NEI 22-04 Pre-Submittal Meeting with NRC - September 27, 2023
ML23261C379
Person / Time
Site: Nuclear Energy Institute
Issue date: 09/27/2023
From: Coren M, Dunkelberger M, Andrea Keim, Renaud E, Richter M, Tannenbaum M
Duke Energy, Electric Power Research Institute, MPR Associates, NRC/NRR/DRO/IQVB, Nuclear Energy Institute, Westinghouse
To:
References
Download: ML23261C379 (32)


Text

Utilization of ISO 9001 and Other Non-nuclear Suppliers for Safety-related Applications Mark Richter - Nuclear Energy Institute Mike Dunkelberger - MPR Mark Coren - Duke Energy Marc Tannenbaum - EPRI Ed Renaud - Westinghouse September 27, 2023

©2023 Nuclear Energy Institute 1

What problem are we trying to solve?

Increasing urgency for carbon reduction (electric and non-electric)

Path to zero-carbon must be reliable and affordable Nuclear energy must be meaningful part of future energy portfolio Advanced reactor deployment plans are aggressive and urgent Deployment plans require additional suppliers

©2023 Nuclear Energy Institute 2

Why focus on ISO 9001?

There is a significant population of suppliers with ISO 9001 programs ISO 9001 is intended to be adaptable to any industry with the resulting level of programmatic rigor commensurate with industry demands As a result, many ISO 9001 suppliers have robust QA programs developed to supply reliable products of high quality to other industries Nuclear suppliers already accept items and services from ISO 9001 suppliers through their commercial grade dedication (CGD) process

©2023 Nuclear Energy Institute 3

Why not focus on ISO 19443?

Small population of Suppliers with ISO 19443 programs in comparison to ISO 9001 The approach described in NEI 22-04 can be applied to various non-nuclear quality programs, including ISO 19443 programs NEI 22-04 includes an Appendix that describes how ISO 19443 addresses potential gaps and differences from ISO 9001 when compared to 10CFR50 Appendix B

©2023 Nuclear Energy Institute 4

Why the NEI 22-04 approach instead of CGD?

The CGD process does not define a path for the non-nuclear supplier to become a nuclear supplier The approach described in NEI 22-04 defines a path for a non-nuclear supplier to become a nuclear supplier and is intended to attract new suppliers into the nuclear industry The approach focuses on satisfying design requirements for procured items instead of developing a list of critical characteristics based on safety function

©2023 Nuclear Energy Institute 5

Building on Foundation of Previous Work NRC SECY-03-0117 Approaches for Adopting More Widely Accepted International Quality Standards compares ISO 9001-2000 against the existing 10 CFR Part 50 Appendix B requirements and assesses the viability of four approaches EPRI 1007937 Analysis and Comparison of ANSI/ISO/ASQ Q9001:2000 with 10CFR50 Appendix B: ISO 9001 Gap Analysis and EPRI 1002976, An In-Depth Review of Licensee Procurement Options for Use with ISO 9001 Suppliers Other regulated industries utilizing an ISO 9001 based quality program and their regulating bodies have recognized the need for and implemented supplemental requirements and actions

©2023 Nuclear Energy Institute 6

Building on Foundation of Previous Work NRC SECY-03-0117 concludes:

Using ISO 9001 as an alternative to Appendix B is not acceptable Other regulated industries considering ISO 9001 recognized the need for supplemental requirements and developed a sector-specific ISO standard One suitable approach is to provide additional controls, such as supplemental procurement requirements and actions, where necessary to satisfy the requirements of 10CFR50 Appendix B NEI 22-04 provides guidance for determining the gaps and differences with, and the supplemental requirements and actions needed to satisfy Appendix B

©2023 Nuclear Energy Institute 7

Content from NEI 22-04 High-level approach for implementation Gap Analysis for ISO 9001:2015 compliance to 10CFR50 Appendix B

  • Decomposes each Appendix B criterion into discrete requirements and identifies comparable requirements from ISO 9001
  • Identifies potential gaps for compliance with the regulation and differences in practice
  • Provides recommended supplemental requirements to address the gaps (recommendations are suggested but not considered mandatory)

Options for Part 21 compliance Nuclear Safety Culture considerations Detailed steps for implementation

©2023 Nuclear Energy Institute 8

High-level approach from NEI 22-04 Approach can be applied to various non-nuclear programs NEI 22-04 focuses on ISO 9001 Purchasers Purchasers Appendix B Program Appendix B Program Supplemental Gap Assessment for Supplemental Appendix B Compliance Requirements Requirements to address gaps Suppliers Suppliers Non-nuclear Program Non-nuclear Program w/ Supplemental Req.

