| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:Zone of Influence (ZOI) |
| | * NUREG/CR-6850 Definition (generic): A volume surrounding an ignition source where all intervening combustibles and targets may be adversely affected by a fire initiated by the ignition source. |
| | * NUREG/CR-6850 (HEAF-specific severity factors): High-energy arcing faults are modeled assuming damage to a predefined zone of influence. The severity factor is 1.0 ZOI Illustration (NUREG/CR-6850 Appendix M, Figure M-1) due to the assumption that the fire will propagate and/or damage equipment within the zone of influence. |
| | |
| | Does Al HEAF Require a Change to Modeled ZOI? |
| | It is a safety concern warranting action It is not a safety concern |
| | * OECD non-prototypic test but no ZOI |
| | * Cables very robust measured * ~100,000 of component operating years with Al widespread |
| | * No op ex shows an increased ZOI |
| | * Harris HEAF with Al |
| | * Actual ZOI bounded by currently modeled ZOI |
| | * Cables within ZOI functional |
| | * Robinson within modeled ZOI |
| | * Appendix R separation - change in ZOI would have to be very large}} |
Latest revision as of 13:15, 18 January 2022
Letter Sequence Other |
---|
|
|
MONTHYEARML21293A0082021-10-20020 October 2021 HEAF - NEI Project stage: Other ML22039A0752022-02-22022 February 2022 Site Walkdown for the Review of Plant Information to Perform a Risk Analysis in Accordance with LIC-504, Integrated Risk-Informed Decisionmaking for Emergent Issues,Regarding High Energy Arcing Faults Project stage: Approval 2021-10-20
[Table View] |
|
---|
Category:Conference/Symposium/Workshop Paper
MONTHYEARML24082A1792024-03-14014 March 2024 RIC-2024 TH18 True Slides ML24086A5342024-03-14014 March 2024 RIC 2024 TH23 Slides - the Industry’S Innovation Imperative ML24067A2592024-03-13013 March 2024 RIC-2024 W14 Slides - NEI-BHoltzman an Industry Perspective on Advanced Reactor Construction Oversight ML24151A0042024-03-12012 March 2024 RIC 2024 Ted Jones Presentation - Nonproliferation Considerations for the Export of Advanced Reactors: an Industry Perspective ML23324A2392023-10-24024 October 2023 S1P6 - Hilary Lane - NRC AMT Workshop - Oct. 2023 ML23045A2892023-03-14014 March 2023 RIC 2023 - 03/14/2023 to 03/16/2023 Regulatory Information Conference (Ric).Operational and Safety Benefits of Risk Informed Applications ML23061A0642023-03-14014 March 2023 W11 RIC 2023 Presentation_Jennifer Uhle ML22136A1162022-05-11011 May 2022 Presentation 5 - Utilizing the Nuclear Energy Institute (NEI) 07-07 Industry Groundwater Protection Initiative as a Foundation for Addressing Subsurface Site Assessments ML22053A2802022-03-31031 March 2022 Regulatory Information Conference (RIC) RIC 2022 Technical Session T8 - True D - NEI Presentation RIDM Greater than Sum of Its Parts ML22153A3472022-03-31031 March 2022 trued-hv-t8 ML22077A4012022-03-23023 March 2022 NEI INL Presentation March 23, 2022, NRC Workshop Isv Hfe Issue ML22153A3442022-03-10010 March 2022 titusb-hv-th28 ML22140A3612022-03-10010 March 2022 mccullumr- hv-th29 ML22118A0942022-03-10010 March 2022 RIC 2022 Technical Session - TH29 - Transcript ML22140A3652022-03-0909 March 2022 montgomeryb-hv-w14 ML22145A2352022-03-0808 March 2022 montgomeryb-w14-bio ML22145A1832022-03-0808 March 2022 trued-t8-bio ML22145A1622022-03-0808 March 2022 grossw-t4-bio ML21293A0082021-10-20020 October 2021 HEAF - NEI ML21194A2412021-03-11011 March 2021 RIC 2021, Introductory Remarks on Economics of the Operating Nuclear Fleet ML21078A0962021-03-0808 March 2021 RIC 2021 - Session W20 - Victoria Anderson - Slide Deck 1 ML20105A0022020-04-15015 April 2020 Radiation Safety-4.15.2020 Workshop Final ML20105A1632020-04-14014 April 2020 RIC 2020 T7 Panel Schlueter NEI ML20079J1182020-03-25025 March 2020 Spent Fuel Performance Margins: Source Terms-Preso March Workshop ML20021A2212020-01-22022 January 2020 Workshop on Spent Fuel Performance Margins ML18086B1962018-03-29029 March 2018 RIC 2018 Richter Session 19 3.14.2018 Final Rev. 1 2024-03-14
