{{#Wiki_filter:From:Thadani, MohanTo:O"Farrill, JorgeCc:Boyle, Patrick; Lingam, Siva; Goldstein, Kay
{{#Wiki_filter:From:Thadani, Mohan To:O"Farrill, Jorge Cc:Boyle, Patrick; Lingam, Siva; Goldstein, Kay


==Subject:==
==Subject:==
Request for approval of license amendment revising the milestone 6 of the Physical Security License Condition.Date:Wednesday, July 25, 2012 11:02:00 AMJorge:
Request for approval of license amendment revising the milestone 6 of the Physical Security License Condition.
Please find below the result of the NRC acceptance review of your LAR dated June 2,2012.
Date:Wednesday, July 25, 2012 11:02:00 AM Jorge:
Please find below the result of the NRC acceptance review of your LAR dated June 2, 2012.


Thanks.
Thanks.
Mohan C ThadaniSenior Project ManagerPlant Licensing Branch IVDivision of Operating Reactor LicensingOffice of Nuclear Reactor Regulation (301) 415-1476     Mohan.Thadani@nrc.gov_______________________________________________________________
Mohan C ThadaniSenior Project ManagerPlant Licensing Branch IVDivision of Operating Reactor LicensingOffice of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov
Vice President, OperationsEntergy Nuclear Operations Inc.James A. FitzPatrick Nuclear Power PlantP.O. Box 110Lycoming, NY  10393  
_______________________________________________________________
 
Vice President, Operations Entergy Nuclear Operations Inc.James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY  10393  


==SUBJECT:==
==SUBJECT:==
R.E. FITZPATRICK NUCLEAR POWER PLANT - ACCEPTANCE REVIEWFOR AMENDMENT REQUEST FOR APPROVAL OF CYBER SECURITYPLAN IMPLEMENTATION SCHEDULE(TAC NO. ME9114)  
 
R.E. FITZPATRICK NUCLEAR POWER PLANT - ACCEPTANCE REVIEW FOR AMENDMENT REQUEST FOR APPROVAL OF CYBER SECURITY PLAN IMPLEMENTATION SCHEDULE(TAC NO. ME9114)  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
By letter dated June 2, 2012,(ADAMS Accession No. ML121780518), Entergy Nuclear Operations, Inc. (Entergy) requested the U.S. Nuclear Regulatory Commission (NRC) staff approval of anamendment to the Facility Operating Licensee for FitzPatrick Nuclear Power Plant (JAF). Entergy isplanning to implement the milestone 6 of the implementation scheme requirements in a slightlydifferent manner than described in the approved implementation schedule. The proposed amendment would revise the existing operating license condition for JAF to reference a change to implementation schedule scope milestone 6. Milestone 6 requires theidentification, documentation, and implementation of cyber security controls for critical digital assets (CADs).
By letter dated June 2, 2012,(ADAMS Accession No. ML121780518), Entergy Nuclear Operations, Inc. (Entergy) requested the U.S. Nuclear Regulatory Commission (NRC) staff approval of anamendment to the Facility Operating Licensee for FitzPatrick Nuclear Power Plant (JAF).
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission(NRC) staff=s acceptance review of this amendment request. The acceptance review wasperformed to determine if there is sufficient technical information in scope and depth to allow theNRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in itscharacterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), anamendment to the license (including the technical specifications) must fully describe the changesrequested, and following as far as applicable, the form prescribed for original applications. Section50.34 of 10 CFR addresses the content of technical information required. This section stipulatesthat the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review andmake an independent assessment regarding the acceptability of the proposed amendment interms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, youwill be advised by separate correspondence.
Entergy isplanning to implement the milestone 6 of the implementation scheme requirements in a slightlydifferent manner than described in the approved implementation schedule.
The proposed amendment would revise the existing operating license condition for JAF to reference a change to implementation schedule scope milestone 6.
Milestone 6 requires theidentification, documentation, and implementation of cyber security controls for critical digital assets (CADs).  
 