Controlled under Purchasers Appendix B Program Implement supplemental requirements as needed to ensure procured items are suitably controlled under the Purchasers Appendix B program

©2023 Nuclear Energy Institute 9

High-level approach from NEI 22-04 Division of Key Responsibilities (not intended to be all inclusive lists)

Suppliers Purchasers Non-nuclear Program Appendix B Program w/ Supplemental Req.

  • Establish suitability of design
  • Provide Purchaser access to design
  • Impose applicable procurement and manufacturing information requirements to satisfy Appendix B
  • Manufacture products to satisfy
  • Provide Supplier oversight, as needed to design requirements ensure requirements are satisfied
  • Control and notify Purchaser of
  • Accept procured items as basic components changes to design of contract items
  • Maintain responsibility for Part 21
  • Control and notify Purchaser of nonconforming contract items Supplier processes are considered an extension of the Purchasers program Thus, Supplier activities are controlled under the Purchasers Appendix B Program

©2023 Nuclear Energy Institute 10

High-level approach from NEI 22-04 Transition to Nuclear Supplier (not intended to be all inclusive lists)

Suppliers Nuclear Suppliers Non-nuclear Program Appendix B Program w/ Supplemental Req.

  • Demonstrate ability to satisfy procurement
  • Complies with applicable Appendix B requirements under Purchasers controls requirements
  • Update or supplement non-nuclear program
  • Complies with Part 21 to address gaps for Appendix B compliance
  • Ready to audit and be qualified to
  • Establish nuclear safety culture supply basic components
  • Update and establish procedures to comply with Part 21

©2023 Nuclear Energy Institute 11

Gap Analysis Examples 10CFR50, Appendix B, Criterion II (excerpt) ISO 9001:2015 The applicant shall establish at the earliest practicable time, 4.4 Quality management system and its processes consistent with the schedule for accomplishing the activities, a 4.4.1 The organization shall establish, implement, maintain and quality assurance program which complies with the continually improve a quality management system, including the requirements of this appendix. processes needed and their interactions, in accordance with the This program shall be documented by written policies, requirements of this International Standard.

procedures, or instructions and shall be carried out throughout 4.4.2 To the extent necessary, the organization shall:

plant life in accordance with those policies, procedures, or a) maintain documented information to support the operation of its instructions. processes; b) retain documented information to have confidence that the processes are being carried out as planned.

8.5 Production and service provision 8.5.1 Control of production and service provision The organization shall implement production and service provision under controlled conditions. Controlled conditions shall include, as applicable:

a) the availability of documented information that defines:

1) the characteristics of the products to be produced, the services to be provided, or the activities to be performed;
2) the results to be achieved;

©2023 Nuclear Energy Institute 12

Gap Analysis Examples Fundamental Requirement from 10CFR50, Appendix B:

To establish a QA program in time to accomplish activities in accordance with applicable requirements, which is documented by written policies, procedures, or instructions and complies with the regulation.

ISO 9001 Comparison ISO 9001 requires a quality management system to be established that includes documented information as needed to ensure the requirements of the ISO standard are satisfied, required processes are implemented properly, and the desired results are achieved.

Potential Gap(s):

ISO 9001 does not identify specific policies, procedures, or instructions that are required to be documented and nuclear regulatory requirements are not considered by most ISO suppliers. As a result, some ISO supplier programs are not documented sufficiently for nuclear applications. However, many ISO suppliers have well documented programs that address quality program attributes comparable to the regulation.