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24303A2212024-10-29029 October 2024 NEI SDP Realism Presentation for October 30, 2024 Public Meeting ML24291A0062024-10-17017 October 2024 NEI Slide Presentation: ACRS Regulatory Policies and Practices - Draft White Paper on Nth-of-a-Kind (Noak) Micro-Reactor Licensing and Deployment Considerations - Sc - October 17, 2024 ML24267A0032024-09-25025 September 2024 NEI Slides for ROP Public Meeting Sept 2024 ML24263A2592024-09-17017 September 2024 06 Jim Slider NEI September 2024 NRC Ai Public Workshop 09-17-2024 ML24249A2012024-09-0909 September 2024 NEI Presentation - Sept 9 Public Meeting - Flooding DGs - Final ML24249A1152024-09-0505 September 2024 Power Uprate September 5, 2024 Public Meeting Slides ML24243A1612024-08-30030 August 2024 Slide Presentations for High Burnup (Hbu) Workshop V ML24228A2102024-08-20020 August 2024 2024 NEI Early Warning System (EWS) Presentation - NEI Slides ML24229A0012024-08-19019 August 2024 NEI - Spent Fuel Management: Safety and Efficiency Improvements Through Technology and Performance Margins - NRC PIRTs Public Meeting Rev. 8.15.2024 Final ML24218A1832024-07-30030 July 2024 NEI 7-30-24 Trial Use RG 1.247 Path Forward Final ML24197A0652024-07-17017 July 2024 SDP Realism Public Meeting NEI Presentation ML24172A1952024-06-27027 June 2024 NEI Slides for 06-27-2024 Public Meeting Structures as IROFS at Fuel Cycle Facilities ML24178A0372024-06-26026 June 2024 NRC Power Uprate Review Preparation June 26, 2024 Public Meeting Slides ML24164A1972024-06-17017 June 2024 Public Meeting Slides - NRC Staff Comments and Observations on NEI 10-01, Rev 2 Industry Guideline for Developing a Plant Parameter Envelope in Support of an Early Site Permit ML24130A1972024-05-0909 May 2024 NEI Presentation Slides on Rapid and Large-Scale Nuclear Reactor Deployments for Remote Industrial Applications - May 14 2024 Public Meeting ML24129A1382024-05-0808 May 2024 NEI Slides on Centralized Inspections for May 9, 2024 Public Workshop ML24114A1142024-04-18018 April 2024 NEI Supplemental Information on NRC Comments on NEI 20-07, Draft Revision E - April 18 Meeting (Non-Proprietary) ML24103A1532024-04-12012 April 2024 NEI Supplemental Information on NRC Comments of NEI 20-07 Rev E (Non-Proprietary) - Slides ML24092A3132024-04-0303 April 2024 Public Mtg_2024-04-03 Pre-submittal Meeting with the Nuclear Energy Institute (NEI) to Discuss an Update to NEI 03-12, Security Plan Template (Revision 8)_NEI Slides ML24088A2252024-03-26026 March 2024 NEI Slides for Centralized Inspections March 2024 ROP Public Meeting ML24075A2092024-03-14014 March 2024 NEI Advanced Reactor Di&C Task Force Slides - Accident Monitoring Instrumentation ML24075A2102024-03-14014 March 2024 NEI Alan Campbell Slides - Non-Safety-Related with Special Treatment – Digital Considerations ML24082A1792024-03-14014 March 2024 RIC-2024 TH18 True Slides ML24086A5342024-03-14014 March 2024 RIC 2024 TH23 Slides - the Industry’S Innovation Imperative ML24067A2592024-03-13013 March 2024 RIC-2024 W14 Slides - NEI-BHoltzman an Industry Perspective on