ML110880355: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 14: | Line 14: | ||
| page count = 339 | | page count = 339 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:}} |
Revision as of 20:36, 8 August 2018
ML110880355 | |
Person / Time | |
---|---|
Site: | Perry ![]() |
Issue date: | 03/25/2011 |
From: | Bezilla M B FirstEnergy Nuclear Operating Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
L-11-082 | |
Download: ML110880355 (339) | |
Similar Documents at Perry | |
---|---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARL-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023
[Table view]Plan, Nineteenth Inservice Inspection Summary Report L-21-282, Proposed Inservice Inspection Alternative IR-0632022-01-0505 January 2022 Proposed Inservice Inspection Alternative IR-063 L-21-017, Eighteenth Inservice Inspection Summary Report2021-06-29029 June 2021 Eighteenth Inservice Inspection Summary Report L-21-028, 10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension2021-01-15015 January 2021 10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension L-19-143, Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2020-04-17017 April 2020 Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-19-257, Submittal of Perry Nuclear Power Plant Inservice Testing Programs2020-02-13013 February 2020 Submittal of Perry Nuclear Power Plant Inservice Testing Programs L-19-119, Seventeenth Inservice Inspection Summary Report2019-06-26026 June 2019 Seventeenth Inservice Inspection Summary Report L-18-104, 10 CFR 50.55a Requests in Support of the Fourth 10-Year In-Service Testing Interval2018-06-21021 June 2018 10 CFR 50.55a Requests in Support of the Fourth 10-Year In-Service Testing Interval L-17-038, Submittal of Report of Facility Changes, Tests, and Experiments2017-10-23023 October 2017 Submittal of Report of Facility Changes, Tests, and Experiments L-17-072, Sixteenth Inservice Inspection Summary Report2017-06-29029 June 2017 Sixteenth Inservice Inspection Summary Report L-15-165, Fifteenth Inservice Inspection Summary Report2015-07-22022 July 2015 Fifteenth Inservice Inspection Summary Report L-14-105, Notification of Impracticality for the Third 10-Year Inservice Inspection Interval2014-03-0707 March 2014 Notification of Impracticality for the Third 10-Year Inservice Inspection Interval ML14043A1082014-02-12012 February 2014 Notification of Impracticality for the Third 10-Year Lnservice Inspection Interval L-13-190, Fourteenth Inservice Inspection Summary Report2013-08-0909 August 2013 Fourteenth Inservice Inspection Summary Report L-11-260, Thirteenth Inservice Inspection Summary Report2011-09-0101 September 2011 Thirteenth Inservice Inspection Summary Report L-11-083, Submittal of Inservice Examination Plan2011-03-28028 March 2011 Submittal of Inservice Examination Plan L-11-082, Submittal of Inservice Testing Programs2011-03-25025 March 2011 Submittal of Inservice Testing Programs L-10-246, 10 CFR 50.55a Requests in Support of the Third 10-Year In-Service Inspection Interval2011-01-24024 January 2011 10 CFR 50.55a Requests in Support of the Third 10-Year In-Service Inspection Interval L-09-197, Twelfth Inservice Inspection Summary Report2009-08-0505 August 2009 Twelfth Inservice Inspection Summary Report L-08-350, 10 CFR 50.55a Request Number PR-3, Inservice Testing Program2009-02-18018 February 2009 10 CFR 50.55a Request Number PR-3, Inservice Testing Program L-08-270, Response to Request for Additional Information Regarding Relief Request IR-054, Revision 02008-09-17017 September 2008 Response to Request for Additional Information Regarding Relief Request IR-054, Revision 0 L-08-066, Inservice Inspection Program Relief Requests IR-043, Revision 1, IR-055, IR-056, and IR-0572008-02-20020 February 2008 Inservice Inspection Program Relief Requests IR-043, Revision 1, IR-055, IR-056, and IR-057 ML0722503652007-08-0707 August 2007 Submittal of Eleventh Inservice Inspection Summary Report ML0522303272005-08-0202 August 2005 Owners Report for Inservice Inspections as Required by the Provisions of the ASME Code Rules ML0327314232003-08-28028 August 2003 Inservice Inspection Summary Report 2023-06-22 Category:Letter MONTHYEARIR 05000440/20230042024-01-30030 January 2024
[Table view]Integrated Inspection Report 05000440/2023004 L-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative IR 05000440/20234022024-01-10010 January 2024 Cyber Security Inspection Report 05000440/2023402 ML24003A8032024-01-0303 January 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML23321A0472023-12-20020 December 2023 Letter to Rod L. Penfield - Perry Nuclear Power Plant, Unit 1 - License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000440/20230112023-11-28028 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000440/2023011 IR 05000440/20234032023-11-27027 November 2023 Security Baseline Inspection Report 05000440/2023403 ML23292A2972023-11-17017 November 2023 Table of Contents LAR (L-2023-LLA-0111) L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 ML23292A2482023-10-19019 October 2023 Fws to NRC, Federal Agency Coordination Under ESA Section 7 for Perry Nuclear Plant, Unit 1, License Renewal, and Concurrence with Not Likely to Adversely Affect Determination for Northern Long-eared Bat ML23292A2472023-10-19019 October 2023 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected IR 05000440/20230032023-10-11011 October 2023 Integrated Inspection Report 05000440/2023003 ML23249A1032023-10-0303 October 2023 Letter to Rod L. Penfield, Site Vice President-Perry Nuclear Power Plant, Unit 1-Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23261C3642023-09-25025 September 2023 License Renewal Application Online Reference Portal ML23261B0192023-09-25025 September 2023 Aging Management Audit Plan Regarding the License Renewal Application Review ML23256A3592023-09-22022 September 2023 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Energy Harbor Nuclear Corp. Application for License Renewal L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual IR 05000440/20234012023-08-28028 August 2023 Public - Perry Nuclear Power Plant Security Baseline Inspection Report 05000440/2023401 ML23129A1722023-08-25025 August 2023 Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Units 1 and 2; Davis Besse Nuclear Power Station, Unit 1; and Perry Nuclear Power Plant, Unit 1 IR 05000440/20230052023-08-24024 August 2023 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2023005) ML23172A2852023-08-23023 August 2023 Safety Evaluation Irradiated Fuel Management Plan and Preliminary Decommissioning Cost Estimate ML23227A2202023-08-15015 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Perry Nuclear Power Plant L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications IR 05000440/20230022023-08-0202 August 2023 Integrated Inspection Report 05000440/2023002 L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative ML23198A2842023-07-17017 July 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant IR 05000440/20230102023-06-29029 June 2023 Comprehensive Engineering Team Inspection Report 05000440/2023010 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener ML23144A3562023-05-25025 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End of Cycle Plant Performance Assessment of Perry Nuclear Power Plant, Unit 1 L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report ML23124A1742023-05-17017 May 2023 Energy Harbor Fleet Vistra License Transfer - Request for Withholding Information from Public Disclosure for Commance Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 ML23129A0112023-05-16016 May 2023 Notice of Consideration of Approval of Indirect and Direct License Transfer for Comanche Peak Plant, Units 1 & 2, Beaver Valley Station, Units 1 & 2, Davis Besse Station, Unit 1 and Perry Plant, Unit 1 (EPID L-2023-LLM-0000) (Letter) IR 05000440/20230012023-05-0404 May 2023 Integrated Inspection Report (05000440/2023001) L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report 2024-01-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML110880355&oldid=950252"