IR 05000440/2011403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
[[Issue date::March 16, 2011]]
-4352 March 16, 2011 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A
 
-PY-A290 Perry, OH 44081
Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097
-0097


SUBJECT: PERRY NUCLEAR POWER PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000440/2011403(DRS)
SUBJECT: PERRY NUCLEAR POWER PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000440/2011403(DRS)


==Dear Mr. Bezilla:==
==Dear Mr. Bezilla:==
On February 18, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Perry Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on February 18, 2011, with Mr. H. Hanson and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. No findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
On February 18, 201 1, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Perry Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on February 18, 2011, with Mr. H. Hanson and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
 
No findings of significance were identified.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
 
However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA by D. Funk for/
Sincerely,/RA by D. Funk for
Richard Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58 Nonpublic  
/
Richard Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50
-440 License No. NPF
-58 Nonpublic  


===Enclosure:===
===Enclosure:===
Inspection Report 05000440/2011403(DRS)  
Inspection Report 05000440/2011 40 3(DRS)  


===w/Attachment:===
===w/Attachment:===
Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV C. O'Claire, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via ListServ
Supplemental Information cc w/encl:
S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV C. O'Claire, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via ListServ
}}
}}

Revision as of 22:45, 8 August 2018

IR 05000440-11-403(DRS); 02/17/11 - 02/18/11; Perry Nuclear Power Plant; Routine Security Baseline Inspection
ML110760484
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/16/2011
From: Skokowski R A
Plant Support Branch II
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
IR-11-403
Download: ML110760484 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532

-4352 March 16, 2011 Mr. Mark Bezilla Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A

-PY-A290 Perry, OH 44081

-0097

SUBJECT: PERRY NUCLEAR POWER PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000440/2011403(DRS)

Dear Mr. Bezilla:

On February 18, 201 1, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Perry Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on February 18, 2011, with Mr. H. Hanson and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA by D. Funk for

/

Richard Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50

-440 License No. NPF

-58 Nonpublic

Enclosure:

Inspection Report 05000440/2011 40 3(DRS)

w/Attachment:

Supplemental Information cc w/encl:

S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV C. O'Claire, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via ListServ