Line 14: |
Line 14: |
| | page count = 19 | | | page count = 19 |
| | project = CAC:MF9699 | | | project = CAC:MF9699 |
| | | stage = |
| }} | | }} |
|
| |
|
Revision as of 01:01, 30 March 2018
Letter Sequence Meeting |
---|
|
|
MONTHYEARML17158B1502017-06-0808 June 2017 Meeting Slides for High Pressure Safety Injection Pump AB Pre-submittal Public Meeting Relief Request Per 50.55a(Z)(2)for Waterford Steam Electric Station, Unit 3 Project stage: Meeting ML17150A4122017-06-0808 June 2017 Request for Presubmittal Public Meeting Relief Request from Asme Code Requirements for High Pressure Safety Injection (Hpsi) Pump AB Testing Requirements Project stage: Meeting ML17174B1922017-06-29029 June 2017 Summary of June 8, 2017, Category 1 Teleconference with Entergy Regarding Planned Request for Alternative Regarding High Pressure Safety Injection Pump for Waterford Steam Electric Station, Unit 3 Project stage: Meeting 2017-06-29
[Table View] |
|
---|
Category:Slides and Viewgraphs
MONTHYEARML24248A2362024-09-0404 September 2024 2023 Annual Assessment Meeting Slides ML24096B4992024-04-0101 April 2024 Slides: Pre-Submittal Meeting for License Amendment Request to Modify Selected Surveillance Requirements in Support of the Surveillance Frequency Control Program ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23296A1002023-10-24024 October 2023 Entergy Presentation Slides for Pre-Submittal Meeting on 10/24/23, Mtc LAR ML23122A1012023-05-0202 May 2023 Assessment Presentation 2022 ML22271A7502022-09-29029 September 2022 Preapplication Meeting Slides: Technical Specification Change to Support Elimination of ESFAS Single Point Vulnerability ML22224A2462022-08-19019 August 2022 Entergy Slides for Regulatory Conference (Enc 3) ML22217A0082022-07-29029 July 2022 Regulatory Conference - NRC Slides (Enc 2) ML22164A8012022-06-13013 June 2022 Entergy Fleet (GGNS, RBS, and WF-3) - Code Case N-752 RR 6-14-22 Pre-Submittal Public Meeting Presentation Slides ML22076A1962022-03-17017 March 2022 Presentation March23, 2022 NRC Di_C Workshop ML21319A2452021-11-15015 November 2021 Natrium Energy Island Decoupling Strategy - 11-17-2021 ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21306A3162021-11-0909 November 2021 Digital IC Presentation 11/09/2021 ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21012A1982021-01-15015 January 2021 Relocate Toxic Gas Monitoring Technical Specifications to Technical Requirements Manual License Amendment Request - NRC Pre-submittal Meeting ML21013A3372020-12-17017 December 2020 Risk-Informed Allowed Outage Time (Riaot) License Amendment Request -NRC Pre-Submittal Meeting, Licensee Slide Presentation, December 17, 2020 EPID L-2020-LRM-0110 ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20288A7292020-09-22022 September 2020 Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020 W3F1-2020-0017, Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2020-03-12012 March 2020 Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2020-0002, Transmittal of Slides for Third Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2020-01-0808 January 2020 Transmittal of Slides for Third Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0082, Transmittal of Slides for Second Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2019-12-0505 December 2019 Transmittal of Slides for Second Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0068, Transmittal of Slides for Presubmittal Public Meeting to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2019-09-12012 September 2019 Transmittal of Slides for Presubmittal Public Meeting to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML18037B1102018-02-0808 February 2018 Presentation Slides for February 8 2018 Preapplication Meeting to Discuss Chapter 15 Fuel Misload ML17318A1232017-11-16016 November 2017 Licensee Presentation Slides for November 16, 2017, Category 1 Public Meeting Regarding Engineered Safety Features Actuation System ML17306A1652017-11-0202 November 2017 Updated Licensee Slide Presentation for October 19, 2017 Category 1 Meeting Regarding Raptor ML17290A6552017-10-19019 October 2017 Public Meeting, Licensee Presentation Slides Regarding Waterford, Unit 3, Fluence Methodology ML17158B1502017-06-0808 June 2017 Meeting Slides for High