Recommendation(s) (if not addressed within the Suppliers program):

The Purchaser could require submittal of project-specific procedures. However, that may not be practical for programs with only a few documented instructions. ISO suppliers that do not have well documented programs are unlikely to be good candidates for acceptance based on their program.

©2023 Nuclear Energy Institute 13

Gap Analysis Examples 10CFR50, Appendix B, Criterion III (excerpt) ISO 9001:2015 The design control measures shall provide for verifying or 8.3.4 Design and development controls checking the adequacy of design, such as by the performance The organization shall apply controls to the design and development of design reviews, by the use of alternate or simplified process to ensure that:

calculational methods, or by the performance of a suitable a) the results to be achieved are defined; testing program. b) reviews are conducted to evaluate the ability of the results of design The verifying or checking process shall be performed by and development to meet requirements; individuals or groups other than those who performed the c) verification activities are conducted to ensure that the design and original design, but who may be from the same organization. development outputs meet the input requirements; d) validation activities are conducted to ensure that the resulting Where a test program is used to verify the adequacy of a products and services meet the requirements for the specified specific design feature in lieu of other verifying or checking application or intended use; processes, it shall include suitable qualifications testing of a e) any necessary actions are taken on problems determined during prototype unit under the most adverse design conditions. the reviews, or verification and validation activities; Design control measures shall be applied to items such as the f) documented information of these activities is retained.

following: reactor physics, stress, thermal, hydraulic, and 8.3.5 Design and development outputs accident analyses; compatibility of materials; accessibility for The organization shall ensure that design and development outputs:

in-service inspection, maintenance, and repair; and delineation c) include or reference monitoring and measuring requirements, as of acceptance criteria for inspections and tests. appropriate, and acceptance criteria; d) specify the characteristics of the products and services that are essential for their intended purpose and their safe and proper provision.

©2023 Nuclear Energy Institute 14

Gap Analysis Examples Fundamental Requirement from 10CFR50, Appendix B:

To perform independent verification of the design, by design review, alternate calculation, or testing a prototype under the most adverse conditions and to apply design control measures to activities such as reactor physics, accident analyses, material compatibility, in-service inspection, and acceptance criteria for inspections and tests.

ISO 9001 Comparison ISO 9001 requires design verification and validation activities (i.e., the result of an inspection or test or other form of determination, such as alternate calculations or reviews) to ensure the design outputs meet the input requirements and to ensure the products and services meet the requirements for the specified application or intended use. ISO 9001 also requires design outputs to define requirements for monitoring and measuring and the acceptance criteria.

Potential Gap(s):

ISO 9001 does not require verification and validation activities to be performed by persons other than those that performed the design and does not explicitly require testing to consider the most adverse conditions. ISO suppliers do not address nuclear safety applications in their QMS scope and do not have the knowledge needed to ensure the design is suitable for a nuclear application.

Recommendation(s) (if not addressed within the Suppliers program):

The Purchaser must retain responsibility for ensuring suitability of the design and impose nuclear industry specific requirements in the contract, as applicable. ©2023 Nuclear Energy Institute 15

Gap Analysis Examples 10CFR50, Appendix B, Criterion IV (excerpt) ISO 9001:2015 To the extent necessary, procurement documents shall require 8 Control of externally provided processes, products and services contractors or subcontractors to provide a quality assurance 8.3.4 Type and extent of control program consistent with the pertinent provisions of this appendix. The organization shall ensure that externally provided processes, products and services do not adversely affect the organization's ability to consistently deliver conforming products and services to its customers.

The organization shall:

a) ensure that externally provided processes remain within the control of its quality management system; b) define both the controls that it intends to apply to an external provider and those it intends to apply to the resulting output; c) take into consideration:

1) the potential impact of the externally provided processes, products and services on the organization's ability to consistently meet customer and applicable statutory and regulatory requirements;
2) the effectiveness of the controls applied by the external provider; d) determine the verification, or other activities, necessary to ensure that the externally provided processes, products and services meet requirements.

©2023 Nuclear Energy Institute 16

Gap Analysis Examples Fundamental Requirement from 10CFR50, Appendix B:

To the extent necessary, require contractors or subcontractors to implement a quality assurance program that complies with 10CFR50, Appendix B.

