 and 05000370/2023002 IR 05000369/20234202023-07-24024 July 2023 – Security Baseline Inspection Report 050003692023420 and 050003702023420 ML23206A0092023-07-24024 July 2023 William B. McGuire Nuclear Station – Operator Licensing Written Examination Approval 05000369/2023301 and 05000370/2023301 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23159A2712023-06-20020 June 2023 William B. McGuire Nuclear Station, Unit 1 - Relief Request Impractical Reactor System Welds ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23124A0862023-05-0303 May 2023 Cycle 29, Revision 1, Core Operating Limits Report (COLR) ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000369/20230012023-05-0101 May 2023 Integrated Inspection Report 05000369/2023001 and 05000370/2023001 ML23115A2122023-05-0101 May 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23094A1832023-04-18018 April 2023 Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility 2024-08-26
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 13, 2012 Mr. Steven D. Capps Vice President McGuire Nuclear Station Duke Energy Carolinas, LLC 12700 Hagers Ferry Road Huntersville, NC 28078
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR MCGUIRE NUCLEAR STATION, UNITS 1 AND 2 (MCGUIRE 1 AND 2)
(TAC NOS. ME8213 AND ME8214)
Dear Mr. Capps:
By letter dated March 5, 2012, Mr. Regis Repko of Duke Energy Carolinas, LLC, attached a letter from Cameron International Corporation (Cameron) dated June 28, 2011, which submitted an affidavit dated June 28, 2011, and executed by Ernest Hauser of Cameron, requesting that the information contained in the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CF R), Part 2, Section 2.390:
Caldon Ultrasonics Engineering Report ER-819 Rev. 1 "Bounding Uncertainty Analysis for Thermal Power Determination at McGuire [Nuclear Station (McGuire),] Unit 2 Using the [leading edge flow meter] LEFM CheckPlus System" [ER-819 Rev. 1]
Caldon Ultrasonics Engineering Report ER-822 Rev. 1 "Bounding Uncertainty Analysis for Thermal Power Determination at McGuire Unit 1 Using the LEFM CheckPlus System"
[ER-822 Rev. 1]
Caldon Ultrasonics Engineering Report ER-823 Rev. 0 "Meter Factor Calculation and Accuracy Assessment for McGuire Unit 2" [ER-823 Rev. 0]
Caldon Ultrasonics Engineering Report ER-874 Rev. 1 "Meter Factor Calculation and Accuracy Assessment for McGuire Unit 1" [ER-874 Rev. 1]
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Cameron.
(ii) The information is of a type customarily held in confidence by Cameron and not customarily disclosed to the public. Cameron has a rational basis for determining the types of information customarily held in confidence by it and, in that connection utilizes a system to determine when and whether to hold certain types of information ill confidence. The application of that system and the substance of
S. Capps -2 that system constitutes Cameron policy and provides the rational basis required.
Furthermore, the information is submitted voluntarily and need not rely on the evaluation of any rational basis.
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Cameron's competitors without license from Cameron constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, and assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Cameron, its customer or suppliers.
(e) It reveals aspects of past, present or future Cameron or customer funded development plans and programs of potential customer value to Cameron.
(f) It contains patentable ideas, for which patent protection may be desirable.
There are sound policy reasons behind the Cameron system, which include the following:
(a) The use of such information by Cameron gives Cameron a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Cameron competitive position.
(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Cameron ability to sell products or services involving the use of the information.
(c) Use by our competitor would put Cameron at a competitive disadvantage by reducing his expenditure of resources at our expense.
(d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, anyone component may be the key to the entire puzzle, thereby depriving Cameron of a competitive advantage.
S. Capps (e) Unrestricted disclosure would jeopardize the position of prominence of Cameron in the world market, and thereby give a market advantage to the competition of those countries.
(f) The Cameron capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
(iii) The information is being transmitted to the Commission in confidence, and, under the provisions of 10 CFR 2.390, it is to be received in confidence by the Commission.
(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same manner or method to the best of our knowledge and belief.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the documents identified above, ER-819 Rev. 1, ER-822 Rev. 1, ER-823 Rev. 0, and ER-874 Rev. 1, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the Nuclear Regulatory Commission (NRC). You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
S. Capps -4 If you have any questions, please call me at 301-415-1119.
Sincerely, Jon Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370 cc: Distribution via Listserv Ernest Hauser Caldon Ultrasonics Technology Center 1000 McClaren Woods Drive Coraopolis, PA 15108
S. Capps -4 If you have any questions, please call me at 301-415-1119.
Sincerely, IRA!
Jon Thompson, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-369 and 50-370 cc: Distribution via Listserv Ernest Hauser Caldon Ultrasonics Technology Center 1000 McClaren Woods Drive Coraopolis, PA 15108 DISTRIBUTION:
Public LPL2-1 RtF RidsNrrDorlLpl2-1 Resource RidsNrrPMMcGuire Resource (hard copy)
RidsNrrLASFigueroa Resource RidsOgcRp Resource RidsRgn2MailCenter Resource NRR/LPL2-1/PM NRRlLPL2-1/LA NRRlLPL2-lIBC NRRlLPL2-1/PM JThompson SFigueroa RPascarelli JThompson 09/07/12 09/07112 09/13/12 09/13/12 OFFICIAL RECORD COPY