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission(NRC) staff
=s acceptance review of this amendment request.
The acceptance review wasperformed to determine if there is sufficient technical information in scope and depth to allow theNRC staff to complete its detailed technical review.
The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in itscharacterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), anamendment to the license (including the technical specifications) must fully describe the changesrequested, and following as far as applicable, the form prescribed for original applications.
Section50.34 of 10 CFR addresses the content of technical information required.
This section stipulatesthat the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review andmake an independent assessment regarding the acceptability of the proposed amendment interms of regulatory requirements and the protection of public health and safety and the
 
environment.
If additional information is needed for the staff to complete its technical review, youwill be advised by separate correspondence.


If you have any questions, please contact me. Mohan C ThadaniSenior Project ManagerPlant Licensing Branch IVDivision of Operating Reactor LicensingOffice of Nuclear Reactor Regulation (301) 415-1476     Mohan.Thadani@nrc.gov
If you have any questions, please contact me.
}}
Mohan C ThadaniSenior Project ManagerPlant Licensing Branch IVDivision of Operating Reactor LicensingOffice of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov}}

Revision as of 09:23, 26 July 2018

R.E. Fitzpatrick Nuclear Power Plant - Acceptance Review for Amendment Request for Approval of Cyber Security Plan Implementation Schedule (TAC No. ME9114)
ML12227A569
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/25/2011
From: Thadani M C
Plant Licensing Branch IV
To: O'Farrill J
Entergy Nuclear Operations
Thadani M
References
TAC ME9114
Download: ML12227A569 (2)


Text

From:Thadani, Mohan To:O"Farrill, Jorge Cc:Boyle, Patrick; Lingam, Siva; Goldstein, Kay

Subject:

Request for approval of license amendment revising the milestone 6 of the Physical Security License Condition.

Date:Wednesday, July 25, 2012 11:02:00 AM Jorge:

Please find below the result of the NRC acceptance review of your LAR dated June 2, 2012.

Thanks.

Mohan C ThadaniSenior Project ManagerPlant Licensing Branch IVDivision of Operating Reactor LicensingOffice of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov

_______________________________________________________________

Vice President, Operations Entergy Nuclear Operations Inc.James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 10393

SUBJECT:

R.E. FITZPATRICK NUCLEAR POWER PLANT - ACCEPTANCE REVIEW FOR AMENDMENT REQUEST FOR APPROVAL OF CYBER SECURITY PLAN IMPLEMENTATION SCHEDULE(TAC NO. ME9114)

Dear Sir or Madam:

By letter dated June 2, 2012,(ADAMS Accession No. ML121780518), Entergy Nuclear Operations, Inc. (Entergy) requested the U.S. Nuclear Regulatory Commission (NRC) staff approval of anamendment to the Facility Operating Licensee for FitzPatrick Nuclear Power Plant (JAF).

Entergy isplanning to implement the milestone 6 of the implementation scheme requirements in a slightlydifferent manner than described in the approved implementation schedule.

The proposed amendment would revise the existing operating license condition for JAF to reference a change to implementation schedule scope milestone 6.

Milestone 6 requires theidentification, documentation, and implementation of cyber security controls for critical digital assets (CADs).

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission(NRC) staff

=s acceptance review of this amendment request.

The acceptance review wasperformed to determine if there is sufficient technical information in scope and depth to allow theNRC staff to complete its detailed technical review.

The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in itscharacterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), anamendment to the license (including the technical specifications) must fully describe the changesrequested, and following as far as applicable, the form prescribed for original applications.

Section50.34 of 10 CFR addresses the content of technical information required.

This section stipulatesthat the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review andmake an independent assessment regarding the acceptability of the proposed amendment interms of regulatory requirements and the protection of public health and safety and the

environment.

If additional information is needed for the staff to complete its technical review, youwill be advised by separate correspondence.

If you have any questions, please contact me.

Mohan C ThadaniSenior Project ManagerPlant Licensing Branch IVDivision of Operating Reactor LicensingOffice of Nuclear Reactor Regulation (301) 415-1476 Mohan.Thadani@nrc.gov