ISO 9001 Comparison ISO 9001 requires the organization to ensure externally provided processes do not prevent the organizations ability to deliver conforming products and services, which includes ensuring that externally provided processes remain in control and applying controls or verification activities, as needed, based on the potential impact the external provider has on the product or service and the effectiveness of the controls applied by the external provider.

Potential Gap(s):

ISO 9001 does not require procurement documents to impose a QA program that, to the extent necessary, complies with 10CFR50, Appendix B. ISO suppliers typically subcontract items and services to suppliers with non-nuclear quality programs that do not comply with 10CFR50, Appendix B.

Recommendation(s) (if not addressed within the Suppliers program):

The Purchaser must assess whether the supplier adequately controls products and services under their program, including their controls applied to subcontracted activities, to ensure applicable requirements are satisfied. The Purchaser may need to supply qualified materials or require the use of Purchaser approved suppliers for subcontracted items and services that are not adequately controlled. ©2023 Nuclear Energy Institute 17

Compliance with 10 CFR Part 21 Two Options for compliance with 10 CFR Part 21 Option 1 (likely first step): Option 2:

Supplier implements non- Supplier updates program to nuclear program with comply with Appendix B and supplemental requirements Part 21 Supplier procedures Supplier establishes nuclear considered as extension of safety culture the Purchasers program Supplier activities are Supplier is qualified by audit controlled under the as nuclear supplier Purchasers Appendix B Supplier accepts program responsibility for Part 21 Purchaser maintains responsibility for Part 21 ©2023 Nuclear Energy Institute 18

Nuclear Safety Culture Considerations Not a requirement from Appendix B or Part 21 but important commensurate with the safety significance of activities performed The Suppliers culture (e.g., behaviors that drive program implementation) is a factor for consideration in determining whether the Supplier is capable of complying with applicable requirements or becoming a nuclear supplier

©2023 Nuclear Energy Institute 19

Detailed Steps for Implementation

1. Purchaser implements screening process (optional)
2. Purchaser performs on-site gap assessment
3. Purchaser and Supplier determine supplemental requirements to close gaps
4. Purchaser issues contract with supplemental requirements
5. Supplier executes the contract
6. Purchaser implements oversight activities, as needed
7. Supplier delivers the procured items
8. Purchaser verifies requirements satisfied and accepts delivery
9. Purchaser maintains supplier qualification (e.g., audits)
10. Supplier updates program to fully satisfy regulatory requirements (optional)
11. Supplier establishes nuclear safety culture (optional)
12. Purchaser qualifies Supplier as a Nuclear Supplier (optional)

©2023 Nuclear Energy Institute 20

Screening Process (Optional)

Useful tool to estimate level of effort to implement supplemental controls for compliance with 10CFR50 Appendix B More significant potential gaps are:

  • Suppliers program not documented sufficiently for nuclear applications
  • Suppliers culture not suitable for a nuclear application
  • Design change control process not defined
  • Significant activities are subcontracted
  • Special process controls are not suitable
  • QA functions, such as inspections and tests, are not sufficiently defined or independent

©2023 Nuclear Energy Institute 21

Screening Process (Optional)

Suggested screening questions:

1. Can Supplier provide copies of certifications to industry standards, quality manual and an index of supporting procedures?
2. Does Supplier provide products to other industries with similar demands for safe and reliable equipment?
3. Does Suppliers program define a process for design change control?
4. What types of items or services are subcontracted by the Supplier? How are subcontracted activities controlled?
5. Does the Supplier perform special processes? How are they controlled?
6. Does the Supplier perform inspections, tests, or NDE? How are activities controlled?

Based on the screening process results, the Purchaser and Supplier can assess whether the business case warrants proceeding with an on-site gap assessment.

©2023 Nuclear Energy Institute 22

On-site Gap Assessment Determines how non-nuclear program compares to 10CFR50 Appendix B Performed in a manner similar to an audit

  • Performance based assessment - documentation reviews and witnessed activities
  • Team lead is qualified Lead Auditor with sufficient experience to judge whether Appendix B requirements are satisfied
  • Technical Specialists (engineering involvement) included as needed to judge technical capabilities and controls Uses Gap Assessment Checklist developed from Appendix B requirements Identifies gaps for Appendix B compliance, not a commercial grade survey Findings only noted if program violations are identified, not for gaps

©2023 Nuclear Energy Institute 23

Determine Supplemental Requirements The Purchaser and Supplier work together to determine the actions and supplemental requirements needed to close the identified gaps.

