ML24067A259

From kanterella
Jump to navigation Jump to search
RIC-2024 W14 Slides - NEI-BHoltzman an Industry Perspective on Advanced Reactor Construction Oversight
ML24067A259
Person / Time
Site: Nuclear Energy Institute
Issue date: 03/13/2024
From: Holtzman B
Nuclear Energy Institute
To:
Office of Nuclear Reactor Regulation
References
Download: ML24067A259 (5)


Text

©2024 Nuclear Energy Institute l 1 Ben Holtzman Director, New Nuclear March 13th, 2024 An Industry Perspective on Advanced Reactor Construction Oversight:

2024 NRC RIC

©2024 Nuclear Energy Institute 2 New Nuclear Deployment Plans

~43 300MWe SMRs per Year

~67 300MWe SMRs per Year State support and projects that may be in operation by early 2030s

©2024 Nuclear Energy Institute 3 A New Approach for Regulatory Oversight Advanced Reactor Construction Oversight Program (ARCOP) o A flexible, technology neutral, program to apply regulatory oversight commensurate with the risk posed o

Provide reasonable assurance that advanced reactor facilities are built and will operate in accordance with their approved designs and licensing bases o

NRC Principles of Good Regulation Implement Learnings from Past Experience o

Part 50/52 Lessons Learned Rulemaking o

10 CFR 52 Construction Lessons Learned Report (ML23325A202) o Nuclear Experience (Existing Fleet, Research and Test Reactors) o External Benchmarking

©2024 Nuclear Energy Institute 4 INHERENTLY SAFE SMALL SIMPLER

=

IMPROVED PERFORMANCE FACTORY-BUILT

  • Increased Standardization
  • 60-80% of Equipment
  • U.S. Supply Chain Growth FASTER CONSTRUCTION
  • Smaller Structures
  • Assembly vs.

Construction

  • Modern Construction Methods
  • Digital Twin
  • 4D Construction Model READILY AVAILABLE EQUIPMENT
  • Off-the-shelf Equipment
  • Proven Performance
  • Operational Excellence
  • Best Practices
  • Design
  • Construction
  • Maintenance and Inspection Designed With Intent

Thank You for Your Time and Attention