Pressure Safety Injection Pump AB Pre-submittal Public Meeting Relief Request Per 50.55a(Z)(2)for Waterford Steam Electric Station, Unit 3 ML17151A2952017-06-0101 June 2017 6/1/2017, Meeting Slide for Pre-Submittal Meeting Regarding Ultimate Heat Sink Technical Specification Change Request for Waterford 3 ML17101A6482017-04-11011 April 2017 Public Meeting Slides ML16190A0842016-06-0808 June 2016 Public Meeting, June 8, 2016 (Pmc Comments1) ML15222A3472015-08-11011 August 2015 Presentation for 8-11-15 Public Meeting on Main Control Room Abandonment ML15196A4152015-07-15015 July 2015 Summary of Meeting with Entergy Corporation to Discuss Annual Performance Assessment ML15113A7872015-04-22022 April 2015 CEA Drop Time Technical Specification Change Request April 22, 2015 Revised Public Meeting Slides ML15110A0622015-04-22022 April 2015 CEA Drop Time T.S. Change Request April 22,2015 Public Meeting Slides ML14035A0942014-02-0404 February 2014 2/4/2014 Waterford Steam Electric Station, Unit 3 - Meeting Slides - NFPA 805 LAR Supplement ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12261A1962012-09-16016 September 2012 Summary of Meeting with Waterford Steam Electric Station to Discuss the Performance of the Waterford Steam Electric Station, Unit 3, for the Period of July 1, 2011 Through June 30, 2012 ML11321A2912011-11-17017 November 2011 Final Significance Determination of White Finding, NRC Inspection ML1110401532011-04-13013 April 2011 Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 ML1031403752010-11-10010 November 2010 Handouts for the 11/10/10 Meeting Regarding Surge Line Leak-Before Break RCS Leakage Detection ML1014606312010-05-26026 May 2010 Summary of Public Meeting with Entergy Operations on Waterford Steam Electric Station Unit 3 2009 Performance ML1006903722010-03-0808 March 2010 Licensee Slides from 3/8/2010 Meeting Generic Letter 2004-02 Response to RAIs ML0935201272009-12-18018 December 2009 Nrc/Entergy Operations, Inc., Management Meeting ML0909603272009-04-0606 April 2009 Summary of Public Meeting with Entergy on Waterford Steam Electric Station Unit -3 2008 Performance 2024-09-04
[Table view] |
Text
HIGHPRESSURESAFETYINJECTIONPUMPABPRESUBMITTALPUBLICMEETINGRELIEFREQUESTPER50.55a(z)(2)WATERFORD3JUNE8,20171 HPSIABReliefRequestPreSubmittalMeetingIntroductionsJohnJarrell-RegulatoryAssuranceManagerBenSheppard-InServiceTestingEngineerMichelleGroome-SystemsEngineerMariaZamber-RegulatoryAssurance2 HPSIABReliefRequestPreSubmittalMeeting*Overview*AdverseCondition,Testing,andCorrectiveActionRequirements*PreviousReliefRequest*ProblemwithRefurbishment*PumpPerformanceData/Analysis*ProposedAlternative3Agenda Overview*EntergyisrequestingreliefoftherequirementtoperformtheISTComprehensiveTestoftheHPSIABpump.*Testisrequiredtobeperformedata39weekfrequencyduetotherequirement(ISTB6200(a))todoublethefrequencyifaparametervalue(inthiscase,vibration)fallswithintheAlertrange.*HighvibrationnotedduringRF20(Nov2015)andreliefpreviouslygrantedforCycle21.*PumpcouldnotberefurbishedduringRF21,thereforereliefisagainbeingrequestedforCycle22.4 HighPressureSafetyInjectionPumpAB*PumpSIMPMP0002ABistheinstalledspare(maybealignedtoeithertrain).*Safetyrelated,horizontallymounted,ninestage,centrifugalpump.*ManufacturerisIngersollRand(Model4X9C9).*Ratedfor405gpmwith2830feetofheadat3575rpm.*GroupBpump.5 AdverseCondition-HighVibration*ComprehensivePumpTestperformedduringRF20(Nov2015)identifiedhighvibrationinthealertrangeatvibrationpoints3H(inboardbearing)and4H(outboardbearing).*Causeofhighvibrationattributedtobeginningstagesofendoflife.6 TestandCorrectiveActionRequirements*ComprehensivePumpTestrequiredtobeperformedon18monthfrequencyduetolengthofWF3OperatingCycles.*Correctiveactionrequiresthatiftestparametervaluefallswithinalertrange,frequencyshallbedoubleduntilthecauseofthedeviationisdeterminedandtheconditioniscorrected.*Comprehensivetestcanonlybeperformedwhenreactorisshutdown(Mode6).7 PreviousReliefRequest/Precedent*ReliefpreviouslygrantedforWaterford3onJuly6,2016forOperatingCycle21[ML16182A270].*ApprovalgrantedtoperformGroupAtestonaquarterlybasisinordertomonitorvibrationwhileonlineinordertoidentifyiftheconditionwasworsening.