Supplemental requirements likely result in a combination of supplemental instructions (e.g., QA Procedures, Plans, etc.) developed by the Supplier and supplemental procurement requirements imposed by the Purchaser.

Recommendations for closing potential gaps are provided in NEI 22-04

  • These recommendations are not intended to be mandatory.
  • The Purchaser is responsible for determining the appropriate actions needed to close each gap identified in the gap assessment.
  • The list of gaps identified in a given gap assessment may differ from the list of potential gaps provided in NEI 22-04.

©2023 Nuclear Energy Institute 24

Contract Execution and Oversight Purchaser issues contract with supplemental requirements and hold /

witness points imposed as needed to ensure supplemental requirements are satisfied Supplier executes contract in accordance with the procurement documents, including the Suppliers non-nuclear quality program and the supplemental requirements.

Purchaser performs source surveillance activities as needed to ensure the Supplier implements the supplemental requirements properly and controls items in accordance with the applicable requirements of Appendix B Supplier notifies Purchaser of nonconforming conditions associated with the contract

©2023 Nuclear Energy Institute 25

Item Delivery and Acceptance Supplier delivers the procured items in accordance with the procurement requirements Purchaser verifies that the procurement requirements were satisfied and accepts delivery of the procured items Items become Basic Components upon acceptance by the Purchaser

©2023 Nuclear Energy Institute 26

Maintaining Supplier Qualification Purchaser continues to perform surveillance activities for items on future contracts Purchaser performs annual performance assessments and triennial audits to ensure the Supplier maintains the ability to implement their non-nuclear quality program and the supplemental requirements The extent and frequency of oversight implemented by the Purchaser should be commensurate with the Suppliers level of performance and the complexity /

importance of the items supplied

©2023 Nuclear Energy Institute 27

Transition to a Nuclear Supplier (optional)

Supplier, with assistance from the Purchaser or a consultant:

  • Establishes a nuclear safety culture Purchaser audits the Supplier for compliance with 10CFR50 Appendix B and 10 CFR Part 21 Upon completion of a successful audit, the Supplier is qualified as a Nuclear Supplier and can accept Part 21 responsibility

©2023 Nuclear Energy Institute 28

Pilot Assessment #1 The pilot assessment was performed to determine the gaps in program requirements.

Supplier program based on ISO 9001-2015 Well defined, documented, and structured Quality Program Items that require resolution:

  • Independent Verification not established as part of the design program
  • Product testing requirements may need to be enhanced
  • M&TE controls will need to be better defined
  • Sub-supplier oversight
  • 10 CFR Part 21 The NEI checklist facilitated successful assessment, including identification of the program differences

©2023 Nuclear Energy Institute 29

Pilot Assessment #2 The pilot assessment was performed to determine the gaps in program requirements.

Supplier program based on ISO 9001-2015 Well defined, documented, and structured Quality Program met ISO 9001 with some aspects closely aligned to 10CFR50 Appendix B Gaps that require resolution by customer agreement:

  • While this supplier had Engineering capabilities and by procedures appeared appropriate, implementation could not be evaluated as POs used were all build to print only
  • Testing requirements were enhanced by the customer POs
  • Sub-supplier controls addressed by PO restrictions and/or using Suppliers as directed on a case by case with Purchasers appropriate direction

©2023 Nuclear Energy Institute 30

Status and Next Steps NEI 22-04 Utilization of ISO 9001 and Other Non-nuclear Suppliers for Safety-related Applications will be informed by industry and pre-submittal meeting feedback, including ISO 9001 supplier dry run assessments and broad industry review (Q3 2023)

NEI participates in pre-submittal meeting with NRC (Q3 2023)

NEI submits for NRC review and endorsement (Q4 2023)

©2023 Nuclear Energy Institute 31