Advanced Reactor Construction Oversight ML24067A0062024-03-0808 March 2024 1 - NRC - Workshop3 - Non-LOCA Release Fractions Feedback - Final ML24067A0072024-03-0808 March 2024 2 - NRC - Workshop3 - Non-LOCA - FFRD - Final ML24067A0092024-03-0808 March 2024 3 - NRC - Worshop3 - CR Dose Presentation - Final ML24067A0102024-03-0808 March 2024 4 - NRC - Workshop3 - EQ Presentation - Final ML24067A0122024-03-0808 March 2024 6 - NRC - Workshop3 - Best Estimate Dose ML24067A0132024-03-0808 March 2024 7 - NRC - Workshop3 - Closing Remarks ML24067A2882024-03-0808 March 2024 1 (Revised)-NRC_Workshop3_Non-LOCA Release Fraction Feedback-Final ML24043A1162024-02-13013 February 2024 3- EQ Presentation Workshop 2 ML24043A1192024-02-13013 February 2024 1- Impacts on RG 1.183 for Workshop2 ML24043A1202024-02-13013 February 2024 2- CR Dose Presentation Workshop 2 ML24016A2372024-01-17017 January 2024 NEI Environmental Reviews Slides Public Meeting 1-17-24 ML24010A0202024-01-11011 January 2024 Public Meeting on SLR Efficiencies - NEI Presentation ML24008A0442024-01-0909 January 2024 NEI - Slides for NRC Workshop 1 on Revision to RG 1.183 R1 - Final - ML24008A044 ML23342A0262023-12-14014 December 2023 December 14, 2023, Presentation on NEI 23-01 Operator Cold Licensing Training Plan for Advanced Nuclear Reactors ML23347A1782023-12-13013 December 2023 12-14 NEI EPRI Presentation NRC Public Meeting 16-03 R1 ML23303A1922023-10-30030 October 2023 NEI Slides for SLR Public Meeting - Oct 31 2023 ML23324A2392023-10-24024 October 2023 S1P6 - Hilary Lane - NRC AMT Workshop - Oct. 2023 ML23261C3792023-09-27027 September 2023 NEI 22-04 Pre-Submittal Meeting with NRC - September 27, 2023 ML23258A1992023-09-20020 September 2023 NEI 99-02 Draft Rev. 8 Update for Sept 2023 ROP Public Meeting ML23242A0782023-08-30030 August 2023 Hbu Workshop IV Industry Presentation: Drive to Deploy ATF with Increased Enrichment and Higher Burnup ML23242A1662023-08-30030 August 2023 the Future of Nuclear Power: 2023 Baseline Survey (Slides) ML23230A0142023-08-22022 August 2023 Industry Slide Presentation for 8-22-23 Meeting on ARCAP-TICAP and DG-1404 Guidance Documents ML23228A0042023-08-18018 August 2023 NEI Slides for Public Meeting to Discuss Possible Efficiencies on the Subsequent License Renewal Review - August 18, 2023 ML23191A0162023-07-11011 July 2023 NEI Comments on Risk-Informed Process for Evaluation (RIPE) DORL TSG - 7/11/23 Public Meeting Slides from NEI ML23191A0632023-07-0707 July 2023 NEI Cybersecurity Presentation for July 2023 ROP Public Meeting 2024-09-09
[Table view] |
Text
Zone of Influence (ZOI)
- NUREG/CR-6850 Definition (generic): A volume surrounding an ignition source where all intervening combustibles and targets may be adversely affected by a fire initiated by the ignition source.
- NUREG/CR-6850 (HEAF-specific severity factors): High-energy arcing faults are modeled assuming damage to a predefined zone of influence. The severity factor is 1.0 ZOI Illustration (NUREG/CR-6850 Appendix M, Figure M-1) due to the assumption that the fire will propagate and/or damage equipment within the zone of influence.
Does Al HEAF Require a Change to Modeled ZOI?
It is a safety concern warranting action It is not a safety concern
- OECD non-prototypic test but no ZOI
- Cables very robust measured * ~100,000 of component operating years with Al widespread
- No op ex shows an increased ZOI
- Actual ZOI bounded by currently modeled ZOI
- Cables within ZOI functional
- Robinson within modeled ZOI
- Appendix R separation - change in ZOI would have to be very large