*Pumprefurbishmentwasscheduledtobeperformedduringthe21strefuelingoutage(RF21).8 ProblemwithRefurbishment*NewHPSIABshaftdamagedbyfabricatoranddeemedunusable*PumpisuniquetoWaterford3andArkansasNuclearOneandsparematerialsnotavailable.*LeadtimeforanewshaftwasbeyondthestartdateofOperatingCycle22.*Inpreparationforrefurbishment,pumpwasuncoupledfrommotor,thenrecoupledwhenrefurbishmentcouldnotbecompleted.Noadditionalmaintenancewasperformed.9 PumpPerformance*Pumpexhibitssatisfactoryhydraulicperformancewithnodegradingtrend.*TSflowsurveillancerequirementsaresatisfactory.*VibrationmeasurementsobservedduringCycle21GroupAtestingwereelevatedyetacceptable.*AftertheuncouplingandrecouplingofthepumpjustpriortoRF21,thevibrationswerenotedtohavebeenreducedsignificantly,andareofthesamemagnitudeasvibrationmeasurementsrecordedduringthecomprehensivetestofRF21.10 ChangeinVibrationReadingsEngineeringevaluationdeterminedthattheuncouplingandrecouplingperformedatthebeginningoftherefurbishmentattemptaffectedthevibrationreadings;however,thisisnotthemostlikelycauseoftheincreasedvibrationsidentifiedinNovember2015andthereforeEntergycannotsaythattheoriginalconditionhasbeenresolved.DuetothecircumstancespresentedbythefactthattheHPSIABpumpcouldnotberefurbished,theoriginalconditionthatcausedtheelevatedvibrationhasnotbeencorrected.11 HPSIABComprehensiveData12DateOutageFlow Rate (gpm)DP(psid)Pump Bearing Vibrations (in/sec)3H3V4H4V4A10/28/2009RF16404.01202.00.2670.1910.2520.2660.05004/16/2011RF17422.81184.20.2350.1610.2410.2500.05812/18/2012RF18411.01215.00.2490.1660.2260.2340.04904/19/2014RF19411.21190.70.0900.0830.0700.0720.05811/03/2015RF20406.01194.50.3320.1910.3360.2300.08811/23/2015RF20408.51202.20.3970.2250.3990.1790.0784/21/2017RF21411.61194.70.2130.1240.2190.1410.042Note:Alertrangeis0.325<V0.700in/sec HPSIABTSDPSurveillanceData13Cycle 20Cycle 21DateDP (psid)DateDP (psid)06/10/20141491.003/09/20161492.309/09/20141462.006/07/20161466.212/12/20141491.509/09/20161467.403/05/20151466.512/01/20161470.106/02/20151471.603/10/20171474.109/04/20151497.004/07/20171468.5Note:TSrequiresaDPgreaterthanorequalto1429psid.
HPSIABTSFlowSurveillanceData14Note:TSrequiresthatthesumofinjectionlineflowratesshallbe>675gpm.Eachpumpmustperformwithahotlegflowrategreaterthanorequalto436gpmandwithin+/-10%ofcoldlegflow.DateOutageTS 4.5.2(h)Cold Leg Flow(gpm)Cold Leg Flow(gpm)Hot/Cold Leg Flow (gpm)90%Cold Leg FlowHot Leg Flow110%Cold Leg Flow10/28/2009RF16687441.0396.90463.7485.1004/16/2011RF17695466.0419.40455.0512.6012/18/2012RF18706451.0405.00458.0496.0004/19/2014RF19 (Header B)708422.0379.80455.2464.2005/06/2014RF19 (Header A)689459.0413.00441.0505.0011/03/2015RF20 (Header A)680454.0408.60445.0499.4011/23/2015RF20 (Header B)694442.0397.80462.0486.204/21/2017RF21 (Header B)678417.8376.00457.5459.604/21/2017RF21 (Header A)679.8443.5399.2457.9487.8 HPSIABGroupATestData(Cycle21)15DateDP (psid)Pump BearingVibrations3H3V4H4V4A03/09/20161376.20.2780.2200.3100.2920.06206/07/20161347.50.2820.2100.2310.2860.07209/09/20161335.20.2700.2000.2900.2900.07012/01/20161340.50.2600.2000.2400.3000.06003/10/20171336.60.2800.2500.2300.3100.05004/07/20171345.00.1430.1420.1510.2230.050Note:At250gpm,eachHPSIPumpmustachieveaminimumof1312.1psid,whichincludesinstrumentaccuracy,inordertofulfilltherequirementsofDesignBasisCalculationECM05003.
Analysis*PumpdischargeflowhasconsistentlyachievedTSflowrequirements.*PumphasachievedTSDPrequirementsduringeachquarterlysurveillanceduringOperatingCycle20andOperatingCycle21.*PumphasbeenwithinISTComprehensivetestDPacceptancecriteriawithnodegradingtrendinpumphydraulicperformance.16 Conclusion17TheprecedinginformationdemonstratesthateventhoughtheHPSIABpumpisinthebeginningstagesofendoflife,itisremainscapableofperformingitssafetyfunctionforitsmissiontime.
ProposedAlternative18*ReliefwillberequestedtoallowperformanceoftheGroupAtestonaquarterlybasisinlieuoftheComprehensiveTestforthedurationofCycle22,essentiallyidenticaltothereliefgrantedforCycle21.*Datawillbeanalyzedtoensurethattheperformanceisintheexpectedrange,providingassurancethatthepumpwillcontinuetobeoperationallyreadyforthedurationofthecycle.
Closing*ExpectedsubmittaldateisJuly6,2017.*ApprovalrequestedbyFebruary3,2018toensurethatreliefisobtainedpriortothetimethattestingwouldneedtobeperformed,whichis39weeksfollowingtheprevioustestduetotheincreasedtestingfrequencyrequirement.*Thankyouforyourtimeandconsideration.*Questions?19